BIM (Building Information Modeling) creation method based on parameterization technology

Through the BIM model creation method based on parameterization technology, combined with a variety of advanced technologies, the problems of low efficiency and insufficient optimization of traditional architectural design methods are solved, and highly customized, intelligent and automated architectural design and construction plan generation are achieved, improving the development of high-quality construction design and construction plans. Design quality and sustainability.

CN119249559AInactive Publication Date: 2025-01-03HANGZHOU BIMU INFORMATION TECHNOLOGY CO LTD
View PDF 0 Cites 10 Cited by

Patent Information

Application Number
CN202411310272.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2025-01-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional architectural design methods have long design cycles, low efficiency, error-prone, difficult to achieve comprehensive optimization, and cannot meet the requirements of modern buildings for performance, quality, cost and sustainability. The traditional BIM model creation method has low customization and design. The rules are complex and the optimization process is not intelligent enough.

Method used

Using the BIM model creation method based on parameterization technology, we can obtain multi-dimensional parameter information of building projects, set parameterization rules, generate parameterized model frameworks, use multi-objective optimization algorithms to make iterative adjustments, realize intelligent model generation and automated updates, and Through simulation verification and automatic generation of construction solutions, combined with the Internet of Things, artificial intelligence, cloud computing, blockchain and digital twin technologies, efficient collaborative design and automated construction are achieved.

Benefits of technology

It has achieved highly customized design, real-time environmental adaptability, intelligent rule optimization, multi-objective optimization, automated model updates and construction plan generation, which has improved design efficiency and quality, reduced costs, and promoted the sustainable development of buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119249559A_ABST
    Figure CN119249559A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building design, and discloses a BIM (Building Information Modeling) creation method based on a parameterization technology, which comprises the following steps: obtaining building project parameters, setting parameterization rules, generating a parameterization model framework, optimizing multi-level parameters, generating an intelligent BIM, verifying and simulating a model and automatically generating a construction scheme. According to the BIM creation method based on the parameterization technology, through collection of multi-dimensional parameter information, intelligent rule optimization, a multi-target optimization algorithm, comprehensive simulation verification and automatic construction scheme generation, high customization, real-time environment adaptability, intelligence and efficient cooperation of building design are achieved. According to the method, the design efficiency and quality are improved, and the optimal performance of the building in the aspects of structure, material, energy efficiency, construction and the like is ensured. Through the application of the block chain technology, the system further guarantees the security and transparency of the data, and guarantees the traceability and consistency of the design process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of architectural design, and in particular to a BIM model creation method based on parameterization technology. Background Art

[0002] With the continuous development of the construction industry, traditional architectural design methods can no longer meet the needs of modern construction projects. Traditional design methods usually rely on the designer's experience and manual drawing, and have problems such as long design cycle, low efficiency, and easy errors. In addition, traditional design methods are difficult to achieve comprehensive optimization of construction projects and cannot meet the requirements of modern buildings for performance, quality, cost and sustainability.

[0003] In order to solve these problems, Building Information Modeling (BIM) technology came into being. BIM technology creates building models in a digital way, realizing the full life cycle management of building design, construction and operation. However, the traditional BIM model creation method still has some limitations, such as low degree of model customization, complex setting of design rules, and insufficient intelligence of optimization process.

[0004] Therefore, a BIM model creation method based on parametric technology is needed, which can achieve highly customized design, real-time environmental adaptability, intelligent rule optimization, multi-objective optimization, automatic model update, efficient collaborative design, comprehensive simulation verification and automatic construction plan generation. This method will help improve the efficiency and quality of architectural design, reduce costs and achieve sustainable development of buildings. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the deficiencies in the prior art, the present invention provides a BIM model creation method based on parametric technology to solve the above problems.

