Green electricity activity control method and device, equipment and storage medium

By obtaining the balance of income and charge status of the optical storage system, sending instructions to the charging pile platform, controlling the charging pile to be in a green electricity activity state, solving the linkage problem between the charging pile platform and the green electricity equipment operation and maintenance platform, and realizing the green Effective utilization of electrical energy in electrical equipment to avoid waste and losses.

CN119239364APending Publication Date: 2025-01-03HNAC TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411512131.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

The lack of good linkage between the existing charging pile platform and the green power generation equipment operation and maintenance platform has led to the inability to effectively utilize the power generated by green power generation equipment, resulting in waste or loss.

Method used

By obtaining the balance of income, state of charge and output power of the optical storage system, sending an on or end command to the charging pile platform to control the charging pile to be in a green electricity active state, ensuring the smooth operation of the charging pile and effectively utilizing the power generated by the green electricity equipment.

Benefits of technology

It realizes the effective use of the electricity generated by green power equipment while ensuring the smooth operation of the charging pile, avoiding waste and losses, and attracting new energy vehicle owners to go to the charging station to charge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119239364A_ABST
    Figure CN119239364A_ABST
Patent Text Reader

Abstract

The invention provides a green electricity activity control method and device, equipment and a storage medium. The method comprises the following steps: acquiring a first optical storage system revenue balance, daily activity revenue consumption, a first optical storage system charge state and optical storage system output power; and if the first light storage system income balance, the daily activity income consumption, the first light storage system charge state and the light storage system output power all meet activity opening conditions, an activity opening instruction is sent to a charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in a green electricity activity opening state. Good linkage can be formed between the light storage system and the charging pile platform, the charge state and the output power are obtained from the light storage system, whether the green electricity activity is started or not is determined, then the instruction is sent to the charging pile platform, and electric energy generated by the light storage system can be effectively utilized while stable operation of the charging pile is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of charging piles, and in particular to a green electricity activity control method, device, equipment and storage medium. Background Art

[0002] In recent years, due to the booming development of new energy electric vehicles, the daily application of charging piles has gradually formed a large scale, which greatly meets the users' demand for electric vehicles. At present, electric vehicles are directly connected to the power grid or green power generation equipment through charging piles to obtain electricity. The electricity generated by green power generation equipment can be regarded as a low-cost green and clean energy, which can reduce the loss of non-renewable energy.

[0003] The charging pile platform focuses on the operation of the charging piles themselves, and its target users are new energy vehicle owners and charging pile operation and maintenance personnel, while the green power generation equipment operation and maintenance platform focuses on the operating status and data statistics of the green power generation equipment itself. At present, the green power generation equipment operation and maintenance platform has not formed a good linkage with the charging pile platform to ensure that the charging piles can operate smoothly while effectively utilizing the electricity generated by the green power generation equipment. Summary of the invention

[0004] In view of this, the purpose of this application is to provide a green electricity activity control method, device, equipment and storage medium to effectively utilize the electric energy generated by green power generation equipment while ensuring the stable operation of the charging pile. The specific technical solution is as follows:

[0005] In a first aspect, the present application provides a green power activity control method, the method comprising:

[0006] Obtaining the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power;

[0007] If the income balance of the first photovoltaic storage system, the daily activity income consumption, the charge state of the first photovoltaic storage system and the output power of the photovoltaic storage system all meet the activity start conditions, an activity start instruction is sent to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state.

[0008] In a possible implementation, before obtaining the first photovoltaic storage system revenue balance, daily activity revenue consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power, the method further includes:

[0009] Predicting the output power of the photovoltaic storage system and the power load of the charging pile;

[0010] If the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions, the charging pile platform is controlled to display a green power activity forecast page.

[0011] In a possible implementation, controlling the charging pile platform to display a green electricity activity notice page includes:

[0012] An activity announcement instruction is sent to the charging pile platform, so that the charging pile platform displays the green electricity activity announcement page according to the activity announcement instruction, wherein the activity announcement instruction includes the activity electricity price.

