Roller bearing lubricating system of belt conveyor

By designing grease injection, cleaning liquid injection and inert gas injection units in the roller bearing of the belt conveyor, combined with sensors and automatic control systems, the problem that traditional lubrication methods cannot monitor the lubrication situation in real time is solved, and good lubrication of the roller bearing is achieved Reliable operation of belt conveyors reduces production costs.

CN119244916APending Publication Date: 2025-01-03SHANDONG MINING MASCH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411421913.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

The lubrication method of traditional belt conveyor roller bearings cannot determine the amount of grease and impurities in the oil cavity in real time, resulting in insufficient or excessive lubrication, affecting the operating reliability and life of the machine, and increasing production costs.

Method used

A belt conveyor roller bearing lubrication system is designed, including a grease injection unit, a cleaning liquid injection unit and an inert gas injection unit, adopting a multiplexer, a pressure regulator, a flow control valve, a grease injection pressure sensor and a gas concentration The detection device uses an inert gas detection and automatic control system to monitor and adjust the amount and quality of grease in real time.

Benefits of technology

It realizes good lubrication of roller bearings, ensures the working reliability of belt conveyors, reduces production costs, improves economic benefits, and extends the service life of the machine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119244916A_ABST
    Figure CN119244916A_ABST
Patent Text Reader

Abstract

The invention discloses a belt conveyor roller bearing lubricating system which comprises a lubricating grease injection unit, the lubricating grease injection unit comprises a multi-way flow divider A, the multi-way flow divider A is arranged between a grease injection pump and bearings and connected with the grease injection pump through a grease injection main pipeline, and the bearings are arranged on the bearings. The multi-path flow divider A is connected with the bearings through the grease injection branch pipelines, grease injection holes are formed in the tops of the bearings, and the grease injection branch pipelines are communicated with the grease injection holes; a pressure regulator A and a flow control valve A are arranged on the grease injection main pipeline, and a three-position four-way valve is arranged on the grease injection branch pipeline. When the lubricating system is used for lubricating the roller bearing, good lubrication of the roller bearing can be guaranteed, the working reliability of the belt conveyor is guaranteed, the production cost of an enterprise is reduced, and the economic benefits of the enterprise are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of belt conveyors, and in particular relates to a belt conveyor roller bearing lubrication system. Background Art

[0002] In the belt conveyor, the roller is the core execution unit and redirection unit of the transmission, which is an important indicator of whether the belt conveyor can operate normally. The normal operation of the roller bearing is crucial to the performance and life of the roller. Good lubrication can reduce friction, wear, reduce heat, and improve the working efficiency and life of the bearing. However, the traditional lubrication method cannot determine the amount of grease in the oil chamber, and it is impossible to determine when to add the appropriate amount of grease; it is impossible to determine whether the grease in the oil chamber contains too many impurities, and it is forced to stop only when the bearing makes abnormal noise, overheats or is damaged. When the lubrication is insufficient, it will cause rapid wear of the bearing; when the lubrication is too much, it will increase the running resistance; when there are too many impurities in the grease, the bearing will be damaged faster. Once there is a problem with the bearing, the roller needs to be removed from the belt conveyor. This removal process is time-consuming and labor-intensive, has a great impact on production and operation, and greatly reduces the economic benefits of the enterprise. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a belt conveyor roller bearing lubrication system, which can ensure good lubrication of the roller bearing, ensure the reliability of the belt conveyor operation, reduce the production cost of the enterprise, and improve the economic benefits of the enterprise.

[0004] In order to solve the above technical problems, the technical solution of the present invention is:

[0005] A belt conveyor roller bearing lubrication system includes a grease injection unit, the grease injection unit includes a multi-way diverter A, the multi-way diverter A is arranged between a grease injection pump and each bearing, the multi-way diverter A is connected to the grease injection pump through a grease injection main line, the multi-way diverter A is connected to each bearing through a grease injection branch line, a grease injection hole is arranged on the top of the bearing, and the grease injection branch line is connected to the grease injection hole; a pressure regulator A and a flow control valve A are arranged on the grease injection main line, and a three-position four-way valve is arranged on the grease injection branch line.

[0006] Furthermore, a grease injection pressure sensor is also provided on the grease injection branch pipeline, and the grease injection pressure sensor is located between the three-position four-way valve and the grease injection hole of the bearing.

