Rapid cooling mechanism for cast copper processing
By designing a rapid cooling mechanism for multi-reducing greenhouses and cooling water storage tanks in cast copper processing, combining water cooling and air cooling technology, the problems of slow cooling water circulation speed and surface water adhesion are solved, and the cooling efficiency and circulation of cast copper parts are improved. Use water volume to avoid condensation and energy consumption.
Patent Information
- Application Number
- CN202411572874.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2024-12-31
AI Technical Summary
In the existing copper casting processing technology, the circulation speed of cooling water is slow, and the heated water adheres to the surface of the casting copper parts, affecting the cooling efficiency and the contact between water and the casting copper parts.
A rapid cooling mechanism including multiple cooling chambers and cooling water storage tanks is designed. The combination of water cooling and air cooling is used to blow dry the cooling water on the surface by spraying and spraying pipes, cooling and dehumidification are reduced in batches, and cooling is improved. Efficiency and circulating water use.
The cooling efficiency of the cast copper parts is improved, the amount of circulating cooling water is reduced, and the condensation is avoided when the cast copper parts come into contact with the outside air after cooling is avoided, thus reducing energy consumption.
Smart Images

Figure CN119222915A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of copper casting processing, in particular to a rapid cooling mechanism for copper casting processing. Background Art
[0002] Cast copper usually refers to a copper alloy containing zinc, which is similar to brass but has different physical and chemical properties. Cast copper is made by mixing copper and zinc in a certain proportion and then casting it into various objects or works of art. The cast copper parts need to be cooled during the processing.
[0003] In the related art, the commonly used cooling method for copper castings is water cooling. However, when the existing water cooling method is used, the heated water is usually gathered in a cooling device for cooling. However, the temperature of the water refluxed from the copper castings at different cooling stages is different. The water is gathered in the same cooling device for cooling, which affects the circulation speed of the cooling water. As a result, the amount of cooling water circulated during the cooling process of the copper castings is relatively large. Moreover, during the cooling process of the copper castings, the heated water will adhere to the surface of the copper castings, affecting the contact between the cooling water and the copper castings. Based on this, the present application proposes a rapid cooling mechanism for copper casting processing. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a rapid cooling mechanism for copper casting, which solves the problem that the circulation speed of cooling water is slow and the amount of circulating water used for cooling the copper casting is increased; during the cooling process of the copper casting, the heated water will adhere to the surface of the copper casting, affecting the contact between the cooling water and the copper casting.
[0005] The present invention provides the following technical solution: a rapid cooling mechanism for copper casting processing, comprising a cooling chamber, a first cooling water storage tank and a second cooling water storage tank, the inner cavity of the cooling chamber is divided into a first cooling chamber, a second cooling chamber and a third cooling chamber, the top of the inner cavity of the first cooling chamber is connected to a spray pipe through a hydraulic telescopic rod, a collecting box is placed at the bottom of the inner cavity of the first cooling chamber, a steam exhauster, a water pump and a first refrigerator are arranged outside the first cooling chamber, the air inlet end of the steam exhauster extends into the inner cavity of the first cooling chamber through a pipeline, the air outlet end of the steam exhauster and the water outlet end of the collecting box are connected to the return water end of the first cooling water storage tank through the first refrigerator, and the first cooling water storage tank is connected to the spray pipe through a water pump;
[0006] The top of the inner cavity of the second cooling chamber is alternately provided with a second spray pipe and an air jet pipe, the bottom of the inner cavity of the second cooling chamber is provided with a second collecting box, the outside of the second cooling chamber is provided with a second water pump, a first blower, and a second refrigerator, the second spray pipe in the second cooling chamber is connected to the first cooling water storage tank through the second water pump, the air jet pipe in the second cooling chamber is connected to the air outlet end of the first blower, the air inlet end of the first blower, the air exhaust end of the second cooling chamber, and the water outlet end of the second collecting box are all connected to the first cooling water storage tank through the second refrigerator;
[0007] Another spray pipe 2 and another air jet pipe are alternately arranged at the top of the inner cavity of the third cooling chamber, another collecting box 2 is arranged at the bottom of the inner cavity of the third cooling chamber, a water pump 3, a blower 2, a third refrigerator and a dehumidification box are arranged outside the third cooling chamber, another spray pipe 2 is connected to the second cooling water storage tank through the water pump 3, the air outlet end of the blower 2 is connected to another air jet pipe, the air outlet end of the third cooling chamber is connected to the air inlet end of the dehumidification box, and the drainage end of the dehumidification box and the drainage end of another collecting box 2 are both connected to the second cooling water storage tank through the third refrigerator;
[0008] The second spray pipe and the air spray pipe are respectively fixedly connected to the cooling chamber through another hydraulic telescopic rod one.
