Project experience management method, device and equipment for rail transit and medium
Through the reporting, summary and evaluation management of project experience, the problem of low experience management efficiency in rail transit projects has been solved, knowledge accumulation and management skills have been improved, and the construction of learning organizations and corporate management efficiency has been promoted.
Patent Information
- Application Number
- CN202411405616.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2025-01-03
AI Technical Summary
In rail transit projects, the management efficiency of project experience is low, which makes it difficult to find and utilize, affecting the work efficiency and results of the enterprise.
Through project experience reporting, summary, review and storage management, we can realize the process of knowledge throughout the life cycle, use the creation object to determine the project experience reporting file, and classify and review documents based on the summary type and review standard hierarchy structure to ensure efficient management .
It has improved knowledge accumulation and management skills, promoted the construction of a learning organization, and improved the overall management efficiency of the enterprise.
Smart Images

Figure CN119250748A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of vehicle project management, and provides a method, device, equipment and medium for project experience management of rail transit. Background Art
[0002] During the research process of rail vehicles, whether it is rail vehicle production, sales or after-sales, it will be formulated and implemented as a project. For this reason, project experience refers to the practical experience and skills accumulated in a specific project. This experience can help individuals and companies better cope with challenges in future projects, improve work efficiency, and achieve better results.
[0003] Therefore, project experience is a kind of wealth that needs to be managed effectively. In the actual management process, if project experience is only stored in folders or files in the terminal, it will be difficult to find in the terminal as personnel move around. Even if it is found, folders or files will be searched in the terminal, which takes a lot of time and effort, and the efficiency of obtaining information is very low. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a project experience management method, device, equipment and medium for rail transit.
[0005] The present invention provides a rail transit project experience management method, comprising: Acquire a creation object corresponding to the project experience, and determine a project experience submission file for the project experience according to the creation object; All project experience submission files are aggregated into multiple file groups based on the aggregation type, and the multiple file groups include file groups in normal status; Based on the hierarchical structure of review standards, the project experience submission documents in the file group that are in normal status are reviewed to determine the project experience submission documents that can be included in the database.
[0006] According to an embodiment of the present invention, the project experience submission file for determining the project experience according to the creation object includes: Determine a data source corresponding to the project experience, and call a data interface corresponding to the data source to obtain an initial file from the data source; Determine the project experience submission interface corresponding to the project experience; In response to a collection operation of creating an object in the project experience submission interface, based on a data structure of the created object, obtaining submission information from the initial file; In response to an upload operation of a file upload item in the project experience submission interface, a submission item is generated based on the submission information, and a binding relationship between the submission item and the initial file is established; the submission item and the initial file are configured as a project experience submission file.
[0007] According to one embodiment of the present invention, the method further includes: When it is determined that there is a creation object in the project experience submission interface that is not configured with submission information, in response to an input operation of the creation object in the project experience submission interface, the submission information is obtained based on the data structure of the creation object and based on the input information.
[0008] According to an embodiment of the present invention, the step of aggregating all project experience submission files into multiple file groups based on the summary type includes: Get the project experience summary interface that displays all project experience submission files; In response to the processing operation of the summary processing item in the project experience summary interface, based on the summary strategy of each summary processing item, the project experience summary interface is divided into regions, region identifiers are configured for the divided regions, and corresponding project experience submission files are displayed in the divided regions; wherein the region identifiers include normal and abnormal; and the project experience submission files displayed in each region constitute a file group; In response to the modification operation of the summary modification item in the project experience summary interface, a modification notification is issued to the reporting terminal corresponding to the project experience reporting file in the abnormal area, and after determining that the modified project experience reporting file is normal within a preset time, the modified project experience reporting file is transferred into the normal area; if it is determined that the modified project experience reporting file is not received within the preset time, the corresponding project experience reporting file in the abnormal area is cleared; In response to the reporting operation of the review report item in the project experience summary interface, a review entry is generated based on the project experience submission file in the normal area, and a binding relationship between the review entry and the initial file is established; the review entry and the initial file are configured as the project experience submission file to be reviewed.