[0013] In a possible implementation, determining the first photovoltaic storage system revenue balance includes:

[0014] Obtain the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price;

[0015] The first photovoltaic storage system profit balance is calculated according to the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price.

[0016] In a possible implementation, after sending the activity start instruction to the charging pile platform corresponding to the charging pile, the method further includes:

[0017] Obtaining the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system;

[0018] If the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system both meet the activity end conditions, an activity end instruction is sent to the charging pile platform, so that the charging pile platform controls the charging pile to be in the green power activity end state.

[0019] In a second aspect, the present application further provides a green electricity activity control device, the device comprising:

[0020] An acquisition module, used to acquire the first photovoltaic storage system revenue balance, daily activity revenue consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power;

[0021] The status start module is used to send an activity start instruction to the charging pile platform corresponding to the charging pile if the income balance of the first photovoltaic storage system, the daily activity income consumption, the charge state of the first photovoltaic storage system and the output power of the photovoltaic storage system all meet the activity start conditions, so that the charging pile platform controls the charging pile to be in the green power activity start state.

[0022] In a possible implementation manner, the device further includes:

[0023] A prediction module, used to predict the output power of the photovoltaic storage system and the power load of the charging pile;

[0024] The display control module is used to control the charging pile platform to display a green power activity forecast page if the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions.

[0025] In a possible implementation, the acquisition module includes:

[0026] An acquisition unit, used for acquiring the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price;

[0027] A calculation unit is used to calculate the first photovoltaic storage system profit balance according to the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price.

[0028] In a third aspect, the present application further provides a computer device, including: a memory and a processor;

[0029] Wherein, the memory is used to store computer programs;

[0030] The processor is used to execute the computer program in the memory to implement the method described in the first aspect or any one of the first aspects.

[0031] In a fourth aspect, the present application further provides a computer-readable storage medium storing instructions, which, when executed on a computer, enables the computer to execute the method described in the first aspect or any one of the first aspects.

[0032] In this application, the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power are obtained; if the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power all meet the activity start conditions, send an activity start instruction to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state. By using this application, a good linkage can be formed between the photovoltaic storage system and the charging pile platform, the charge state and output power can be obtained from the photovoltaic storage system, and it can be determined whether the green power activity is turned on, and then a command can be sent to the charging pile platform. While ensuring the smooth operation of the charging pile, the electricity generated by the photovoltaic storage system can be effectively utilized. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0034] Figure 1A flow chart of a green power activity control method provided by an embodiment of the present application is shown;

[0035] Figure 2 A schematic diagram of starting and stopping judgment of a green power activity provided by an embodiment of the present application is shown;

[0036] Figure 3 A schematic diagram of a display page of a charging pile platform provided in an embodiment of the present application is shown;

[0037] Figure 4 A schematic diagram showing a revenue bucket configuration information provided by an embodiment of the present application;

[0038] Figure 5 A schematic diagram of green power activity forecast judgment provided by an embodiment of the present application is shown;

[0039] Figure 6 A schematic diagram of interaction between a charging pile platform and a photovoltaic storage system operation and maintenance platform provided in an embodiment of the present application is shown;

[0040] Figure 7 A schematic structural diagram of a green power activity control device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0042] For charging stations (such as photovoltaic, wind power, etc.) equipped with green zero-carbon power generation equipment (referred to as green power equipment for short), the electricity generated by the green power equipment (referred to as green electricity for short) can be used as low-priced electricity to attract more new energy vehicle owners to go to the charging stations to charge.

