Karst underground water sampling device
By designing a karst groundwater sampling device containing a cylinder, piston rod and placement box, the problem of shaking and spilling of the sampling bottle during traction and transportation is solved, and the water in the sampling and transportation is not spilled out.
Patent Information
- Application Number
- CN202411436256.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2025-01-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing karst groundwater sampling device can easily cause the sampling bottle to shake during the traction and transportation process, causing the sampling bottle to spill and affect the sampling effect.
A device including support columns, extension blocks, cylinders, piston rods, push blocks, sliding blocks, guide rods, draw ropes and placement boxes is designed. The piston rod drives the push blocks and slide blocks to move and adjust the placement boxes. Position so that the sampling bottle is secured in the placement box, ensuring that it does not shake during transportation and prevents water from spilling out.
It effectively prevents the sampling bottle from shaking and water spilling during transportation, improving the sampling effect and operation safety.
Smart Images

Figure CN119321920A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of groundwater detection, in particular to a karst groundwater sampling device. Background Art
[0002] The sum of various forms and hydrological phenomena formed by the destruction and transformation of soluble rocks by groundwater and surface water. Karst is a geological action of water on soluble rocks (carbonate rocks, gypsum, rock salt, etc.) mainly in the form of chemical dissolution, supplemented by mechanical actions such as erosion, subsidence and collapse of flowing water, as well as the general term for the phenomena produced by these actions. The karst environment is regarded as a fragile ecological environment like the edge of a desert. Its vulnerability is mainly manifested in: small environmental capacity, a long time for vegetation to recover after being destroyed, rapid changes in hydrological processes, frequent droughts and floods, and the transition of biological production depends on habitat conditions, but habitat conditions are significantly affected by the environment; the benign evolution of the ecological environment depends on the recovery of vegetation; the sustainable development approach between water resource utilization and land use lacks effectiveness and operability, resulting in unreasonable land use (such as slash-and-burn farming, excessive cultivation), causing serious loss of seed banks in the ecological environment and affecting species diversity. The necessity of karst groundwater sampling lies in its unique geological and hydrological characteristics. The geological structure of the karst area is complex, the groundwater flow path is complex, and it is often accompanied by strong dissolution, which may cause the water to contain special chemical components and microorganisms. These components are very important for assessing the quality of groundwater and its potential environmental impact.
[0003] Karst refers to the geological process in which groundwater dissolves and erodes soluble rocks (such as limestone, gypsum, etc.) under the action of dissolution. This process is mainly due to the reaction of carbon dioxide dissolved in groundwater with carbonates in rocks to form a carbonate solution, which then dissolves the minerals in the rocks, causing geomorphic features such as caves and dissolution troughs on the rock surface. The formation of karst is closely related to geological structure, hydrogeological conditions, climate and other factors. In terms of geological structure, karst mainly occurs in areas containing soluble rocks, such as karst areas. Hydrogeological conditions also play an important role in the development of karst, and the flow and dissolution of groundwater are the key to the formation of karst. Climate conditions can also affect the development of karst. For example, the high temperature and high humidity climate in tropical rainforest areas is conducive to dissolution. Karst landform is a unique landform type with rich caves, underground rivers, underground sediments and other characteristics. Karst areas are rich in groundwater resources and are also important tourist attractions. The study of karst landform is of great significance for the development and utilization of groundwater resources and the prevention and control of geological disasters.
[0004] However, there are still the following problems in the sampling process of existing karst groundwater:
[0005] After the existing karst groundwater is sampled, the traction and conveying mechanism moves the sampling bottle. Since the sampling bottle is prone to shaking during traction and conveying, the sampling bottle may spill, affecting the sampling effect of the sampling bottle. Therefore, it is necessary to involve a karst groundwater sampling device for use in the existing groundwater detection field. Summary of the invention
[0006] In order to make up for the shortcomings of the prior art, after the existing karst groundwater is sampled, the traction and conveying mechanism moves the sampling bottle. Since the sampling bottle is easily shaken during the traction and conveying, the sampling bottle is spilled, affecting the sampling effect of the sampling bottle. The present invention proposes a karst groundwater sampling device.