[0009] According to an embodiment of the present invention, the review criteria hierarchical structure includes expert review criteria and non-expert review criteria. Accordingly, based on the review criteria hierarchical structure, the project experience submission files in the file group in a normal state are reviewed to determine the project experience submission files that can be stored, including: In response to the review operation of the review item in the project experience review interface, obtain the calculation strategy corresponding to each level of the non-expert review standard in the review standard hierarchy structure, and send a review notification to the review terminal; Based on the calculation strategies corresponding to each level of the non-expert review criteria in the review criteria hierarchy structure, score the project experience submission document to be reviewed and generate a first scoring result; Acquire the review information sent by the review terminal, and perform scoring calculation on the project experience submission file to be reviewed based on the calculation strategy corresponding to the expert review standard to generate a second scoring result; Generate a scoring result based on the first scoring result and the second scoring result; Generate a storage entry based on the scoring result and the project experience submission file, and establish a binding relationship between the storage entry and the initial file; configure the storage entry and the initial file as a project experience file that can be stored.
[0010] According to one embodiment of the present invention, the method further includes: The authority information of the review terminal is obtained, and when it is determined that the authority information meets the authority condition, a review notification is sent to the review terminal.
[0011] According to one embodiment of the present invention, the method further includes: The project information applied for by the declaration terminal is obtained, a project experience file matching the project information is extracted from a database, and the project experience file is pushed to the declaration terminal.
[0012] The present invention also provides a project experience management device for rail transit, comprising: An acquisition module, used for acquiring a creation object corresponding to the project experience, and determining a project experience submission file of the project experience according to the creation object; A summary module is used to summarize all project experience submission files into multiple file groups based on the summary type, and the multiple file groups include file groups in a normal state; The review module is used to review the project experience submission files in the file group in normal status based on the review standard hierarchical structure, and determine the project experience submission files that can be stored.
[0013] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the project experience management method for rail transit as described above is implemented.
[0014] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for project experience management of rail transit as described above is implemented.
[0015] The present invention also provides a computer program product, including a computer program, which, when executed by a processor, implements the above-mentioned project experience management method for rail transit.
[0016] The above one or more technical solutions in the embodiments of the present invention have at least one of the following technical effects: The present invention realizes the management of the entire knowledge life cycle process through the management of project experience submission, project experience summary, project experience review and warehousing, realizes the accumulation and sedimentation of knowledge, improves the demand for management skills, promotes the construction of a learning organization, and improves the comprehensive management efficiency of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a flow chart of the project experience management method for rail transit provided by the present invention.
[0019] Figure 2 It is a structural schematic diagram of the project experience management device for rail transit provided by the present invention.
[0020] Figure 3 It is a structural diagram of the project experience management system for rail transit provided by the present invention.
[0021] Figure 4 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0022] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0023] Combine the following Figure 1-Figure 4 The present invention describes a rail transit project experience management system, terminal and method.
[0024] Figure 1 A schematic diagram showing the process flow of the rail transit project experience management method provided by the present invention is shown in FIG. Figure 1 , the method comprises the following steps: Step 11: Obtain a creation object corresponding to the project experience, and determine a project experience submission file for the project experience based on the creation object.
[0025] Step 12: All project experience submission files are summarized into multiple file groups based on the summary type, and the multiple file groups include a file group in a normal state.
[0026] Step 13: Based on the hierarchical structure of review standards, review the project experience submission documents in the file group that are in normal status and determine the project experience submission documents that can be stored.
[0027] In this regard, it should be noted that during the research process of rail vehicles, whether it is rail vehicle production, sales or after-sales, it will be formulated and implemented as a project. Therefore, project experience refers to the practical experience and skills accumulated in a specific project. These experiences can help individuals and companies better cope with challenges, improve work efficiency and achieve better results in future projects.
[0028] Therefore, project experience is a kind of wealth that needs to be managed effectively. In the actual management process, if project experience is only stored in folders or files in the terminal, it will be difficult to find in the terminal as personnel move around. Even if it is searched, folders or files will be searched in the terminal, which takes a lot of time and effort, and the efficiency of obtaining information is very low.
