Production device and process for improving composite strength of high-strength and high-conductivity copper and aluminum

By using open gantry brackets and booster components in the production of copper-aluminum composite materials, the rolling force is significantly improved, the problem of low peel strength of copper-aluminum composite materials is solved, and the effect of high strength and high conductivity is achieved.

CN119216362APending Publication Date: 2024-12-31JIANGSU ZHONGSE COMPOSITE MATERIAL CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411465330.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

Due to the influence of rolling force during the production process, copper-aluminum composite materials have defects of low peel strength, which is difficult to meet the needs of high strength and high conductivity.

Method used

The use of open gantry bracket and synchronous booster assembly is used to significantly increase the rolling force through the rolling roll with a small roll diameter roll and the booster pump, avoiding mutual collision and wear between the rolling rolls, and improving the composite strength of the copper-aluminum composite material.

Benefits of technology

The composite strength of copper-aluminum composite materials is effectively increased, avoiding the problems of high energy consumption, high cost and long production cycle in traditional large-roll rolling processes, and ensuring the flatness and parallelism of the rolling roll surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119216362A_ABST
    Figure CN119216362A_ABST
Patent Text Reader

Abstract

The invention aims at disclosing a production device and process for improving the composite strength of high-strength and high-conductivity copper and aluminum, and relates to the technical field of metal composite materials, the production device comprises a gantry support, a first rolling roller and a second rolling roller; a first hinge point is arranged between the first vertical support and the first horizontal support, and a second hinge point is arranged between the second vertical support and the second horizontal support. A first bearing seat is arranged on the first vertical support, and a second bearing seat is arranged on the second vertical support; the first vertical support is provided with a first vertical sliding rail and a third bearing seat, and the second vertical support is provided with a second vertical sliding rail and a fourth bearing seat. The rolling device has the beneficial effects that the second rolling roller and the first rolling roller can be hung and installed from top to bottom, and the rolling force between the second rolling roller and the first rolling roller can be remarkably increased through the first pressurizing assembly and the second pressurizing assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of metal composite materials, and in particular to a production device and process for improving the strength of high-strength and high-conductivity copper-aluminum composites. Background Art

[0002] In the fields of aerospace, transportation, electronic communications, marine engineering, special equipment, new energy vehicle battery systems, etc., high strength and high conductivity are required for conductor materials, and copper-aluminum composite materials are one of the good choices.

[0003] At present, during the production process of copper-aluminum composite materials, due to the influence of rolling force, the composite materials have the defect of low peeling strength.

[0004] In view of this, it is necessary to develop a production device and process for improving the strength of high-strength and high-conductivity copper-aluminum composites to overcome the above-mentioned defects. Summary of the invention

[0005] The purpose of the present invention is to disclose a production device and process for improving the strength of high-strength and high-conductivity copper-aluminum composites.

[0006] The first object of the present invention is to provide a production device for improving the strength of high-strength and high-conductivity copper-aluminum composites.

[0007] The second object of the present invention is to provide a production process for improving the strength of high-strength and high-conductivity copper-aluminum composites.

[0008] To achieve the above first invention objective, the present invention provides a production device for improving the strength of high-strength and high-conductivity copper-aluminum composites, comprising a gantry support, a first rolling roller and a second rolling roller;

[0009] The gantry support comprises a first vertical support, a first horizontal support, a second vertical support and a second horizontal support, a first hinge point is arranged between the first vertical support and the first horizontal support, and a second hinge point is arranged between the second vertical support and the second horizontal support;

[0010] A first bearing seat is arranged on the first vertical support, a second bearing seat is arranged on the second vertical support, and the first rolling roller is installed on the first bearing seat and the second bearing seat through a first bearing;

[0011] A first vertical slide rail and a third bearing seat are arranged on the first vertical support, and the third bearing seat is lifted and lowered along the first vertical slide rail; a second vertical slide rail and a fourth bearing seat are arranged on the second vertical support, and the fourth bearing seat is lifted and lowered along the second vertical slide rail;

[0012] The second rolling roller is mounted on the third bearing seat and the fourth bearing seat through a second bearing;

[0013] A first booster assembly is arranged below the third bearing seat, and a second booster assembly is arranged below the fourth bearing seat.

[0014] Preferably, the rotation angle range of the first horizontal bracket with the first hinge point as the center is 0°-90°;

[0015] The rotation angle range of the second horizontal bracket around the second hinge point is 0°-90°.