[0043] However, there is currently an imbalance between the amount of electricity generated by green power equipment and the amount of electricity used by charging piles. Even if energy storage equipment and various instruments are added between green power equipment and charging piles, it is impossible to accurately guarantee that charging piles only use green electricity without using city electricity. The charging pile platform focuses on the operation of the charging piles themselves, and its users are new energy vehicle owners and charging pile operation and maintenance personnel, while the green power equipment operation and maintenance platform focuses on the operating status and data statistics of the green power equipment itself. The green power equipment operation and maintenance platform does not form a good linkage with the charging pile platform. When the intensity of light / wind power of the green power equipment is high enough, and the power of the energy storage cabinet is close to full charge, if the charging pile in the charging station fails to consume the green electricity generated by the green power equipment in time, then the green electricity will be wasted. Therefore, how to ensure that the charging piles can operate smoothly while effectively utilizing green electricity without wasting or losing money is a problem that needs to be solved.

[0044] The embodiment of the present application provides a green electricity activity control method, which uses real-time statistics and scheduling to ensure that the income generated by the power generation of green electricity equipment is greater than or equal to the green electricity order discount released by the charging pile platform, thereby ensuring that the charging station does not suffer losses in operation while achieving the purpose of attracting new energy vehicle owners to charge at the charging station and attracting traffic.

[0045] See also Figure 1 , shows a flow chart of a green power activity control method provided by an embodiment of the present application, and the embodiment of the present application at least includes the following steps:

[0046] S11, obtaining the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power.

[0047] The embodiment of the present application can obtain the first photovoltaic storage system revenue balance, daily activity revenue consumption, first photovoltaic storage system charge state and photovoltaic storage system output power in real time, or obtain the first photovoltaic storage system revenue balance, daily activity revenue consumption, first photovoltaic storage system charge state and photovoltaic storage system output power according to a preset monitoring period. The first photovoltaic storage system revenue balance is the balance of the revenue obtained by using the photovoltaic storage system when obtaining the first photovoltaic storage system revenue balance, the first photovoltaic storage system charge state is the charge state (State of Charge, SOC) of the photovoltaic storage system when obtaining the first photovoltaic storage system charge state, and the photovoltaic storage system output power is the output power of the photovoltaic storage system.

[0048] In the embodiment of the present application, the first green electricity generation, the first photovoltaic storage system charge state and the photovoltaic storage system output power can be obtained from the operation and maintenance platform of the photovoltaic storage system, and the first green electricity order power consumption, the original electricity price and the active electricity price can be obtained from the charging pile platform. The first green electricity generation is the total power generation of the photovoltaic storage system when the first green electricity generation is obtained. The first green electricity order power consumption includes the power consumption corresponding to the historical green electricity order when the first green electricity order power consumption is obtained. The active electricity price includes the historical green electricity prices corresponding to the historical green electricity orders. The original electricity price is the peak and valley electricity price before the green electricity activity is started. Green electricity activity refers to the activity of outputting the electric energy of the charging pile as low-priced electricity. The active electricity price of the green electricity activity is lower than the original electricity price. The historical green electricity order is the order participating in the green electricity activity.

[0049] The first photovoltaic storage system revenue balance is determined based on the first green electricity generation, the electricity consumption of the first green electricity order, the original electricity price and the preferential electricity price, where preferential electricity price = original electricity price - active electricity price. Specifically, the first photovoltaic storage system revenue balance = first green electricity generation revenue - first green electricity order consumption, first green electricity generation revenue = first green electricity generation * original electricity price, first green electricity order consumption = ∑ preferential electricity price of historical green electricity order t * electricity consumption of historical green electricity order t, where t is a positive integer. Historical green electricity order t is the historical green electricity order when obtaining the first photovoltaic storage system revenue balance. The first green electricity generation revenue and the first green electricity order consumption can be calculated from the preset start calculation time.

[0050] The daily activity revenue consumption is obtained from the first green electricity order consumption. The daily activity revenue consumption is the green electricity order consumption on the day when the daily activity revenue consumption is obtained. If no green electricity activity has been started on the day when the daily activity revenue consumption is obtained, the daily activity revenue consumption is 0.