[0007] Furthermore, the belt conveyor roller bearing lubrication system also includes a cleaning liquid injection unit, which includes a multi-way diverter B, which is connected to the injection pump through the injection main line, and the multi-way diverter B is connected to each of the three-position four-way valves through the injection branch line; an electric gate valve is arranged at the bottom of the bearing.

[0008] Furthermore, a pressure regulator B and a flow control valve B are also provided on the main injection line, and the pressure regulator B and the flow control valve B are located between the multi-way diverter B and the injection pump.

[0009] Furthermore, an injection hole is provided at the lower part of the side of the bearing, and an exhaust hole is provided at the top of the bearing; the belt conveyor roller bearing lubrication system also includes an inert gas injection unit, and the inert gas injection unit includes a multi-way diverter C, and the multi-way diverter C is connected to the gas injection pump through the gas injection main line, and the multi-way diverter C is connected to each of the gas injection holes through the gas injection branch line.

[0010] Furthermore, a pressure regulator C and a flow controller C are provided on the main gas injection line, and the pressure regulator C and the flow controller C are located between the gas injection pump and the multi-way flow divider C.

[0011] Furthermore, a two-way diverter is provided on the gas injection branch line, and the two-way diverter is arranged between the multi-way diverter C and the corresponding three-position four-way valve. The two-way diverter is connected to the multi-way diverter C, and the two-way diverter is also connected to the corresponding three-position four-way valve and the corresponding gas injection port.

[0012] Furthermore, a gas injection pressure sensor is provided on the gas injection branch pipeline, and the gas injection pressure sensor is located between the two-way flow divider and the gas injection hole.

[0013] Furthermore, the exhaust hole is connected to a gas concentration detection device.

[0014] Furthermore, an overflow groove is provided below the electric gate valve.

[0015] Due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0016] The belt conveyor roller bearing lubrication system includes a grease injection unit, and the grease injection unit includes a multi-way diverter A, which is arranged between the grease injection pump and each bearing, and is connected to the grease injection pump through a grease injection main line, and is connected to each bearing through a grease injection branch line, and a grease injection hole is arranged on the top of the bearing, and the grease injection branch line is connected to the grease injection hole; a pressure regulator A and a flow control valve A are arranged on the grease injection main line, and a three-position four-way valve is arranged on the grease injection branch line. The use of the lubrication system of the present invention to lubricate the roller bearing can ensure good lubrication of the roller bearing, ensure the reliability of the belt conveyor operation, reduce the production cost of the enterprise, and improve the economic benefits of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the process of the belt conveyor roller bearing lubrication system of the present invention;

[0018] In the figure, the solid line represents the pipeline for gas or liquid circulation;

[0019] Dashed lines represent wires;

[0020] Solid arrows indicate the direction of gas or liquid flow;

[0021] The hollow arrows indicate the direction of the electrical signal;

[0022] In the figure, 1, central processing unit; 2, grease storage tank; 3, grease injection pump; 4, pressure regulator A; 5, flow control valve A; 6, multi-way diverter A; 7, two-way diverter A; 8, three-position four-way valve A; 9, grease injection pressure sensor A; 10, bearing A; 11, electric gate valve A; 12, overflow tank A; 13, gas injection pressure sensor A; 14, gas concentration detection device A; 15, liquid storage tank; 16, liquid injection pump; 17, pressure regulator B; 18, flow control valve B; 19, multi-way diverter B; 20, two-way diverter B; 21, three-position four-way Valve B; 22. Grease injection pressure sensor B; 23. Gas concentration detection device B; 24. Bearing B; 25. Electric gate valve B; 26. Overflow tank B; 27. Gas injection pressure sensor B; 28. Gas storage tank; 29. ​​Gas injection pump; 30. Pressure regulator C; 31. Flow control valve C; 32. Multi-way diverter C; 33. Two-way diverter C; 34. Three-position four-way valve C; 35. Grease injection pressure sensor C; 36. Gas concentration detection device C; 37. Bearing C; 38. Electric gate valve C; 39. Overflow tank C; 40. Gas injection pressure sensor C. DETAILED DESCRIPTION

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0024] Combination Figure 1As shown, a belt conveyor roller bearing lubrication system includes a grease injection unit, which includes a multi-way diverter A6. The multi-way diverter A6 is arranged between the grease injection pump 3 and each bearing. The multi-way diverter A6 is connected to the grease injection pump 3 through a grease injection main line. The grease injection pump 3 is also preferably connected to a grease storage tank 2.