[0029] To this end, the present invention provides a project experience management method for rail transit, which realizes the management of the entire knowledge life cycle process through project experience submission, project experience summary, project experience review and warehousing management, realizes knowledge accumulation and sedimentation, improves management skills, promotes the construction of a learning organization, and enhances the comprehensive management efficiency of the enterprise.
[0030] In the present invention, first, the person involved in the project needs to log in to the interface of the project experience management system on the terminal, and determine the creation object corresponding to the project experience on the interface. The creation object here can collect information that conforms to the project experience. For example, the creation object can be an input box, a remark area, a selection box, etc.
[0031] In the present invention, project experience can be summarized into a data file, or it can be composed of multiple data contents. For this reason, the project experience submission file that uses the creation object to determine the project experience is equivalent to extracting the basic information of the project experience (as the submission information) and the file itself. Therefore, it is configured that the project experience submission file includes submission information and files. As basic information to characterize project experience, the submission information may include project name, project type, project leader, project members, project description, experience description and other contents, which are not described one by one here. After the file is submitted, it will be temporarily stored in the memory of the terminal to wait for the final judgment whether it will be stored in the database. At this time, a binding relationship will be established between the file and the submission information, which will be connected to the memory by the system's docking interface to facilitate the retrieval of the file.
[0032] In the present invention, the project experience submission files obtained include normal files and abnormal files. Normal files are qualified files. Abnormal files are unqualified files, such as incomplete data, mismatched data, duplicate files, etc.
[0033] Therefore, the present invention needs to summarize all project experience submission files based on the summary type, so as to summarize all project experience submission files into multiple file groups. It should be noted that the summary type is used as a standard for dividing the file groups. If the summary type is incomplete data, the divided file groups contain project experience submission files with incomplete data.
[0034] After the files are aggregated, the multiple file groups obtained can generally include a file group in a normal state and a file group in an abnormal state. In the present invention, the normal files and abnormal files can be divided more finely to generate more file groups.
[0035] In the present invention, the project experience submission files in the file group in the normal state among the multiple file groups will be subsequently reviewed to determine which files can be stored in the database as future reference files.
[0036] In the present invention, there are many types of projects involved in rail transit, such as vehicle manufacturing, vehicle operation, etc. Different projects may succeed or fail during the design process. For this reason, the project will generate design experience, which can be regarded as project experience. However, project experience can be used as a reference or not, and can be used a lot or a little. For this reason, it is necessary to review the project experience submission documents to determine which project experience documents can be stored in the database.
[0037] To review the project experience submission document, it is necessary to consider multiple aspects, such as the participation of the writer of the project experience submission document in the project, because only with more participation can the design of the project be better understood and the experience of practical value be obtained. For example, the investment in the project, if too much investment is made, it will have an impact on other projects in the department. For example, the fit between the project and the actual situation, because the project that is out of touch with the actual situation has little significance. They are not listed one by one here. However, there are loopholes in simply relying on statistical technical information to review project experience, because the design of the project is ahead of time, and it may have practical significance in expert evaluation. For this reason, the results of expert review need to be considered. In the present invention, the review aspects cited above can be used as review criteria. Accordingly, the relevance of each standard can be reflected. For this reason, based on the preset review criteria, a hierarchical structure of review criteria can be constructed, and the project experience submission documents in the file group in a normal state are reviewed with detailed review criteria and the relationship between review criteria, so that the review results can better express the factual evaluation of the project experience submission documents, and the project experience submission documents that can be stored are determined by the factual review results.
[0038] The rail transit project experience management method provided by the present invention realizes the management of the entire knowledge life cycle process through the management of project experience submission, project experience summary, project experience review and warehousing, realizes the accumulation and sedimentation of knowledge, improves the demand for management skills, promotes the construction of a learning organization, and improves the comprehensive management efficiency of the enterprise.
