Construction waste conveying channel and manufacturing method
By designing construction waste transportation channels and using connecting pipes and connecting components to achieve automated transportation of garbage, the problem of cumbersome manual transportation in the existing technology is solved, cleaning efficiency and safety are improved, and different construction environments are adapted.
Patent Information
- Application Number
- CN202411246860.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2025-01-14
AI Technical Summary
There are a lot of manual transportation and cumbersome processes in the cleaning process of existing construction waste, resulting in economic and time waste and lack of automated solutions.
A construction waste transportation channel was designed, through the combination of connecting pipes, connecting components and fixtures, the garbage was directly transported from each layer of structure to the garbage transport vehicle. The pipe bending design was adopted to adapt to different angles, and a sealing cover was set up at the conveyor port. and rollers for increased flexibility and safety.
It improves the rate and automation of garbage cleaning and transportation, reduces manual operations, ensures the rapid, safe and seamless transportation of garbage, reduces environmental pollution, and adapts to construction environments of different heights and angles.
Smart Images

Figure CN119308493A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of pipeline transportation, and in particular to a construction waste transportation channel and a manufacturing method thereof. Background Art
[0002] At present, when most civil, municipal and industrial buildings are completed and cleaned, construction workers usually clean up the industrial waste in each structure, and then transport the industrial waste to the elevators and unloading platforms on each floor, or directly transport the industrial waste to the designated location manually; the transportation process wastes a lot of manpower and material resources, and brings cumbersome procedures and economic burden to the civilized construction on site. Summary of the invention
[0003] The present invention is made to solve the above-mentioned technical problems, and its purpose is to provide a construction waste conveying channel and a manufacturing method to ensure the speed and automation of garbage cleaning and transportation, reduce the use of odd jobs, and can be adjusted and adapted according to different entity heights, angles, etc. It is flexible, compact, highly maneuverable, and beautiful in appearance, does not occupy too much space, and is more standardized.
[0004] In order to achieve the above-mentioned purpose, the present invention provides a construction waste conveying channel for conveying construction waste in each layer of the structure to a garbage transport vehicle, comprising: a plurality of interconnected connecting pipes, a conveying port arranged on each connecting pipe, a connecting assembly for connecting each connecting pipe, and a fixing member for fixing the connecting pipe; wherein,
[0005] The upper end of the connecting pipe at the head end is used as the delivery port, the lower end of the connecting pipe at the tail end is used as the delivery port, and the delivery port of the connecting pipe between the head end and the tail end is arranged on the cylinder wall of the connecting pipe;
[0006] The ports of adjacent connecting pipes are fixedly connected to each other through the connecting assembly, and the fixing member is arranged on a side of the connecting pipe close to the vertical surface of the structure;
[0007] The connecting assembly is used to connect a plurality of the connecting pipes;
[0008] The delivery port is used to put construction waste into the connecting pipe;
[0009] The fixing member is used to fix the connecting pipe outside the structure;
[0010] The connecting pipe is used to transport the construction waste put into the conveying port to the garbage transport vehicle.
[0011] Preferably, the connection assembly comprises: flanges respectively arranged at the ports of two interconnected connecting pipes, openings uniformly arranged on each flange, and bolts inserted into the openings; wherein,
[0012] The bolts pass through corresponding openings of each flange.
[0013] Preferably, the fixing member is a rigid buckle.
[0014] Preferably, a roller is provided on one side of each connecting tube, and the roller is used to drive the connecting tube to move.
[0015] Preferably, a rubber sheet is provided on the inner wall of the connecting pipe, and the rubber sheet is used to reduce the impact force when the garbage falls.
[0016] Preferably, the buffer pad is a rubber plate.
[0017] Preferably, a sealing cover is provided on the delivery port, and the sealing cover is used to seal the delivery port.
[0018] Preferably, a handle is provided on the sealing cover.
[0019] The present invention also provides a method for manufacturing a construction waste conveying channel, which specifically comprises the following steps:
[0020] S1: selecting the length of each connecting pipe according to the height of each floor of the structure, and selecting the number of the connecting pipes according to the number of floors of the structure;
[0021] S2: making the connecting pipe as the head end and the connecting pipe as the tail end into connecting pipes with curvature; selecting two of the connecting pipes to make curvatures, and using the two curved connecting pipes as the head end and the tail end of the conveying channel respectively;
[0022] S3: opening the delivery port on the side of each connecting pipe between the connecting pipe at the head end and the connecting pipe at the end end, and setting a sealing cover on the delivery port;
[0023] S4: assembling the connecting pipes in sequence through the connecting assembly, wherein the connecting pipe at the head end and the connecting pipe at the tail end are bent in opposite directions;
[0024] S5: Fixing the assembled connecting pipe to one side of the structure by means of a fixing member.