[0007] The technical solution adopted by the present invention to solve its technical problems is: a karst groundwater sampling device, including a support column and an extension block, a cylinder is fixedly assembled on the extension block, the cylinder is close to one end of the extension block, a fixed block is fixedly assembled on the bottom of the extension block, the cylinder is located above the fixed block, a fixed plate is fixedly assembled on the bottom of the fixed block, an operating chamber is arranged inside the fixed block, a movable groove is arranged on the side of the fixed block, the movable groove is connected with the operating chamber, a piston rod is fixedly assembled on the output end of the cylinder, the piston rod movably passes through the extension block and the fixed block to the operating chamber, and a push block is fixedly assembled on the bottom of the piston rod, the push block is movably assembled with the operating chamber, a sliding block is fixedly assembled on the push block, the sliding block is movably assembled with the movable groove, one end of the sliding block is fixedly assembled with a fixed plate, and the fixed plate A plurality of guide openings are arranged on the top, the guide openings are located at the outside of the fixed block, the guide openings are symmetrically fixedly equipped with guide rods, the guide rods are movably equipped with movable blocks, the tops of the movable blocks are fixedly equipped with mounting plates, the mounting plates are movably equipped with adjusting rods, the other ends of the adjusting rods are movably assembled with the fixed plates, and the bottoms of the movable blocks are fixedly equipped with pull ropes, one ends of two pull ropes are fixedly equipped with the first assembly block, and one ends of the other two pull ropes are fixedly equipped with the second assembly block, the first assembly block and the second assembly block are fixedly equipped with placement boxes, the tops of the two second assembly blocks are fixedly equipped with bearing blocks, the bottom of the fixed plate is symmetrically fixedly equipped with traction rods, the traction rods are located between the guide openings, the traction rods are movably assembled with the bearing blocks, and the bottoms of the two traction rods are fixedly equipped with card covers.
[0008] Preferably, a connecting block is fixedly mounted on the fixing plate, a camera is fixedly mounted on the bottom of the connecting block, a hanging rope is fixedly mounted on the bottom of the placement box, and a gravity ball is fixedly mounted on the bottom of the hanging rope.
[0009] Preferably, the placement box is equipped with a sampling bottle, and a plurality of mounting blocks are fixedly mounted on the sampling bottle, and threaded holes are provided on the mounting blocks. The first assembly block and the second assembly block are threadedly mounted with fastening bolts, and one end of the fastening bolts is threadedly mounted corresponding to the threaded holes on the mounting blocks, and the sampling bottle is located below the card cover, and the sampling bottle is snap-connected with the card cover.
[0010] Preferably, a display screen is fixedly mounted on the support column, and an operating block is fixedly mounted on the upper side of the support column.
[0011] Preferably, the operating block is provided with an installation opening, an inner cavity is provided inside the operating block, a traction groove is provided at the bottom of the operating block, the traction groove is connected with the inner cavity, and the traction groove and the inner cavity are both located on one side of the installation opening.
[0012] Preferably, an operating motor is fixedly mounted on the mounting port, a transmission screw is fixedly mounted on the output end of the operating motor, the transmission screw movably penetrates into the inner cavity, and a threaded sleeve is threadedly mounted on the transmission screw.
[0013] Preferably, a traction block is fixedly mounted on the threaded sleeve block, the traction block is movably assembled with the traction groove, and the bottom of the traction block is fixedly assembled with the extension block.
[0014] Preferably, the sliding block is fixedly equipped with a vertical rod, which is located on one side of the fixed block, one end of the vertical rod is fixedly equipped with a cross rod, which is located above the fixed plate, one end of the cross rod is fixedly equipped with a detection rod, which is located on one side of the fixed plate, and a limit block is fixedly equipped on the detection rod.