[0025] The multi-way flow divider A6 is connected to each bearing through a grease injection branch pipeline. A grease injection hole is provided on the top of the bearing, and the grease injection branch pipeline is connected to the grease injection hole; a pressure regulator A4 and a flow control valve A5 are provided on the grease injection main pipeline, and a three-position four-way valve is provided on the grease injection branch pipeline.

[0026] In this embodiment, three bearings are arranged in parallel, namely bearing A10, bearing B 24, and bearing C 37. Three three-position four-way valves are arranged accordingly, namely three-position four-way valve A 8, three-position four-way valve B 21, and three-position four-way valve C 34. Three grease injection pipelines are arranged, namely grease injection pipeline A, grease injection pipeline B, and grease injection pipeline C.

[0027] Preferably, a grease injection pressure sensor A9 is also provided on the grease injection branch pipeline A, and the grease injection pressure sensor A is located between the three-position four-way valve A8 and the grease injection hole A of the bearing A10. A grease injection pressure sensor B22 is also provided on the grease injection branch pipeline B, and the grease injection pressure sensor B22 is located between the three-position four-way valve B23 and the grease injection hole B of the bearing B24. A grease injection pressure sensor C35 is also provided on the grease injection branch pipeline C, and the grease injection pressure sensor C35 is located between the three-position four-way valve C34 and the grease injection hole C of the bearing C37.

[0028] Preferably, the belt conveyor roller bearing lubrication system also includes a cleaning liquid injection unit, which includes a multi-way diverter B19, which is connected to an injection pump 16 through an injection main line, and the injection pump 16 is preferably connected to a liquid storage tank 15 for storing cleaning liquid.

[0029] The multi-way diverter B19 is connected to each three-position four-way valve A8 through the liquid injection branch pipeline A; the multi-way diverter B19 is connected to each three-position four-way valve B21 through the liquid injection branch pipeline B; the multi-way diverter B19 is connected to each three-position four-way valve C34 through the liquid injection branch pipeline C.

[0030] An electric gate valve A11 is provided at the bottom of the bearing A10; an electric gate valve B25 is provided at the bottom of the bearing B24; and an electric gate valve C38 is provided at the bottom of the bearing C37.

[0031] An overflow groove A12 is provided below the electric gate valve A11; an overflow groove B26 is provided below the electric gate valve B25; and an overflow groove C39 is provided below the electric gate valve C38.

[0032] Preferably, a pressure regulator B17 and a flow control valve B18 are also provided on the main injection line, and the pressure regulator B17 and the flow control valve B18 are located between the multi-way diverter B19 and the injection pump 16 .

[0033] An injection hole A is provided at the lower part of the side of the bearing A10, and an exhaust hole A is provided at the top of the bearing A10; an injection hole B is provided at the lower part of the side of the bearing B 24, and an exhaust hole B is provided at the top of the bearing B 24; an injection hole C is provided at the lower part of the side of the bearing C 37, and an exhaust hole C is provided at the top of the bearing C 37.

[0034] Preferably, the belt conveyor roller bearing lubrication system also includes an inert gas injection unit, which includes a multi-way diverter C 32, and the multi-way diverter C 32 is connected to the gas injection pump 29 through the gas injection main line. The gas injection pump 29 is preferably a pulse gas injection pump, and the gas injection pump 29 is preferably connected to a gas storage tank 28 for storing inert gas.

[0035] A pressure regulator C30 and a flow controller C31 are provided on the main gas injection line. The pressure regulator C30 and the flow controller C31 are located between the gas injection pump 29 and the multi-way flow divider C32.

[0036] The multi-way diverter C 32 is connected to the gas injection hole A of the bearing A10 through the gas injection branch pipeline A; the multi-way diverter C 32 is connected to the gas injection hole B of the bearing B 24 through the gas injection branch pipeline B; the multi-way diverter C 32 is connected to the gas injection hole C of the bearing C 27 through the gas injection branch pipeline C.

[0037] Preferably, a two-way diverter A7 is provided on the gas injection branch pipeline A, and the two-way diverter A7 is arranged between the multi-way diverter C32 and the three-position four-way valve A8. The two-way diverter A7 is connected to the multi-way diverter C32, and the two-way diverter A7 is also connected to the three-position four-way valve A8 and the gas injection port A.

