Method and device for monitoring carbon emission reduction of photovoltaic power generation system in expressway service area

By monitoring the power generation and consumption difference of the photovoltaic power generation system in the highway service area in real time, and optimizing the layout of photovoltaic modules using AI models, the service area's demand for improved power supply capacity is solved, real-time monitoring of energy carbon emission reduction is achieved and improve efficiency.

CN119298846AActive Publication Date: 2025-01-10GANSU TRANSPORTATION INVESTMENT MANAGEMENT CO LTD +1

Patent Information

Application Number
CN202411403589.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2025-01-10
Estimated Expiration
2044-10-09

AI Technical Summary

Technical Problem

There is a lack of effective methods for real-time monitoring of energy carbon emission reduction in highway service areas in real-time in the highway service areas.

Method used

Provide a carbon emission reduction monitoring method for photovoltaic power generation systems in highway service areas, including determining the installation location of photovoltaic modules, monitoring the power generation and consumption difference of photovoltaic modules in real time, and visually displaying the power difference value, and using AI model to predict Power and sunshine, optimize the layout of photovoltaic modules.

Benefits of technology

Real-time monitoring of energy carbon emission reduction in highway service areas has been achieved, energy use efficiency has been improved, and carbon emission reduction targets have been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119298846A_ABST
    Figure CN119298846A_ABST
Patent Text Reader

Abstract

The invention provides a method and a device for monitoring carbon emission reduction of a photovoltaic power generation system in an expressway service area. The method comprises the following steps: determining an installation position of a photovoltaic module in any target expressway service area; installing the photovoltaic module at the determined installation position, starting the photovoltaic module, and monitoring the photovoltaic module in real time; at the current monitoring moment, the electric quantity generated by a photovoltaic module of any target expressway service area in the current monitoring time period and the electric quantity consumed by any target expressway service area in the current monitoring time period are obtained; and obtaining an electric quantity difference value between the electric quantity generated by the photovoltaic module of any target expressway service area in the current monitoring time period and the electric quantity consumed by any target expressway service area in the current monitoring time period, and performing visual display. According to the invention, the carbon emission reduction of the photovoltaic power generation system in the expressway service area can be monitored in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method and device for monitoring carbon emission reduction of a photovoltaic power generation system in a highway service area. Background Art

[0002] With the vigorous advocacy of clean energy, trams have been widely popularized. With the continuous improvement of battery life, more and more trams are running on highways. This puts higher demands on the power supply capacity of highway service areas. As an important renewable energy source, solar energy has become the focus of clean energy application. Therefore, real-time monitoring of energy carbon emission reduction in highway service areas is a topic worth studying. Summary of the invention

[0003] In view of the above technical problems, the technical solution adopted by the present invention is:

[0004] According to a first aspect of the present invention, a method for monitoring carbon emission reduction of a photovoltaic power generation system in a highway service area is provided, the method comprising the following steps:

[0005] S400: Determine the installation location of the photovoltaic modules in any target highway service area.

[0006] S410, installing the photovoltaic module at the determined installation location, starting the photovoltaic module and performing real-time monitoring on the photovoltaic module.

[0007] S420, at the current monitoring moment, obtain the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period; the current monitoring time period is the time period between the current monitoring moment and the previous monitoring moment.

[0008] S430, obtaining the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period, and displaying it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

[0009] According to a second aspect of the present invention, a real-time monitoring device for energy carbon emission reduction in a highway service area is provided, wherein:

[0010] The first determination module is used to determine the installation location of the photovoltaic components in any target highway service area.

[0011] The second determination module is used to install the photovoltaic module at the determined installation location, start the photovoltaic module and perform real-time monitoring on the photovoltaic module.

[0012] The power monitoring module is used to obtain the power generated by the photovoltaic components of any target highway service area during the current monitoring time period and the power consumed by any target highway service area during the current monitoring time period at the current monitoring moment; the current monitoring time period is the time period between the current monitoring moment and the previous monitoring moment.