[0015] The present invention is beneficial in that:
[0016] 1. The present invention places the sampling bottle on the placement box, installs the fastening bolts on the first assembly block and the second assembly block, so that one end of the fastening bolt is threadedly assembled with the threaded hole on the installation block, the sampling bottle is fixed to the placement box, and the operating motor is started to rotate the transmission screw on the threaded sleeve block, so that the traction block moves on the traction groove, and the traction block drives the extension block to move toward the karst groundwater. The camera can shoot the situation of the karst groundwater and feed it back to the display screen. When the gravity ball is located above the karst groundwater, the cylinder is started, so that the piston rod drives the push block to move upward, and the sliding block moves upward with the push block. Under the action of the adjustment rod, each movable block moves on the guide rod toward the fixed block. Under the action of the pull rope, the placement box is adjusted downward, and under the gravity of the gravity ball, the placement box sinks into the karst groundwater, and the sampling bottle on the placement box samples the karst groundwater. After the sampling is completed, the cylinder is started again, so that the piston rod drives the push block to move downward, and the sliding block on the push block moves downward on the moving groove. Under the action of the adjusting rod, each movable block moves outward on the guide rod. Under the action of the pull rope, the placement box is adjusted upward, and the bearing block moves on the traction rod, so that the sampling bottle on the placement box will not shake. At the same time, the sampling bottle on the placement box moves toward the direction of the card cover until the card cover is connected to the sampling bottle, so that the sampled water in the sampling bottle cannot be spilled from the sampling bottle during transportation, thereby improving the operation effect.
[0017] 2. The present invention starts the cylinder so that the piston rod drives the sliding block on the push block to move downward, the sliding block drives the cross bar on the vertical bar to move downward, and the cross bar drives the detection rod to be inserted into the karst groundwater. When the limit block is not located in the karst groundwater, it is inconvenient to perform sampling operations on the karst groundwater. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the structure of the karst groundwater traction sampling device of the present invention;
[0020] Figure 2 It is a schematic diagram of the structure of the karst groundwater traction sampling device of the present invention;
[0021] Figure 3 It is a schematic cross-sectional structure diagram of the karst groundwater traction sampling device of the present invention;
[0022] Figure 4 It is a schematic diagram of the structure of the sampling mechanism of the present invention;
[0023] Figure 5 It is a schematic diagram of the exploded structure of the sampling bottle and the placement mechanism of the present invention;
[0024] Figure 6 It is a schematic diagram of the structure of the depth verification mechanism of the present invention.
[0025] In the figure:
[0026] 10. Support column; 11. Operation block; 12. Display screen; 13. Installation port;
[0027] 20. Operating motor; 21. Traction block; 22. Extension block; 23. Cylinder;
[0028] 30. fixing block; 31. fixing plate; 32. connecting block; 33. camera;
[0029] 40. Placement box; 41. Hanging rope; 42. Gravity ball; 43. Detection rod;
[0030] 50. Limit block; 51. Traction groove; 52. Traction rod; 53. Pull rope;
[0031] 60, inner cavity; 61, transmission screw; 62, threaded sleeve block; 63, mounting plate;
[0032] 70. operating chamber; 71. moving groove; 72. piston rod; 73. push block;
[0033] 80, sliding block; 81, fixing plate; 82, adjusting rod; 83, first assembly block; 84, guide rod; 85, movable block;
[0034] 90. Second assembly block; 91. Fastening bolt; 92. Carrying block; 93. Card cover; 94. Sampling bottle; 95. Mounting block; 96. Threaded hole; 97. Vertical rod; 98. Horizontal rod; 99. Guide port. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Example 1
[0037] like Figure 1-5 As shown, it is a schematic diagram of the structure of a karst groundwater sampling device according to a preferred embodiment of the present invention, referring to Figure 1 and Figure 4 as well as Figure 5A karst groundwater sampling device includes a support column 10 and an extension block 22, a cylinder 23 is fixedly mounted on the extension block 22, the cylinder 23 is close to one end of the extension block 22, a fixed block 30 is fixedly mounted on the bottom of the extension block 22, the cylinder 23 is located above the fixed block 30, a fixed plate 31 is fixedly mounted on the bottom of the fixed block 30, a connecting block 32 is fixedly mounted on the fixed plate 31, a camera 33 is fixedly mounted on the bottom of the connecting block 32, an operating cavity 70 is arranged inside the fixed block 30, and a movable groove connected to the operating cavity 70 is arranged on the side of the fixed block 30 The output end of the cylinder 23 is fixedly equipped with a piston rod 72, which movably penetrates the extension block 22 and the fixed block 30 to