[0038] A two-way flow divider B20 is provided on the gas injection branch pipeline B. The two-way flow divider B20 is arranged between the multi-way flow divider C32 and the three-position four-way valve B21. The two-way flow divider B20 is connected to the multi-way flow divider C32. The two-way flow divider B20 is also connected to the three-position four-way valve B21 and the gas injection port B.

[0039] A two-way flow divider C33 is provided on the gas injection branch pipeline C. The two-way flow divider C33 is arranged between the multi-way flow divider C32 and the three-position four-way valve C34. The two-way flow divider C33 is connected to the multi-way flow divider C32. The two-way flow divider C33 is also connected to the three-position four-way valve C34 and the gas injection port C.

[0040] Further preferably, a gas injection pressure sensor A13 is provided on the gas injection branch pipeline A, and the gas injection pressure sensor A13 is located between the dual-path flow divider A7 and the gas injection hole A.

[0041] A gas injection pressure sensor B 27 is provided on the gas injection branch pipeline B, and the gas injection pressure sensor B 27 is located between the dual-path flow divider B 20 and the gas injection hole B.

[0042] A gas injection pressure sensor C 40 is provided on the gas injection branch pipeline C, and the gas injection pressure sensor C 40 is located between the dual-path flow divider C 33 and the gas injection hole C.

[0043] Preferably, the exhaust hole A is connected to a gas concentration detection device A14; the exhaust hole B is connected to a gas concentration detection device B23; and the exhaust hole C is connected to a gas concentration detection device C36.

[0044] Preferably, the grease injection pump 3, the liquid injection pump 16, the gas injection pump 29, the grease injection pressure sensor A9, the grease injection pressure sensor B22, the grease injection pressure sensor C35, the gas injection pressure sensor A13, the gas injection pressure sensor B27, the gas injection pressure sensor C40, etc. are all electrically connected to the central processing unit 1 through wires. The central processing unit 1 adopts a common structure in the prior art such as an advanced microprocessor or a programmable controller, which will not be described one by one here.

[0045] The inert gas used in this embodiment is argon, carbon dioxide, etc.

[0046] The process of lubricating the roller bearing of the belt conveyor roller bearing lubrication system of the present invention is described in detail as follows:

[0047] The clearance volumes of bearing A 10, bearing B 24, and bearing C 37 are detected in sequence.

[0048] When measuring the void volume of bearing A10, the central processor 1 issues an instruction to measure the void volume of bearing A10, the gas injection pump 29 is started, and the inert gas is pumped out from the gas storage tank 28. The gas pressure is adjusted by the pressure regulator C30, and the flow is controlled by the flow control valve C31. The inert gas is diverted to the gas injection branch pipeline A through the multi-way diverter C32. It enters the gas injection hole A through the two-way diverter A7 and enters the bearing A10. The air inside the bearing A10 is slowly discharged from the exhaust hole A, the inert gas continues to flow in, and then the inert gas is discharged through the exhaust hole A, and the concentration of the discharged inert gas is detected using the gas concentration detection device A14. The gas concentration detection device A14 can use a gas chromatograph to measure the concentration of the inert gas by gas chromatography. When the comparison shows that the inert gas concentration exceeds 90%, it is considered that the bearing A10 is filled with inert gas. The space in the bearing A10 is converted by flow and pressure to determine the amount of grease consumed by the bearing A10 per day. This data is fed back to the central processor 1 through an electrical signal to determine the filling amount and filling cycle of the grease. The gas chromatograph is an outsourced component and belongs to the prior art. Its structure and working principle are common knowledge to those skilled in the art and will not be described in detail here.

[0049] After the measurement is completed, the gas injection pump 29 is turned off under the instruction of the central processor 1.

[0050] When measuring the void volume of bearing B 24, the central processor 1 issues an instruction to measure the void volume of bearing B, the gas injection pump 29 is started, and the inert gas is pumped out from the gas storage tank 28. The gas pressure is adjusted by the pressure regulator C 30, and the flow is controlled by the flow control valve C 31. The inert gas is diverted to the gas injection branch pipe B through the multi-way diverter C32. It enters the gas injection hole B and enters the bearing B 24 by flowing through the two-way diverter B 20. The air inside the bearing B 24 is slowly discharged from the exhaust hole B, the inert gas continues to flow in, and then the inert gas is discharged through the exhaust hole B, and the gas concentration detection device B 23 is used to detect the concentration of the discharged inert gas. The gas concentration detection device B23 can use a gas chromatograph to measure the concentration of the inert gas by gas chromatography. When the comparison shows that the inert gas concentration exceeds 90%, it is considered that the bearing B24 is filled with inert gas. The space in the bearing B24 is converted by flow rate and pressure to determine the amount of grease consumed by the bearing B24 per day. This data is fed back to the central processor 1 through an electrical signal to determine the filling amount and filling cycle of the grease. The gas chromatograph is an outsourced component and belongs to the prior art. Its structure and working principle are common knowledge to those skilled in the art and will not be described in detail here.