[0007] (II) Technical solution

[0008] To achieve the above object, the present invention provides the following technical solution: a BIM model creation method based on parametric technology, comprising the following steps:

[0009] Step 1: Obtaining construction project parameters: Collect multi-dimensional parameter information of the construction project from design specifications, environmental data, functional requirements and owner requirements, including but not limited to building form, spatial layout, building materials, structural form, climate conditions, energy efficiency standards, etc.;

[0010] Step 2: Parametric rule setting: parametric rules are set based on the requirements of architectural design. The rules establish the association between architectural design parameters through mathematical formulas, geometric relationships, logical conditions, etc.

[0011] Step 3: Generate a parametric model framework: Generate a preliminary framework of a building information model (BIM) according to the set parametric rules, and the framework dynamically responds to changes in input design parameters through predefined geometric and functional components;

[0012] Step 4: Multi-level parameter optimization: Use multi-objective optimization algorithms to iteratively adjust parameters at different levels, including but not limited to geometric structure optimization, material performance optimization, energy consumption optimal path selection, etc., and use automated tools to optimize structural cost, energy efficiency and constructability;

[0013] Step 5: Intelligent BIM model generation: Automatically generate a complete building information model based on the optimized parameters. The model has an automatic adjustment function and can quickly generate different solutions under different design conditions;

[0014] Step 6: Model verification and simulation: Verify the generated BIM model and verify the performance, stability and feasibility of the model through various simulation technologies (such as structural simulation, energy consumption analysis, environmental adaptability testing, etc.) to ensure compliance with building design specifications and industry standards;

[0015] Step 7: Automatic generation of construction plan: Based on the final optimized BIM model, a construction plan including construction drawings, bill of quantities, construction schedule and budget assessment is automatically generated.

[0016] As a preferred technical solution of the present invention, the construction project parameter acquisition step further includes obtaining construction site environmental parameters, such as temperature, humidity, wind speed, etc., in real time through Internet of Things (IoT) sensors for optimizing building design.

[0017] As a preferred technical solution of the present invention, the parameterized rule setting step further includes learning historical data of existing construction projects based on artificial intelligence (AI) to automatically generate preliminary parametric design rules.

[0018] As a preferred technical solution of the present invention, the multi-objective optimization algorithm includes but is not limited to a genetic algorithm, a particle swarm algorithm or a Bayesian optimization algorithm, and multiple factors such as material cost, energy efficiency, construction difficulty and project duration are considered simultaneously during the optimization process.

[0019] As a preferred technical solution of the present invention, the intelligent BIM model generation step includes multi-team collaborative design through a cloud computing-based BIM platform, so that experts from different fields can work together in real time and adjust the model.

[0020] As a preferred technical solution of the present invention, the model verification and simulation steps further include the application of virtual reality (VR) technology to evaluate and verify the interior space of the building through immersive experience.

[0021] As a preferred technical solution of the present invention, the automatic generation step of the construction plan further includes realizing automated and intelligent control of the construction process through the digital twin (Digital Twin) technology of the BIM model and construction machinery.

[0022] As a preferred technical solution of the present invention, the system comprises:

[0023] a. Parametric rule setting module, used to generate parametric design rules according to design requirements;

[0024] b. Model generation module, which generates a preliminary BIM model framework based on the set parametric rules;

[0025] c. Optimization module, which applies multi-objective optimization algorithm to optimize parameters at different levels;

[0026] d. Model verification module, which verifies the performance of the generated BIM model based on a variety of simulation technologies;

[0027] e. Construction automatic generation module, which automatically generates construction plans based on the final model.

[0028] As a preferred technical solution of the present invention, it further includes a cloud-based collaborative design platform that supports parallel optimization and design adjustment by multiple professional teams.

[0029] As a preferred technical solution of the present invention, it further includes blockchain technology for data transmission and sharing to ensure data security and transparency of all participants in the construction project.

[0030] Compared with the prior art, the present invention provides a BIM model creation method based on parametric technology, which has the following beneficial effects:

[0031] Highly customized design:

[0032] By collecting multi-dimensional parameter information and setting parameterized rules, the system can generate highly customized BIM models to meet the needs of different projects. This customization is not only reflected in the building form and spatial layout, but also includes material selection, structural form, energy efficiency standards and other aspects to ensure that each project can get the best design solution.