[0009] Preferably, two sets of water squeezing structures are provided in the inner cavity of the dehumidifier box, an air inlet is provided on one side of the bottom of the inner cavity of the dehumidifier box, and a drain outlet is provided on the other side of the bottom of the inner cavity of the dehumidifier box. The two sets of water squeezing structures are located between the air inlet and the drain outlet, and exhaust holes are evenly provided on the side wall of the dehumidifier box near the drain outlet.
[0010] Preferably, the water squeezing structure includes two hydraulic telescopic rods fixedly connected to the dehumidification box, an extrusion block fixedly connected to the end of the output shaft of the two hydraulic telescopic rods, and a water-absorbing sponge released from the extrusion block, two groups of limiting plates are fixedly connected to the inner cavity of the dehumidification box, the water-absorbing sponge is located in the middle of the inner cavity of one group of limiting plates, the extrusion block is movably connected to the inner cavity of one group of limiting plates, and flow channels are provided at the bottom of the two groups of limiting plates, one end of the flow channel is located at the bottom of the inner cavity of the limiting plate, and the other end of the flow channel extends to the inner cavity of the drain outlet.
[0011] Preferably, a supporting mesh plate is fixedly connected to the bottom end of the inner cavity of the cooling chamber, and the supporting mesh plate is located between the collecting box 1 and the spray pipe 1, and the supporting mesh plate supports the upper straight section of the conveyor belt of the copper casting.
[0012] Preferably, the bottoms of the spray pipe 1, the spray pipe 2 and the air jet pipe are at the same height, one end of the spray pipe 1 and the other end of the spray pipe 2 are fixedly connected to a water inlet pipe, the other end of the water inlet pipe is connected to the water outlet end of water pump 1 or the water outlet end of water pump 2, the top of the air jet pipe is fixedly connected to an air inlet pipe, and the other end of the air inlet pipe is connected to the air outlet end of blower 1 or the air outlet end of blower 2.
[0013] Preferably, the temperature of the water in the second cooling water storage tank is lower than the temperature of the water in the first cooling water storage tank, and the temperature of the water in the second cooling water storage tank is room temperature.
[0014] Preferably, the air sprayed out from the air spray pipe in the third cooling chamber is at room temperature, and the air spray pipe is located on the side of the spray pipe 2 away from the spray pipe 1.
[0015] Preferably, the outer surface of the first cooling water storage tank is wrapped with a thermal insulation pad, and the outer surface of the second cooling water storage tank is wrapped with a thermal conductive pad.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The rapid cooling mechanism for copper castings dries the cooling water adhering to the surface of the copper castings by combining water cooling and air cooling, which facilitates the contact between the cooling water and the surface of the copper castings, improves the cooling efficiency of the copper castings, and cools the return water of the copper castings in different cooling stages in batches, thereby increasing the speed at which the heated water participates in the cycle and reducing the amount of circulating cooling water.