[0051] After the measurement is completed, the gas injection pump 29 is turned off under the instruction of the central processor 1.

[0052] When measuring the void volume of the bearing C 37, the central processor 1 issues an instruction to measure the void volume of the bearing C 37, the gas injection pump 29 is started, the inert gas is pumped out from the gas storage tank 28, the gas pressure is adjusted by the pressure regulator C 30, and the flow is controlled by the flow control valve C 31. The inert gas is diverted to the gas injection branch pipeline C through the multi-way diverter C 32. It flows through the two-way diverter C 33 and enters the gas injection hole C and enters the bearing C 37. The air inside the bearing C 37 is slowly discharged from the exhaust hole C, the inert gas continues to flow in, and then the inert gas is discharged through the exhaust hole C, and the gas concentration detection device C 36 is used to detect the concentration of the discharged inert gas. The gas concentration detection device C36 can use a gas chromatograph to measure the concentration of the inert gas by gas chromatography. When the comparison shows that the inert gas concentration exceeds 90%, it is considered that the bearing C37 is filled with inert gas. The space in the bearing C37 is converted by flow rate and pressure to determine the amount of grease consumed by the bearing C37 per day. This data is fed back to the central processor 1 through an electrical signal to determine the filling amount and filling cycle of the grease. The gas chromatograph is an outsourced component and belongs to the prior art. Its structure and working principle are common knowledge to those skilled in the art and will not be described in detail here.

[0053] After the measurement is completed, the gas injection pump 29 is turned off under the instruction of the central processor 1.

[0054] When bearing A10, bearing B24, or bearing C37 needs to be greased, the grease pump only greases one of bearing A10, bearing B24, or bearing C37 at a time.

[0055] When it is necessary to inject grease into bearing A10, the central processor 1 issues a command to inject grease into bearing A10, the grease injection pump 3 starts, extracts grease from the grease storage tank 2, adjusts the injection pressure through the pressure regulator A4, and then quantitatively injects grease through the flow control valve A5. The grease is diverted to the grease injection pipeline A through the multi-way diverter A6, and then flows through the three-position four-way valve A7 and the grease injection pressure sensor A8 into the bearing A10, completing the grease injection of the bearing A10.

[0056] When it is necessary to inject grease into bearing B 24, the central processor 1 issues a command to inject grease into bearing B 24, the grease injection pump 3 starts, extracts grease from the grease storage tank 2, adjusts the injection pressure through the pressure regulator A 4, and then quantitatively injects grease through the flow control valve A 5. The grease is diverted to the grease injection pipeline B through the multi-way diverter A 6, and then flows through the three-position four-way valve B 21 and the grease injection pressure sensor B 22 to enter the bearing B 24, completing the grease injection of the bearing B 24.

[0057] When it is necessary to inject grease into the bearing C37, the central processor 1 issues a command to inject grease into the bearing C37, the grease injection pump 3 starts, extracts grease from the grease storage tank 2, adjusts the injection pressure through the pressure regulator A4, and then quantitatively injects grease through the flow control valve A5. The grease is diverted to the grease injection pipeline C through the multi-way diverter A6, and then flows through the three-position four-way valve C34 and the grease injection pressure sensor C35 to enter the bearing C37, completing the grease injection of the bearing C37.

[0058] The bearing A10, the bearing B24, and the bearing C37 are greased as needed. The bearing A10, the bearing B24, and the bearing C37 are not greased at the same time, but at different times.

[0059] After the belt conveyor has been working for a certain period of time, a large amount of impurities may be mixed in the grease. In order to effectively protect bearing A10, bearing B 24, and bearing C 37 and make bearing A10, bearing B 24, and bearing C 37 work safely and reliably, it is necessary to check whether the grease of bearing A10, bearing B 24, and bearing C 37 needs to be replaced.