the operating chamber 70, and the bottom of the piston rod 72 is fixedly equipped with a push block 73 that moves in the operating chamber 70, and the push block 73 is fixedly equipped with a sliding block 80 that moves in the moving groove 71, and one end of the sliding block 80 is fixedly equipped with a fixed plate 81, and a plurality of guide openings 99 are provided on the fixed plate 31, and the guide openings 99 are symmetrically fixedly equipped with guide rods 84, and the guide rods 84 are movable. The movable block 85 is equipped with a mounting plate 63 fixedly mounted on the top of the movable block 85, and an adjusting rod 82 is movably mounted on the mounting plate 63. The other end of the adjusting rod 82 is movably mounted on the fixed plate 81. The bottom of the movable block 85 is fixedly equipped with a pull rope 53, wherein one end of two pull ropes 53 is fixedly equipped with a first assembly block 83, and one end of the other two pull ropes 53 is fixedly equipped with a second assembly block 90. The first assembly block 83 and the second assembly block 90 are fixedly equipped with a placement box 40, and the tops of the two second assembly blocks 90 are fixedly equipped with a bearing block 92. The bottom of the fixed plate 31 is symmetrically fixedly equipped with traction rods 52, which are located between the guide openings 99. The traction rods 52 are movably assembled with the bearing blocks 92. The bottoms of the two traction rods 52 are fixedly equipped with card covers 93. The bottom of the placement box 40 is fixedly equipped with a hanging rope 41, and the bottom of the hanging rope 41 is fixedly equipped with a gravity ball 42. The placement box 40 is equipped with a sampling bottle 94, and the sampling bottle 94 is fixedly equipped with a plurality of mounting blocks 95. The mounting blocks 95 are all provided with threaded holes 96. The first assembly block 83 and the second assembly block 90 are both threadedly equipped with fastening bolts 91.One end of the fastening bolt 91 is threadedly assembled with the threaded hole 96 on the mounting block 95, and the sampling bottle 94 is located below the card cover 93. The sampling bottle 94 is snap-fitted with the card cover 93, and the sampling bottle 94 is placed on the placement box 40. The fastening bolt 91 is installed on the first assembly block 83 and the second assembly block 90, so that one end of the fastening bolt 91 is threadedly assembled with the threaded hole 96 on the mounting block 95, and the sampling bottle 94 is fixed to the placement box 40. The cylinder 23 is started, so that the piston rod 72 drives the push block 73 to move upward, and the sliding block 80 moves upward with the push block 73. Under the action of the adjusting rod 82, each movable block 85 moves on the guide rod 84 toward the fixed block 30. Under the action of the pull rope 53, the placement box 40 is adjusted downward. Under the gravity of the gravity ball 42 Under the action of force, the placing box 40 sinks into the karst groundwater, and the sampling bottle 94 on the placing box 40 samples the karst groundwater. After the sampling is completed, the cylinder 23 is started again, so that the piston rod 72 drives the push block 73 to move downward, and the sliding block 80 on the push block 73 moves downward on the moving groove 71. Under the action of the adjusting rod 82, each movable block 85 moves toward the outside direction on the guide rod 84. Under the action of the pull rope 53, the placing box 40 is adjusted upward, and the bearing block 92 moves on the traction rod 52, so that the sampling bottle 94 on the placing box 40 will not shake. At the same time, the sampling bottle 94 on the placing box 40 moves toward the direction of the card cover 93 until the card cover 93 is connected to the sampling bottle 94, so that the sampled water in the sampling bottle 94 cannot be spilled from the sampling bottle 94.
[0038] Reference Figure 1 and Figure 3 The support column 10 is fixedly equipped with a display screen 12, and an operation block 11 is fixedly equipped on the upper side of the support column 10. The operation block 11 is provided with a mounting opening 13, and an inner cavity 60 is provided inside the operation block 11. A traction groove 51 communicating with the inner cavity 60 is provided at the bottom of the operation block 11, and the traction groove 51 and the inner cavity 60 are both located on one side of the mounting opening 13. An operation motor 20 is fixedly equipped on the mounting opening 13, and a transmission screw 61 is fixedly equipped on the output end of the operation motor 20, and the transmission screw 61 is movable and penetrates the inner cavity 60. , and a threaded sleeve block 62 is threadedly assembled on the transmission screw 61, and a traction block 21 that moves in the traction groove 51 is fixedly assembled on the threaded sleeve block 62. The bottom of the traction block 21 is fixedly assembled with the extension block 22. The operating motor 20 is started to make the transmission screw 61 rotate on the threaded sleeve block 62, so that the traction block 21 moves on the traction groove 51. At this time, the traction block 21 drives the extension block 22 to move toward the karst groundwater. The camera 33 can shoot the situation of the karst groundwater and feed it back to the display screen 12.