[0013] The display module is used to obtain the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring period and the amount of electricity consumed by any target highway service area during the current monitoring period, and to display it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

[0014] The present invention has at least the following beneficial effects:

[0015] The real-time monitoring solution for energy carbon emission reduction in highway service areas provided by the embodiments of the present invention can monitor the energy carbon emission reduction in highway service areas in real time.

[0016] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 A flow chart of a method for monitoring carbon emission reduction of a photovoltaic power generation system in a highway service area provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0021] It should be noted that some exemplary embodiments are described as processes or methods depicted as flow charts. Although the flow charts describe the steps as sequential processes, many of the steps can be implemented in parallel, concurrently or simultaneously. In addition, the order of the steps can be rearranged. The process can be terminated when its operation is completed, but it can also have additional steps not included in the accompanying drawings. The process can correspond to a method, function, procedure, subroutine, subprogram, etc.

[0022] The embodiment of the present invention provides a method for monitoring carbon emission reduction of a photovoltaic power generation system in a highway service area, such as Figure 1 As shown, the method may include the following steps:

[0023] S400: Determine the installation location of the photovoltaic modules in any target highway service area.

[0024] S410, installing the photovoltaic module at the determined installation location, starting the photovoltaic module and performing real-time monitoring on the photovoltaic module.

[0025] S420, at the current monitoring moment, obtain the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period; the current monitoring time period is the time period between the current monitoring moment and the previous monitoring moment.

[0026] S430, obtaining the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period, and displaying it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

[0027] The real-time monitoring solution for energy carbon emission reduction in highway service areas provided by the embodiments of the present invention can monitor the energy carbon emission reduction in highway service areas in real time.

[0028] In the embodiment of the present invention, the photovoltaic assembly may be an existing photovoltaic assembly, for example, including components such as a combiner box, an electric energy converter, and a bridge.

[0029] Furthermore, in the embodiment of the present invention, the target high-speed service area may be a high-speed service area specified by a user. A plurality of target high-speed service areas may be communicatively connected to the remote monitoring terminal.

[0030] Furthermore, S400 may specifically include:

[0031] S410, obtaining the power Qt required by the target highway service area within a second preset time period.

[0032] S420, obtaining a grid unit corresponding to the target expressway service area based on Qt.

[0033] S430, obtaining a photovoltaic module installable area corresponding to a target highway service area as a target installation area, and dividing the target installation area by using the grid units to obtain a plurality of grid areas.

[0034] S440, obtaining the sunshine amount of any grid area in the preset time period and the distance between any grid area and the target highway service area.

[0035] S450, obtaining the normalized vegetation index and environmental variables of the green plants in the area corresponding to any grid area, and obtaining the blocked area and the changing speed of the blocked area in any grid area within a preset time period; the blocked area is the projection area of ​​the green plants in the area corresponding to the grid area in the corresponding grid area.

[0036] S460, based on the sunshine amount of the grid area corresponding to the target installation area, the distance between the grid area and the target high-speed service area, the shaded area of ​​the grid area within a preset time period and the speed of change of the shaded area, obtain the target grid as the grid for installing the photovoltaic components.

[0037] In the embodiment of the present invention, since the sunshine amount of the installation area, the distance from the service area and the influence of green plants on the installation area are comprehensively considered, the optimal photovoltaic module installation area can be selected as much as possible to achieve the optimal layout of the photovoltaic modules.

[0038] Furthermore, in an embodiment of the present invention, Qt can be obtained based on a trained power prediction model. The power prediction model can be an existing AI model, such as a deep neural network model.

[0039] Furthermore, in the embodiment of the present invention, the trained power prediction model can be obtained through the following steps:

[0040] S101, obtaining a sample data set, wherein the sample data set includes a plurality of sample data, each sample data includes U and D, wherein U is the ID of the corresponding high-speed service area, such as the name or name code of the service area, and D is the power consumption time series data corresponding to the corresponding high-speed service area in a set historical time period, D = {D1, D2, ..., D i , ..., D n}, D i is the electricity consumption data corresponding to the i-th unit time period, i ranges from 1 to n, n is the number of unit time periods corresponding to the set historical segment, D i =(DC i ,DE i , Q i ), DC i is the traffic volume entering the corresponding highway service area in the i-th unit time period, that is, the number of all vehicles entering the service area, including fuel vehicles and electric vehicles, DE i is the number of electric vehicles entering the corresponding highway service area in the i-th unit time period, Q i is the power consumption of the corresponding high-speed service area in the i-th unit time period.