[0060] When checking whether the bearing A10 needs to be replaced with grease, open the electric gate valve A11, and the grease overflows to the overflow tank A12. After the grease is taken out, it can be evenly scraped on a clean white cloth. Based on the experience of the staff, observe the impurity particles in the grease or the degree of change in the color of the grease to determine whether the grease in the bearing A10 needs to be replaced. Of course, other conventional methods can also be used to determine whether the grease needs to be replaced, which will not be introduced here one by one.

[0061] When it is determined that bearing A10 contains a large amount of impurities and needs to be cleaned and grease replaced, the central processor 1 issues a command to inject cleaning liquid into bearing A10. The injection pump 16 starts to pump cleaning liquid from the liquid storage tank 15, adjusts the injection pressure through the pressure regulator B17, and then controls the flow through the flow control valve B18. The cleaning liquid is diverted to the injection branch pipeline A through the multi-way diverter B19. Then it passes through the three-position four-way valve A8 and flows through the grease injection pressure sensor A9, enters the bearing A10, and at the same time opens the electric gate valve A11, and the grease and cleaning liquid in the bearing A10 flow into the overflow tank A12.

[0062] After the cleaning of bearing A10 is completed, some cleaning liquid may remain in bearing A10. If it is only evaporated naturally, it will take a long time and be inefficient. If it is not treated, re-adding grease will reduce the viscosity of the grease and fail to play a good lubricating role. At the same time, the corrosion of bearing A10 will increase due to excessive water in the residual cleaning liquid. After the central processor 1 issues an instruction to empty the cleaning liquid, the air injection pump 29 is started, and the inert gas enters the grease injection pipeline A of bearing A10 through the multi-way diverter C 32, the two-way diverter A 7, and the three-position four-way valve A 8, and the cleaning liquid remaining in the grease injection pipeline A and the bearing A10 is discharged, and the inner wall of the grease injection pipeline A and the inside of the bearing A10 are blown dry, thereby ensuring that when the bearing A10 is greased again, the water in the residual cleaning liquid will not affect the consistency of the grease and corrode the bearing A10.

[0063] When checking whether the bearing B 24 needs to be replaced with grease, open the electric gate valve B 25, and the grease overflows into the overflow tank B 26. The grease can be taken out and evenly scraped on a clean white cloth. Based on the experience of the staff, observe the impurity particles in the grease or the degree of change in the color of the grease to determine whether the grease in the bearing B 24 needs to be replaced. Of course, other conventional methods can also be used to determine whether the grease needs to be replaced, which will not be introduced here one by one.

[0064] When it is determined that bearing B 24 contains a large amount of impurities and needs to be cleaned and grease replaced, the central processor 1 issues a command to inject cleaning liquid into bearing B. The injection pump 16 is started to pump cleaning liquid from the liquid storage tank 15, and the injection pressure is adjusted by the pressure regulator B17, and then the flow is controlled by the flow control valve B19. The cleaning liquid is diverted to the injection branch pipeline B through the multi-way diverter B19. Then it passes through the three-position four-way valve B 21 and flows through the grease injection pressure sensor B 22, and enters the bearing B 24. At the same time, the electric gate valve B25 is opened, and the grease and cleaning liquid in the bearing B 24 flow into the overflow tank B 26.

[0065] After the cleaning of bearing B 24 is completed, some cleaning liquid may remain in bearing B 24. If it is only evaporated naturally, it will take a long time and be inefficient. If it is not treated, adding grease again will reduce the viscosity of the grease and fail to play a good lubricating role. At the same time, the corrosion of bearing B 24 will increase due to the excessive water in the residual cleaning liquid. The central processor 1 issues an instruction to empty the cleaning liquid, and the gas injection pump 29 is started to pass the inert gas through the multi-way diverter C 32, the two-way diverter B 20, and the three-position four-way valve B 21 into the grease injection branch pipeline B of bearing B 24, discharge the cleaning liquid remaining in the grease injection branch pipeline B and bearing B 24, and blow dry the inner wall of the grease injection branch pipeline B and the inside of bearing B 24, so as to ensure that when bearing B 24 is greased again, the residual cleaning liquid will not affect the consistency of the grease and corrode bearing B 24.