[0039] Working principle: Place the sampling bottle 94 on the placement box 40, install the fastening bolt 91 on the first assembly block 83 and the second assembly block 90, so that one end of the fastening bolt 91 is threadedly assembled with the threaded hole 96 on the mounting block 95, and the sampling bottle 94 is fixed to the placement box 40, and the operating motor 20 is started to rotate the transmission screw 61 on the threaded sleeve block 62, so that the traction block 21 moves on the traction groove 51, and at this time, the traction block 21 drives the extension block 22 to move toward the karst groundwater. The camera 33 can shoot the situation of the karst groundwater and feedback it to the display screen 12. When the gravity ball 42 is located above the karst groundwater, start the cylinder 23, so that the piston rod 72 drives the push block 73 to move upward, and the sliding block 80 moves upward with the push block 73. Under the action of the adjusting rod 82, each movable block 85 moves on the guide rod 84 toward the fixed block 30. Under the action of the pull rope 53, the placement box 40 is adjusted downward, and under the gravity of the gravity ball 42, the placement box 40 sinks into the karst groundwater, and the sampling bottle 94 on the placement box 40 samples the karst groundwater. After the sampling is completed, the cylinder 23 is started again, so that the piston rod 72 drives the push block 73 to move downward, and the sliding block 80 on the push block 73 moves downward on the moving groove 71. Under the action of the adjusting rod 82, each movable block 85 moves toward the outside on the guide rod 84. Under the action of the pull rope 53, the placement box 40 is adjusted upward, and the bearing block 92 moves on the traction rod 52, so that the sampling bottle 94 on the placement box 40 will not shake. At the same time, the sampling bottle 94 on the placement box 40 moves toward the direction of the card cover 93 until the card cover 93 is connected to the sampling bottle 94, so that the sampled water in the sampling bottle 94 cannot be spilled from the sampling bottle 94 during transportation, thereby improving the operation effect.
[0040] Example 2
[0041] like Figure 6 As shown, it is a structural schematic diagram of a karst groundwater sampling device according to another preferred embodiment of the present invention. The water quality of the karst groundwater is clear. Some karst groundwater looks shallow but is very deep, and some karst groundwater looks deep but is very deep, making it difficult for operators to observe the data information fed back to the display screen 12 through the camera 33, and the gravity ball 42 falls into the shallower karst groundwater. The impact generated by the gravity ball 42 can easily cause damage to the karst landform. Therefore, on the basis of Example 1, the device is improved, and a vertical rod 97 is fixedly mounted on the sliding block 80, and the vertical rod 97 is located on one side of the fixed block 30. One end of the vertical rod 97 is fixedly mounted with a cross rod 98, and the cross rod 98 is located above the fixed disk 31. One end of the cross rod 98 is fixedly mounted with a detection rod 43, and the detection rod 43 is located on one side of the fixed disk 31. A limit block 50 is fixedly mounted on the detection rod 43.
[0042] Working principle: start the cylinder 23, so that the piston rod 72 drives the sliding block 80 on the push block 73 to move downward, the sliding block 80 drives the cross bar 98 on the vertical rod 97 to move downward, and the cross bar 98 drives the detection rod 43 to insert into the karst groundwater. When the limit block 50 is not located in the karst groundwater, it is inconvenient to perform sampling operations on the karst groundwater.