[0025] Preferably, in S4, the connecting pipes are assembled in sequence through the connecting components, including the following steps:
[0026] Align the openings of the flanges of the ports of the two interconnected communication pipes one by one;
[0027] The bolts are inserted into the openings corresponding to the two flanges, thereby connecting the two adjacent connecting pipes to each other.
[0028] According to the above description and practice, the construction waste conveying channel and the manufacturing method of the present invention have the following advantages:
[0029] 1. The connecting pipe adopts a segmented manufacturing process. The precise size of each segment - length, diameter and even overall length - is customized according to the actual situation on site, and the appropriate number of connecting pipes can be selected according to the different heights of the structure.
[0030] 2. Installing a fixing on one side of the connecting pipe can make the connecting pipe fit more closely to the structure and make the connection more secure.
[0031] 3. Set the first and last sections of the connecting pipe as curved pipes and adjust them according to the receiving angle so that the connecting pipe fits the structure better. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the structure of a construction waste conveying channel involved in one embodiment of the present invention.
[0033] Figure 2 for Figure 1 Schematic diagram of the structure of part A in the middle.
[0034] Figure 3 It is a schematic diagram of the structure of a connection component involved in an embodiment of the present invention.
[0035] Figure 4 It is a schematic diagram of the structure of the delivery port involved in one embodiment of the present invention.
[0036] Figure 5 Schematic diagram of the structure of a roller involved in one embodiment of the present invention.
[0037] Figure 6 The present invention is a flowchart of a method for manufacturing a conveying channel according to an embodiment of the present invention.
[0038] The reference numerals in the figure are:
[0039] 1. Connecting pipe; 2. Delivery port; 21. Sealing cover; 22. Handle; 3. Connecting assembly; 31. Flange; 32. Opening; 4. Fixing piece; 5. Roller; 6. Construction waste; 7. Garbage transport truck. DETAILED DESCRIPTION
[0040] The exemplary embodiments will now be described more fully with reference to the accompanying drawings. However, the exemplary embodiments can be implemented in many forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and fully convey the concepts of the exemplary embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0041] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and thus their repeated descriptions will be omitted. It should be noted that in the present disclosure, the terms "including", "configured with", and "set in" are used to express the meaning of open-ended inclusion, and mean that in addition to the listed elements / components / etc., there may be other elements / components / etc.; the terms "first", "second", etc. are only used as marks, and are not restrictions on the number or order of their objects; the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0042] Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0043] In this embodiment, a construction waste conveying channel and a manufacturing method are disclosed. Figure 1 The entire structure of the construction waste conveying channel is shown. Figure 2 The structure of section A, i.e., the entire structure of the connecting pipe, is shown; Figure 3 The structure of the connection assembly is shown; Figure 4 The structure of the delivery port is shown; Figure 5 The structure of the roller is shown.
[0044] Please refer to Figures 1 to 5The construction waste conveying channel of the present invention comprises: a connecting pipe 1, a conveying port 2, a connecting assembly 3 and a fixing member 4, wherein the conveying port 2 is arranged at the conveying port 2 on one side of the connecting pipe 1, and the connecting assembly 3 is respectively arranged at the upper and lower ends of the connecting pipe 1, wherein the upper end of the connecting pipe 1 located at the head end is used as the conveying port 2, and the lower end of the connecting pipe 1 located at the end is used as the conveying port 2, and the conveying port 2 of the connecting pipe located between the head end and the end end is arranged on the cylinder wall of the connecting pipe 1; the ports of adjacent connecting pipes 1 are fixedly connected to each other through the connecting assembly 3, and the fixing member 4 is arranged on the side of the connecting pipe 1 close to the facade of the structure; the connecting assembly 3 connects several connecting pipes 1; the conveying port 2 puts construction waste 6 into the connecting pipe 1; the connecting pipe 1 transports the construction waste 6 put into the conveying port 2 to the garbage transport vehicle 7. Through the conveying channel of the present invention, workers only need to put the construction waste 6 into the conveying port 2 of each layer, and no tedious handling and loading work is required. The connecting pipe 1 of the first section can directly put the construction waste 6 into the upper end of the connecting pipe 1, and there is no need to open a separate conveying port 2. Under the action of gravity, the garbage quickly slides down the connecting pipe 1 into the garbage transport vehicle 7, which greatly improves the cleaning efficiency. At the same time, since the conveying channel is closed, the environmental pollution problem caused by the scattering of garbage during transportation is effectively avoided.