[0033] Real-time environmental adaptability:

[0034] By collecting environmental parameters of the construction site in real time through IoT sensors, the system can ensure that the building model is highly consistent with the actual environment. This real-time data collection and analysis capability enables architectural design to better adapt to different climates and geographical conditions, improving the adaptability and durability of buildings.

[0035] Intelligent rule optimization:

[0036] By introducing artificial intelligence algorithms, the system can automatically generate and optimize design rules based on historical data, improving the adaptability and accuracy of the rules. This intelligent rule optimization not only reduces the need for manual intervention, but also improves design efficiency and quality, ensuring the optimal combination of building structure, materials and energy efficiency.

[0037] Multi-objective optimization:

[0038] Through multi-objective optimization algorithms, the system is able to optimize in multiple dimensions such as geometry, material selection, energy efficiency, construction feasibility, and maintenance costs. This all-round optimization ensures that the building's performance is optimal in all aspects while reducing overall costs and resource consumption.

[0039] Automatic model updates:

[0040] Intelligent BIM models have automatic adjustment functions. Whenever design parameters change, the model will automatically update the geometry and associated parameters. This automated model update not only improves design efficiency, but also ensures the consistency and accuracy of the design, reducing the possibility of human error.

[0041] Efficient collaborative design:

[0042] Collaborative design based on cloud computing platform supports multiple teams to access and modify models in real time, and all modifications are synchronized in real time. This efficient collaborative design improves the efficiency and accuracy of teamwork and ensures the smooth progress of the design process.

[0043] Comprehensive simulation verification:

[0044] By checking and validating the model using a variety of simulation technologies, the system can ensure that the building's performance meets expectations in terms of structure, energy consumption, and environmental adaptability. This comprehensive simulation verification not only improves the reliability of the design, but also provides an important reference for subsequent construction and operation.

[0045] Automatic construction plan generation:

[0046] The system can automatically generate detailed construction plans based on the final optimized BIM model, including construction drawings, bill of quantities, construction schedule and budget assessment. This automated construction plan generation ensures the accuracy and feasibility of the construction process and improves construction efficiency and quality.

[0047] Data security and transparency:

[0048] Through blockchain technology, the system ensures the security and transparency of design data during multi-party transmission and sharing. This data security guarantee not only prevents data tampering and leakage, but also ensures the traceability of all operations in the design process, improving the transparency and trust of the project.

[0049] The BIM model creation method based on parametric technology achieves high customization, real-time environmental adaptability, intelligence and efficient collaboration of architectural design through the collection of multi-dimensional parameter information, intelligent rule optimization, multi-objective optimization algorithm, comprehensive simulation verification and automated construction plan generation. This method not only improves design efficiency and quality, but also ensures the optimal performance of the building in terms of structure, materials, energy efficiency and construction. Through the application of blockchain technology, the system further guarantees the security and transparency of data and ensures the traceability and consistency of the design process.

[0050] The application of this method not only promotes the digital transformation of the construction industry, but also provides strong technical support for future smart buildings and sustainable development. Through continuous optimization and improvement, this method is expected to become a standard tool in the field of architectural design, driving the construction industry towards a more efficient, smarter and more sustainable direction. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a flow chart of the steps of the present invention;

[0052] Figure 2 It is a schematic diagram of the connection structure of each module of the present invention. DETAILED DESCRIPTION

[0053] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. Obviously, the described embodiments are only part of the embodiments of the invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the invention.

[0054] It should be noted that if the embodiments of the invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0055] In addition, "multiple" means more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by the invention.

[0056] See also Figure 1-2 , a BIM model creation method based on parametric technology.