[0016] Preferably, when the angle between the first horizontal support and the first vertical support is 0°, and when the angle between the second horizontal support and the second vertical support is 0°;

[0017] The second rolling roller is suspended from top to bottom from the space between the first horizontal support and the second horizontal support to the third bearing seat and the fourth bearing seat;

[0018] The first rolling roller is suspended from top to bottom from the space between the first horizontal support and the second horizontal support to the first bearing seat and the second bearing seat.

[0019] Preferably, the roller diameters of the first rolling roller and the second rolling roller are respectively 930 mm-990 mm.

[0020] Preferably, the first boosting assembly adopts a first boosting pump, and the second boosting assembly adopts a second boosting pump.

[0021] Preferably, the maximum boosting pressure of the first boosting pump and the second boosting pump are both 40 MPa.

[0022] Preferably, when the boost pressure of the first boost pump and the second boost pump is 0, the maximum rolling force of the first rolling roller and the second rolling roller is 2000 tons.

[0023] Preferably, when the boost pressure of the first boost pump and the second boost pump is 40 MPa, the maximum rolling force of the first rolling roller and the second rolling roller is 4000 tons.

[0024] Based on the same inventive principle, in order to achieve the above second inventive object, the present invention provides a production process for improving the strength of high-strength and high-conductivity copper-aluminum composites, comprising the following steps:

[0025] Select a first rolling roller and a second rolling roller with a roller diameter of 930 mm to 990 mm;

[0026] adjusting the gap between the first rolling roller and the second rolling roller;

[0027] The rolling is started, and the first boosting assembly and the second boosting assembly are started synchronously at both ends of the second rolling roller.

[0028] Preferably, the second rolling roller and the first rolling roller are successively suspended from the top of the open gantry support from top to bottom to the installation position.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] The present invention adopts an open gantry support and simultaneously adopts a first booster component and a second booster component; on the first aspect, the first horizontal support and the second horizontal support of the open gantry support can be opened. After opening, the second rolling roller and the first rolling roller can be successively suspended and installed from top to bottom from the top of the opened gantry support, thereby avoiding the traditional practice of horizontally pushing the rolling rollers, and also avoiding mechanical damage such as mutual collision, wear, and scratches between the rolling rollers caused by horizontally pushing the rolling rollers, thereby ensuring the flatness and parallelism of the surfaces of the second rolling roller and the first rolling roller. Compared with the roll changing equipment of the traditional closed gantry, the open gantry support of the present invention saves floor space; on the second aspect, the first booster component and the second booster component act on the third bearing seat and the fourth bearing seat respectively, which can significantly increase the rolling force between the second rolling roller and the first rolling roller, thereby And effectively increased the composite strength between the copper-aluminum composite materials; thirdly, in the traditional rolling process, in order to increase the rolling force, it is necessary to use a rolling roller with a large roller diameter (1300mm-1700mm), which has the problems of high energy consumption, high cost, and long production cycle. There is a defect of a large contact area between the rolling roller with a large roller diameter and the copper-aluminum composite material, which leads to insufficient pressure of the rolling roller on the copper-aluminum composite material. In the present invention, when the first booster assembly and the second booster assembly are adopted, even if the second rolling roller and the first rolling roller with a small roller diameter (930mm-990mm) are used, not only can the rolling roller with a large roller diameter (1300mm-1700mm) be replaced, but also because the contact area between the second rolling roller and the first rolling roller of the present invention and the copper-aluminum composite material is reduced, the rolling pressure is increased, which can effectively ensure the composite strength of the copper-aluminum composite material. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a side view schematic diagram of a production device for improving the strength of high-strength and high-conductivity copper-aluminum composites according to the present invention.

[0032] Figure 2 The present invention Figure 1 Schematic diagram of the cross-section at AA.

[0033] Figure 3 This is a production process flow chart of the present invention for improving the strength of high-strength and high-conductivity copper-aluminum composite.

[0034] Among them, 1. gantry bracket; 11. first vertical bracket; 12. first horizontal bracket; 13. second vertical bracket; 14. second horizontal bracket; 15. first hinge point; 16. second hinge point; 2. first rolling roller; 21. first bearing; 3. second rolling roller; 31. second bearing; 4. first bearing seat; 5. second bearing seat; 6. first vertical slide rail; 7. third bearing seat; 71. first booster assembly; 8. second vertical slide rail; 9. fourth bearing seat; 91. second booster assembly. DETAILED DESCRIPTION

[0035] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.