[0041] In an embodiment of the present invention, the duration of the historical time period may be a time period specified by the user, for example, several years. The duration of the unit time period may be a time period specified by the user, for example, one day or one month, etc., preferably one day. The power consumption data in the sample data may be obtained based on the historical data of the corresponding service area.

[0042] S102, inputting the training sample data of the current batch into the current electricity prediction model for training to obtain corresponding prediction results, wherein the prediction results include electricity consumption data corresponding to the next unit time period of the unit time period corresponding to the current batch.

[0043] S103, based on the prediction results of the current batch and the corresponding actual results, obtain the current loss function value of the current electricity prediction model, and determine whether the current loss function value meets the preset model training end condition. If yes, execute step S105, otherwise, execute step S104.

[0044] S104, updating the parameters of the current power prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S102.

[0045] S105: Using the current power prediction model as the trained power prediction model.

[0046] In an embodiment of the present invention, the loss function value can be calculated based on an existing loss function. The preset model training end condition can be set based on actual needs. For example, the loss is less than or equal to a set loss threshold and remains unchanged within a set time period.

[0047] Furthermore, Qt can be obtained through the following steps:

[0048] S10, based on the vehicle flow rate and the number of electric vehicles in the target highway service area in a set historical time period, determine the vehicle flow rate and the number of electric vehicles in the target highway service area in a unit time period as initial electricity consumption data.

[0049] S11, set counter variable j=1.

[0050] S12, if j≤k, execute S13, otherwise, execute S16; k is the number of unit time periods corresponding to the preset time period, k=roundup(t1 / t2), t1 is the duration corresponding to the preset time period, t2 is the duration corresponding to the unit time period, and roundup() means rounding up.

[0051] S13, using the current prediction result based on the trained electricity prediction model as the current electricity consumption data corresponding to the target highway service area, and adding the current prediction result to the current prediction result set; the current prediction result includes the corresponding predicted traffic flow, predicted number of electric vehicles and predicted electricity consumption; the initial value of the current prediction result set is empty.

[0052] S14, inputting the current electricity consumption data corresponding to the target highway service area into the trained electricity consumption prediction model to obtain the corresponding current prediction result.

[0053] S15, set j=j+1, and execute S12;

[0054] S16, obtaining Qt based on the predicted power consumption corresponding to the current prediction result set.

[0055] Furthermore, in an embodiment of the present invention, the grid unit corresponding to the target highway service area is obtained by consulting a preset lookup table, wherein each row of data in the preset lookup table includes the highway service area, the power consumption of the service area within a preset time period, and the corresponding grid unit.

[0056] The preset query table can be obtained based on the following steps:

[0057] S201, obtaining the power required by any reference highway service area within a preset time period.

[0058] In the embodiment of the present invention, the reference high-speed service area may be a high-speed service area specified by a user.

[0059] S202, obtaining a photovoltaic module installable area corresponding to any reference highway service area as a corresponding target installation area.

[0060] In the embodiment of the present invention, the photovoltaic module installation area corresponding to the highway service area can be determined based on actual needs, for example, it can be located on both sides of the highway between the reference highway service area and the highway service area adjacent to the reference highway service area. If there is a green belt on the highway, it can also include the top of the green belt, etc.

[0061] S203, using preset initial grid units to divide the target installation area corresponding to any reference highway service area to obtain corresponding multiple grid areas; the preset initial grid unit is a grid area suitable for installing a photovoltaic module, that is, the size of the preset initial grid unit is set to a size that can install a photovoltaic module, and the grid unit can be rectangular or square.

[0062] S204: Obtain the sunshine amount of any grid area corresponding to any reference highway service area within the preset time period.