[0057] Implementation method 1: Acquisition of construction project parameters

[0058] At the project start-up stage, the system obtains multi-dimensional parameter information of the construction project through various channels. These parameters include but are not limited to building form, spatial layout, building materials, structural form, climatic conditions, energy efficiency standards, acoustic performance, light environment requirements, etc. In order to ensure that the building model is highly consistent with the actual environment, the system collects environmental parameters of the construction site in real time through Internet of Things (IoT) sensors, such as temperature, humidity, wind speed and solar radiation. These data not only provide a solid foundation for optimizing building design, but also provide important references for subsequent construction stages to ensure the adaptability of buildings under different climatic and geographical conditions. In addition, the system will also obtain building specifications and regional planning data from relevant government departments to further ensure the legality and compliance of the design.

[0059] Implementation Method 2: Setting of Parameterized Rules

[0060] After collecting complete building project parameters, the system controls the model generation process by setting detailed parametric rules. The rules construct the relationship between design parameters through mathematical formulas, geometric relationships, and logical conditions. For example, the system will automatically set the relationship between building height and structural support system, window area and energy consumption standards, wall materials and sound insulation performance, etc. according to different building requirements.

[0061] In order to further improve the adaptability of the rules, the system introduces artificial intelligence (AI) algorithms to learn based on existing historical data of construction projects. By analyzing these historical data, AI can automatically generate preliminary design rules and continuously optimize these rules according to the specific needs of the project. For example, in the design of complex building structures, the system will learn the stress distribution and load characteristics of similar projects, so as to set reasonable support points and structural forms to ensure the stability and seismic performance of the building.

[0062] Implementation 3: Generate a parameterized model framework

[0063] According to the set parametric rules, the system automatically generates a preliminary framework for the building information model (BIM). This framework is constructed through a combination of parametric geometric components, including basic building elements such as walls, floor slabs, beams, columns, doors and windows. The model framework not only focuses on the appearance of the building, but also covers the functional layout of the interior space and the structural bearing system. For example, the system will automatically allocate appropriate beam and column cross-sectional dimensions according to floor height and load requirements to ensure the safety of the structure. In addition, the model framework also includes reserved locations for infrastructure such as energy systems, ventilation systems, and water supply and drainage systems, so that they can be optimized and adjusted in subsequent designs.

[0064] Implementation 4: Multi-level parameter optimization

[0065] After the initial model is generated, the system optimizes the parameters of each level in the model through multi-objective optimization algorithms. These algorithms include but are not limited to genetic algorithms, particle swarm algorithms, and Bayesian optimization algorithms. The optimization objectives are not only the rationality of the geometric structure, but also multiple factors such as material selection, energy efficiency, construction feasibility, and maintenance cost.

[0066] Structural optimization: By optimizing the geometric structure, the system will select the optimal beam-column arrangement and foundation form to ensure the stability and earthquake resistance of the building, while reducing unnecessary material waste and lowering structural costs.

[0067] Material optimization: For different building parts, the system will select appropriate materials according to the building performance requirements (such as thermal insulation, sound insulation, fire protection, etc.). For example, the exterior wall system will give priority to energy-saving and environmentally friendly thermal insulation materials, while the internal partition wall may pay more attention to sound insulation performance.

[0068] Energy efficiency optimization: The system optimizes the energy consumption path by combining factors such as the building's orientation, window ratio, and exterior wall insulation performance. Through simulation analysis, the system will design the best light and heat environment for the building, thereby achieving the goal of reducing energy consumption.

[0069] Implementation 5: Intelligent BIM model generation

[0070] The BIM model optimized through multi-level parameters has a highly intelligent automatic adjustment function. Whenever the design parameters change, the model will automatically update the geometric structure and associated parameters. For example, when the owner requests to change the building height, the system will not only automatically adjust the floor height, but also recalculate the structural bearing capacity and adjust the size of the columns and beams accordingly. At the same time, the intelligent BIM model can also quickly generate multiple design solutions according to different project stages, helping the design team make better decisions when screening solutions.