[0036] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thick", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.

[0037] Embodiment 1

[0038] Ginseng Figure 1 and Figure 2 As shown, this embodiment discloses a specific implementation method of a production device (hereinafter referred to as "production device") for improving the strength of high-strength and high-conductivity copper-aluminum composites.

[0039] A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites, Figure 1 and Figure 2As shown, it includes a gantry support 1, a first rolling roller 2 and a second rolling roller 3; the gantry support 1 includes a first vertical support 11, a first horizontal support 12, a second vertical support 13 and a second horizontal support 14, a first hinge point 15 is set between the first vertical support 11 and the first horizontal support 12, a second hinge point 16 is set between the second vertical support 13 and the second horizontal support 14, the first vertical support 11, the first horizontal support 12, the second vertical support 13, the second horizontal support 14, the first hinge point 15 and the second hinge point 16 constitute an open gantry support 1, the first horizontal support 12 has a rotation angle range of 0°-90° around the first hinge point 15 as the center, and the second horizontal support 14 has a rotation angle range of 0°-90° around the second hinge point 16 as the center The range is 0°-90°; a first bearing seat 4 is arranged on the first vertical support 11, a second bearing seat 5 is arranged on the second vertical support 13, and the first rolling roller 2 is installed on the first bearing seat 4 and the second bearing seat 5 through a first bearing 21; a first vertical slide rail 6 and a third bearing seat 7 are arranged on the first vertical support 11, and the third bearing seat 7 is lifted and lowered along the first vertical slide rail 6, a second vertical slide rail 8 and a fourth bearing seat 9 are arranged on the second vertical support 13, and the fourth bearing seat 9 is lifted and lowered along the second vertical slide rail 8; the second rolling roller 3 is installed on the third bearing seat 7 and the fourth bearing seat 9 through a second bearing 31; a first booster assembly 71 is arranged below the third bearing seat 7, and a second booster assembly 91 is arranged below the fourth bearing seat 9.

[0040] Specifically, the following defects exist in traditional rolling production equipment: (1) A closed gantry support is used, and a horizontal track needs to be set up for the installation of the rolling roller. The rolling roller is installed through the horizontal track, and there are mechanical damages such as collision, wear, and scratches between the upper and lower rolling rollers, which can easily cause wear on the surface of the rolling roller, affecting the flatness and parallelism of the surface of the rolling roller. The closed gantry support occupies a large area; (2) A large roller diameter (1300mm-1700mm) rolling roller is used to ensure the rolling force, but the contact area between the large roller diameter rolling roller and the copper-aluminum composite material is large, which has problems such as high energy consumption, high cost, and long production cycle. There are also defects such as insufficient rolling pressure and energy consumption. In order to overcome the above-mentioned defects, the present embodiment adopts an open gantry support 1, and simultaneously adopts a first booster assembly 71 and a second booster assembly 91; on the one hand, the first horizontal support 12 and the second horizontal support 14 of the open gantry support 1 can be opened. After opening, the second rolling roller 3 and the first rolling roller 2 can be successively suspended and installed from the top of the opened gantry support 1 from top to bottom, avoiding the traditional practice of horizontally pushing the rolling rollers, and also avoiding the mutual wear and scratches between the rolling rollers caused by horizontally pushing the rolling rollers. Mechanical damage such as, thereby ensuring the flatness and parallelism of the surfaces of the second rolling roller and the first rolling roller; on the other hand, the first booster assembly 71 and the second booster assembly 72 act on the third bearing seat 7 and the fourth bearing seat 9 respectively, which can significantly increase the rolling force between the second rolling roller 3 and the first rolling roller 2. Thereby, the peel strength between the copper-aluminum composite materials is effectively increased; thirdly, in the traditional rolling process, in order to increase the rolling force, a rolling roller with a large roller diameter (1300mm-1700mm) is required, which has the defects of high energy consumption and a large contact area between the rolling roller and the copper-aluminum composite material, resulting in insufficient pressure of the rolling roller on the copper-aluminum composite material. In this embodiment, the first boosting component 71 and the second boosting component 91 are used. Even if the second rolling roller 3 and the first rolling roller 2 with a small roller diameter (930mm-990mm) are used, not only can the rolling roller with a large roller diameter (1300mm-1700mm) be replaced, but also because the contact area between the second rolling roller 3 and the first rolling roller 2 of the embodiment and the copper-aluminum composite material is reduced, the rolling pressure is increased, which can effectively ensure the composite strength of the copper-aluminum composite material.

