Steel structure surface paint spraying waste gas purification treatment device

By designing a waste gas purification and treatment device for painting on steel structures, the problem of dust and waste gas collection and treatment during sandblasting and spraying was solved, achieving efficient environmental protection and improved production efficiency.

CN119304786APending Publication Date: 2025-01-14QINGDAO HAOHUI METAL STRUCTURE CO LTD

Patent Information

Application Number
CN202411707051.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

Existing technologies fail to effectively collect and treat rust dust, metal shavings, and exhaust gases from sandblasting and coating processes during steel structure fabrication, leading to environmental pollution and health threats.

Method used

A purification and treatment device for exhaust gas from painting on steel structures was designed, including a transportation, sandblasting, turning, spraying and purification mechanism. Dust is collected through a slag suction port, exhaust gas is initially filtered by a filter plate, and further purification is carried out using a low-temperature plasma treatment box.

Benefits of technology

It enables dust collection during sandblasting and timely treatment of exhaust gases during spraying, preventing pollution from spreading, improving processing efficiency and quality, and ensuring a clean and safe working environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119304786A_ABST
    Figure CN119304786A_ABST
Patent Text Reader

Abstract

The invention discloses a purification treatment device for paint spraying waste gas on the surface of a steel structure. The purification treatment device comprises a treatment bin, a fixing frame I, a fixing plate I, a partition plate II, a sand blasting area, a spraying area, a shot blasting mechanism, a turnover mechanism, a spraying mechanism and a purification treatment mechanism. One end of the treatment bin is provided with a feed port, and the other end is provided with a discharge port; the interior of the treatment bin is separated into a sand blasting area and a spraying area through the partition plate II, the sand blasting area is located at the feeding port end, and the spraying area is located at the discharging port end; a conveying mechanism is arranged among the feeding hole, the turnover mechanism and the shot blasting mechanism; the shot blasting mechanism is mounted in the sand blasting area; and the turnover mechanism, the spraying mechanism and the purification treatment mechanism are all mounted in the spraying area. While sand blasting is conducted on the surface of the steel structure, rust dust and metal chippings generated during sand blasting are collected, waste gas generated during spraying is recycled in time, overflow and diffusion are prevented, environmental pollution is greatly reduced, and meanwhile the environmental protection property and efficiency of device treatment are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel structure processing, and in particular relates to a device for purifying waste gas from spraying paint on the surface of a steel structure. Background Art

[0002] In the field of steel structure processing technology, existing technologies generally achieve efficient treatment of steel structure surfaces, but most existing technologies often ignore the effective collection and treatment of pollutants such as rust dust, metal debris and overflow paint exhaust gas generated during sandblasting and spraying.

[0003] After searching, the prior art publication number is CN108514794A, which is a paint spraying waste gas treatment equipment and its treatment process, including a spray tower, an air pump, an air pipe, a low-temperature plasma treatment box, a high-frequency discharge plate, a plunger, a cover plate, a discharge device and an exhaust pipe. An air pump is provided on one side of the spray tower, the air inlet of the spray tower is connected to the air pump through an air pipe, the air outlet of the spray tower is connected to the air inlet of the low-temperature plasma treatment box through an air pipe, a high-frequency discharge plate is provided in the low-temperature plasma treatment box, the top of the high-frequency discharge plate is fixedly connected to the plunger, the top of the plunger is fixedly connected to the cover plate, the plunger is stuck in the top of the low-temperature plasma treatment box, a pull ring is provided on the top of the cover plate, a first cavity is opened in the cover plate, a second cavity and a third cavity are opened in the plunger, and the first cavity, the second cavity and the third cavity are connected in sequence.

[0004] After searching: Prior art publication number: CN117182742A A method for surface treatment of building steel structure, the method for surface treatment of building steel structure is realized by a steel structure surface treatment system, the steel structure surface treatment system includes two positioning mechanisms, a rust removal mechanism and a cleaning mechanism; the two positioning mechanisms are respectively installed at both ends of the rust removal mechanism, and the cleaning mechanism is installed on the outside of the rust removal mechanism; the device only performs sandblasting on the surface of the steel structure, and does not effectively collect and treat the rust dust, metal debris and other pollutants generated during sandblasting. The generated rust dust and metal debris will cause serious pollution to the environment.

[0005] Further search: Prior art publication number: CN118788519A A floating bridge steel structure surface treatment device, including a conveying part and a spraying part, the conveying part is used to fix, clamp and convey the steel structure workpiece; the spraying part is used to spray it, wherein the spraying assembly includes a spray pipe, a storage tank and a pressure pump, the spray pipe is connected to the pressure pump and the storage tank through a hose and is used to spray paint on the surface of the workpiece, and a circle of high-pressure air nozzles forming an isolation airflow layer are evenly distributed on the outside of the spray port of the spray pipe, and the coverage range of the isolation airflow layer gradually increases along the spraying direction; the device also fails to effectively collect and treat the exhaust gas generated during spraying, and the exhaust gas generated during spraying will not only pollute the atmosphere, but also may pose a potential threat to the health of surrounding personnel and organisms. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a steel structure surface paint waste gas purification treatment device, which not only realizes the collection of rust dust and metal debris generated during sandblasting while sandblasting the steel structure surface, but also realizes the timely recovery and treatment of the waste gas generated by spraying during spraying, thereby preventing the overflow and diffusion of organic waste gas, greatly reducing the environmental pollution of organic waste gas, and improving the efficiency of steel structure surface treatment and waste gas purification of the device.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is:

[0008] A steel structure surface spray paint exhaust gas purification treatment device, characterized in that the device processes the exhaust gas in the following specific steps:

[0009] 1) Transportation by transportation mechanism: I-beams enter the sandblasting area from the feed port of the processing bin through the transportation mechanism;

[0010] 2) Shot blasting mechanism: Motor II drives the worm to rotate, driving the worm wheel meshing with it to rotate, so that the lead screw I rotates, and the sliding frame II moves under the action of the lead screw I. The motor IV drives the worm to rotate, driving the worm wheel on the bidirectional lead screw to rotate, so that the clamp slides in the rotating shell to clamp the I-beam horizontally. The motor III drives the rotating shell to rotate, thereby driving the I-beam to rotate; the nozzle I at the bottom of the raw material box I sprays metal projectiles to sandblast the I-beam;

[0011] 3) Sandblasting dust collection: The slag suction port on the sliding frame I frame collects the dust during sandblasting and transports it to the purification treatment mechanism. After completion, the transportation mechanism transports the I-beam to the flipping mechanism;

[0012] 4) Flipping of the flipping mechanism: Motor VI rotates the lead screw II through the bevel gear transmission, thereby driving the sliding frame III to move in the sliding groove II to adjust the clamping position of the limit plate; at the same time, the cylinder III drives the sliding block I to move, so that the rotating block rotates, and then drives the rotating shaft III to rotate, prompting the limit plate to rotate to clamp the I-beam; then the double-acting cylinder at the output connection end of the first group of rotating shafts II contracts, so that the flipping frame of the first group of rotating shafts II rotates 90° to face the flipping frame of the second group of rotating shafts II; the cylinder III drives the sliding block I to move, so that the rotating block rotates; the cylinder II drives the top plate II to push the I-beam onto the flipping frame of the second group of rotating shafts II;

[0013] 5) Spraying by spraying mechanism: Motor VII drives the spray hood to slide in the processing chamber to cover the area to be sprayed; during the spraying process, the paint is transported from the raw material box II to the hose through the pipeline, and the paint is transported to the telescopic nozzle to spray the I-beam;

[0014] 6) Drying with dryer: After spraying is completed, motor VIII drives rotating shaft IV, and the rotating baffle rotates close to the telescopic nozzle through bevel gear transmission. The dryer dries the sprayed I-beam in time through air pipe I and drying hot air outlet, and then repeats steps 4) to 6) until the spraying and drying of the I-beam is completed;

[0015] 7) Waste gas collection: The generated waste gas is first guided to the collection tank on the fixed frame III, and the waste gas is initially filtered through the filter plate to remove the paint mist particles and impurities. At the same time, the motor Ⅺ drives the lead screw IV to rotate, driving the cleaning component to move on the filter plate to clean the accumulated impurities and ensure the filtering effect; the waste gas after the initial filtration enters the trachea IV through the trachea II and trachea III, and is finally extracted by the vacuum pump and sent to the low-temperature plasma treatment box for further treatment to meet the emission standards;

[0016] A device for purifying and treating waste gas from spraying paint on a steel structure surface comprises a treatment bin, a fixed frame I, a fixed plate I, a partition II, a sandblasting area, a spraying area, a transport mechanism, a shot blasting mechanism, a flip mechanism, a spraying mechanism and a purification mechanism; a feed port is provided at one end of the treatment bin and a discharge port is provided at the other end; fixed plates I are installed on both sides of the treatment bin, a slide rail I is provided on the top of the fixed plate I, a fixed frame I is installed on one side of the slide rail I, a partition I is provided on the top of the fixed frame I, a partition II is installed on one side of the partition I, and a partition III is provided on one side of the partition II; the partition II separates the sandblasting area and the spraying area in the treatment bin, the sandblasting area is located at the feed port end; the spraying area is located at the discharge port end; a transport mechanism is installed between the feed port, the flip mechanism and the shot blasting mechanism; the shot blasting mechanism is installed in the sandblasting area; the flip mechanism, the spraying mechanism and the purification mechanism are all installed in the spraying area, the spraying mechanism is located at the top of the spraying area, the purification mechanism is located at the bottom of the spraying area, and the flip mechanism is located between the spraying mechanism and the purification mechanism.

