Single-tower cable-stayed bridge fusiform bent tower curved surface and straight surface hydraulic creeping formwork construction method and device

Through the single-tower cable-stayed bridge's fusiform cable tower curved surface and direct-face hydraulic climbing formwork construction methods, combined with the protection mechanism of the sliding protective tube, the problem that traditional hydraulic climbing formwork construction is difficult to adapt to the complex tower shape has been solved, and construction efficiency and safety have been improved. , adapting to the diverse changes in the shape of the bridge tower.

CN119332595APending Publication Date: 2025-01-21GUANGXI CHANGCHANG ROAD & BRIDGE CONSTR
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411453239.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2025-01-21

AI Technical Summary

Technical Problem

Traditional hydraulic climbing mold construction methods are difficult to adapt to the diversified changes in the shape of bridge towers. Especially when facing bridge towers with complex shapes such as diamond-shaped, inverted "Y" shape, and shuttle-shaped, they need to frequently disassemble and assemble mold climbing brackets, resulting in construction efficiency. Low and safety hazards.

Method used

The single-tower cable-stayed bridge's fusiform cable tower curved surface and direct-face hydraulic climbing formwork construction methods are used. Through segmented construction and multiple sets of template designs, combined with the protection mechanism of the sliding protective tube, the screw deformation and the difficulty in adjusting the connecting tube are reduced to ensure Stability and safety of the construction process.

Benefits of technology

It improves the efficiency and safety of hydraulic molding construction, reduce unnecessary disassembly operation during the construction process, adapt to the diverse changes of the shape of the bridge tower, and improve the flexibility and reliability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119332595A_ABST
    Figure CN119332595A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of hydraulic creeping formwork construction, and particularly relates to a single-tower cable-stayed bridge fusiform bent tower curved surface and straight surface hydraulic creeping formwork construction method and device, and the construction method comprises the following specific steps: S1, construction preparation: early-stage material purchasing, drawing auditing, auxiliary materials required by hydraulic creeping formwork construction and the like are included; s2, a tower base and a starting section are constructed, and a creeping formwork system is installed after construction of the tower base and the starting section is completed; s3, performing creeping formwork construction in the middle of the cable bent tower in sections, and checking the position of a formwork during construction of each section; s4, erecting a cross beam bracket and constructing a cross beam section; s5, tower crown section construction; s6, full-bridge cable pulling and cable adjusting are carried out; by means of the construction method, the repeated disassembly and assembly of the creeping formwork support are reduced for the bridge tower shape with the continuously-changing line shape, and hydraulic creeping formwork construction can better adapt to bridge towers with diversified shapes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of hydraulic climbing formwork construction, in particular to a method and a device for constructing a hydraulic climbing formwork for a curved surface and a straight surface of a shuttle-shaped cable tower of a single-tower cable-stayed bridge. Background Art

[0002] A cable tower is a tower-shaped structure that supports the main cables in a suspension bridge or a cable-stayed bridge. It plays an important role in bearing and transferring loads in the bridge structure and is a key component to ensure the stability and safety of the bridge.

[0003] The construction of bridge towers of modern cable-stayed bridges and suspension bridges cannot be separated from hydraulic climbing formwork. With the development of current bridge technology, the stress and structure of bridges are no longer the difficulties faced by engineers. Now, people are beginning to pursue a diversified appearance of bridges. In order to better meet people's aesthetic and visual perception, bridge towers will be more innovative and have more changes in geometric shapes. This is also a new test for the climbing formwork construction technology of tower bridges. Faced with the ever-changing linear shapes of bridge towers and the diamond-shaped, inverted "Y"-shaped, and shuttle-shaped bridge tower shapes, traditional hydraulic climbing formworks need to repeatedly disassemble and assemble the climbing formwork bracket, which brings a lot of unnecessary trouble to the construction. Therefore, how the hydraulic climbing formwork construction technology can adapt to the construction of bridge towers with diverse shapes is a difficult problem that hydraulic climbing formwork technology faces and must solve.