[0063] S205, based on the amount of electricity required by any reference highway service area within a preset time period and the amount of sunshine corresponding to each grid area, obtain a target grid area from multiple grid areas as a grid unit corresponding to the reference highway service area; wherein the target grid area is a square area formed by at least one initial grid unit, and the amount of electricity that can be generated by the target grid area is greater than or equal to the amount of electricity required by the corresponding reference highway service area within the preset time period.

[0064] S206: Based on the power required by any reference highway service area within a preset time period and the corresponding grid unit, the preset query table is formed.

[0065] Furthermore, the photovoltaic components can be monitored in real time according to a set monitoring period, and the monitoring period can be set based on actual needs, for example, the monitoring period can be 1 hour. The duration of each monitoring time period is equal to one monitoring period.

[0066] Furthermore, in the embodiment of the present invention, the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring period can be obtained based on the sunshine amount of the photovoltaic components during the current monitoring period, and the specific acquisition method can be the existing technology. The sunshine amount of the photovoltaic components during the current monitoring period is obtained based on the trained sunshine amount prediction model. The sunshine amount prediction model can be an AI model, such as a deep neural network model.

[0067] Furthermore, the trained sunshine amount prediction model can be obtained through the following steps:

[0068] S1, obtain a training sample data set, each sample data includes the sunshine amount time series data SA of the corresponding sampling point of the corresponding sample data in the set historical time period, SA = {SA1, SA2, ..., SA r , ..., SA m}, SA r is the sunshine data corresponding to the rth unit time period, r ranges from 1 to m, m is the number of unit time periods corresponding to the set historical period, SA r =(L r , SA1 r , SA2 r ), L r is the position of the sampling point corresponding to the sample data, SA1 r is the weather characteristic information corresponding to the sampling point in the rth unit time period, SA2 r is the sunshine amount corresponding to the sampling point in the rth unit time period.

[0069] In the embodiment of the present invention, the sampling point may be an open area without any obstruction. The position of the sampling point may be the longitude and latitude coordinates of the sampling point, which may be obtained through the corresponding remote sensing image.

[0070] In the embodiment of the present invention, the weather characteristic information may include sunrise time, sunset time, ultraviolet intensity, temperature, humidity, visibility, etc. The sunshine amount at the sampling point may be obtained by testing an installed sunshine meter, sunshine radiation sensor, etc.

[0071] S2, input the training sample data of the current batch into the current sunshine prediction model for training to obtain corresponding prediction results, which include weather characteristic information and sunshine amount corresponding to the next unit time period of the unit time period corresponding to the current batch.

[0072] S3, based on the prediction results of the current batch and the corresponding actual results, obtain the current loss function value of the current sunshine prediction model, and determine whether the current loss function value meets the preset model training end condition. If yes, execute step S5, otherwise, execute step S4.

[0073] S4, updating the parameters of the current sunshine prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S2.

[0074] S5: Using the current sunshine amount prediction model as the trained sunshine amount prediction model.

[0075] Furthermore, the sunshine amount of any grid area in the preset time period is obtained based on the following steps:

[0076] S20, taking the location corresponding to any grid area and the weather characteristic information corresponding to the current unit time period as initial input data.

[0077] S21, set the counter variable j1=1.

[0078] S22, if j1≤k1, execute S23, otherwise, execute S26; k1 is the number of unit time periods corresponding to the preset time period, k1=roundup(t1 / t2), t1 is the duration corresponding to the preset time period, t2 is the duration corresponding to the unit time period, and roundup() means rounding up.

[0079] S23, using the current prediction result based on the trained sunshine amount prediction model as the current input data corresponding to any grid area, and adding the current prediction result to the current prediction result set; the current prediction result includes the corresponding weather characteristic information and sunshine amount; the initial value of the current prediction result set is empty.

[0080] S24, inputting the current input data corresponding to any grid area into the trained sunshine amount prediction model to obtain the corresponding current prediction result.

[0081] S25, set j1=j1+1, and execute S22.

[0082] S26, obtaining the sunshine amount of any grid area within a preset time period based on the sunshine amount corresponding to the current prediction result set corresponding to the grid area.