[0017] The transport mechanism includes a transport plate, a motor I, and a rotating shaft I; a transport plate is slidably installed between the feed port, the flip mechanism and the shot blasting mechanism, a groove is provided at the bottom of the transport plate, a rack is provided in the groove, the rotating shaft I is located at the bottom of the transport plate, a gear is provided on the rotating shaft I, and the gear and the rack are meshed with each other; a motor I is installed at one end of the rotating shaft I.

[0018] The shot blasting mechanism includes a raw material box I, a sliding frame I, a sandblasting bin, a recovery box, a fixed frame II, a motor II, a support roller, a telescopic air pipe, a motor III, a sliding frame II, a rotating shell, a bidirectional screw, a clamping claw, a top plate I, and an oil cylinder I; the raw material box I is fixedly installed on the top of the sandblasting area, a feed port is provided on the top of the raw material box I, and a nozzle I is provided at the bottom, and the nozzle I is used to spray metal projectiles for sandblasting I-beams; the recovery box is installed at the bottom of the sandblasting area, a sandblasting bin is installed on the top of the recovery box, and the recovery box is connected to the sandblasting bin, and a nozzle I is provided in the sandblasting bin. Several groups of supporting rollers are installed. Screw I and sliding rod I are arranged on both sides between the raw material box I and the sandblasting chamber. Screw I is rotatably connected with the raw material box I and the sandblasting chamber, and sliding rod I is fixedly connected with the raw material box I and the sandblasting chamber. A fixing frame II is installed at the bottom of the raw material box I. The fixing frame II is rotatably connected with screw I. A worm wheel is arranged on the screw I. A worm is arranged on one side of the fixing frame II. The worm is rotatably connected with the fixing frame II. The worm wheel and the worm are meshed with each other. A motor II is installed on one side of the worm. The output shaft of motor II is fixedly connected with the worm. The sliding frame I is connected to the screw. The rod I is threadedly connected and slidably connected to the sliding rod I. The sliding frame I is set to be hollow, and a slag suction port is provided on the frame of the sliding frame I. A telescopic air pipe is installed on the top of the sliding frame I, and the output end of the telescopic air pipe is fixedly connected to the purification treatment mechanism; the sliding frame II is provided with two groups, and the two groups of sliding frames II are located on both sides of the bottom of the sliding frame I. The sliding frame II is threadedly connected to the lead screw I and slidably connected to the sliding rod I. The rotating shell is rotatably connected to the sliding frame II, and a bidirectional lead screw is rotatably installed on the rotating shell, and a worm gear is provided on the bidirectional lead screw. The top of the worm gear is provided with a There is a worm, the worm wheel and the worm are meshed with each other, a motor IV is arranged on one side of the worm, the output end of the motor IV is fixedly connected to the worm, and the motor IV is fixedly installed in the rotating shell; the clamping jaws are provided with two groups, the clamping jaws are slidably connected to the rotating shell, and are threadedly connected to the bidirectional lead screw, an oil cylinder I is installed inside the clamping end of the clamping jaw, the oil cylinder I is a bidirectional synchronous oil cylinder, a top plate I is installed on the top and bottom of the clamping end of the clamping jaw, and the top plate I is fixedly connected to the output end of the oil cylinder I; a motor III is installed on one side of the rotating shell, and the output end of the motor III is fixedly connected to the rotating shell.

[0019] The flip mechanism includes a flip frame, a rotating shaft II, a motor V, a double-acting oil cylinder, a top plate II, an oil cylinder II, an oil cylinder III, a limit plate, a lead screw II, a fixed plate II, a sliding rod II, a motor VI, a sliding frame III, a rotating shaft III, a rotating block, a sliding block I, and a slide rail II; the rotating shaft II is provided with four groups, and the four groups of rotating shaft II are arrayed in the spraying area and are rotatably connected with the fixed frame I. Gears are provided on both sides of the first and third groups of rotating shaft II, and a rack is provided at the bottom of the gear. The rack is slidably installed in the slide rail I, and the gear and the rack are meshed with each other. The double-acting oil cylinder is provided with two groups, and the double-acting oil cylinder is installed on the fixed plate I on both sides of the processing chamber. One end of the rack is fixedly connected to the output end of the double-acting oil cylinder; pulleys are provided on both sides of the second and fourth groups of rotating shafts II, and a belt is provided between the pulleys on both sides of the second and fourth groups of rotating shafts II, and the pulleys are driven by the belt; a bevel gear is provided at one end of the fourth group of rotating shafts II, and a motor V is installed at one end of the fourth group of rotating shafts II, and a bevel gear is provided at the output end of the motor V, and the bevel gear of the motor V is meshed with the bevel gear of the fourth group of rotating shafts II; a plurality of groups of turning frames are installed on the rotating shaft II, and the turning frames on each group of rotating shafts II are staggered; the turning frame is "L" shaped, and one end of the turning frame is a supporting end and the other end is a clamping end; the top plate Ⅱ is located at the supporting end of the flip frame, a protective shell is provided at the bottom of the top plate Ⅱ, the cylinder Ⅱ is installed in the protective shell, and the output end of the cylinder Ⅱ is fixedly connected to the top plate Ⅱ; a groove is provided at the top of the clamping end of the flip frame, sliding grooves Ⅰ are provided on both sides of the groove, and a sliding groove Ⅱ is provided at the bottom of the groove. The limit plate is slidably installed in the groove, and the rotating shaft Ⅲ is fixedly connected to the limit plate. Both ends of the rotating shaft Ⅲ are located in the sliding groove Ⅰ, and one end of the sliding frame Ⅲ is slidably installed in the sliding groove Ⅱ, and the sliding frame Ⅲ is rotatably connected to the rotating shaft Ⅲ; two sets of fixed plates Ⅱ are installed at the supporting end of the flip frame, and the screw Ⅱ and the sliding rod Ⅱ are located between the two sets of fixed plates Ⅱ. The screw Ⅱ and the fixed plate Ⅱ rotate The rotating shaft III is fixedly connected to the sliding frame III and is threadedly connected to the sliding frame III. The sliding rod II is fixedly connected to the fixed plate II and is slidably connected to the sliding frame III. A bevel gear is provided at one end of the lead screw II. The motor VI is installed on one side of the fixed plate II. A bevel gear is provided at one end of the motor VI. The bevel gear at the end of the lead screw II and the bevel gear at the end of the motor VI are meshed with each other. Rotating blocks are fixedly installed at both ends of the rotating shaft III. A through groove is provided on the rotating block. Slide rails II are installed on both sides of the support end of the flip frame. The sliding block I is slidably connected to the slide rail II. One end of the sliding block I is arranged in the through groove and is slidably connected to the rotating block. The oil cylinder III is installed on both sides of the sliding frame III, and the output end of the oil cylinder III is fixedly connected to the sliding block I.

[0020] The spraying mechanism includes a raw material box II, a pipeline, a dryer, an air pipe I, a spray hood, a hose, a rotating baffle, a rotating shaft IV, a motor IX, a screw III, a sliding rod III, a sliding block II, a motor X, a rotating rod, a telescopic nozzle, an electric push rod, a connecting plate, a swing frame, and a sliding groove III; the raw material box II is installed on one side of the processing warehouse, and a feed port is provided on the top of the raw material box II; the pipeline is provided with a plurality of installations on the top of the spraying area of ​​the processing warehouse, and one end of the pipeline is connected to the raw material box II; the spray hood is located at the bottom of the pipeline, and the spray hood is slidably connected to the inner wall of the processing warehouse, and racks are provided at both ends of the top of the spray hood, and a gear is provided on one side of the rack, and the gear and the rack are meshed with each other, and a motor VII is provided on one side of the gear, and the output end of the motor VII is fixedly connected to the gear, and the motor VII is installed on the inner walls on both sides of the spraying area of ​​the processing warehouse; dryers are installed at both ends of the top of the spray hood, and air pipes I are installed on both sides of the top of the spray hood, and the air pipe I is connected to the dryer; a plurality of groups of drying hot air outlets are provided on the air pipe I, and the drying hot air outlets are located in the spray hood;

[0021] The lead screw III and sliding rod III are located on the inner sides of the two sets of rotating baffles, the lead screw III is rotatably connected to the spray hood, the sliding rod III is fixedly connected to the spray hood, a motor IX is installed at one end of the lead screw III, and the output end of the motor IX is fixedly connected to the lead screw III; the sliding block II is threadedly connected to the lead screw III and is slidably connected to the sliding rod III, the swing frame is located at the bottom of the sliding block II and is rotatably connected to the sliding block II; a motor X is installed on the top of the sliding block II, a rotating rod is fixedly installed at the output end of the motor X, a swing rod is provided on one side of the rotating rod, one end of the swing rod is fixedly connected to the swing frame, a sliding groove III is provided on the swing rod, one end of the rotating rod is arranged in the sliding groove III and is slidably connected to the swing rod; a telescopic nozzle and an electric push rod are installed at the bottom of the swing frame, the telescopic end of the electric push rod is fixedly connected to the telescopic end of the telescopic nozzle through a connecting plate, a hose is installed at the top of the telescopic nozzle, and the hose is connected to the pipeline.