[0051] S12: If the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power all meet the activity start conditions, an activity start instruction is sent to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state.

[0052] See also Figure 2 , after obtaining the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power, it is determined whether the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power meet the activity start condition. The activity start condition may include that the first photovoltaic storage system income balance is greater than the maximum threshold of the green power quota and the daily activity income consumption is less than the daily green power quota and the first photovoltaic storage system charge state is greater than the activity start threshold and the photovoltaic storage system output power is greater than the photovoltaic output power threshold.

[0053] Determining whether the revenue consumption of the day's activities is less than the daily green electricity quota can ensure that the daily green electricity activities are released in limited quantities, thus avoiding losses incurred by charging stations due to green electricity activities.

[0054] After the green electricity activity is turned on, the embodiment of the present application can control the charging pile platform corresponding to the charging pile to display the green electricity activity page, such as Figure 3 As shown, the green electricity activity page may include the activity electricity price corresponding to the green electricity activity.

[0055] Specifically, the embodiment of the present application sends an activity start instruction to the charging pile platform, and the activity start instruction includes the activity electricity price corresponding to the green electricity activity. The activity start instruction is used to instruct the charging pile platform to control the charging pile to be in the green electricity activity start state, and also instructs the charging pile platform to display the green electricity activity page.

[0056] In the embodiment of the present application, a charging pile may correspond to one or more charging positions, and each charging position may be provided with a charging line or a charging gun. It can be understood that the charging device is connected to the charging position, which means that the charging device is electrically connected to the charging line or charging gun provided on the charging position. Taking the charging pile for charging electric vehicles as an example, the electric vehicle is connected to the charging position, which means that the electric vehicle is parked in the parking space corresponding to the charging position and connected to the charging gun. It should be pointed out that the charging device in the embodiment of the present application can be an electronic terminal such as a mobile phone or a tablet, or it can be an electric device such as an electric car or an electric bicycle.

[0057] In the embodiment of the present application, information such as the start calculation time and threshold can be configured in the revenue bucket configuration. Figure 4 As shown, "loss coefficient" is the loss generated in the process of power generation to power consumption; "start calculation time" is the date from which the income and green electricity order consumption are calculated; "green electricity tariff discount" is the unit price discount for each kilowatt-hour of electricity for the specified green electricity order; "green electricity quota" is to start the green electricity activity when the balance is greater than the maximum value of this range, and stop the green electricity activity when it is less than the minimum value of this range to ensure that the green electricity activity can continue for a period of time; "daily green electricity quota" controls the amount of green electricity discount released to the outside every day; "remaining energy storage power when turning on / off" indicates the threshold of energy storage power when turning on / off the green electricity activity; "photovoltaic output power" is the threshold of photovoltaic output power when turning on the green electricity activity; "income bucket statistics" and "whether green electricity is being used" indicate the current balance statistics and whether the charging pile platform is doing green electricity activities.

[0058] In the embodiment of the present application, the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power are obtained; if the first photovoltaic storage system income balance, daily activity income consumption, first photovoltaic storage system charge state and photovoltaic storage system output power all meet the activity start conditions, an activity start instruction is sent to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state. By using the embodiment of the present application, a good linkage can be formed between the photovoltaic storage system and the charging pile platform, the charge state and output power are obtained from the photovoltaic storage system, and it is determined whether the green power activity is turned on, and then instructions are sent to the charging pile platform. While ensuring the smooth operation of the charging pile, the electric energy generated by the photovoltaic storage system can be effectively utilized.

[0059] Next, a method for starting and stopping a green power activity provided in an embodiment of the present application is introduced.

[0060] S21, predict the output power of the photovoltaic storage system and the power load of the charging pile.