[0071] The system is operated on a cloud computing platform and supports multi-team collaborative design. For example, different professional design teams such as architects, structural engineers, and mechanical and electrical engineers can access and modify the model at the same time, and all modifications are synchronized in real time, greatly improving the efficiency and accuracy of collaborative work. In addition, the cloud platform also integrates a building regulations library to ensure that the model automatically complies with relevant regulatory requirements during the design process.

[0072] Implementation 6: Model Verification and Simulation

[0073] After the BIM model is generated, the system verifies and validates the model through a variety of simulation technologies. The simulation content includes:

[0074] Structural simulation: The system simulates the load, stress, deformation, etc. of the building structure through finite element analysis to ensure the safety and stability of the building under various load conditions.

[0075] Energy consumption analysis: Through the energy consumption simulation analysis system, the energy consumption performance of the building under different climatic conditions is simulated to find the most energy-saving design solution and ensure that the building meets high energy efficiency standards.

[0076] Environmental adaptability test: The system evaluates the adaptability and comfort of a building in an actual environment through lighting, ventilation and temperature simulation, ensuring the thermal comfort and light environment quality of the building's interior space.

[0077] At the same time, virtual reality (VR) technology is also used at this stage. Through immersive experience, the design team and the owner can intuitively feel the spatial effect and functional layout of the building, and further verify whether the design meets the needs. For example, through VR experience, the owner can experience the internal traffic line design and sense of space of the building in advance, so as to make modification suggestions and ensure that the final design is more in line with their expectations.

[0078] Implementation method seven: Automatic generation of construction plan

[0079] After the model optimization and verification is completed, the system automatically generates a detailed construction plan based on the final optimized BIM model. The construction plan includes:

[0080] Construction drawings: The system automatically generates accurate floor plans, elevations, sections and detailed node drawings based on the model.

[0081] Bill of Quantities: Automatically generate an accurate bill of materials based on the building materials and components involved in the model to facilitate procurement and cost control.

[0082] Construction schedule: The system automatically generates a construction schedule based on the various components of the model, optimizes the construction process, and avoids process conflicts.

[0083] Budget Assessment: Automatically generate budget estimates based on the bill of quantities and current market prices to help owners better control project funds.

[0084] In addition, the BIM model is combined with the digital twin technology of construction machinery, and the system can realize the automation and intelligent control of the construction process. For example, mechanical equipment such as excavators and cranes can automatically complete the corresponding construction operations according to the instructions of the digital twin model, which greatly improves the construction efficiency and accuracy and reduces the errors that may be caused by human operation.

[0085] Implementation 8: System module construction and function description

[0086] The system relies on multiple core modules, including:

[0087] Parametric rule setting module: used to generate association rules between design parameters according to project requirements.

[0088] Model generation module: Generates a preliminary BIM model framework through parametric rules, with highly flexible geometric and functional components.

[0089] Optimization module: Apply multi-objective optimization algorithms to comprehensively optimize parameters at different levels to ensure the optimal combination of materials, structure and energy efficiency.

[0090] Model verification module: Use a variety of simulation technologies to test the performance of the model, including structural simulation, energy consumption analysis and environmental adaptability testing.

[0091] Automatic construction generation module: automatically generates a complete construction plan based on the final model to ensure the accuracy and feasibility of the plan.

[0092] Implementation Method 9: Cloud Collaborative Design and Data Security

[0093] The system uses a cloud-based collaborative design platform to enable experts and design teams from different fields to participate in the design, optimization and adjustment of models in real time. The platform has high concurrent processing capabilities and can support multiple users to operate simultaneously, improving design efficiency. In order to ensure the security of project data, the system introduces blockchain technology to ensure the security and transparency of design data during multi-party transmission and sharing, and prevent data tampering and leakage.

[0094] Implementation Method 10: Data Sharing and Information Transparency

[0095] The application of blockchain technology ensures the data security of project participants. The system will record every design modification and parameter optimization to ensure that all operations in the design process are traceable, and ensure efficient and secure data transmission between different parties through smart contracts. At the same time, the system provides the data information required by all parties to ensure the transparency and consistency of information flow from concept to implementation of architectural design.