[0018] 2. The rapid cooling mechanism for copper casting can keep the temperature of the copper casting consistent with the outside air temperature through the setting of the third cooling chamber, avoiding condensation when the copper casting contacts the outside air. The dehumidification box can be set to dehumidify the air discharged from the third cooling chamber, recover the moisture in the air, avoid the third refrigerator to cool the air discharged from the third cooling chamber, and reduce energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a front schematic diagram of the structure of the present invention;
[0020] Figure 2 The structure of the present invention Figure 1 Back side diagram;
[0021] Figure 3 The structure of the present invention Figure 1 Internal schematic diagram;
[0022] Figure 4 The structure of the present invention Figure 3 Front view schematic diagram;
[0023] Figure 5It is a schematic cross-sectional view of the dehumidification box structure of the present invention.
[0024] In the figure: 1. cooling chamber; 2. first cooling water storage tank; 3. second cooling water storage tank; 4. water inlet pipe; 5. air inlet pipe; 6. hydraulic telescopic rod one; 7. steam exhauster; 8. spray pipe one; 9. collecting box one; 10. air spray pipe; 11. supporting mesh plate; 12. drain outlet; 13. dehumidification box; 14. water pump one; 15. water pump two; 16. blower one; 17. blower two; 18. third refrigerator; 19. first refrigerator; 20. spray pipe two; 21. collecting box two; 22. second refrigerator; 23. hydraulic telescopic rod two; 25. water-absorbing sponge; 26. air inlet; 27. extrusion block; 28. limit plate. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] The present invention proposes a rapid cooling mechanism for copper casting, comprising a cooling chamber 1, a first cooling water storage tank 2 and a second cooling water storage tank 3. The inner cavity of the cooling chamber 1 is divided into a first cooling chamber, a second cooling chamber and a third cooling chamber. A support mesh plate 11 is fixedly connected to the bottom end of the inner cavity of the cooling chamber 1, and the support mesh plate 11 supports the upper straight section of the conveyor belt of the copper casting. The top of the inner cavity of the first cooling chamber is connected to a spray pipe 8 through a hydraulic telescopic rod 6, and a collection box 9 is placed at the bottom of the inner cavity of the first cooling chamber. The support mesh plate 11 is located between the collection box 9 and the spray pipe 8. A steam exhauster 7, a water pump 14 and a first refrigerator 19 are provided outside the first cooling chamber. The air inlet end of the steam exhauster 7 extends to the inner cavity of the first cooling chamber through a pipeline. The air outlet end of the steam exhauster 7 and the water outlet end of the collection box 9 are both connected through the first refrigerator 19 and the return water end of the first cooling water storage tank 2. The first refrigerator 19 can cool down the steam and the heated cooling water. The cooled cooling water flows back to the first cooling water storage tank 2 for storage. The first cooling water storage tank 2 is connected to the spray pipe 8 through a water pump 14. The water pump 14 can pump the water in the first cooling water storage tank 2 into the spray pipe 8. The cooling water in the inner cavity of the spray pipe 8 is sprayed onto the copper casting through the water spray holes of the spray pipe 8 to cool down the copper casting. The heated water passes through the copper casting conveyor belt and the supporting mesh and falls into the collecting box 9.
[0027] A spray pipe 20 and an air jet pipe 10 are alternately arranged at the top of the inner cavity of the second cooling chamber, and a collecting box 21 is arranged at the bottom of the inner cavity of the second cooling chamber. The spray pipe 20 and the air jet pipe 10 are respectively fixedly connected to the cooling chamber 1 through another hydraulic telescopic rod 6. A water pump 2 15, a blower 16 and a second refrigerator 22 are arranged on the outside of the second cooling chamber. The spray pipe 20 in the second cooling chamber is connected to the first cooling water storage tank 2 through the water pump 15. The water pump 15 pumps the water in the first cooling water storage tank 2 into the inner cavity of the spray pipe 20. The air jet pipe 10 in the second cooling chamber is connected to the air outlet end of the blower 16. The air inlet end of the blower 16, the exhaust end of the second cooling chamber and the water outlet end of the collecting box 21 are all connected to the first cooling water storage tank 2 through the second refrigerator 22. The second refrigerator 22 can cool the heated air, the heated cooling water and the air to be pumped into the air jet pipe 10. The second cooling chamber uses spraying and air jetting to cool the copper castings, and the air can dry the water adhering to the surface of the copper castings, making it easier for the cooling water to cool the copper castings again.