[0039] In a further method of the above method, the processing process of the project experience submission file for determining the project experience according to the creation object is mainly explained as follows: Determine the data source corresponding to the project experience, and call the data interface corresponding to the data source to obtain the initial file from the data source; Determine the project experience submission interface corresponding to the project experience; In response to the collection operation of creating an object in the project experience submission interface, based on the data structure of the created object, the submission information is obtained from the initial file; In response to the upload operation of the file upload item in the project experience submission interface, a submission item is generated based on the submission information, and a binding relationship between the submission item and the initial file is established; the submission item and the initial file are configured as a project experience submission file.
[0040] In this regard, it should be noted that the writer of the project experience submission document will write a project experience document based on the file format of the project experience. The file will be stored on the submission terminal used by the writer. At this time, the data source is the submission terminal. Therefore, the data interface corresponding to the data source is called to obtain the initial file from the data source. The initial file is a file initially written by the writer.
[0041] During the process of extracting project experience, the system configures a processing interface, namely the project experience submission interface. A large number of creation objects will be configured on the project experience submission interface. Different business experiences may configure different project experience submission interfaces.
[0042] In response to the collection operation of the creation object in the project experience submission interface, based on the data structure of the creation object, the submission information is obtained from the initial file. Different creation objects are configured with different data formats. For example, if the data structure of the project code is in digital format, the input text content cannot satisfy the data structure.
[0043] To obtain the submission information from the initial file, the content on the initial file can be analyzed to analyze the content that can correspond to the created object. However, there are some created objects on the interface that cannot be analyzed to have appropriate content. Therefore, when it is determined that there are created objects that are not configured with submission information in the project experience submission interface, the input operation of the created object in the project experience submission interface is responded to, and the submission information is obtained based on the data structure of the created object and the input information. In other words, content can be entered on the created object, and the system responds to the input content to obtain the submission information.
[0044] In response to the upload operation of the file upload item in the project experience submission interface, a submission item is generated based on the submission information, and a binding relationship between the submission item and the initial file is established; the submission item and the initial file are configured as a project experience submission file. Only basic information can be displayed for project experience on the system interface, so submission items are generated based on the submission information, and each submission item represents a project experience file. A binding relationship between the submission item and the initial file is established to facilitate viewing the project experience file corresponding to the submission item, and the file can be called based on the binding relationship. If a button such as "View" is set on the submission item, the button can be triggered to view the specific project experience submission file.
[0045] A further method of the present invention can provide a comprehensive report on project experience and ensure the integrity of the project experience report document.
[0046] In a further method of the above method, the process of aggregating all project experience submission files into multiple file groups based on the aggregation type is mainly explained as follows: Get the project experience summary interface that displays all project experience submission files.
[0047] In response to the processing operations of the summary processing items in the project experience summary interface, the project experience summary interface is divided into areas based on the summary strategies of the various summary processing items, area identifiers are configured for the divided areas, and corresponding project experience submission files are displayed in the divided areas; wherein the area identifiers include normal and abnormal; the project experience submission files displayed in each area constitute a file group.
[0048] In response to the modification operation of the summary modification items in the project experience summary interface, a modification notification is sent to the submission terminal corresponding to the project experience submission file in the abnormal area, and after determining that the modified project experience submission file is normal within a preset time, the modified project experience submission file is transferred into the normal area; if it is determined that the modified project experience submission file has not been received within the preset time, the corresponding project experience submission file in the abnormal area will be cleared.
[0049] In response to the reporting operation of the review report item in the project experience summary interface, a review entry is generated based on the project experience submission file in the normal area, and a binding relationship between the review entry and the initial file is established; the review entry and the initial file are configured as the project experience submission file to be reviewed.
[0050] In this regard, it should be noted that the project experience submission files obtained include normal files and abnormal files. Normal files are qualified files. Abnormal files are unqualified files, such as incomplete data, mismatched data, duplicate files, etc.
[0051] Therefore, the present invention needs to summarize all project experience submission files based on the summary type, so as to summarize all project experience submission files into multiple file groups.
[0052] After the files are aggregated, the multiple file groups obtained can generally include a file group in a normal state and a file group in an abnormal state. In the present invention, the normal files and abnormal files can be divided more finely to generate more file groups.