[0045] Generally speaking, as the main body of the conveying channel, the connecting pipe 1 is made of high-strength, corrosion-resistant materials to ensure its stability and safety in long-term use, such as welded pipes or oil drums. In addition, the length and diameter of each section of the connecting pipe 1, as well as its overall length, are controllable and can be determined according to the actual situation on site. Each section is closely connected by a connecting assembly 3 to form a continuous conveying path. In particular, the connecting pipe 1 at the first section and the end is designed to be a curved pipe shape to adapt to the angle difference between the structure and the garbage truck 7 to ensure that the garbage can slide smoothly. The conveying port 2 is arranged on the side wall of the connecting pipe 1 and is adjusted according to the height of each layer of the structure to ensure that the conveying port 2 is located at an appropriate position on each layer of the structure. During construction, garbage can be easily placed on each layer or each construction area, which is convenient for workers to directly put construction waste 6 into it. In addition, the conveying channel also has good adaptability and scalability. With the increase in the height of the structure or the change in the construction environment, it is only necessary to increase the number of connecting pipes 1 and adjust the position of the conveying port 2 accordingly to meet the needs.
[0046] The connection assembly 3 includes flanges 31 respectively arranged at the ports of two interconnected connecting pipes, openings 32 evenly arranged on each flange 31, and bolts penetrating the openings 32; wherein the bolts pass through the corresponding openings of each flange 31. The two connecting pipes 1 are connected together through the connection assembly 3, wherein a first flange is arranged at the lower end of one connecting pipe, and a second flange is arranged at the upper end of the other connecting pipe, the first flange and the second flange are overlapped, and the openings 32 on the first flange and the second flange are aligned, and the two adjacent connecting pipes 1 are tightly connected together by bolts passing through the openings. This design not only ensures the stability of the connection, but also facilitates future maintenance and replacement, and the bolt connection is not only simple and quick, but also can withstand large tension and pressure, ensuring that the system can operate stably under various working conditions.
[0047] Among them, a fixing part 4 is provided on one side of the connecting pipe 1, and the fixing part 4 is used to fix the connecting pipe 1 to the outside of the structure. In this embodiment, the fixing part 4 is a rigid buckle. In order to ensure that its on-site transportation, assembly, disassembly and movement are more convenient, a roller 5 can be added to the connecting pipe 1 at 90 degrees or 180 degrees away from the other side of the fixing part 4, so that it can increase its flexibility and mobility in special narrow or relatively long distance areas, and better meet the actual needs of the site. The roller is fixed to the connecting pipe 1 through an angle steel. A fixing part 4 and a roller 5 are installed on one side of each connecting pipe 1. The fixing part 4 is used to firmly fix the connecting pipe 1 to the structure to prevent it from being displaced under the action of external forces such as wind; and the roller 5 can drive the connecting pipe 1 to be fine-tuned or moved when necessary to adapt to different construction environments.
[0048] A rubber sheet is arranged on the inner wall of each connecting pipe 1, and the rubber sheet is used to reduce the impact force when the garbage falls. In order to reduce the damage to the connecting pipe 1 caused by excessive impact force during the transportation of garbage, a layer of rubber sheet is laid on the inner wall of the connecting pipe 1, which not only has good buffering performance, but also can effectively reduce noise pollution.
[0049] Among them, a sealing cover 21 is provided on the delivery port 2 to seal the delivery port 2, and a handle 22 is provided on the sealing cover 21, so that the operator can easily open and close it, which greatly improves the work efficiency and safety. When it is necessary to clean up the garbage, the operator opens the sealing cover 21, and when it is not necessary, the sealing cover 21 is closed.
[0050] The present invention also provides a method for manufacturing the above-mentioned construction waste conveying channel 6. Figure 6 The flowchart of a manufacturing method involved in one embodiment of the present invention is shown.
[0051] like Figure 6 As shown, the method for making the conveying channel provided by the present invention comprises the following steps:
[0052] S1: selecting the length of each connecting pipe according to the height of each floor of the structure, and selecting the number of the connecting pipes according to the number of floors of the structure;
[0053] S2: making the connecting pipe as the head end and the connecting pipe as the tail end into connecting pipes with curvature; selecting two of the connecting pipes to make curvatures, and using the two curved connecting pipes as the head end and the tail end of the conveying channel respectively;
[0054] S3: opening the delivery port on the side of each connecting pipe between the connecting pipe at the head end and the connecting pipe at the end end, and setting a sealing cover on the delivery port;
[0055] S4: assembling the connecting pipes in sequence through the connecting assembly, wherein the connecting pipe at the head end and the connecting pipe at the tail end are bent in opposite directions;
[0056] S5: Fixing the assembled connecting pipe to one side of the structure by means of a fixing member.