[0028] When the cooling mechanism is actually used, multiple groups of spray pipes 20 and air jet pipes 10 can be provided, which can be arranged according to needs, and are not limited here, so as to improve the cooling speed of the copper casting.
[0029] Another spray pipe 20 and another air jet pipe 10 are alternately arranged at the top of the inner cavity of the third cooling chamber, and the other spray pipe 20 and the other air jet pipe 10 are respectively fixedly connected to the cooling chamber 1 through another hydraulic telescopic rod 16. Another collecting box 21 is arranged at the bottom of the inner cavity of the third cooling chamber. A water pump 3, a blower 2 17, a third refrigerator 18 and a dehumidification box 13 are arranged outside the third cooling chamber. Another spray pipe 20 is connected to the second cooling water storage tank 3 through a water pump 3. The water pump 3 can pump the water in the second cooling water storage tank 3 into the inner cavity of another spray pipe 20. The air outlet end of the blower 2 17 is connected to another air jet pipe 10. The air outlet end of the third cooling chamber is connected to the air inlet end of the dehumidification box 13. The drainage end of the dehumidification box 13 and the drainage end of another collecting box 21 are both connected to the second cooling water storage tank 3 through the third refrigerator 18. The third refrigerator 18 can cool the moisture recovered from the air and the recovered spray water.
[0030] Two groups of squeezing water structures are provided in the inner cavity of the dehumidifier box 13. An air inlet 26 is provided on one side of the bottom of the inner cavity of the dehumidifier box 13, and a drain port 12 is provided on the other side of the bottom of the inner cavity of the dehumidifier box 13. The two groups of squeezing water structures are located between the air inlet 26 and the drain port 12. Exhaust holes are evenly provided on the side wall of the dehumidifier box 13 near the drain port 12. The squeezing water structure includes a hydraulic telescopic rod 23 fixedly connected to the dehumidifier box 13, an extrusion block 27 fixedly connected to the end of the output shaft of the hydraulic telescopic rod 23, and a water-absorbing sponge 25 released from the extrusion block 27. Two groups of limiting plates 28 are fixedly connected in the inner cavity of the dehumidifier box 13. The water-absorbing sponge 25 is located in the middle of the inner cavity of one group of limiting plates 28. The extrusion block 27 is movably connected to the inner cavity of one group of limiting plates 28. A flow channel is provided at the bottom of the two groups of limiting plates 28. One end of the flow channel is located at the bottom of the inner cavity of the limiting plate 28, and the other end of the flow channel extends to the inner cavity of the drain port 12. By setting the dehumidification box 13, the water-absorbing sponge 25 can dehumidify the air exhausted from the third cooling chamber, and the hydraulic telescopic rod 23 drives the squeezing block 27 to squeeze out the water absorbed in the water-absorbing sponge 25, and the squeezed water is retained in the drain port 12 through the flow channel, thereby reducing the loss of cooling water.
[0031] The bottoms of the spray pipe 1 8, the spray pipe 2 20 and the air jet pipe 10 are at the same height, and one end of the spray pipe 1 8 and the other end of the spray pipe 2 20 are fixedly connected to the water inlet pipe 4, and the other end of the water inlet pipe 4 is connected to the water outlet end of the water pump 14 or the water outlet end of the water pump 2 15. The top of the air jet pipe 10 is fixedly connected to the air inlet pipe 5, and the other end of the air inlet pipe 5 is connected to the air outlet end of the blower 16 or the air outlet end of the blower 2 17. The air inlet pipe 5 and the water inlet pipe 4 are both telescopic pipes, and the material thereof can be a corrugated pipe.