[0083] Furthermore, the sunshine amount of the photovoltaic components in the current monitoring time period can be obtained by inputting the installation location of the photovoltaic components and the weather characteristic information corresponding to the current monitoring time period into a trained sunshine amount prediction model.

[0084] Further, in an embodiment of the present invention, if there is one target highway service area, the photovoltaic component installable area corresponding to the target highway service area may be located on both sides of the highway between the target highway service area and the highway service area adjacent to the target highway service area. If there is a green belt on the highway, it may also include the top of the green belt, etc. If there are two target highway service areas, the photovoltaic component installable area corresponding to the target highway service area may be located on both sides of the highway between the corresponding two highway service areas. If there is a green belt on the highway, it may also include the top of the green belt, etc. If there are multiple target highway service areas, the photovoltaic component installable area corresponding to the target highway service area may be located on both sides of all highways within the enclosing box of the corresponding multiple highway service areas. If there is a green belt on the corresponding highway, it may also include the top of the green belt, etc.

[0085] Further, in the embodiment of the present invention, the distance between each grid area and the target highway service area may be the distance between the center of the grid area and the center of the corresponding highway service area.

[0086] Those skilled in the art know that the position of each location point in each grid area can be obtained based on a corresponding map.

[0087] Further, in S140, the area corresponding to any grid area may be the green plant planting area closest to the grid area. The blocked area of ​​any grid area within a preset time period may be predicted based on the current normalized vegetation index and environmental variables of the green plants in the area corresponding to the grid area.

[0088] In the embodiment of the present invention, the environmental variables may be temperature, precipitation, etc.

[0089] Specifically, based on the current normalized vegetation index and environmental variables, the growth range of green plants in the corresponding area after a preset time period can be predicted, and then a regression model between the blocked area and the normalized vegetation index and environmental variables can be obtained.

[0090] Those skilled in the art know that, since the blocked area of ​​each grid region in each unit time period can be known, the changing speed of the blocked area of ​​each grid region in a preset time period can be obtained.

[0091] Furthermore, in the embodiment of the present invention, the target grid area can be obtained by the following steps:

[0092] S161, based on the sunshine amount, distance, shaded area and shaded area change rate corresponding to any grid area, determine the scores corresponding to the sunshine amount, distance, shaded area and shaded area change rate corresponding to the grid area.

[0093] In the embodiment of the present invention, the score determination method of the sunshine amount, distance, shaded area and shaded area change speed can be set based on actual needs. Generally, the scores of sunshine amount, distance, shaded area and shaded area change speed are positively correlated with the size of sunshine amount, distance, shaded area and shaded area change speed. For example, the greater the sunshine amount, the greater the corresponding score, and vice versa.

[0094] S162, multiplying the scores corresponding to the sunshine amount, distance, shaded area and shaded area change speed corresponding to any grid area by the corresponding weights respectively and adding the respective multiplication results as the installation weight of the grid area.

[0095] In an embodiment of the present invention, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be set based on actual needs. In an exemplary embodiment, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be the same, for example, all 0.25. In another exemplary embodiment, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be different, for example, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be set in a descending order.

[0096] S163: The grid area corresponding to the largest of all installation weights is used as the target grid area.

[0097] Based on the same inventive concept, an embodiment of the present invention provides a real-time monitoring device for energy carbon emission reduction in a highway service area, the device comprising:

[0098] The first determination module is used to determine the installation location of the photovoltaic components in any target highway service area.

[0099] The second determination module is used to install the photovoltaic module at the determined installation location, start the photovoltaic module and perform real-time monitoring on the photovoltaic module.

[0100] The power monitoring module is used to obtain the power generated by the photovoltaic components of any target highway service area during the current monitoring time period and the power consumed by any target highway service area during the current monitoring time period at the current monitoring moment; the current monitoring time period is the time period between the current monitoring moment and the previous monitoring moment.

[0101] The display module is used to obtain the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring period and the amount of electricity consumed by any target highway service area during the current monitoring period, and to display it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

[0102] The device can be used to perform Figure 1 Therefore, for the functions that can be realized by each functional module of the device, please refer to Figure 1 The description of the illustrated embodiment is not repeated in detail.