[0022] The purification treatment mechanism includes a low-temperature plasma treatment box, a fixed frame III, a filter plate, a motor XI, a cleaning component, a sewage bin, an air pump, an air pipe II, and an air pipe III; the low-temperature plasma treatment box is installed on one side of the treatment bin; the fixed frame III is installed at the bottom of the flip mechanism, the top of the fixed frame III is matched with the bottom of the flip frame, and a plurality of collection tanks are arranged on the fixed frame III, the collection tanks are located at the bottom of the flip frame, and the filter plates are installed in the collection tanks, and the top of the filter plates is provided with a lead screw IV and a sliding rod IV, the lead screw IV is rotatably connected with the sewage bin and the fixed frame III, and the sliding rod IV is provided with a lead screw IV and a sliding rod IV. The moving rod IV is fixedly connected to the sewage discharge bin and the fixed frame III, a motor XI is installed at one end of the lead screw IV, the output end of the motor XI is fixedly connected to the lead screw IV, the cleaning component is located on the filter plate and is threadedly connected to the lead screw IV, and is slidingly connected to the sliding rod IV; a sewage discharge bin is installed at one end of the collecting tank, the sewage discharge bin is connected to the collecting tank, and a waste collection box is installed at the bottom of the sewage discharge bin; a plurality of groups of air pipes II are arranged at the bottom of the collecting tank, the bottom of the air pipe II is connected to the air pipe III, one end of the air pipe III is connected to the air pipe IV, and one end of the air pipe IV is connected to the low-temperature plasma treatment box through a vacuum pump.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1) When sandblasting the steel structure surface, the rust dust and metal debris generated during sandblasting are collected to prevent dust pollution. The waste gas generated during spraying is also recovered and treated in time to prevent the overflow and diffusion of organic waste gas. While greatly reducing the environmental pollution of organic waste gas, the efficiency of steel structure surface treatment and waste gas purification of the device is improved;

[0025] 2) Motor II drives the worm to rotate, so that the lead screw I rotates, and the sliding frame II moves under the action of the lead screw I. The motor IV drives the worm to rotate, which drives the worm wheel on the bidirectional lead screw to rotate, so that the clamp slides in the rotating shell to clamp the I-beam horizontally. The motor III drives the rotating shell to rotate, thereby driving the I-beam to rotate; the nozzle I at the bottom of the raw material box I sprays metal projectiles to sandblast the I-beam; through the precise coordination of the motor-driven worm, worm wheel and lead screw, all-round and precise sandblasting of the I-beam is achieved, which significantly improves the efficiency and quality of sandblasting; the slag suction port on the sliding frame I frame collects the dust generated by sandblasting when the shot blasting mechanism is sandblasting and transports it to the purification treatment mechanism; during the process of the shot blasting mechanism sandblasting the I-beam, the slag suction port can collect the dust generated during the sandblasting process in real time and efficiently, effectively avoiding the accumulation of dust in the working area, while ensuring the cleanliness and safety of the working environment, avoiding dust pollution to the environment;

[0026] 3) Motor Ⅶ drives the spray hood to slide downward in the processing chamber. The inner diameter of the spray hood matches the inner diameter of the collection tank, and the positions of the spray hood and the collection tank correspond. When the spray hood fits with the fixed frame III, the spray hood and the collection tank form a closed spraying space. When the I-beam is sprayed in the spray hood, the exhaust gas generated is first guided to the collection tank on the fixed frame III. The exhaust gas is initially filtered through the filter plate to remove the paint mist particles and impurities. At the same time, motor Ⅺ drives the screw IV to rotate, driving The cleaning component moves on the filter plate to clean the accumulated impurities and ensure the filtering effect; the waste gas after preliminary filtration enters the trachea IV through the trachea II and trachea III, and is finally extracted by the vacuum pump and sent to the low-temperature plasma treatment box for effective purification treatment; the matching design of the inner diameter of the spray hood and the inner diameter of the collection tank ensures the airtightness of the spraying space, so that the waste gas generated by the I-beam during the spraying process can be effectively guided to the collection tank, which improves the efficiency of waste gas collection and avoids the pollution of the environment caused by the overflow of organic waste gas;

[0027] 4) When the spray hood is fitted with the fixed frame III, and the spray hood and the collection tank form a closed spraying space, the support end of the flip frame is located in the spraying space, and the clamping end of the flip frame is located outside the spraying space, which can prevent the paint sprayed from the telescopic nozzle from directly contacting the clamping end during the spraying process; after the spraying mechanism completes spraying in the spraying space, the dryer quickly dries the painted I-beam surface; the closed spraying space provides a stable environment for spraying, ensuring that the paint is evenly attached to the surface of the I-beam, improving the spraying quality, and reducing the pollution of the environment by organic waste gas produced by the volatilization of the paint; secondly, drying immediately after spraying shortens the production cycle and improves production efficiency, while preventing the paint on the surface of the I-beam from drying and causing flow marks when the flip mechanism flips the I-beam, and effectively prevents the paint on the surface of the I-beam from contaminating the clamping end of the flip frame, thereby ensuring the cleanliness of the flip frame and reducing the frequency and cost of maintenance of the clamping end of the flip frame;

[0028] 5) Motor VII drives the spray hood to slide in the processing chamber to cover the area that needs to be sprayed; during the spraying process, the paint is transported from the raw material box II to the hose through the pipeline, and the paint is transported to the telescopic nozzle to spray the I-beam. At the same time, motor VIII drives the rotating shaft IV, and the rotating baffle is rotated close to the drying hot air outlet through the bevel gear transmission, so as to prevent the paint mist from overflowing to the drying hot air outlet and blocking the air duct, and at the same time, maximize the spraying range of the telescopic nozzle; after the spraying is completed, motor VIII drives the rotating shaft IV, and the rotating baffle is rotated close to the telescopic nozzle through the bevel gear transmission, so as to prevent the paint on the telescopic nozzle from being dried and causing the telescopic nozzle to be blocked, and at the same time, maximize the drying hot air range of the drying hot air outlet; further, the dryer promptly dries the I-beam after spraying through the air pipe I and the drying hot air outlet;

[0029] 6) After spraying is completed, motor VI rotates lead screw II through bevel gear transmission, thereby driving sliding frame III to move in sliding groove II to adjust the clamping position of the limit plate; it can be flexibly adjusted according to I-beams of different sizes to adapt to spraying operations of I-beams of various specifications, thereby improving the versatility of the equipment; at the same time, cylinder III drives sliding block I to move, causing the rotating block to rotate, thereby driving rotating shaft III to rotate, causing the limit plate to rotate to clamp the I-beam to prevent the I-beam from slipping during the flipping process. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Attached Figure 1 This is a schematic structural diagram of a steel structure surface spray paint waste gas purification treatment device of the present invention;

[0031] Attached Figure 2 Yes Figure 1 Schematic diagram of the distribution of the sandblasting area and the spraying area;

[0032] Attached Figure 3 Yes Figure 1 Schematic diagram of the transport mechanism structure;

[0033] Attached Figure 4 Yes Figure 1 Schematic diagram of shot blasting mechanism structure Figure 1 ;

[0034] Attached Figure 5 Yes Figure 1 Schematic diagram of shot blasting mechanism structure Figure 2 ;

[0035] Attached Figure 6 Yes Figure 4 Schematic diagram of the rotating shell structure;

[0036] Attached Figure 7 Yes Figure 1 Schematic diagram of the flip mechanism structure;

[0037] Attached Figure 8 Yes Figure 1 Schematic diagram of the flipping effect of the middle flipping mechanism;

[0038] Attached Fig. 9 Yes Figure 7 Schematic diagram of the mid-turn frame structure Figure 1 ;