[0041] The working principle of the open gantry support 1 is as follows, see Figure 1 and Figure 2In normal circumstances, the gantry support 1 is in a closed state, the angle between the first horizontal support 12 and the first vertical support 11 is 90°, and the angle between the second horizontal support 14 and the first vertical support 13 is 90°; when the first rolling roller 2 and the third rolling roller 3 need to be replaced, the first horizontal support 12 and the second horizontal support 14 are opened, so that the angle between the first horizontal support 12 and the first vertical support 11 is 0°, and the angle between the second horizontal support 14 and the second vertical support 13 is 0°, so that the first horizontal support 12 and the second horizontal support 14 are in a straight line. In the open state, the second rolling roller 3 is suspended from top to bottom from the space between the first horizontal support 12 and the second horizontal support 14 to the third bearing seat 7 and the fourth bearing seat 9; the first rolling roller 2 is suspended from top to bottom from the space between the first horizontal support 12 and the second horizontal support 14 to the first bearing seat 4 and the second bearing seat 5; by suspending the second rolling roller 3 and the first rolling roller 2 from top to bottom, the friction between the second rolling roller 3 and the first rolling roller 2 is avoided, so that the surfaces of the second rolling roller 3 and the first rolling roller 2 remain smooth, which helps to improve the efficiency of roller changing.

[0042] The working principle of the second rolling roller 3 pressurization is as follows, see Figure 1 and Figure 2 The first boosting assembly 71 uses a first boosting pump, which applies a vertical upward force ( Figure 1 The force F (in the direction of the arrow shown by F) is increased in the middle of the third bearing seat 7, and the direction of the force F passes through the axis of the second bearing 31. The force F causes the third bearing seat 7 to rise and fall slightly along the first vertical slide rail 6; the second boosting assembly 91 adopts a second boosting pump, and the second boosting pump increases the vertical upward force in the middle of the fourth bearing seat 9, and causes the fourth bearing seat 9 to rise and fall slightly along the second vertical slide rail 8; the maximum boosting pressure of the first boosting pump and the second boosting pump are both 40MPa; when the boosting pressure of the first boosting pump and the second boosting pump is 0, the maximum rolling force of the first rolling roller 2 and the second rolling roller 3 is 2000 tons; the boosting pressure of the first boosting pump and the second boosting pump is When the pressure is 40MPa, the maximum rolling force of the first rolling roller 2 and the second rolling roller 3 is 4000 tons, which is twice as much as that without pressurization. The first booster pump and the second booster pump simultaneously apply vertical upward pressure to the third bearing seat 7 and the fourth bearing seat 9. Under the condition of the same roller spacing between the first rolling roller 2 and the second rolling roller 3, this embodiment can greatly increase the rolling force between the rollers through the first booster pump and the second booster pump. When the first rolling roller 2 and the second rolling roller 3 with a small roller diameter (930mm-990mm) are used, the first rolling roller 2 and the second rolling roller 3 exert a greater pressure on the copper-aluminum composite material, which is more conducive to improving the interfacial bonding strength of the copper-aluminum composite material.

[0043] Embodiment 2

[0044] Ginseng Figure 3 As shown, this embodiment discloses a specific implementation method of a production process for improving the strength of high-strength and high-conductivity copper-aluminum composites.

[0045] A production process for improving the strength of high-strength and high-conductivity copper-aluminum composites, Figure 3 As shown, the following steps are included:

[0046] S1: Select a first rolling roller and a second rolling roller with a roller diameter of 930mm-990mm; specifically, select a first rolling roller and a second rolling roller with a small roller diameter, and install the second rolling roller and the first rolling roller from top to bottom above an open gantry support 1 of a production device for improving the strength of high-strength and high-conductivity copper-aluminum composite according to Example 1.

[0047] S2: adjusting the gap between the first rolling roller and the second rolling roller; specifically, adjusting the gap between the first rolling roller and the second rolling roller according to the thickness of the copper-aluminum composite material to be rolled.