[0103] An embodiment of the present invention also provides an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are configured to execute the method described in the embodiment of the present invention.

[0104] The embodiment of the present invention further provides a non-transitory computer-readable storage medium storing computer-executable instructions, wherein the computer instructions are used to execute the method described in the embodiment of the present invention.

[0105] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and this document does not limit this.

[0106] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for monitoring carbon emission reduction of a photovoltaic power generation system in a highway service area, characterized in that: The method comprises the following steps: S400, determining the installation location of the photovoltaic modules in any target highway service area; S410, installing the photovoltaic module at the determined installation location, starting the photovoltaic module and performing real-time monitoring on the photovoltaic module; S420, at the current monitoring time, obtaining the amount of electricity generated by the photovoltaic modules of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period; the current monitoring time period is the time period between the current monitoring time and the previous monitoring time; S430, obtaining the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period and the amount of electricity consumed by any target highway service area during the current monitoring time period, and displaying it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

2. The method according to claim 1, characterized in that S400 specifically includes: S410, obtaining the power Qt required by the target highway service area within a second preset time period; S420, obtaining a grid unit corresponding to the target highway service area based on Qt; S430, obtaining a photovoltaic module installable area corresponding to a target highway service area as a target installation area, and dividing the target installation area by using the grid units to obtain a plurality of grid areas; S440, obtaining the sunshine amount of any grid area in the preset time period and the distance between any grid area and the target highway service area; S450, obtaining the normalized vegetation index and environmental variables of the green plants in the area corresponding to any grid area, and obtaining the blocked area and the speed of change of the blocked area in any grid area within a preset time period; the blocked area is the projection area of ​​the green plants in the area corresponding to the grid area in the corresponding grid area; S460, based on the sunshine amount of the grid area corresponding to the target installation area, the distance between the grid area and the target high-speed service area, the shaded area of ​​the grid area within a preset time period, and the speed of change of the shaded area, obtain the target grid as the grid for installing the photovoltaic components.

3. The method according to claim 2, characterized in that Qt is obtained based on the trained power prediction model.

4. The method according to claim 3, characterized in that The trained power prediction model is obtained through the following steps: S101, obtaining a sample data set, wherein the sample data set includes a plurality of sample data, each sample data includes U and D, wherein U is the ID of the corresponding high-speed service area, and D is the power consumption time series data corresponding to the corresponding high-speed service area in a set historical time period, and D = {D1, D2, ..., D i , ..., D n }, D i is the electricity consumption data corresponding to the i-th unit time period, i ranges from 1 to n, n is the number of unit time periods corresponding to the set historical segment, D i =(DC i ,DE i , Q i ), DC i is the traffic volume entering the corresponding highway service area in the i-th unit time period, DE i is the number of electric vehicles entering the corresponding highway service area in the i-th unit time period, Q i is the power consumption of the corresponding high-speed service area in the i-th unit time period; S102, inputting the training sample data of the current batch into the current power prediction model for training to obtain corresponding prediction results, wherein the prediction results include power consumption data corresponding to the next unit time period of the unit time period corresponding to the current batch; S103, based on the prediction results of the current batch and the corresponding actual results, the current loss function value of the current electricity prediction model is obtained, and it is determined whether the current loss function value meets the preset model training end condition. If so, step S105 is executed, otherwise, step S104 is executed; S104, updating the parameters of the current power prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S102; S105: Using the current power prediction model as the trained power prediction model.

5. The method according to claim 4, characterized in that Qt is obtained through the following steps: S10, based on the traffic volume and the number of electric vehicles in the target highway service area in the historical time period, determining the traffic volume and the number of electric vehicles in the target highway service area in a unit time period as initial power load data; S11, set the counter variable j=1; S12, if j≤k, execute S13, otherwise execute S16; k is the number of unit time periods corresponding to the preset time period, k=roundup(t1 / t2), t1 is the duration corresponding to the preset time period, t2 is the duration corresponding to the unit time period, and roundup() means rounding up; S13, using the current prediction result based on the trained power prediction model as the current power consumption data corresponding to the target highway service area, and adding the current prediction result to the current prediction result set; the current prediction result includes the corresponding predicted vehicle flow, predicted number of electric vehicles and predicted power consumption; the initial value of the current prediction result set is empty; S14, inputting the current power consumption data corresponding to the target highway service area into the trained power consumption prediction model to obtain the corresponding current prediction result; S15, set j=j+1, and execute S12; S16, obtaining Qt based on the predicted power consumption corresponding to the current prediction result set.