[0053] The system configures a processing interface, namely the project experience summary interface. In response to the processing operation of the summary processing items in the project experience summary interface, the project experience summary interface is divided into regions based on the summary strategy of each summary processing item, and region identifiers are configured for the divided regions, and the corresponding project experience submission files are displayed in the divided regions.
[0054] In the present invention, the project experience submission files in the abnormal area are allowed to be modified and improved. Therefore, in response to the modification operation of the summary modification items in the project experience summary interface, a modification notification is sent to the submission terminal corresponding to the project experience submission file in the abnormal area, so that the submitting user can modify and improve the project experience submission file at the submission terminal.
[0055] After confirming that the modified project experience submission document is normal within the preset time, the modified project experience submission document will be transferred into the normal area.
[0056] Determine within a preset time that no modified project experience submission files have been received, and clear the corresponding project experience submission files in the abnormal area.
[0057] In response to the reporting operation of the review report item in the project experience summary interface, a review entry is generated based on the project experience submission file in the normal area, and a binding relationship between the review entry and the initial file is established; the review entry and the initial file are configured as the project experience submission file to be reviewed.
[0058] A further method of the present invention can reasonably divide the project experience files, making it easier to improve the project experience and correctly upload it for review, thereby achieving convenient file management.
[0059] In a further method of the above method, the process of reviewing the project experience submission files in the file group in a normal state based on the hierarchical structure of the review criteria and determining the project experience submission files that can be stored in the database is explained as follows: In response to the review operation of the review item in the project experience review interface, the calculation strategy corresponding to each level of the non-expert review standard in the review standard hierarchy structure is obtained, and a review notification is sent to the review terminal.
[0060] Based on the calculation strategies corresponding to each level of the non-expert review criteria in the review criteria hierarchy, a score calculation is performed on the project experience submission document to be reviewed to generate a first score result.
[0061] The review information sent by the review terminal is obtained, and based on the calculation strategy corresponding to the expert review standard, the project experience submission file to be reviewed is scored and calculated to generate a second scoring result.
[0062] Based on the first scoring result and the second scoring result, a scoring result is generated.
[0063] Generate inventory entries based on the scoring results and project experience submission files, and establish a binding relationship between the inventory entries and the initial files; configure the inventory entries and initial files as project experience files that can be stored.
[0064] In this regard, it should be noted that, in the present invention, the evaluation criteria hierarchy structure includes expert evaluation criteria and non-expert evaluation criteria.
[0065] Non-expert review criteria include the participation of the author of the project experience submission document in the project, because only with more participation can one have a better understanding of the project design and gain practical experience. For example, the investment in the project. Too much investment will affect other projects in the department. For example, the fit between the project and the actual situation, because a project that is out of touch with the actual situation has little significance. I will not list them all here.
[0066] In the present invention, the above-mentioned evaluation aspects can be used as evaluation criteria. Accordingly, the relevance of various criteria can be reflected. Therefore, based on the preset evaluation criteria, an evaluation criteria hierarchical structure can be constructed to detail the evaluation criteria and the relevance between the evaluation criteria.
[0067] Based on the calculation strategies corresponding to each level of the non-expert review criteria in the hierarchical structure of the review criteria, the project experience submission documents to be reviewed are scored and calculated to generate the first scoring result. Different levels can be configured with different calculation strategies. Different weights for different levels will also configure an overall calculation strategy suitable for all levels.
[0068] The review information sent by the review terminal is obtained, and based on the calculation strategy corresponding to the expert review standard, the project experience submission file to be reviewed is scored and calculated to generate the second scoring result. Different expert reviews have different weights, and an overall calculation strategy suitable for all expert scores will be configured.
[0069] Based on the first scoring result and the second scoring result, a scoring result is generated.
[0070] Generate entry based on the scoring results and project experience submission files, and establish a binding relationship between the entry and the initial file. Configure the entry and initial file as project experience files that can be stored.
[0071] In addition, in response to the storage operation of the storage item in the project experience storage interface, the project experience file corresponding to the storage item in the project experience storage interface is stored in the storage.