[0039] Attached Fig.10 Yes Figure 7 Schematic diagram of the mid-turn frame structure Figure 2 ;

[0040] Attached Fig.11 Yes Figure 1 Schematic diagram of the spraying mechanism structure Figure 1 ;

[0041] Attached Fig.12 Yes Figure 1 Schematic diagram of the spraying mechanism structure Figure 2 ;

[0042] Attached Fig.13 Yes Fig.12 Schematic diagram of the structure of the medium telescopic nozzle;

[0043] Attached Fig.14 Yes Figure 1 Schematic diagram of the exhaust gas collection mechanism;

[0044] Attached Fig.15 Yes Fig.14 Schematic diagram of the structure of the middle filter plate;

[0045] Attached Fig.16 Yes Figure 1 Schematic diagram of the closing effect of the spraying mechanism and the exhaust gas collection mechanism;

[0046] Attached Fig.17This is a schematic diagram of the appearance of a steel structure surface spray paint waste gas purification treatment device of the present invention;

[0047] In the figure: 1. Processing chamber; 101. Feeding port; 102. Discharging port; 103. Partition plate I; 104. Fixed frame I; 105. Slide rail I; 106. Fixed plate I; 107. Partition plate II; 108. Sandblasting area; 109. Spraying area; 110. Partition plate III; 2. Transport mechanism; 21. Transport plate; 22. Motor I; 23. Rotating shaft I; 3. Shot blasting mechanism; 31. Raw material box I; 32. Spray head I; 33. Lead screw I; 34. Sliding rod I; 35. Sliding frame I; 36. Slag suction port; 37. Sandblasting chamber; 38. Recovery box; 39. Fixed frame Ⅱ; 310, motor Ⅱ; 311, support roller; 312, telescopic air pipe; 313, motor Ⅲ; 314, sliding frame Ⅱ; 315, rotating shell; 316, motor Ⅳ; 317, two-way screw; 318, clamping claw; 319, top plate Ⅰ; 320, cylinder Ⅰ; 4, turning mechanism; 41, turning frame; 42, rotating shaft Ⅱ; 43, motor Ⅴ; 44, double-acting cylinder; 45, top plate Ⅱ; 46, cylinder Ⅱ; 47, sliding groove Ⅰ; 48, cylinder Ⅲ; 49, limit plate; 410, sliding groove Ⅱ; 411, screw Ⅱ; 412, fixed plate Ⅱ; 4 13. Sliding rod II; 414. Motor VI; 415. Sliding frame III; 416. Rotating shaft III; 417. Rotating block; 418. Through slot; 419. Sliding block I; 420. Slide rail II; 5. Spraying mechanism; 51. Raw material box II; 52. Pipe; 53. Sliding slot III; 54. Dryer; 55. Air pipe I; 56. Spraying hood; 57. Motor VII; 58. Hose; 59. Drying hot air outlet; 510. Rotating baffle; 511. Motor VIII; 512. Rotating shaft IV; 513. Motor IX; 514. Lead screw III; 515. Sliding rod III; 51 6. Sliding block II; 517. Motor X; 518. Rotating rod; 519. Swinging rod; 520. Telescopic nozzle; 521. Electric push rod; 522. Connecting plate; 523. Swinging frame; 6. Purification treatment mechanism; 61. Low-temperature plasma treatment box; 62. Fixed frame III; 63. Collecting tank; 64. Filter plate; 65. Lead screw IV; 66. Sliding rod IV; 67. Motor XI; 68. Cleaning component; 69. Drain bin; 610. Vacuum pump; 611. Air pipe II; 612. Air pipe III; 613. Waste collection box; 614. Air pipe IV; 7. I-beam. DETAILED DESCRIPTION

[0048] To facilitate the understanding of those skilled in the art, Figure 1-17 , the technical solution of the present invention is further specifically described.

[0049] A steel structure surface spray paint exhaust gas purification treatment device, comprising a treatment chamber 1, a fixed frame Ⅰ104, a fixed plate Ⅰ106, a partition Ⅱ107, a sandblasting area 108, a spraying area 109, a transportation mechanism 2, a shot blasting mechanism 3, a flip mechanism 4, a spraying mechanism 5, and a purification treatment mechanism 6; the treatment chamber 1 is provided with a feed inlet 101 at one end and a discharge port 102 at one end; fixed plates Ⅰ106 are installed on both sides of the treatment chamber 1, a slide rail Ⅰ105 is provided on the top of the fixed plate Ⅰ106, a fixed frame Ⅰ104 is installed on one side of the slide rail Ⅰ105, a partition Ⅰ103 is provided on the top of the fixed frame Ⅰ104, and the partition Ⅰ103 is provided A partition plate II 107 is installed on one side, and a partition plate III 110 is provided on one side of the partition plate II 107; the partition plate II 107 separates the sandblasting area 108 and the spraying area 109 in the processing chamber 1, and the sandblasting area 108 is located at the end of the feed port 101; the spraying area 109 is located at the end of the discharge port 102; a transportation mechanism 2 is installed between the feed port 101, the turning mechanism 4 and the shot blasting mechanism 3; the shot blasting mechanism 3 is installed in the sandblasting area 108; the turning mechanism 4, the spraying mechanism 5, and the purification treatment mechanism 6 are all installed in the spraying area 109, the spraying mechanism 5 is located at the top of the spraying area 109, the purification treatment mechanism 6 is located at the bottom of the spraying area 109, and the turning mechanism 4 is located between the spraying mechanism 5 and the purification treatment mechanism 6.

[0050] From the above description, it can be seen that: first, the I-beam 7 enters the sandblasting area 108 from the feed port 101 of the processing bin 1 through the transport mechanism 2, and the shot blasting mechanism 3 performs sandblasting on the surface of the I-beam 7; then, the I-beam 7 is transferred to the spraying area 109 through the transport mechanism 2; the spraying mechanism 5 sprays paint on the I-beam 7, and the flipping mechanism 4 flips the I-beam 7 to ensure that each surface of the I-beam 7 can be evenly painted, and the purification treatment mechanism 6 recovers the waste gas generated by the painting in time; finally, the I-beam 7 that has completed the painting is sent out from the discharge port 102.

[0051] The transport mechanism 2 includes a transport plate 21, a motor Ⅰ22, and a rotating shaft Ⅰ23; the transport plate 21 is slidably installed between the feed port 101, the flip mechanism 4 and the shot blasting mechanism 3, the bottom of the transport plate 21 is provided with a groove, and a rack is provided in the groove. The rotating shaft Ⅰ23 is located at the bottom of the transport plate 21, and a gear is provided on the rotating shaft Ⅰ23, and the gear and the rack are meshed with each other; a motor Ⅰ22 is installed at one end of the rotating shaft Ⅰ23.

[0052] From the above description, it can be known that the motor Ⅰ22 drives the rotating shaft Ⅰ23 to rotate, and the gear on the rotating shaft Ⅰ23 engages with the rack at the bottom of the transport plate 21, pushing the transport plate 21 to transport the I-beam 7 between the feed port 101, the turning mechanism 4 and the shot blasting mechanism 3.

[0053] The shot blasting mechanism 3 includes a raw material box I31, a sliding frame I35, a sandblasting chamber 37, a recovery box 38, a fixed frame II39, a motor II310, a support roller 311, a telescopic air pipe 312, a motor III313, a sliding frame II314, a rotating shell 315, a bidirectional screw 317, a clamping claw 318, a top plate I319, and an oil cylinder I320; the raw material box I31 is fixedly installed on the top of the sandblasting area 108, a feed port 101 is provided on the top of the raw material box I31, and a nozzle I32 is provided at the bottom, and the nozzle I32 is used to spray the metal projectiles of the sandblasting I-beam 7; the recovery box 38 is installed at the bottom of the sandblasting area 108, and a sandblasting chamber 37 is installed on the top of the recovery box 38. The recovery box 38 and The sandblasting chamber 37 is connected, and several groups of supporting rollers 311 are installed in the sandblasting chamber 37. Screws I33 and sliding rods I34 are arranged on both sides between the raw material box I31 and the sandblasting chamber 37. The screws I33 are rotatably connected to the raw material box I31 and the sandblasting chamber 37, and the sliding rods I34 are fixedly connected to the raw material box I31 and the sandblasting chamber 37. A fixing frame II39 is installed at the bottom of the raw material box I31, and the fixing frame II39 is rotatably connected to the screw I33. A worm wheel is arranged on the screw I33, and a worm is arranged on one side of the fixing frame II39. The worm is rotatably connected to the fixing frame II39, and the worm wheel and the worm are meshed with each other. A motor II310 is installed on one side of the worm, and the output shaft of the motor II310 is fixedly connected to the worm. The sliding frame Ⅰ35 is threadedly connected with the lead screw Ⅰ33 and is slidably connected with the sliding rod Ⅰ34. The sliding frame Ⅰ35 is set to be hollow, and a slag suction port 36 is provided on the frame of the sliding frame Ⅰ35. A telescopic air pipe 312 is installed on the top of the sliding frame Ⅰ35, and the output end of the telescopic air pipe 312 is fixedly connected with the purification treatment mechanism 6; the sliding frame Ⅱ314 is provided with two groups, and the two groups of sliding frames Ⅱ314 are located on both sides of the bottom of the sliding frame Ⅰ35. The sliding frame Ⅱ314 is threadedly connected with the lead screw Ⅰ33 and is slidably connected with the sliding rod Ⅰ34. The rotating shell 315 is rotatably connected with the sliding frame Ⅱ314, and a bidirectional lead screw 317 is rotatably installed on the rotating shell 315, and a worm gear is provided on the bidirectional lead screw 317, and a worm gear is provided on the top of the worm gear. Rod, worm wheel and worm are meshed with each other, a motor IV316 is provided on one side of the worm, the output end of motor IV316 is fixedly connected to the worm, and motor IV316 is fixedly installed in the rotating shell 315; the clamping jaws 318 are provided with two groups, the clamping jaws 318 are slidably connected to the rotating shell 315, and are threadedly connected to the bidirectional lead screw 317, and a cylinder I320 is installed inside the clamping end of the clamping jaw 318, and the cylinder I320 is a bidirectional synchronous cylinder, and a top plate I319 is installed on the top and bottom of the clamping end of the clamping jaw 318, and the top plate I319 is fixedly connected to the output end of the cylinder I320; a motor III313 is installed on one side of the rotating shell 315, and the output end of the motor III313 is fixedly connected to the rotating shell 315.