[0066] When checking whether the bearing C 37 needs to be replaced with grease, open the electric gate valve C 38, and the grease overflows into the overflow tank C 39. After the grease is taken out, it can be evenly scraped on a clean white cloth. Based on the experience of the staff, observe the impurity particles in the grease or the degree of change in the color of the grease to determine whether the grease in the bearing C 37 needs to be replaced. Of course, other conventional methods can also be used to determine whether the grease needs to be replaced, which will not be introduced here one by one.

[0067] When it is determined that bearing C 39 contains a large amount of impurities and needs to be cleaned and grease replaced, the central processor 1 issues a command to inject cleaning liquid into bearing C 27. The injection pump 16 is started to pump cleaning liquid from the liquid storage tank 15, and the injection pressure is adjusted by the pressure regulator B17, and then the flow is controlled by the flow control valve B18. The cleaning liquid is diverted to the injection branch pipeline C through the multi-way diverter B19. Then it passes through the three-position four-way valve C 34 and flows through the grease injection pressure sensor C 35, entering the bearing C 37, and at the same time, the electric gate valve C 38 is opened, and the grease and cleaning liquid in the bearing C 37 flow into the overflow tank C 39.

[0068] After the bearing C37 is cleaned, some cleaning liquid may remain in the bearing C37. If it is only evaporated naturally, it will take a long time and be inefficient. If it is not treated, adding grease again will reduce the viscosity of the grease and fail to play a good lubricating role. At the same time, the excessive water in the residual cleaning liquid will increase the corrosion of the bearing C37. The central processor 1 issues an instruction to empty the cleaning liquid, and the gas injection pump 29 is started to pass the inert gas through the multi-way diverter C32, the two-way diverter C33, and the three-position four-way valve C34 into the grease injection pipeline C of the bearing C37, discharge the cleaning liquid remaining in the grease injection pipeline C and the bearing C37, and blow dry the inner wall of the grease injection pipeline C and the inside of the bearing C37, so as to ensure that when the bearing C37 is greased again, the residual cleaning liquid will not affect the consistency of the grease and corrode the bearing C37.

[0069] After the belt conveyor roller bearing lubrication system of the present invention has been working for a period of time, when the central processor 1 issues a grease injection instruction to the bearing A10, if it is detected that the value of the grease injection pressure sensor A9 increases abnormally, it indicates that the bearing A10 is blocked. At this time, the central processor 1 issues an instruction to start the gas injection pump 29, and the gas opens to the three-position four-way valve A8 when flowing through the two-way diverter A7, and then the inert gas directly passes through the grease injection hole A of the bearing A10 and enters the shaft A10, and the pulse impact is unblocked. If it is detected that the value of the pressure regulator A4 increases abnormally, it indicates that the grease injection main line is blocked. At this time, the inert gas is pumped back to the grease injection branch line A and the grease injection main line through the three-position four-way valve A8, and the grease is pumped back to the grease storage tank 2 through repeated pulse impacts, thereby unblocking the grease injection main line.

[0070] When the central processor 1 issues a grease injection command to the bearing B 24, if the value of the grease injection pressure sensor B 22 is detected to increase abnormally, it means that the bearing B 24 is blocked. At this time, the central processor 1 issues a command to start the gas injection pump 29. When the gas flows through the two-way diverter B 20, it opens to the three-position four-way valve B 21, and then the inert gas directly passes through the grease injection hole B of the bearing B 24 and enters the bearing B 24, and the pulse impact is unblocked. If the value of the pressure regulator A 4 is detected to increase abnormally, it means that the grease injection main line is blocked. At this time, the inert gas is pumped back to the grease injection branch line B and the grease injection main line through the three-position four-way valve B 21, and the grease is pumped back to the grease storage tank 2 through repeated pulse impacts, thereby unblocking the grease injection main line.

[0071] When the central processor 1 issues a grease injection command to the bearing C 37, if the value of the grease injection pressure sensor C 35 is detected to increase abnormally, it means that the bearing C 37 is blocked. At this time, the central processor 1 issues a command to start the gas injection pump 29. When the gas flows through the two-way diverter C 33, it opens to the three-position four-way valve C 34, and then the inert gas directly passes through the grease injection hole C of the bearing C 37 and enters the bearing C 37, and the pulse impact is unblocked. If the value of the pressure regulator A 4 is detected to increase abnormally, it means that the grease injection main line is blocked. At this time, the inert gas is pumped back to the grease injection sub-line C and the grease injection main line through the three-position four-way valve C 34, and the grease is pumped back to the grease storage tank 2 through repeated pulse impacts, thereby unblocking the grease injection main line.