[0072] It should be noted that when the scoring result represented by the entry meets the entry condition, the corresponding entry operation can be triggered to store the project experience file in the warehouse. The entry condition here can be that the score exceeds a preset value.
[0073] A further method of the present invention reviews the project experience submission documents in a file group in a normal state by using detailed review criteria and the relationship between the review criteria, so that the review results can better express the factual evaluation of the project experience submission documents and can make the stored documents have practical significance.
[0074] In order to reflect the principle of fairness, an expert avoidance algorithm is designed to ensure that experts related to project experience cannot evaluate the corresponding project experience. Therefore, the authority information of the review terminal is obtained, and when it is determined that the authority information meets the authority conditions, a review notification is sent to the review terminal.
[0075] The present invention realizes functions such as intelligent push of project experience through the knowledge and experience intelligent push algorithm, forms a virtuous cycle of knowledge summarization, knowledge sharing, and knowledge application value-added, satisfies users' needs for active learning, knowledge acquisition, and management skills improvement, promotes the construction of learning organizations, and improves the comprehensive management efficiency of enterprises. To this end, the project information applied by the declaration terminal is obtained, the project experience file matching the project information is extracted, and the project experience file is pushed to the declaration terminal.
[0076] If the "business unit", "vehicle type" and "project stage" of the project that the terminal currently logged in by the user (project manager) is responsible for completely matches the "business unit", "vehicle type" and "project stage" data in the project experience library, the system automatically searches from the project experience library and pushes the search results to the terminal currently logged in by the user (project manager) in the form of a message.
[0077] In a further method of the above method, different project experiences may have certain risks in different scenarios. Therefore, when facing a new execution scenario, it may be necessary to judge the estimation of certain risks. To this end, the target risk information sent by the retrieval terminal is obtained, the risk index of each project experience file is estimated, and the risk items corresponding to each project experience file are generated and displayed based on the risk index.
[0078] For example, when the current user (project manager) adds a new risk, the system automatically retrieves the risks of all projects in the system based on the "Risk Nature" (exact match), "Project Risk Description" (fuzzy match), and "Risk Impact Quantitative Assessment" (fuzzy match), and pops up an experience list. The user can view it by clicking the "Details" button.
[0079] According to the words in "Project Risk Description" and "Risk Impact Quantitative Evaluation", the words are split and matched after the split. When 3 word segments are matched successfully, the search results will be displayed. For example, if "complex environment and bad climate" is filled in "Project Risk Description", the system will split it into "environment", "complex", "climate", "bad" and other word segments. When the "Project Risk Description" in the risk library contains the content "complex geographical environment, demanding climate (high temperature, wind and sand protection), and the risk of paint peeling and discoloration of the car body and bogie", the search results will be displayed.
[0080] The system of the present invention promotes the creation of a management platform for knowledge accumulation, sharing, application and empowerment, and improves the full life cycle management mechanism of project knowledge. Through the application of the present invention, combined with corporate management and cultural atmosphere, a unified project knowledge management and sharing platform for the enterprise is shaped to form the core intangible assets of the enterprise. Under the various incentive systems supporting the present invention, employees are encouraged to actively accumulate, summarize, and share knowledge, promote the formation of a good sharing and communication environment, and promote the construction of a learning organization. After the project knowledge is effectively precipitated through this platform, employees will have more channels to learn and apply project knowledge, ultimately enabling employees to grow in learning and sharing, providing the company with continuous competitiveness.
[0081] Figure 2 The schematic diagram of the structure of the project experience management device for rail transit provided by the present invention is shown in FIG. Figure 2 The device comprises an acquisition module 21, a summary module 22 and a review module 23, wherein: An acquisition module is used to acquire a creation object corresponding to the project experience and determine a project experience submission file of the project experience according to the creation object; A summary module is used to summarize all project experience submission files into multiple file groups based on the summary type, and the multiple file groups include file groups in a normal state; The review module is used to review the project experience submission files in the file group in normal status based on the review standard hierarchical structure, and determine the project experience submission files that can be stored.
[0082] Since the principle of the device of the embodiment of the present invention is the same as that of the method of the above embodiment, a more detailed explanation is omitted here.