[0054] From the above description, it can be seen that: the transport mechanism 2 of the feed port 101 transports the I-beam 7 to the sandblasting area 108, the motor II 310 drives the worm to rotate, drives the worm wheel engaged with it to rotate, causes the lead screw I 33 to rotate, and the sliding frame II 314 moves under the action of the lead screw I 33. After the sliding frame II 314 moves to the two ends of the I-beam 7, the motor IV 316 drives the worm to rotate, drives the worm wheel on the bidirectional lead screw 317 to rotate, causes the clamp 318 to slide in the rotating shell 315, and the I-beam 7 is moved to the two ends of the I-beam 7. The I-beam 7 is clamped horizontally, and the oil cylinder Ⅰ320 inside the clamping jaw 318 can further clamp the I-beam 7 through the top plate Ⅰ319. The motor Ⅲ313 drives the rotating shell 315 to rotate, thereby driving the I-beam 7 to rotate, which is convenient for all-round sandblasting of the I-beam 7; the nozzle Ⅰ32 at the bottom of the raw material box Ⅰ31 sprays metal projectiles to sandblast the I-beam 7, and the dust is collected and transported to the purification treatment mechanism 6 by the slag suction port 36 on the frame of the sliding frame Ⅰ35. After the sandblasting is completed, it is turned over. The transport mechanism 2 between the mechanism 4 and the shot blasting mechanism 3 moves to the bottom of the I-beam 7, the motor IV 316 drives the bidirectional screw 317 to make the clamp 318 release the I-beam 7, the motor III 313 drives the rotating shell 315 to rotate 90°, the motor IV 316 drives the bidirectional screw 317 to make the clamp 318 vertically clamp the I-beam 7, the motor III 313 drives the rotating shell 315 to continue to rotate, the transport mechanism 2 exits the sandblasting area 108, and the nozzle I at the bottom of the raw material box I 31 is 32 sprays metal shots to sandblast the unblasted end of the I-beam 7. After the sandblasting of the clamped end is completed, the transportation mechanism 2 between the flipping mechanism 4 and the shot blasting mechanism 3 moves to the bottom of the I-beam 7, and the motor IV 316 drives the bidirectional screw 317 to make the clamping claw 318 release the I-beam 7. The motor II 310 drives the screw I 33 to rotate to move the sliding frame II 314 upward, and the transportation mechanism 2 transports the I-beam 7 to the flipping mechanism 4, thereby realizing efficient sandblasting and dust recovery of the I-beam 7.

[0055] The flip mechanism 4 includes a flip frame 41, a rotating shaft II 42, a motor V 43, a double-acting cylinder 44, a top plate II 45, a cylinder II 46, a cylinder III 48, a limit plate 49, a screw II 411, a fixed plate II 412, a sliding rod II 413, a motor VI 414, a sliding frame III 415, a rotating shaft III 416, a rotating block 417, a sliding block I 419, and a slide rail II 420; the rotating shaft II 42 is provided with four groups, and the four groups of rotating shafts II 42 are arrayed in the spraying area 109 and are rotatably connected with the fixed frame I 104. Gears are provided on both sides of the first and third groups of rotating shafts II 42, and a rack is provided at the bottom of the gear. The rack is slidably installed in the slide rail I 105, and the gear and the rack are meshed with each other. The double-acting cylinder 44 is provided with two groups, and the double-acting cylinder 44 It is installed on the fixed plate Ⅰ106 on both sides of the processing chamber 1, and one end of the rack is fixedly connected to the output end of the double-acting cylinder 44; the second and fourth groups of rotating shafts Ⅱ42 are provided with pulleys on both sides, and a belt is provided between the pulleys on both sides of the second and fourth groups of rotating shafts Ⅱ42, and the pulleys are driven by the belt, and a bevel gear is provided at one end of the fourth group of rotating shafts Ⅱ42, and a motor Ⅴ43 is installed at one end of the fourth group of rotating shafts Ⅱ42, and a bevel gear is provided at the output end of the motor Ⅴ43, and the bevel gear of the motor Ⅴ43 is meshed with the bevel gear of the fourth group of rotating shafts Ⅱ42; a plurality of groups of turning frames 41 are installed on the rotating shaft Ⅱ42, and the turning frames 41 on each group of rotating shafts Ⅱ42 are staggered; the turning frame 41 is "L" shaped, and one end of the turning frame 41 is a supporting end, and the other end is a clamping end; the The top plate Ⅱ45 is located at the supporting end of the flip frame 41, and a protective shell is provided at the bottom of the top plate Ⅱ45. The cylinder Ⅱ46 is installed in the protective shell, and the output end of the cylinder Ⅱ46 is fixedly connected to the top plate Ⅱ45; a groove is provided at the top of the clamping end of the flip frame 41, and sliding grooves Ⅰ47 are provided on both sides of the groove. A sliding groove Ⅱ410 is provided at the bottom of the groove, and a limit plate 49 is slidably installed in the groove, and a rotating shaft Ⅲ416 is fixedly connected to the limit plate 49. Both ends of the rotating shaft Ⅲ416 are located in the sliding groove Ⅰ47. One end of the sliding frame Ⅲ415 is slidably installed in the sliding groove Ⅱ410, and the sliding frame Ⅲ415 is rotatably connected to the rotating shaft Ⅲ416; two sets of fixed plates Ⅱ412 are installed at the supporting end of the flip frame 41, and the lead screw Ⅱ411 and the sliding rod Ⅱ413 are located between the two sets of fixed plates Ⅱ412 The lead screw Ⅱ411 is rotatably connected with the fixed plate Ⅱ412 and is threadedly connected with the sliding frame Ⅲ415. The sliding rod Ⅱ413 is fixedly connected with the fixed plate Ⅱ412 and is slidably connected with the sliding frame Ⅲ415. A bevel gear is provided at one end of the lead screw Ⅱ411. The motor Ⅵ414 is installed on one side of the fixed plate Ⅱ412. A bevel gear is provided at one end of the motor Ⅵ414. The bevel gear at the end of the lead screw Ⅱ411 and the bevel gear at the end of the motor Ⅵ414 are meshed with each other; rotating blocks 417 are fixedly installed at both ends of the rotating shaft Ⅲ416, and a through groove 418 is provided on the rotating block 417. Slide rails Ⅱ420 are installed on both sides of the supporting end of the flip frame 41. The sliding block Ⅰ419 is slidably connected with the slide rail Ⅱ420. One end of the sliding block Ⅰ419 is arranged in the through groove 418 and is slidably connected with the rotating block 417;The oil cylinder III48 is installed on both sides of the sliding frame III415, and the output end of the oil cylinder III48 is fixedly connected to the sliding block I419. ;