[0061] See also Figure 5 , the embodiment of the present application can predict the output power of the photovoltaic storage system and the power load of the charging pile before starting the green power activity. The photovoltaic storage system, also known as the solar photovoltaic energy storage power generation system, is a power generation system composed of photovoltaic equipment and energy storage equipment. Therefore, the output power of the photovoltaic storage system in the embodiment of the present application mainly refers to the output power of the photovoltaic equipment.

[0062] The factors affecting the output power prediction of photovoltaic equipment may include the latitude and longitude of the photovoltaic equipment, installed capacity, array inclination, array orientation, horizontal diffuse reflection coefficient, etc. These factors may affect the light intensity, photovoltaic irradiation area and photovoltaic efficiency.

[0063] The factors affecting the power load forecast of charging piles may include the power load in the recent period, the power load in the same period in recent years, the number and rated power of load equipment, etc.

[0064] In practical applications, there are many methods for predicting the output power of photovoltaic equipment and the power load of charging piles, which are not limited here.

[0065] S22: If the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions, the charging pile platform is controlled to display the green power activity forecast page.

[0066] It is determined whether the predicted output power of the photovoltaic storage system and the power load of the charging pile meet the forecast conditions. The forecast conditions may include that the output power of the photovoltaic storage system is greater than the output power threshold and the power load of the charging pile is less than the load threshold.

[0067] When the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions, that is, the output power of the photovoltaic storage system is greater than the output power threshold and the power load of the charging pile is less than the load threshold, it means that the power generated by the photovoltaic storage system is much greater than the power consumed by the charging pile. In order to avoid wasting green electricity, the embodiment of the present application controls the charging pile platform corresponding to the charging pile to display the green electricity activity forecast page. The embodiment of the present application forecasts green electricity activities on the charging pile platform in advance to attract a certain amount of attention traffic in advance.

[0068] Specifically, the embodiment of the present application can send an activity notification instruction to the charging pile platform, so that the charging pile platform displays a green electricity activity notification page according to the activity notification instruction. The activity notification instruction can include the activity electricity price of the green electricity activity, so that the user can know the activity electricity price through the green electricity activity notification page.

[0069] S23, obtaining the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power.

[0070] S24, if the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power all meet the activity start conditions, send an activity start instruction to the charging pile platform, so that the charging pile platform controls the charging pile to be in the green power activity start state.

[0071] S23-S24 may refer to S11-S12, and will not be described in detail in the embodiment of the present application.

[0072] S25, obtaining the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system.

[0073] After starting the green power activity, the embodiment of the present application can obtain the second photovoltaic storage system income balance and the second photovoltaic storage system charge state in real time, or obtain the second photovoltaic storage system income balance and the second photovoltaic storage system charge state according to a preset monitoring period.

[0074] In the embodiment of the present application, the second green electricity generation and the second photovoltaic storage system charge state can be obtained from the photovoltaic storage system operation and maintenance platform, and the second green electricity order consumption, original electricity price and active electricity price can be obtained from the charging pile platform. The second green electricity generation is the total generation of the photovoltaic storage system when the second green electricity generation is obtained, the second photovoltaic storage system charge state is the charge state of the photovoltaic storage system when the second photovoltaic storage system charge state is obtained, and the second green electricity order consumption is the consumption corresponding to the historical green electricity order when the second green electricity order consumption is obtained.

[0075] The third photovoltaic storage system revenue balance is determined based on the second green electricity generation, the electricity consumption of the second green electricity order, the original electricity price and the preferential electricity price. The second photovoltaic storage system revenue balance is the balance of the income obtained by using the photovoltaic storage system when obtaining the second photovoltaic storage system revenue balance. Specifically, the second photovoltaic storage system revenue balance = second green electricity generation revenue - second green electricity order consumption, second green electricity generation revenue = second green electricity generation * original electricity price, second green electricity order consumption = ∑ preferential electricity price of historical green electricity order n * electricity consumption of historical green electricity order n, n is a positive integer. Historical green electricity order n is the historical green electricity order when obtaining the second photovoltaic storage system revenue balance. The second green electricity generation revenue and the second green electricity order consumption can be calculated from the preset start calculation time.