[0083] It should be noted that, in the embodiments of the present invention, relevant functional modules may be implemented by a hardware processor.
[0084] The rail transit project experience management device provided by the present invention realizes the management of the entire knowledge life cycle process through the management of project experience submission, project experience summary, project experience review and warehousing, realizes the accumulation and sedimentation of knowledge, improves the needs of management skills, promotes the construction of a learning organization, and improves the comprehensive management efficiency of the enterprise.
[0085] Figure 3 The schematic diagram of the structure of the project experience management system for rail transit provided by the present invention is shown in FIG. Figure 3 The system includes a project experience submission module 31, a project experience summary module 32, a project experience review module 33 and a project experience storage module 34, wherein: The project experience submission module is used to obtain the creation object corresponding to the project experience and determine the project experience submission file of the project experience according to the creation object.
[0086] The project experience summary module is used to summarize all project experience submission files into multiple file groups based on the summary type, and the multiple file groups include file groups in a normal state.
[0087] The project experience review module is used to review the project experience submission files in the file group in normal status based on the review standard hierarchical structure, and determine the project experience submission files that can be stored in the database.
[0088] The project experience storage module is used to store project experience submission documents that have passed the review.
[0089] Since the system of the embodiment of the present invention has the same principle as the method of the above embodiment, a more detailed explanation will not be repeated here.
[0090] It should be noted that, in the embodiments of the present invention, relevant functional modules may be implemented by a hardware processor.
[0091] The rail transit project experience management system provided by the present invention realizes the management of the entire knowledge life cycle process through the management of project experience submission, project experience summary, project experience review and warehousing, realizes the accumulation and sedimentation of knowledge, improves the needs of management skills, promotes the construction of a learning organization, and improves the comprehensive management efficiency of the enterprise.
[0092] Figure 4 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 41 (processor), a communication interface 42 (Communications Interface), a memory 43 (memory) and a communication bus 44, wherein the processor 41, the communication interface 42, and the memory 43 communicate with each other through the communication bus 44. The processor 41 can call the logic instructions in the memory 43 to execute the project experience management method of rail transit, the method comprising: obtaining a creation object corresponding to the project experience, and determining the project experience submission file of the project experience according to the creation object; summarizing all the project experience submission files into multiple file groups based on the summary type, and the multiple file groups include a file group in a normal state; based on the review standard hierarchical structure, reviewing the project experience submission files in the file group in a normal state, and determining the project experience submission files that can be stored.
[0093] In addition, the logic instructions in the above-mentioned memory 43 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0094] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the project experience management method for rail transit provided by the above-mentioned methods, and the method includes: obtaining a creation object corresponding to the project experience, and determining a project experience submission file for the project experience according to the creation object; aggregating all project experience submission files into multiple file groups based on the summary type, and the multiple file groups include a file group in a normal state; based on the hierarchical structure of the review criteria, reviewing the project experience submission files in the file group in a normal state, and determining the project experience submission files that can be stored in the database.
[0095] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the project experience management method for rail transit provided by the above-mentioned methods, the method comprising: obtaining a creation object corresponding to the project experience, and determining a project experience submission file for the project experience according to the creation object; aggregating all project experience submission files into multiple file groups based on the summary type, the multiple file groups including a file group in a normal state; based on the hierarchical structure of review standards, reviewing the project experience submission files in the file group in a normal state, and determining the project experience submission files that can be stored in the database.
[0096] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0097] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0098] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A project experience management method for rail transit, characterized in that: include: Acquire a creation object corresponding to the project experience, and determine a project experience submission file for the project experience according to the creation object; All project experience submission files are aggregated into multiple file groups based on the aggregation type, and the multiple file groups include file groups in normal status; Based on the hierarchical structure of review standards, the project experience submission documents in the file group that are in normal status are reviewed to determine the project experience submission documents that can be included in the database.