[0056] From the above content, it can be known that: the motor V43 drives the fourth group of rotating shafts II42 to rotate by means of bevel gear transmission, and the second group of rotating shafts II42 realizes rotation through the transmission method of pulleys and belts; for the first and third groups of rotating shafts II42, the rack is pushed to slide in the slide rail I105 by the double-acting cylinder 44, thereby driving the gear to rotate, so that the corresponding rotating shaft II42 can rotate; when the transportation mechanism 2 transports the sandblasted I-beam 7 to the turning frame 41 of the first group of rotating shafts II42, the spraying mechanism 5 sprays the top surface of the I-beam 7; after the spraying is completed, the motor VI414 rotates the lead screw II411 through the bevel gear transmission, thereby driving the sliding frame III415 to move in the sliding groove II410 to adjust the clamping position of the limit plate 49; at the same time, the cylinder III48 drives the sliding block I419 to move, so that the rotating block 417 rotates, thereby driving the rotating shaft III416 to rotate, so that the limit plate 4 9 rotates to clamp the I-beam 7 to prevent the I-beam 7 from slipping during the flipping process; then the double-acting cylinder 44 at the output connection end of the first group of rotating shafts II 42 contracts, causing the flip frame 41 on the first group of rotating shafts II 42 to flip, so that the flip frame 41 of the first group of rotating shafts II 42 rotates 90° to face the flip frame 41 of the second group of rotating shafts II 42; then, the cylinder III 48 drives the sliding block I 419 to move, causing the rotating block 417 to rotate, thereby driving the rotating shaft III 416 to rotate, so that the limit plate 49 rotates to the groove at the supporting end of the flip frame 41; then, the cylinder II 46 drives the top plate II 45 to push the I-beam 7 onto the flip frame 41 of the second group of rotating shafts II 42; then, the spraying mechanism 5 on the top of the second group of rotating shafts II 42 sprays the side of the I-beam 7; and so on, when the I-beam 7 is sprayed on the flip frame 41 on the fourth group of rotating shafts II 42, the I-beam 7 has completely completed the spraying operation.

[0057] The spraying mechanism 5 includes a raw material box II 51, a pipeline 52, a drying machine 54, an air pipe I 55, a spray hood 56, a hose 58, a rotating baffle 510, a rotating shaft IV 512, a motor IX 513, a screw III 514, a sliding rod III 515, a sliding block II 516, a motor X 517, a rotating rod 518, a telescopic nozzle 520, an electric push rod 521, a connecting plate 522, and a swing frame 523; the raw material box II 51 is installed on one side of the processing warehouse 1, and a feed port is provided on the top of the raw material box II 51; the pipeline 52 is provided with a plurality of raw material boxes II 51 installed on the top of the spraying area of ​​the processing warehouse 1, and one end of the pipeline 52 is connected to the raw material box II 51; The spray hood 56 is located at the bottom of the pipeline 52, and the spray hood 56 is slidably connected to the inner wall of the processing chamber 1. Racks are provided at both ends of the top of the spray hood 56, and a gear is provided on one side of the rack. The gear and the rack are meshed with each other. A motor VII 57 is provided on one side of the gear. The output end of the motor VII 57 is fixedly connected to the gear. The motor VII 57 is installed on the inner walls on both sides of the spraying area of ​​the processing chamber 1; dryers 54 are installed at both ends of the top of the spray hood 56, and air pipes I 55 are installed on both sides of the top of the spray hood 56. The air pipes I 55 are connected to the dryers 54; a plurality of groups of drying hot air outlets 59 are provided on the air pipes I 55, and the drying hot air outlets 59 are located in the spray hood 56;

[0058] The rotating baffle 510 is provided with two groups located on one side of the drying hot air outlet 59, and the rotating baffle 510 is rotatably connected with the spray hood 56. A bevel gear is provided at one end of the spray hood 56, and a rotating shaft IV512 is rotatably installed at one end of the top of the spray hood 56. A bevel gear is provided on the rotating shaft IV512, and the bevel gear on the rotating shaft IV512 is meshed with the bevel gear at the end of the rotating baffle 510. A motor VIII511 is provided at one end of the rotating shaft IV512, and the motor VIII511 is installed at one end of the top of the spray hood 56. The output end of the motor VIII511 is fixedly connected to the rotating shaft IV512;

[0059] The lead screw III514 and the sliding rod III515 are located inside the two sets of rotating baffles 510. The lead screw III514 is rotatably connected to the spray hood 56, and the sliding rod III515 is fixedly connected to the spray hood 56. A motor IX513 is installed at one end of the lead screw III514, and the output end of the motor IX513 is fixedly connected to the lead screw III514; the sliding block II516 is threadedly connected to the lead screw III514 and slidably connected to the sliding rod III515. The swing frame 523 is located at the bottom of the sliding block II516 and is rotatably connected to the sliding block II516; the motor X517 is installed at the top of the sliding block II516, and the motor X517 is fixedly connected to the output end of the motor X513. A rotating rod 518 is fixedly installed at the output end of the machine X517, and a swing rod 519 is provided on one side of the rotating rod 518. One end of the swing rod 519 is fixedly connected to the swing frame 523. A sliding groove III53 is provided on the swing rod 519. One end of the rotating rod 518 is arranged in the sliding groove III53 and is slidably connected to the swing rod 519; a telescopic nozzle 520 and an electric push rod 521 are installed at the bottom of the swing frame 523, and the telescopic end of the electric push rod 521 is fixedly connected to the telescopic end of the telescopic nozzle 520 through a connecting plate 522. A hose 58 is installed on the top of the telescopic nozzle 520, and the hose 58 is connected to the pipeline 52.

[0060] From the above description, it can be seen that: motor VII 57 drives the spray hood 56 to slide in the processing chamber 1 to cover the area that needs to be sprayed; during the spraying process, the paint is transported from the raw material box II 51 to the hose 58 through the pipe 52, and the paint is transported to the telescopic nozzle 520 to spray the I-beam 7. At the same time, the motor VIII 511 drives the rotating shaft IV 512, and the rotating baffle 510 is rotated close to the drying hot air outlet 59 through the bevel gear transmission, so as to maximize the spraying range of the telescopic nozzle 520 while preventing the paint mist from overflowing to the drying hot air outlet 59 and blocking the air duct; after the spraying is completed, the motor VIII 511 drives the rotating shaft IV 512, and the rotating baffle 510 is rotated close to the telescopic nozzle 520 through the bevel gear transmission, so as to prevent the paint on the telescopic nozzle 520 from being dried and causing the telescopic nozzle 520 to be blocked. At the same time, the drying hot air range of the drying hot air outlet 59 is maximized; and the dryer 54 promptly dries the sprayed I-beam 7 through the air pipe I55 and the drying hot air outlet 59; the motor IX 513 drives the lead screw III 514 to rotate, and the sliding block II 516 keeps stable sliding on the sliding rod III 515, so that the telescopic nozzle 520 can quickly spray the I-beam 7, and the motor X 517 drives the rotating rod 518 to rotate, and through the sliding connection of the swing rod 519 and the sliding groove III 53, the swing frame 523 and the telescopic nozzle 520 and the electric push rod 521 at the bottom thereof are swung and adjusted, and the electric push rod 521 pushes the telescopic nozzle 520 to adjust the height, thereby increasing the spraying range and height of the telescopic nozzle 520, and ensuring that the spraying mechanism 5 can adapt to I-beams 7 of different sizes.

[0061] The purification treatment mechanism 6 includes a low-temperature plasma treatment box 61, a fixed frame III 62, a filter plate 64, a motor XI 67, a cleaning component 68, a sewage bin 69, an air pump 610, an air pipe II 611, and an air pipe III 612; the low-temperature plasma treatment box 61 is installed on one side of the treatment bin 1; the fixed frame III 62 is installed at the bottom of the flip mechanism 4, the top of the fixed frame III 62 is matched with the bottom of the flip frame 41, and a plurality of collection grooves 63 are arranged on the fixed frame III 62, and the collection grooves 63 are located at the bottom of the flip frame 41, and a filter plate 64 is installed in the collection groove 63, and a lead screw IV 65 and a sliding rod IV 66 are arranged on the top of the filter plate 64, and the lead screw IV 65 is rotatably connected with the sewage bin 69 and the fixed frame III 62, and the sliding rod Ⅳ66 is fixedly connected to the sewage bin 69 and the fixed frame III62, a motor Ⅺ67 is installed at one end of the screw IV65, and the output end of the motor Ⅺ67 is fixedly connected to the screw IV65, and the cleaning assembly 68 is located on the filter plate 64 and is threadedly connected to the screw IV65, and is slidingly connected to the sliding rod IV66; a sewage bin 69 is installed at one end of the collecting tank 63, the sewage bin 69 is connected to the collecting tank 63, and a waste collection box 613 is installed at the bottom of the sewage bin 69; a plurality of groups of air pipes II 611 are provided at the bottom of the collecting tank 63, and an air pipe III 612 is connected to the bottom of the air pipe II 611, one end of the air pipe III 612 is connected to the air pipe IV 614, and one end of the air pipe IV 614 is connected to the low-temperature plasma treatment box 61 through the vacuum pump 610.