[0072] The technical features named with serial numbers involved in this specification (such as pressure regulator A, flow control valve A, multi-way diverter A, two-way diverter A, three-position four-way valve A, grease injection pressure sensor A, bearing A, electric gate valve A, overflow groove A, gas injection pressure sensor A, gas concentration detection device A, pressure regulator B, flow control valve B, multi-way diverter B, two-way diverter B, three-position four-way valve B, grease injection pressure sensor B, gas concentration detection device B, bearing B, electric gate valve B, overflow groove B, gas injection pressure sensor B, pressure regulator C, flow control valve C, multi-way diverter C, two-way diverter C, three-position four-way valve C, grease injection pressure sensor C, gas concentration detection device C, bearing C, electric gate valve C, overflow groove C, gas injection pressure sensor C, etc.) are only for distinguishing the various technical features and do not represent the positional relationship, installation sequence and working sequence between the various technical features.

[0073] In the description of this specification, it is necessary to understand that the orientations or positional relationships described by “bottom”, “top”, “side”, “below”, etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0074] Although the specific embodiments of the present invention are described above, those skilled in the art should understand that the described embodiments are only some embodiments of the present invention, rather than all embodiments, which are merely examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention and without any creative work, but these changes and modifications all fall within the protection scope of the present invention.

Claims

1. A belt conveyor roller bearing lubrication system, characterized in that: It comprises a grease injection unit, which comprises a multi-way diverter A, which is arranged between a grease injection pump and each bearing, and is connected to the grease injection pump through a grease injection main line, and is connected to each bearing through a grease injection branch line, a grease injection hole is arranged on the top of the bearing, and the grease injection branch line is connected to the grease injection hole; a pressure regulator A and a flow control valve A are arranged on the grease injection main line, and a three-position four-way valve is arranged on the grease injection branch line.

2. The belt conveyor roller bearing lubrication system according to claim 1, characterized in that: The grease injection branch pipeline is also provided with a grease injection pressure sensor, and the grease injection pressure sensor is located between the three-position four-way valve and the grease injection hole of the bearing.

3. The belt conveyor roller bearing lubrication system according to claim 1, characterized in that: The belt conveyor roller bearing lubrication system also includes a cleaning liquid injection unit, which includes a multi-way diverter B. The multi-way diverter B is connected to the injection pump through the injection main line, and the multi-way diverter B is connected to each of the three-position four-way valves through the injection branch line; an electric gate valve is arranged at the bottom of the bearing.

4. The belt conveyor roller bearing lubrication system according to claim 3, characterized in that: The main injection line is also provided with a pressure regulator B and a flow control valve B, and the pressure regulator B and the flow control valve B are located between the multi-way diverter B and the injection pump.

5. The belt conveyor roller bearing lubrication system according to claim 1, characterized in that: An injection hole is provided at the lower part of the side of the bearing, and an exhaust hole is provided at the top of the bearing; the belt conveyor roller bearing lubrication system also includes an inert gas injection unit, and the inert gas injection unit includes a multi-way diverter C, and the multi-way diverter C is connected to the gas injection pump through the gas injection main line, and the multi-way diverter C is connected to each of the gas injection holes through the gas injection branch line.

6. The belt conveyor roller bearing lubrication system according to claim 5, characterized in that: The main gas injection line is provided with a pressure regulator C and a flow controller C, and the pressure regulator C and the flow controller C are located between the gas injection pump and the multi-way flow divider C.

7. The belt conveyor roller bearing lubrication system according to claim 6, characterized in that: A two-way diverter is arranged on the gas injection branch line, and the two-way diverter is arranged between the multi-way diverter C and the corresponding three-position four-way valve. The two-way diverter is connected to the multi-way diverter C, and the two-way diverter is also connected to the corresponding three-position four-way valve and the corresponding gas injection port.

8. The belt conveyor roller bearing lubrication system according to claim 7, characterized in that: The gas injection branch pipeline is provided with a gas injection pressure sensor, and the gas injection pressure sensor is located between the two-way flow divider and the gas injection hole.

9. The belt conveyor roller bearing lubrication system according to claim 8, characterized in that: The exhaust hole is connected to a gas concentration detection device.

10. The belt conveyor roller bearing lubrication system according to claim 3, characterized in that: An overflow groove is arranged below the electric gate valve.