[0076] S26, if the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system both meet the activity end conditions, send an activity end instruction to the charging pile platform, so that the charging pile platform controls the charging pile to be in the green power activity end state.

[0077] After obtaining the revenue balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system, determine whether the revenue balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system meet the activity termination conditions. The activity termination conditions include that the revenue balance of the second photovoltaic storage system is less than the minimum threshold of the green power quota, or the revenue balance of the second photovoltaic storage system is not less than the minimum threshold of the green power quota but the charge state of the second photovoltaic storage system is less than the activity shutdown threshold.

[0078] When the output power of the photovoltaic equipment is greater than the set threshold and the remaining power of the energy storage equipment in the charging station also reaches the set threshold, it can be determined that the power generation of the photovoltaic equipment needs to be consumed by the charging pile. Figure 6 As shown, the embodiment of the present application is used as a universal module to connect the charging pile platform and the photovoltaic storage system operation and maintenance platform, obtain green electricity data from the photovoltaic storage system operation and maintenance platform, and control the charging pile platform to start and stop green electricity activities. The embodiment of the present application can send an instruction to the charging pile platform to start the green electricity charging pile activity to control the charging pile to be in a green electricity activity on state. Conversely, the embodiment of the present application can also send an instruction to close the activity to the charging pile platform to control the charging pile to be in a green electricity activity stop state, thereby achieving automatic start / stop of the green electricity charging pile activity. By starting the green electricity activity and attracting users to go to the station for charging, the green electricity generated by the green electricity equipment can be consumed more quickly, achieving the purpose of absorbing photovoltaic power generation.

[0079] Next, a green electricity activity control device provided by the present application is introduced. The green electricity activity control device introduced below and the green electricity activity control method introduced above can be referred to each other.

[0080] See also Figure 7 , showing a schematic structural diagram of a green electricity activity control device provided by the present application, the device comprising:

[0081] An acquisition module 701 is used to acquire the first photovoltaic storage system revenue balance, daily activity revenue consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power;

[0082] The status start module 702 is used to send an activity start instruction to the charging pile platform corresponding to the charging pile if the income balance of the first photovoltaic storage system, the daily activity income consumption, the charge state of the first photovoltaic storage system and the output power of the photovoltaic storage system all meet the activity start conditions, so that the charging pile platform controls the charging pile to be in the green power activity start state.

[0083] In the embodiment of the present application, the device further includes:

[0084] A prediction module, used to predict the output power of the photovoltaic storage system and the power load of the charging pile;

[0085] The display control module is used to control the charging pile platform corresponding to the charging pile to display a green power activity forecast page if the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions.

[0086] In the embodiment of the present application, the display control module is specifically used to:

[0087] An activity announcement instruction is sent to the charging pile platform, so that the charging pile platform displays the green electricity activity announcement page according to the activity announcement instruction, wherein the activity announcement instruction includes the activity electricity price.

[0088] In the embodiment of the present application, the acquisition module 701 includes:

[0089] An acquisition unit, used for acquiring the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price;

[0090] A calculation unit is used to calculate the first photovoltaic storage system profit balance according to the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price.

[0091] In the embodiment of the present application, the device further includes:

[0092] A parameter acquisition module, used to obtain the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system;

[0093] The status stop module is used to send an activity end instruction to the charging pile platform if the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system both meet the activity end conditions, so that the charging pile platform controls the charging pile to be in the green power activity end state.

[0094] The embodiment of the present application also provides a computer device, including: a memory and a processor;

[0095] Wherein, the memory is used to store computer programs;

[0096] The processor is used to execute the computer program in the memory to implement the method described in the above method embodiment.

[0097] The embodiment of the present application also provides a computer-readable storage medium storing instructions, which, when executed on a computer, enables the computer to execute the method described in the above method embodiment.