[0032] The temperature of the water in the second cooling water storage tank 3 is lower than that of the water in the first cooling water storage tank 2. The temperature of the water in the second cooling water storage tank 3 is room temperature. With this arrangement, the temperature of the cooled copper casting can be kept at room temperature, thereby avoiding condensation when the copper casting comes into contact with the outside air.
[0033] The air sprayed out from the air spray pipe 10 in the third cooling chamber is at room temperature, and the air spray pipe 10 is located on the side of the spray pipe 2 20 away from the spray pipe 1 8 .
[0034] The outer surface of the first cooling water storage tank 2 is wrapped with a heat-insulating pad, which can be made of pearl cotton to reduce the impact of the external environment on the cooling water temperature. The outer surface of the second cooling water storage tank 3 is wrapped with a heat-conducting pad, which can be made of heat-conducting silica gel, so that the cooling water temperature in the second cooling water storage tank 3 can be kept consistent with normal temperature, which is convenient for use.
[0035] Among them, the electrical components involved in this application are all existing technologies, and technical personnel in this field understand their connection methods. Through these personnel, all electrical components in this application are connected to their compatible power supplies through wires, and according to actual conditions, a suitable controller is selected to meet the control requirements. The specific connection and control sequence are described below. The electrical connection is completed in a sequential working order between each electrical component, and the detailed connection method is a well-known technology in this field. The following mainly introduces the working principle and process, and no longer explains the electrical control.
[0036] In summary, when used in this application, a segmented cooling method is adopted to improve the cooling efficiency of the copper casting and avoid the generation of cold dew when the cooled copper casting contacts the outside air; spraying and air blowing are adopted. By combining water cooling and air cooling, the cooling water adhering to the surface of the copper casting is blown dry, which facilitates the contact between the cooling water and the surface of the copper casting, improves the cooling efficiency of the copper casting, and cools the return water of the copper casting at different cooling stages in batches, increases the speed at which the heated water participates in the cycle, and thus reduces the amount of circulating cooling water.
[0037] The standard parts used in the present invention can all be purchased from the market, and special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. Machinery, parts and equipment all adopt conventional models in the prior art and will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field. Although the embodiments of the present invention have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and modifications can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A rapid cooling mechanism for copper casting, comprising a cooling chamber (1), a first cooling water storage tank (2) and a second cooling water storage tank (3), characterized in that: The inner cavity of the cooling chamber (1) is divided into a first cooling chamber, a second cooling chamber and a third cooling chamber. The top of the inner cavity of the first cooling chamber is connected to a spray pipe (8) via a hydraulic telescopic rod (6). A collecting box (9) is placed at the bottom of the inner cavity of the first cooling chamber. A steam exhauster (7), a water pump (14) and a first refrigerator (19) are provided outside the first cooling chamber. The air inlet end of the steam exhauster (7) extends into the inner cavity of the first cooling chamber through a pipeline. The air outlet end of the steam exhauster (7) and the water outlet end of the collecting box (9) are connected to the return water end of the first cooling water storage tank (2) via the first refrigerator (19). The first cooling water storage tank (2) is connected to the spray pipe (8) via a water pump (14). The top of the inner cavity of the second cooling chamber is alternately provided with a second spray pipe (20) and an air jet pipe (10), the bottom of the inner cavity of the second cooling chamber is provided with a second collecting box (21), the outside of the second cooling chamber is provided with a second water pump (15), a first blower (16) and a second refrigerator (22), the second spray pipe (20) in the second cooling chamber is connected to the first cooling water storage tank (2) through the second water pump (15), the air jet pipe (10) in the second cooling chamber is connected to the air outlet end of the first blower (16), the air inlet end of the first blower (16), the air outlet end of the second cooling chamber and the water outlet end of the second collecting box (21) are all connected to the first cooling water storage tank (2) through the second refrigerator (22); Another spray pipe 2 (20) and another air jet pipe (10) are alternately arranged at the top of the inner cavity of the third cooling chamber, another collecting box 2 (21) is arranged at the bottom of the inner cavity of the third cooling chamber, a water pump 3, a blower 2 (17), a third refrigerator (18) and a dehumidification box (13) are arranged outside the third cooling chamber, another spray pipe 2 (20) is connected to the second cooling water storage tank (3) through the water pump 3, the air outlet end of the blower 2 (17) is connected to another air jet pipe (10), the air outlet end of the third cooling chamber is connected to the air inlet end of the dehumidification box (13), and the drainage end of the dehumidification box (13) and the drainage end of another collecting box 2 (21) are both connected to the second cooling water storage tank (3) through the third refrigerator (18); The second spray pipe (20) and the air spray pipe (10) are respectively fixedly connected to the cooling chamber (1) via another hydraulic telescopic rod (6).