[0004] To this end, the present invention provides a method and device for constructing a curved surface and a straight surface hydraulic climbing formwork of a shuttle-shaped cable tower of a single-tower cable-stayed bridge. Summary of the invention

[0005] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0006] The technical solution adopted by the present invention to solve the technical problem is: the single-tower cable-stayed bridge shuttle tower curved surface and straight surface hydraulic climbing formwork construction method of the present invention, the specific steps of the construction method are as follows:

[0007] S1: Construction preparation, including early material procurement, drawing review, auxiliary materials required for hydraulic climbing formwork construction, etc.;

[0008] S2: The tower base and the starting section are constructed, and the climbing formwork system is installed after the tower base and the starting section are completed;

[0009] S3: Carry out climbing formwork construction in the middle of the cable tower in sections, and check the position of the formwork during the construction of each section;

[0010] S4: erection of beam supports and construction of beam sections;

[0011] S5: construction of the tower crown section;

[0012] S6: Cables and adjustment cables for the entire bridge.

[0013] Preferably, the specific steps of the climbing formwork construction in S3 are as follows:

[0014] S11: The outer formwork consists of two types of formwork: steel-wood (WISA) combination formwork and stainless steel formwork. The straight segments are made of steel-wood combination formwork, and the arc segments are made of stainless steel formwork.

[0015] S12: Due to the different curvatures of the upper and lower tower columns, the arc section stainless steel templates need to be made into multiple sets of templates with different curvatures as needed;

[0016] S13: To ensure smooth connection between steel formwork and steel-wood (WISA) combined formwork, plane overlap is adopted, the steel formwork strap is pressed on the wooden formwork purlin and tightened with hook screws;

[0017] S14: During the climbing process, the steel-wood composite formwork needs to be cut and shrunk according to the reduction of the tower section.

[0018] Preferably, the specific steps of installing the climbing formwork system in S2 are as follows:

[0019] S21: Assemble the tripod and platform;

[0020] S22: Install trusses and platforms;

[0021] S23: Installation of the first section of cast embedded parts;

[0022] S24: Lifting tripod;

[0023] S25: hoisting the upper truss;

[0024] S26: hoisting formwork;

[0025] S27: Installation of the second section casting embedded parts;

[0026] S28: Install the upper and lower reversing boxes and hydraulic cylinders;

[0027] S29: Install the guide rail;

[0028] S210: Install hydraulic system;

[0029] S211: Climbing frame.

[0030] Preferably, the specific steps of template position calibration in S3 are as follows:

[0031] S31: Draw a horizontal line on the pier concrete at the bottom of the hydraulic climbing formwork to initially level the model to ensure the verticality of the model;

[0032] S32: Use a total station to locate the axis of the pier body at the top of the pier body formwork, and re-measure and check after each model climbing;

[0033] S33: Regularly re-measure the axis of each pier;

[0034] S34: Before each concrete pouring, a dedicated person will check the model connection parts and tie rods to ensure that the model is stable and not deformed;

[0035] S35: The inner cavity formwork is constructed on-site using a steel formwork, and the chamfers are processed using a fixed-length formwork, which is connected to the outer formwork via tension screws.

[0036] Preferably, the specific steps of constructing the crossbeam section in S4 are as follows:

[0037] S41: Remove the inner climbing formwork;

[0038] S42: Installation of custom steel formwork;

[0039] S43: Carry out the construction of the lower beam;

[0040] S44: Reinstall the climbing formwork system on the lower beam;

[0041] S45: Continue the climbing construction of the main tower.

[0042] Preferably, the specific steps for constructing the tower crown section in S5 are as follows:

[0043] S51: Dismantle the inner climbing formwork system;

[0044] S52: Install the tower crown bottom mold support;

[0045] S53: Tie the tower crown reinforcement and install the customized curved steel formwork;

[0046] S54: pouring tower crown concrete.