[0057] Specifically, first, the number of bends at the head and tail ends and the number of connecting pipes 1 in the middle section are customized according to the height and number of floors of the structure on site. Next, a delivery port 2 is opened at an appropriate position of the connecting pipe 1, and a sealing cover 21 and a handle 22 are installed. Then, the adjacent connecting pipes 1 are assembled into a whole through a connecting assembly 3 and fixed to one side of the structure. Finally, the garbage transport vehicle 7 is driven to the bottom of the connecting pipe 1 at the tail section to prepare to receive the transported construction waste 6.
[0058] Among them, in S4, the connecting pipes are assembled in sequence through the connecting assembly, including the following steps: the openings 32 of the flanges of the ports of the two connecting pipes connected to each other are matched one by one; bolts are inserted into the openings 32 corresponding to the two flanges 31, and then the two adjacent connecting pipes are connected to each other. That is, the second flange of any connecting pipe 1 is arranged opposite to the first flange of the other connecting pipe 1, and the openings 32 on the second flange are aligned one by one with the openings 32 on the first flange; then bolts are inserted into the openings on the second flange facing each other and the openings on the first flange, so as to realize the connection of the adjacent connecting pipes 1.
[0059] The construction waste 6 conveying channel and its manufacturing method described above can ensure the standardization and integration of garbage transportation and cleaning of each layer and each part of the structure, ensure the speed and automation of garbage cleaning and transportation, and reduce the use of odd jobs. In addition, the device can be adjusted according to different entity heights, angles, etc. It is flexible, compact, highly maneuverable, and beautiful, does not occupy too much space, and is more standardized.
[0060] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A construction waste conveying channel, used to convey construction waste in each layer of the structure to a waste transport vehicle, characterized in that: include: A plurality of interconnected connecting pipes, a delivery port arranged on each connecting pipe, a connecting assembly for connecting each adjacent connecting pipe, and a fixing member for fixing the connecting pipe; wherein, The upper end of the connecting pipe at the head end is used as the delivery port, the lower end of the connecting pipe at the tail end is used as the delivery port, and the delivery port of the connecting pipe between the head end and the tail end is arranged on the cylinder wall of the connecting pipe; The ports of adjacent connecting pipes are fixedly connected to each other through the connecting assembly, and the fixing member is arranged on a side of the connecting pipe close to the vertical surface of the structure; The connecting assembly is used to connect a plurality of the connecting pipes; The delivery port is used to put construction waste into the connecting pipe; The fixing member is used to fix the connecting pipe outside the structure; The connecting pipe is used to transport the construction waste put into the conveying port to the garbage transport vehicle.
2. The construction waste conveying channel according to claim 1, characterized in that: The connection assembly comprises: flanges respectively arranged at the ports of two interconnected connecting pipes, openings uniformly arranged on each flange, and bolts inserted into the openings; wherein, The bolts pass through corresponding openings of each flange.
3. The construction waste conveying channel according to claim 1, characterized in that: The fixing piece is a rigid buckle.
4. The construction waste conveying channel according to claim 1, characterized in that: A roller is arranged on one side of each connecting pipe, and the roller is used to drive the connecting pipe to move.
5. The construction waste conveying channel according to claim 1, characterized in that: A buffer pad is arranged on the inner wall of each connecting pipe, and the buffer pad is used to reduce the impact force when garbage falls.
6. The construction waste conveying channel according to claim 5, characterized in that: The buffer pad is a rubber plate.
7. The construction waste conveying channel according to claim 1, characterized in that: A sealing cover is provided on the delivery port, and the sealing cover is used to seal the delivery port.
8. The construction waste conveying channel according to claim 7, characterized in that: A handle is arranged on the sealing cover.
9. A method for manufacturing a construction waste conveying channel according to any one of claims 1 to 8, comprising the following steps: S1: selecting the length of each connecting pipe according to the height of each floor of the structure, and selecting the number of the connecting pipes according to the number of floors of the structure; S2: making the connecting pipe as the head end and the connecting pipe as the tail end into connecting pipes with curvature, selecting two of the connecting pipes to make curvatures, and using the two curved connecting pipes as the head end and the tail end of the conveying channel respectively; S3: opening the delivery port on the side of each connecting pipe between the connecting pipe at the head end and the connecting pipe at the end end, and setting a sealing cover on the delivery port; S4: Assembling the connecting pipes in sequence through the connecting components, wherein: The connecting pipe at the head end and the connecting pipe at the tail end are bent in opposite directions; S5: Fixing the assembled connecting pipe to one side of the structure by means of a fixing member.
10. The construction waste conveying channel according to claim 9, characterized in that: In S4, the connecting pipes are assembled in sequence through the connecting components, including the following steps: Align the openings of the flanges of the ports of the two interconnected communication pipes one by one; The bolts are inserted into the openings corresponding to the two flanges, thereby connecting the two adjacent connecting pipes to each other.