[0062] From the above description, it can be seen that during the operation of the processing chamber 1, the waste gas generated is first guided to the collection tank 63 on the fixed frame III 62, and the waste gas is preliminarily filtered through the filter plate 64 to remove the paint mist particles and impurities therein. At the same time, the motor XI 67 drives the screw IV 65 to rotate, driving the cleaning component 68 to move on the filter plate 64 to clean the accumulated impurities and ensure the filtering effect; the waste gas after the preliminary filtration enters the trachea IV 614 through the trachea II 611 and the trachea III 612, and is finally extracted by the vacuum pump 610 and sent to the low-temperature plasma processing box 61 for further treatment to meet the emission standards; when the impurities on the filter plate 64 accumulate to a certain extent, the motor XI 67 drives the cleaning component 68 to push the impurities into the sewage discharge bin 69, and finally falls into the waste collection box 613, which is convenient for subsequent treatment and cleaning.

[0063] A steel structure surface spray paint exhaust gas purification treatment device, the working process is as follows:

[0064] First, the I-beam 7 enters the sandblasting area 108 from the feed port 101 of the processing chamber 1 through the transportation mechanism 2, and the shot blasting mechanism 3 performs sandblasting on the surface of the I-beam 7; then, the I-beam 7 is transferred to the spraying area 109 through the transportation mechanism 2; the spraying mechanism 5 sprays paint on the I-beam 7, and the turning mechanism 4 turns the I-beam 7 to ensure that each surface of the I-beam 7 can be evenly painted, and the purification treatment mechanism 6 recovers the waste gas generated by the painting in time; finally, the I-beam 7 that has completed the painting is sent out from the discharge port 102.

[0065] In the description of the present invention, unless otherwise specified, the cylinders involved are all single-acting cylinders.

[0066] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0067] In summary, electronic or electrical components including but not limited to motors, cylinders, vacuum pumps, electric push rods, etc. are components in the prior art, obtained through private customization or purchase, and the electrical connections between the components are conventional circuit connections or electrical connections in the prior art and are not within the scope of protection of the present invention.

[0068] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

Claims

1. A steel structure surface spray paint exhaust gas purification treatment device, characterized in that The specific steps of the device processing method are as follows: 1) Transportation by transportation mechanism: I-beams enter the sandblasting area from the feed port of the processing bin through the transportation mechanism; 2) Shot blasting mechanism: Motor II drives the worm to rotate, driving the worm wheel meshing with it to rotate, so that the lead screw I rotates, and the sliding frame II moves under the action of the lead screw I. The motor IV drives the worm to rotate, driving the worm wheel on the bidirectional lead screw to rotate, so that the clamp slides in the rotating shell to clamp the I-beam horizontally. The motor III drives the rotating shell to rotate, thereby driving the I-beam to rotate; the nozzle I at the bottom of the raw material box I sprays metal projectiles to sandblast the I-beam; 3) Sandblasting dust collection: The slag suction port on the sliding frame I frame collects the dust during sandblasting and transports it to the purification treatment mechanism. After completion, the transportation mechanism transports the I-beam to the flipping mechanism; 4) Flipping of the flipping mechanism: Motor VI rotates the lead screw II through the bevel gear transmission, thereby driving the sliding frame III to move in the sliding groove II to adjust the clamping position of the limit plate; at the same time, the cylinder III drives the sliding block I to move, so that the rotating block rotates, and then drives the rotating shaft III to rotate, so that the limit plate rotates to clamp the I-beam; then the double-acting cylinder at the output connection end of the first group of rotating shafts II contracts, so that the flip frame of the first group of rotating shafts II rotates 90° to face the flip frame of the second group of rotating shafts II; Cylinder III drives sliding block I to move, causing the rotating block to rotate; The oil cylinder II drives the top plate II to push the I-beam onto the turning frame of the second set of rotating shafts II; 5) Spraying by spraying mechanism: Motor VII drives the spray hood to slide in the processing chamber to cover the area to be sprayed; during the spraying process, the paint is transported from the raw material box II to the hose through the pipeline, and the paint is transported to the telescopic nozzle to spray the I-beam; 6) Drying with dryer: After spraying is completed, motor VIII drives rotating shaft IV, and the rotating baffle rotates close to the telescopic nozzle through bevel gear transmission. The dryer dries the sprayed I-beam in time through air pipe I and drying hot air outlet, and then repeats steps 4) to 6) until the spraying and drying of the I-beam is completed; 7) Waste gas collection: The generated waste gas is first guided to the collection tank on the fixed frame III, and the waste gas is initially filtered through the filter plate to remove the paint mist particles and impurities. At the same time, the motor Ⅺ drives the lead screw IV to rotate, driving the cleaning component to move on the filter plate to clean the accumulated impurities and ensure the filtering effect; the waste gas after the initial filtration enters the trachea IV through the trachea II and trachea III, and is finally extracted by the vacuum pump and sent to the low-temperature plasma treatment box for further treatment to meet the emission standards; A device for purifying and treating waste gas from spraying paint on a steel structure surface, comprising a treatment chamber, a fixed frame I, a fixed plate I, a partition II, a sandblasting area, a spraying area, a transport mechanism, a shot blasting mechanism, a flip mechanism, a spraying mechanism, and a purification mechanism; a feed port is provided at one end of the treatment chamber, and a discharge port is provided at one end; fixed plates I are installed on both sides of the treatment chamber, a slide rail I is provided on the top of the fixed plate I, a fixed frame I is installed on one side of the slide rail I, a partition I is provided on the top of the fixed frame I, a partition II is installed on one side of the partition I, and a partition III is provided on one side of the partition II; the partition II separates the sandblasting area and the spraying area in the treatment chamber, the sandblasting area is located at the feed port end; the spraying area is located at the discharge port end; a transport mechanism is installed between the feed port, the flip mechanism, and the shot blasting mechanism; the shot blasting mechanism is installed in the sandblasting area; the flip mechanism, the spraying mechanism, and the purification mechanism are all installed in the spraying area, the spraying mechanism is located at the top of the spraying area, the purification mechanism is located at the bottom of the spraying area, and the flip mechanism is located between the spraying mechanism and the purification mechanism; The flip mechanism includes a flip frame, a rotating shaft II, a motor V, a double-acting cylinder, a top plate II, a cylinder II, a cylinder III, a limit plate, a screw II, a fixed plate II, a sliding rod II, a motor VI, a sliding frame III, a rotating shaft III, a rotating block, a sliding block I, and a slide rail II; the rotating shaft II is provided with four groups, and the four groups of rotating shaft II are arrayed in the spraying area and are rotatably connected with the fixed frame I. Gears are provided on both sides of the first and third groups of rotating shaft II, and a rack is provided at the bottom of the gear. The rack is slidably installed in the slide rail I, and the gear and the rack are meshed with each other. The double-acting cylinder is provided with two groups, and the double-acting cylinder is installed on the fixed plate I on both sides of the processing chamber, and one end of the rack is fixedly connected to the output end of the double-acting cylinder; the second and fourth Pulleys are arranged on both sides of the rotating shaft II of the group, and a belt is arranged between the pulleys on both sides of the second and fourth rotating shafts II, and the pulleys are driven by the belts. A bevel gear is arranged at one end of the fourth rotating shaft II, and a motor V is installed at one end of the fourth rotating shaft II. A bevel gear is arranged at the output end of the motor V, and the bevel gear of the motor V is meshed with the bevel gear of the fourth rotating shaft II; a plurality of groups of turning frames are installed on the rotating shaft II, and the turning frames on each group of rotating shaft II are staggered; the turning frame is "L" shaped, and one end of the turning frame is a supporting end, and the other end is a clamping end; the top plate II is located at the supporting end of the turning frame, and a protective shell is arranged at the bottom of the top plate II, and the oil cylinder II is installed in the protective shell, and the output end of the oil cylinder II is fixedly connected to the top plate II; The purification treatment mechanism includes a low-temperature plasma treatment box, a fixed frame III, a filter plate, a motor XI, a cleaning component, a sewage bin, an air pump, an air pipe II, and an air pipe III; the low-temperature plasma treatment box is installed on one side of the treatment bin; the fixed frame III is installed at the bottom of the flip mechanism, the top of the fixed frame III is matched with the bottom of the flip frame, and a plurality of collection tanks are arranged on the fixed frame III, the collection tanks are located at the bottom of the flip frame, and the filter plates are installed in the collection tanks, and the top of the filter plates is provided with a lead screw IV and a sliding rod IV, the lead screw IV is rotatably connected with the sewage bin and the fixed frame III, and the sliding rod IV is provided with a lead screw IV and a sliding rod IV. The moving rod IV is fixedly connected to the sewage discharge bin and the fixed frame III, a motor XI is installed at one end of the lead screw IV, the output end of the motor XI is fixedly connected to the lead screw IV, the cleaning component is located on the filter plate and is threadedly connected to the lead screw IV, and is slidingly connected to the sliding rod IV; a sewage discharge bin is installed at one end of the collecting tank, the sewage discharge bin is connected to the collecting tank, and a waste collection box is installed at the bottom of the sewage discharge bin; a plurality of groups of air pipes II are arranged at the bottom of the collecting tank, the bottom of the air pipe II is connected to the air pipe III, one end of the air pipe III is connected to the air pipe IV, and one end of the air pipe IV is connected to the low-temperature plasma treatment box through a vacuum pump.