[0043] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0044] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A karst groundwater sampling device, characterized in that: The invention comprises a support column (10) and an extension block (22), wherein a cylinder (23) is fixedly mounted on the extension block (22), the cylinder (23) is close to one end of the extension block (22), a fixed block (30) is fixedly mounted on the bottom of the extension block (22), the cylinder (23) is located above the fixed block (30), a fixed plate (31) is fixedly mounted on the bottom of the fixed block (30), an operating chamber (70) is arranged inside the fixed block (30), and a movable groove (71) is arranged on the side surface of the fixed block (30), the movable groove (71) is connected to the operating chamber (70), and the cylinder (23) is located above the fixed block (30), and the fixed plate (31) is fixedly mounted on the bottom of the fixed block (30). The output end of the cylinder (23) is fixedly equipped with a piston rod (72), the piston rod (72) movably penetrates the extension block (22) and the fixed block (30) to the operating chamber (70), and the bottom of the piston rod (72) is fixedly equipped with a push block (73), the push block (73) is movably assembled with the operating chamber (70), and a sliding block (80) is fixedly equipped on the push block (73), and the sliding block (80) is movably assembled with the movable groove (71), and one end of the sliding block (80) is fixedly equipped with a fixed plate (81), and a plurality of guide openings ( 99), the guide opening (99) is located on the outside of the fixed block (30), the guide opening (99) is symmetrically fixedly equipped with a guide rod (84), the guide rod (84) is movably equipped with a movable block (85), the top of the movable block (85) is fixedly equipped with a mounting plate (63), the mounting plate (63) is movably equipped with an adjustment rod (82), the other end of the adjustment rod (82) is movably assembled with the fixed plate (81), and the bottom of the movable block (85) is fixedly equipped with a pull rope (53), wherein one end of each of the two pull ropes (53) is fixedly equipped with a first The first assembly block (83) and the second assembly block (90) are fixedly mounted on one end of the other two pull ropes (53); a placement box (40) is fixedly mounted on the first assembly block (83) and the second assembly block (90); a bearing block (92) is fixedly mounted on the top of the two second assembly blocks (90); a traction rod (52) is symmetrically fixedly mounted on the bottom of the fixed plate (31); the traction rod (52) is located between the guide openings (99); the traction rod (52) is movably mounted corresponding to the bearing block (92); and a card cover (93) is fixedly mounted on the bottom of the two traction rods (52).
2. A karst groundwater sampling device according to claim 1, characterized in that: A connecting block (32) is fixedly mounted on the fixing plate (31), a camera (33) is fixedly mounted on the bottom of the connecting block (32), a hanging rope (41) is fixedly mounted on the bottom of the placement box (40), and a gravity ball (42) is fixedly mounted on the bottom of the hanging rope (41).
3. A karst groundwater sampling device according to claim 2, characterized in that: The placement box (40) is equipped with a sampling bottle (94), and a plurality of mounting blocks (95) are fixedly mounted on the sampling bottle (94), and threaded holes (96) are provided on the mounting blocks (95). The first mounting block (83) and the second mounting block (90) are threadedly mounted with fastening bolts (91), and one end of the fastening bolts (91) is threadedly mounted corresponding to the threaded holes (96) on the mounting blocks (95), and the sampling bottle (94) is located below the card cover (93), and the sampling bottle (94) is card-connected with the card cover (93).
4. A karst groundwater sampling device according to claim 1, characterized in that: A display screen (12) is fixedly mounted on the support column (10), and an operating block (11) is fixedly mounted on the upper side of the support column (10).
5. A karst groundwater sampling device according to claim 4, characterized in that: The operating block (11) is provided with a mounting opening (13) extending therethrough, an inner cavity (60) is provided inside the operating block (11), a traction groove (51) is provided at the bottom of the operating block (11), the traction groove (51) is in communication with the inner cavity (60), and the traction groove (51) and the inner cavity (60) are both located on one side of the mounting opening (13).
6. A karst groundwater sampling device according to claim 5, characterized in that: An operating motor (20) is fixedly mounted on the mounting opening (13); a transmission screw (61) is fixedly mounted on the output end of the operating motor (20); the transmission screw (61) movably penetrates the inner cavity (60); and a threaded sleeve (62) is threadedly mounted on the transmission screw (61).
7. A karst groundwater sampling device according to claim 6, characterized in that: The threaded sleeve block (62) is fixedly mounted with a traction block (21), the traction block (21) is movably assembled with the traction groove (51), and the bottom of the traction block (21) is fixedly assembled with the extension block (22).
8. A karst groundwater sampling device according to claim 1, characterized in that: The sliding block (80) is fixedly equipped with a vertical rod (97), the vertical rod (97) is located on one side of the fixed block (30), one end of the vertical rod (97) is fixedly equipped with a cross rod (98), the cross rod (98) is located above the fixed plate (31), one end of the cross rod (98) is fixedly equipped with a detection rod (43), the detection rod (43) is located on one side of the fixed plate (31), and a limit block (50) is fixedly equipped on the detection rod (43).