[0096] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0097] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0098] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A BIM model creation method based on parametric technology, characterized by: The following steps are involved: Step 1: Obtaining construction project parameters: Collect multi-dimensional parameter information of the construction project from design specifications, environmental data, functional requirements and owner requirements, including but not limited to building form, spatial layout, building materials, structural form, climate conditions, energy efficiency standards, etc.; Step 2: Parametric rule setting: parametric rules are set based on the requirements of architectural design. The rules establish the association between architectural design parameters through mathematical formulas, geometric relationships, logical conditions, etc. Step 3: Generate a parametric model framework: Generate a preliminary framework of a building information model (BIM) according to the set parametric rules, and the framework dynamically responds to changes in input design parameters through predefined geometric and functional components; Step 4: Multi-level parameter optimization: Use multi-objective optimization algorithms to iteratively adjust parameters at different levels, including but not limited to geometric structure optimization, material performance optimization, energy consumption optimal path selection, etc., and use automated tools to optimize structural cost, energy efficiency and constructability; Step 5: Intelligent BIM model generation: Automatically generate a complete building information model based on the optimized parameters. The model has an automatic adjustment function and can quickly generate different solutions under different design conditions; Step 6: Model verification and simulation: Verify the generated BIM model and verify the performance, stability and feasibility of the model through various simulation technologies (such as structural simulation, energy consumption analysis, environmental adaptability testing, etc.) to ensure compliance with building design specifications and industry standards; Step 7: Automatic generation of construction plan: Based on the final optimized BIM model, a construction plan including construction drawings, bill of quantities, construction schedule and budget assessment is automatically generated.

2. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The construction project parameter acquisition step further includes acquiring construction site environmental parameters, such as temperature, humidity, wind speed, etc., in real time through Internet of Things (IoT) sensors for optimizing building design.

3. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The parametric rule setting step further includes automatically generating preliminary parametric design rules based on artificial intelligence (AI) learning historical data of existing construction projects.

4. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The multi-objective optimization algorithm includes but is not limited to a genetic algorithm, a particle swarm algorithm or a Bayesian optimization algorithm, and multiple factors such as material cost, energy efficiency, construction difficulty and project duration are considered simultaneously during the optimization process.

5. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The intelligent BIM model generation step includes multi-team collaborative design through a cloud computing-based BIM platform, so that experts from different fields can work together in real time and adjust the model.

6. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The model verification and simulation steps further include the application of virtual reality (VR) technology to evaluate and verify the interior space of the building through immersive experience.

7. The BIM model creation method based on parametric technology according to claim 1, characterized in that: The automatic generation step of the construction plan further includes realizing automation and intelligent control of the construction process through the digital twin technology of the BIM model and construction machinery.

8. A BIM model creation method based on parametric technology, characterized by: The system comprises: a. Parametric rule setting module, used to generate parametric design rules according to design requirements; b. Model generation module, which generates a preliminary BIM model framework based on the set parametric rules; c. Optimization module, which applies multi-objective optimization algorithm to optimize parameters at different levels; d. Model verification module, which verifies the performance of the generated BIM model based on a variety of simulation technologies; e. Construction automatic generation module, which automatically generates construction plans based on the final model.

9. The system of the BIM model creation method based on parametric technology according to claim 8, characterized in that: It further includes a cloud-based collaborative design platform that supports parallel optimization and design adjustments by multi-professional teams.

10. The system of the BIM model creation method based on parametric technology according to claim 8, characterized in that: It further includes blockchain technology for data transmission and sharing to ensure data security and transparency for all parties involved in the construction project.

Citation Information

Cited By

  • Fabricated steel structure building house type intelligent simulation management platform

    CN120125118A

  • Indoor optimization design method and system based on BIM

    CN120277772A

  • Green intelligent building multi-factor fusion planning design method

    CN120408812A

  • Bridge model intelligent construction method and system based on BIM

    CN120671480A

  • Intelligent construction method and system for bridge model based on BIM

    CN120671480B