2. A rapid cooling mechanism for copper casting according to claim 1, characterized in that: Two groups of water squeezing structures are provided in the inner cavity of the dehumidification box (13); an air inlet (26) is provided on one side of the bottom of the inner cavity of the dehumidification box (13); a water drain (12) is provided on the other side of the bottom of the inner cavity of the dehumidification box (13); the two groups of water squeezing structures are located between the air inlet (26) and the water drain (12); and exhaust holes are evenly provided on the side wall of the dehumidification box (13) near the water drain (12).
3. A rapid cooling mechanism for copper casting according to claim 2, characterized in that: The squeezing structure comprises a second hydraulic telescopic rod (23) fixedly connected to the dehumidification box (13), an extrusion block (27) fixedly connected to the end of the output shaft of the second hydraulic telescopic rod (23), and a water-absorbing sponge (25) released from the extrusion block (27); two groups of limit plates (28) are fixedly connected to the inner cavity of the dehumidification box (13); the water-absorbing sponge (25) is located in the middle of the inner cavity of one group of limit plates (28); the extrusion block (27) is movably connected to the inner cavity of one group of limit plates (28); and flow channels are provided at the bottom of the two groups of limit plates (28); one end of the flow channel is located at the bottom of the inner cavity of the limit plate (28); and the other end of the flow channel extends to the inner cavity of the drain port (12).
4. A rapid cooling mechanism for copper casting according to claim 1, characterized in that: A supporting mesh plate (11) is fixedly connected to the bottom end of the inner cavity of the cooling chamber (1), and the supporting mesh plate (11) is located between the collecting box (9) and the spray pipe (8), and the supporting mesh plate (11) supports the upper straight section of the copper casting conveyor belt.
5. The rapid cooling mechanism for copper casting according to claim 1, characterized in that: The bottoms of the spray pipe 1 (8), the spray pipe 2 (20) and the air jet pipe (10) are at the same height; one end of the other end of the spray pipe 1 (8) and the spray pipe 2 (20) are fixedly connected to a water inlet pipe (4); the other end of the water inlet pipe (4) is connected to the water outlet end of the water pump 1 (14) or the water outlet end of the water pump 2 (15); the top of the air jet pipe (10) is fixedly connected to an air inlet pipe (5); the other end of the air inlet pipe (5) is connected to the air outlet end of the blower 1 (16) or the air outlet end of the blower 2 (17).
6. A rapid cooling mechanism for copper casting according to claim 1, characterized in that: The temperature of the water in the second cooling water storage tank (3) is lower than the temperature of the water in the first cooling water storage tank (2), and the temperature of the water in the second cooling water storage tank (3) is normal temperature.
7. A rapid cooling mechanism for copper casting according to claim 1, characterized in that: The air sprayed out from the air spray pipe (10) in the third cooling chamber is at room temperature, and the air spray pipe (10) is located on the side of the second spray pipe (20) away from the first spray pipe (8).
8. The rapid cooling mechanism for copper casting according to claim 1, characterized in that: The outer surface of the first cooling water storage tank (2) is wrapped with a heat-insulating pad, and the outer surface of the second cooling water storage tank (3) is wrapped with a heat-conducting pad.