2. The device for purifying waste gas from spray painting on a steel structure surface according to claim 1 is characterized in that The top of the clamping end of the flip frame is provided with a groove, sliding grooves I are provided on both sides of the groove, and a sliding groove II is provided at the bottom of the groove. The limit plate is slidably installed in the groove, the rotating shaft III is fixedly connected to the limit plate, and both ends of the rotating shaft III are located in the sliding groove I. One end of the sliding frame III is slidably installed in the sliding groove II, and the sliding frame III is rotatably connected to the rotating shaft III; two groups of fixed plates II are installed on the supporting end of the flip frame, and the screw II and the sliding rod II are located between the two groups of fixed plates II. The screw II is rotatably connected to the fixed plate II and is threadedly connected to the sliding frame III. The sliding rod II is connected to the fixed plate Ⅱ is fixedly connected and slidably connected with the sliding frame III, one end of the screw II is provided with a bevel gear, the motor VI is installed on one side of the fixed plate II, one end of the motor VI is provided with a bevel gear, the bevel gear at the end of the screw II and the bevel gear at the end of the motor VI are meshed with each other; rotating blocks are fixedly installed at both ends of the rotating shaft III, the rotating block is provided with a through groove, slide rails Ⅱ are installed on both sides of the support end of the flip frame, the sliding block I is slidably connected with the slide rail Ⅱ, one end of the sliding block I is arranged in the through groove and slidably connected with the rotating block; the cylinder III is installed on both sides of the sliding frame III, and the output end of the cylinder III is fixedly connected with the sliding block I.

3. The device for purifying waste gas from spray painting on steel structure surface according to claim 1 is characterized in that The transport mechanism includes a transport plate, a motor I, and a rotating shaft I; a transport plate is slidably installed between the feed port, the flip mechanism and the shot blasting mechanism, a groove is provided at the bottom of the transport plate, a rack is provided in the groove, the rotating shaft I is located at the bottom of the transport plate, a gear is provided on the rotating shaft I, and the gear and the rack are meshed with each other; a motor I is installed at one end of the rotating shaft I.

4. The device for purifying waste gas from spray painting on steel structure surface according to claim 1 is characterized in that The shot blasting mechanism includes a raw material box I, a sliding frame I, a sandblasting bin, a recovery box, a fixed frame II, a motor II, a support roller, a telescopic air pipe, a motor III, a sliding frame II, a rotating shell, a bidirectional screw, a clamp, a top plate I, and a cylinder I; the raw material box I is fixedly installed on the top of the sandblasting area, a feed port is provided on the top of the raw material box I, and a nozzle I is provided at the bottom; the recovery box is installed at the bottom of the sandblasting area, a sandblasting bin is installed on the top of the recovery box, the recovery box is connected to the sandblasting bin, and several groups of support rollers are installed in the sandblasting bin, screws I and sliding rods I are provided on both sides between the raw material box I and the sandblasting bin, screws I are rotatably connected to the raw material box I and the sandblasting bin, and sliding rods I are fixedly connected to the raw material box I and the sandblasting bin; a fixed frame II is installed at the bottom of the raw material box I, the fixed frame II is rotatably connected to the screw I, a worm wheel is provided on the screw I, a worm is provided on one side of the fixed frame II, the worm is rotatably connected to the fixed frame II, and the worm wheel and the worm are mutually The worm is meshed, and a motor II is installed on one side of the worm, and the output shaft of motor II is fixedly connected to the worm; the sliding frame I is threadedly connected to the lead screw I, and is slidably connected to the sliding rod I, the sliding frame I is set to be hollow, and a slag suction port is provided on the frame of the sliding frame I, and a telescopic air pipe is installed on the top of the sliding frame I, and the output end of the telescopic air pipe is fixedly connected to the purification treatment mechanism; the sliding frame II is provided with two groups, and the two groups of sliding frames II are located on both sides of the bottom of the sliding frame I, the sliding frame II is threadedly connected to the lead screw I, and is slidably connected to the sliding rod I, the rotating shell is rotatably connected to the sliding frame II, a bidirectional lead screw is rotatably installed on the rotating shell, a worm wheel is provided on the bidirectional lead screw, a worm is provided on the top of the worm wheel, the worm wheel and the worm are meshed with each other, a motor IV is provided on one side of the worm, and the output end of motor IV is fixedly connected to the worm, and motor IV is fixedly installed in the rotating shell; a motor III is installed on one side of the rotating shell, and the output end of motor III is fixedly connected to the rotating shell.

5. The device for purifying waste gas from spray painting on steel structure surface according to claim 4 is characterized in that The clamping jaws are provided with two groups, the clamping jaws are slidably connected to the rotating shell and are threadedly connected to the bidirectional lead screw. A cylinder I is installed inside the clamping end of the clamping jaw, and the cylinder I is a bidirectional synchronous cylinder. A top plate I is installed at the top and bottom of the clamping end of the clamping jaw, and the top plate I is fixedly connected to the output end of the cylinder I.

6. The device for purifying waste gas from spray painting on steel structure surface according to claim 1 is characterized in that The spraying mechanism includes a raw material box II, a pipeline, a dryer, an air pipe I, a spray hood, a hose, a rotating baffle, a rotating shaft IV, a motor IX, a screw III, a sliding rod III, a sliding block II, a motor X, a rotating rod, a telescopic nozzle, an electric push rod, a connecting plate, and a swing frame; the raw material box II is installed on one side of the processing warehouse, and a feed port is provided on the top of the raw material box II; the pipeline is provided with a plurality of installations on the top of the spraying area of ​​the processing warehouse, and one end of the pipeline is connected to the raw material box II; the spray hood is located at the bottom of the pipeline, and the spray hood is slidably connected to the inner wall of the processing warehouse, and racks are provided at both ends of the top of the spray hood, and a gear is provided on one side of the rack, and the gear and the rack are meshed with each other. A motor VII is provided on one side of the gear, and the output end of the motor VII is fixedly connected to the gear. Motor VII is installed on the inner walls on both sides of the spraying area of ​​the processing chamber; dryers are installed at both ends of the top of the spray hood, and air pipes I are installed on both sides of the top of the spray hood, and air pipes I are connected to the dryers; air pipes I are provided with several groups of drying hot air outlets, and the drying hot air outlets are located in the spray hood; the rotating baffle is provided with two groups located on one side of the drying hot air outlet, the rotating baffle is rotatably connected to the spray hood, a bevel gear is provided at one end of the spray hood, a rotating shaft IV is rotatably installed at one end of the top of the spray hood, a bevel gear is provided on the rotating shaft IV, the bevel gear on the rotating shaft IV is meshed with the bevel gear at the end of the rotating baffle, a motor VIII is provided at one end of the rotating shaft IV, motor VIII is installed at one end of the top of the spray hood, and the output end of motor VIII is fixedly connected to the rotating shaft IV.

7. The device for purifying waste gas from spray painting on steel structure surface according to claim 6 is characterized in that The lead screw III and sliding rod III are located on the inner sides of the two sets of rotating baffles, the lead screw III is rotatably connected to the spray hood, the sliding rod III is fixedly connected to the spray hood, a motor IX is installed at one end of the lead screw III, and the output end of the motor IX is fixedly connected to the lead screw III; the sliding block II is threadedly connected to the lead screw III and is slidably connected to the sliding rod III, the swing frame is located at the bottom of the sliding block II and is rotatably connected to the sliding block II; a motor X is installed on the top of the sliding block II, a rotating rod is fixedly installed at the output end of the motor X, a swing rod is provided on one side of the rotating rod, one end of the swing rod is fixedly connected to the swing frame, a sliding groove III is provided on the swing rod, one end of the rotating rod is arranged in the sliding groove III and is slidably connected to the swing rod; a telescopic nozzle and an electric push rod are installed at the bottom of the swing frame, the telescopic end of the electric push rod is fixedly connected to the telescopic end of the telescopic nozzle through a connecting plate, a hose is installed at the top of the telescopic nozzle, and the hose is connected to the pipeline.

Citation Information

Patent Citations

  • Paint spraying waste gas treatment device and treatment process therefor

    CN108514794A

  • Building steel structure surface treatment method

    CN117182742A

  • Floating bridge steel structure surface treatment device

    CN118788519A

Cited By

  • Adjustable clamp type measuring device for monitoring slope earth surface cracks

    CN121140701A