[0098] In the embodiment of the present application, the acquisition module acquires the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power; if the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power all meet the activity start conditions, the state start module sends an activity start instruction to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state. By using the embodiment of the present application, a good linkage can be formed between the photovoltaic storage system and the charging pile platform, the charge state and output power can be obtained from the photovoltaic storage system, and it can be determined whether the green power activity is turned on, and then instructions can be sent to the charging pile platform. While ensuring the smooth operation of the charging pile, the electric energy generated by the photovoltaic storage system can be effectively utilized.

[0099] It should be noted that the same or similar parts between the various embodiments can be referred to each other. As for the device embodiment and the system embodiment, since they are basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0100] For the above-mentioned embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present application is not limited by the order of the actions described, because according to the present application, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0101] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0102] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

[0103] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A green power activity control method, characterized in that: The method comprises: Obtaining the first photovoltaic storage system income balance, daily activity income consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power; If the income balance of the first photovoltaic storage system, the daily activity income consumption, the charge state of the first photovoltaic storage system and the output power of the photovoltaic storage system all meet the activity start conditions, an activity start instruction is sent to the charging pile platform corresponding to the charging pile, so that the charging pile platform controls the charging pile to be in the green power activity start state.

2. The method according to claim 1, characterized in that Before obtaining the first photovoltaic storage system revenue balance, daily activity revenue consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power, the method further includes: Predicting the output power of the photovoltaic storage system and the power load of the charging pile; If the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions, the charging pile platform is controlled to display a green power activity forecast page.

3. The method according to claim 2, characterized in that The controlling the charging pile platform to display a green electricity activity notice page includes: An activity announcement instruction is sent to the charging pile platform, so that the charging pile platform displays the green electricity activity announcement page according to the activity announcement instruction, wherein the activity announcement instruction includes the activity electricity price.

4. The method according to claim 1 or 2, characterized in that: The determining of the first photovoltaic storage system revenue balance includes: Obtain the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price; The first photovoltaic storage system profit balance is calculated according to the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price.

5. The method according to claim 1 or 2, characterized in that: After sending the activity start instruction to the charging pile platform corresponding to the charging pile, the method further includes: Obtaining the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system; If the income balance of the second photovoltaic storage system and the charge state of the second photovoltaic storage system both meet the activity end conditions, an activity end instruction is sent to the charging pile platform, so that the charging pile platform controls the charging pile to be in the green power activity end state.

6. A green electricity activity control device, characterized in that: The device comprises: An acquisition module, used to acquire the first photovoltaic storage system revenue balance, daily activity revenue consumption, the first photovoltaic storage system charge state and the photovoltaic storage system output power; The status start module is used to send an activity start instruction to the charging pile platform corresponding to the charging pile if the income balance of the first photovoltaic storage system, the daily activity income consumption, the charge state of the first photovoltaic storage system and the output power of the photovoltaic storage system all meet the activity start conditions, so that the charging pile platform controls the charging pile to be in the green power activity start state.

7. The device according to claim 6, characterized in that The device also includes: A prediction module, used to predict the output power of the photovoltaic storage system and the power load of the charging pile; The display control module is used to control the charging pile platform to display a green power activity forecast page if the predicted output power of the photovoltaic storage system and the power load of the charging pile both meet the forecast conditions.

8. The device according to claim 6 or 7, characterized in that The acquisition module comprises: An acquisition unit, used for acquiring the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price; A calculation unit is used to calculate the first photovoltaic storage system profit balance according to the first green electricity generation, the first green electricity order consumption, the original electricity price and the preferential electricity price.

9. A computer device, characterized in that: include: Memory and processor; The memory is used to store computer programs; The processor is configured to execute the computer program in the memory to implement the method according to any one of claims 1 to 5.

10. A computer-readable storage medium, characterized in that: The device stores instructions which, when executed on a computer, cause the computer to execute the method according to any one of claims 1 to 5.