6. The method according to claim 2, characterized in that The grid unit corresponding to the target highway service area is obtained by consulting a preset lookup table, wherein each row of data in the preset lookup table includes the highway service area, the power consumption of the service area within a preset time period, and the corresponding grid unit.

7. The method according to claim 6, characterized in that The preset query table is obtained based on the following steps: S201, obtaining the power required by any reference highway service area within a preset time period; S202, obtaining a photovoltaic module installable area corresponding to any reference highway service area as a corresponding target installation area; S203, using preset initial grid units to divide the target installation area corresponding to any reference highway service area to obtain a plurality of corresponding grid areas; the preset initial grid unit is a grid area suitable for installing one photovoltaic module; S204, obtaining the sunshine amount of any grid area corresponding to any reference highway service area within the preset time period; S205, based on the power required by any reference highway service area within a preset time period and the sunshine amount corresponding to each grid area, a target grid area is obtained from multiple grid areas as a grid unit corresponding to the reference highway service area; wherein the target grid area is a square area composed of at least one initial grid unit, and the power that can be generated by the target grid area is greater than or equal to the power required by the corresponding reference highway service area within the preset time period; S206: Based on the power required by any reference highway service area within a preset time period and the corresponding grid unit, the preset query table is formed.

8. The method according to claim 2, characterized in that: The amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring time period can be obtained based on the amount of sunshine of the photovoltaic components during the current monitoring time period.

9. The method according to claim 2, characterized in that: The target grid area is obtained by the following steps: S161, based on the sunshine amount, distance, shaded area and shaded area change rate corresponding to any grid area, determining the scores corresponding to the sunshine amount, distance, shaded area and shaded area change rate corresponding to the grid area; S162, multiplying the scores corresponding to the sunshine amount, distance, shaded area and shaded area change speed corresponding to any grid area by the corresponding weights respectively and adding the respective multiplication results as the installation weight of the grid area; S163: The grid area corresponding to the largest of all installation weights is used as the target grid area.

10. A real-time monitoring device for energy carbon emission reduction in a highway service area, characterized in that: The device comprises: A first determination module is used to determine the installation location of the photovoltaic modules in any target highway service area; A second determination module is used to install the photovoltaic module at the determined installation location, start the photovoltaic module and perform real-time monitoring on the photovoltaic module; The power monitoring module is used to obtain the power generated by the photovoltaic components of any target highway service area during the current monitoring period and the power consumed by any target highway service area during the current monitoring period at the current monitoring time; The current monitoring time period is the time period between the current monitoring time and the previous monitoring time; The display module is used to obtain the difference between the amount of electricity generated by the photovoltaic components of any target highway service area during the current monitoring period and the amount of electricity consumed by any target highway service area during the current monitoring period, and to display it visually; wherein, the amount of electricity difference with a negative value is displayed in a set color.

Citation Information

Patent Citations

  • Photovoltaic power scheduling method and device, computer device and storage medium

    CN109767087A

  • Calculation method and device of net carbon emission, storage medium and electronic equipment

    CN115600363A

  • Photovoltaic deployment plan generation method and device, storage medium and terminal equipment

    CN116188200A

  • Highway integrated energy microgrid planning method and system based on traffic flow prediction

    CN116542451A

  • Distribution area anti-countercurrent control method, system and equipment of power distribution network and storage medium

    CN116845957A

Cited By

  • Method and device for managing photovoltaic generating capacity of expressway service area

    CN119253606A

  • A management method and device for photovoltaic power generation in highway service areas

    CN119253606B