2. The project experience management method for rail transit according to claim 1 is characterized in that: The project experience submission file for determining the project experience according to the creation object includes: Determine a data source corresponding to the project experience, and call a data interface corresponding to the data source to obtain an initial file from the data source; Determine the project experience submission interface corresponding to the project experience; In response to a collection operation of creating an object in the project experience submission interface, based on a data structure of the created object, obtaining submission information from the initial file; In response to an upload operation of a file upload item in the project experience submission interface, a submission item is generated based on the submission information, and a binding relationship between the submission item and the initial file is established; the submission item and the initial file are configured as a project experience submission file.
3. The project experience management method for rail transit according to claim 2 is characterized in that: The method further comprises: When it is determined that there is a creation object in the project experience submission interface that is not configured with submission information, in response to an input operation of the creation object in the project experience submission interface, the submission information is obtained based on the data structure of the creation object and based on the input information.
4. The project experience management method for rail transit according to claim 1 or 3, characterized in that: The summary type is used to summarize all project experience submission documents into multiple document groups, including: Get the project experience summary interface that displays all project experience submission files; In response to the processing operation of the summary processing item in the project experience summary interface, based on the summary strategy of each summary processing item, the project experience summary interface is divided into regions, region identifiers are configured for the divided regions, and corresponding project experience submission files are displayed in the divided regions; wherein the region identifiers include normal and abnormal; and the project experience submission files displayed in each region constitute a file group; In response to the modification operation of the summary modification item in the project experience summary interface, a modification notification is issued to the reporting terminal corresponding to the project experience reporting file in the abnormal area, and after determining that the modified project experience reporting file is normal within a preset time, the modified project experience reporting file is transferred into the normal area; if it is determined that the modified project experience reporting file is not received within the preset time, the corresponding project experience reporting file in the abnormal area is cleared; In response to the reporting operation of the review report item in the project experience summary interface, a review entry is generated based on the project experience submission file in the normal area, and a binding relationship between the review entry and the initial file is established; the review entry and the initial file are configured as the project experience submission file to be reviewed.
5. The project experience management method for rail transit according to claim 4 is characterized in that: The hierarchical structure of the review criteria includes expert review criteria and non-expert review criteria. Accordingly, based on the hierarchical structure of the review criteria, the project experience submission documents in the file group in a normal state are reviewed to determine the project experience submission documents that can be stored, including: In response to the review operation of the review item in the project experience review interface, obtain the calculation strategy corresponding to each level of the non-expert review standard in the review standard hierarchy structure, and send a review notification to the review terminal; Based on the calculation strategies corresponding to each level of the non-expert review criteria in the review criteria hierarchy structure, score the project experience submission document to be reviewed and generate a first scoring result; Acquire the review information sent by the review terminal, and perform scoring calculation on the project experience submission file to be reviewed based on the calculation strategy corresponding to the expert review standard to generate a second scoring result; Generate a scoring result based on the first scoring result and the second scoring result; Generate a storage entry based on the scoring result and the project experience submission file, and establish a binding relationship between the storage entry and the initial file; configure the storage entry and the initial file as a project experience file that can be stored.
6. The project experience management method for rail transit according to claim 5 is characterized in that: The method further comprises: The authority information of the review terminal is obtained, and when it is determined that the authority information meets the authority condition, a review notification is sent to the review terminal.
7. The project experience management method for rail transit according to claim 5, characterized in that: The method further comprises: The project information applied for by the declaration terminal is obtained, a project experience file matching the project information is extracted from a database, and the project experience file is pushed to the declaration terminal.
8. A project experience management device for rail transit, characterized in that: include: An acquisition module, used for acquiring a creation object corresponding to the project experience, and determining a project experience submission file of the project experience according to the creation object; A summary module is used to summarize all project experience submission files into multiple file groups based on the summary type, and the multiple file groups include file groups in a normal state; The review module is used to review the project experience submission files in the file group in normal status based on the review standard hierarchical structure, and determine the project experience submission files that can be stored.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, it implements the project experience management method for rail transit as described in any one of claims 1-7.
10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the project experience management method for rail transit as described in any one of claims 1 to 7 is implemented.
Citation Information
Cited By
Excavator problem solving system and method based on intelligent terminal big data problem management
CN120632657A