[0048] S3: Start rolling, and synchronously start the first boosting assembly and the second boosting assembly at both ends of the second rolling roller. Specifically, the maximum boost pressure of the first boost pump and the second boost pump is 40MPa; when the boost pressure of the first boost pump and the second boost pump is 0, the maximum rolling force of the first rolling roller 2 and the second rolling roller 3 is 2000 tons; when the boost pressure of the first boost pump and the second boost pump is 40MPa, the maximum rolling force of the first rolling roller 2 and the second rolling roller 3 is 4000 tons, which is doubled compared with the non-boosted state; the first boost pump and the second boost pump simultaneously apply vertical upward pressure to the third bearing seat 7 and the fourth bearing seat 9. Under the condition of the same roller spacing between the first rolling roller 2 and the second rolling roller 3, this embodiment can greatly improve the rolling force between the rollers through the first boost pump and the second boost pump. When the first rolling roller 2 and the second rolling roller 3 with a small roller diameter (930mm-990mm) are used, the first rolling roller 2 and the second rolling roller 3 have a greater pressure on the copper-aluminum composite material, which is more conducive to improving the interface bonding strength of the copper-aluminum composite material.

[0049] Embodiment 2 is implemented by using a production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as described in Embodiment 1. The production process for improving the strength of high-strength and high-conductivity copper-aluminum composites disclosed in this embodiment has the same technical solutions as those in Embodiment 1. Please refer to Embodiment 1 and will not be repeated here.

Claims

1. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites, characterized in that: It includes a gantry support, a first rolling roller and a second rolling roller; The gantry support comprises a first vertical support, a first horizontal support, a second vertical support and a second horizontal support, a first hinge point is arranged between the first vertical support and the first horizontal support, and a second hinge point is arranged between the second vertical support and the second horizontal support; A first bearing seat is arranged on the first vertical support, a second bearing seat is arranged on the second vertical support, and the first rolling roller is installed on the first bearing seat and the second bearing seat through a first bearing; A first vertical slide rail and a third bearing seat are arranged on the first vertical support, and the third bearing seat is lifted and lowered along the first vertical slide rail; a second vertical slide rail and a fourth bearing seat are arranged on the second vertical support, and the fourth bearing seat is lifted and lowered along the second vertical slide rail; The second rolling roller is mounted on the third bearing seat and the fourth bearing seat through a second bearing; A first booster assembly is arranged below the third bearing seat, and a second booster assembly is arranged below the fourth bearing seat.

2. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 1, characterized in that: The rotation angle range of the first horizontal bracket about the first hinge point is 0°-90°; The rotation angle range of the second horizontal bracket around the second hinge point is 0°-90°.

3. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 2, characterized in that: When the angle between the first horizontal support and the first vertical support is 0°, and when the angle between the second horizontal support and the second vertical support is 0°; The second rolling roller is suspended from top to bottom from the space between the first horizontal support and the second horizontal support to the third bearing seat and the fourth bearing seat; The first rolling roller is suspended from top to bottom from the space between the first horizontal support and the second horizontal support to the first bearing seat and the second bearing seat.

4. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as described in any one of claims 1 to 3, characterized in that: The roller diameters of the first rolling roller and the second rolling roller are 930 mm-990 mm respectively.

5. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 4, characterized in that: The first boosting assembly adopts a first boosting pump, and the second boosting assembly adopts a second boosting pump.

6. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 5, characterized in that: The maximum boost pressure of the first boost pump and the second boost pump are both 40 MPa.

7. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 6, characterized in that: When the boost pressure of the first boost pump and the second boost pump is 0, the maximum rolling force of the first rolling roller and the second rolling roller is 2000 tons.

8. A production device for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 6, characterized in that: When the boost pressure of the first boost pump and the second boost pump is 40 MPa, the maximum rolling force of the first rolling roller and the second rolling roller is 4000 tons.

9. A production process for improving the strength of high-strength and high-conductivity copper-aluminum composites, characterized in that: The following steps are involved: Select a first rolling roller and a second rolling roller with a roller diameter of 930 mm to 990 mm; adjusting the gap between the first rolling roller and the second rolling roller; The rolling is started, and the first boosting assembly and the second boosting assembly are started synchronously at both ends of the second rolling roller.

10. A production process for improving the strength of high-strength and high-conductivity copper-aluminum composites as claimed in claim 9, characterized in that: The second rolling roller and the first rolling roller are successively suspended from the top of the open gantry support from top to bottom to the installation position.

Citation Information

Patent Citations

  • Copper-aluminium bilayer structure composite thin belt and preparation method thereof

    CN111618093A

  • Polishing machine with two working rolls

    CN205253730U

  • Calender

    DE4301096A1

  • hydraulic positioning device for rolling mills

    FR1283123A

  • device, particularly applicable to rolling mills, allowing adjustment and regulation of a clamping action

    FR1350824A