[0047] A hydraulic climbing formwork construction device for the curved and straight surfaces of a shuttle-shaped cable tower of a single-tower cable-stayed bridge, the climbing formwork construction device is suitable for any of the above-mentioned hydraulic climbing formwork construction methods for the curved and straight surfaces of a shuttle-shaped cable tower of a single-tower cable-stayed bridge, wherein the tripod in S21 includes a longitudinal support rod; the middle part of the longitudinal support rod is rotatably connected to a transverse support rod; the bottom of the transverse support rod and the side walls of the longitudinal support rod are both hinged with a connecting plate; the side walls of the connecting plate are connected to a screw rod by bolts; a connecting tube is threadedly connected between a pair of the screw rods; the middle part of the connecting tube is symmetrically arranged and rotatably connected to a pair of sleeves; the middle part of the sleeve is slidably connected to a protective tube; a connecting assembly is installed in the middle part of the protective tube; the connecting assembly includes a connecting ring; the connecting ring and the connecting disk are threadedly matched; through the above-mentioned structure, the occurrence of objects hitting the middle part of the screw rod causing deformation of the screw rod is reduced, thereby reducing the occurrence of difficulties in rotating and adjusting the connecting tube due to screw deformation, and reducing the safety hazards caused by the transverse support rod being in a non-horizontal state due to difficulty in adjustment, which causes workers to construct on an inclined plane.

[0048] Preferably, the connecting assembly includes a ring; the ring is rotatably connected to the middle part of the protective tube; the connecting ring is a pair and is symmetrically arranged on both sides of the ring; the middle part of the sleeve is symmetrically arranged and fixed with a pair of fixing rings; the connecting ring and the fixing ring are threadedly matched; through the above structure, when the screw rod and the connecting tube need to be disassembled and stored, the connecting ring and the fixing ring can be threadedly connected to restrict the pair of protective tubes to the middle part of the connecting tube, thereby reducing the impact of random sliding of the protective tubes during storage, thereby improving the convenience of use of the device.

[0049] Preferably, a plurality of slide grooves are opened in the middle of the sleeve; a plurality of reinforcing plates are fixedly connected to the inside of the protective tube; the reinforcing plates are slidably connected to the inside of the slide grooves; through the above structure, the impact resistance of the protective tube can be improved, the deformation of the protective tube can be reduced, and the impact of the deformation of the protective tube on the use of the device can be reduced.

[0050] The beneficial effects of the present invention are as follows:

[0051] 1. The method and device for constructing the curved and straight surfaces of the shuttle tower of a single-tower cable-stayed bridge of the present invention connect the protective tube to the connecting plate by sliding the protective tube, and use the protective tube to protect the screw, thereby reducing the occurrence of objects hitting the middle of the screw and causing deformation of the screw, thereby reducing the occurrence of difficulties in rotating and adjusting the connecting tube due to screw deformation, and reducing the safety hazards caused by the lateral support rod being in a non-horizontal state due to difficulty in adjustment, which makes it difficult for workers to construct on an inclined plane.

[0052] 2. The method and device for constructing the curved and straight hydraulic climbing formwork of the shuttle-shaped tower of a single-tower cable-stayed bridge described in the present invention can, when the screw rod and the connecting tube need to be disassembled for storage, threadedly connect the connecting ring with the fixed ring, and restrict a pair of protective tubes to the middle of the connecting tube, thereby reducing the impact of random sliding of the protective tubes during storage and improving the ease of use of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] The present invention will be further described below in conjunction with the accompanying drawings.

[0054] Figure 1 is a method flow chart of the construction method of the present invention;

[0055] Figure 2 It is a flow chart of the working steps of the climbing formwork construction in the present invention;

[0056] Figure 3 It is a flow chart of the working steps of installing the climbing formwork system in the present invention;

[0057] Figure 4 It is a flow chart of the working steps of template position calibration in the present invention;

[0058] Figure 5 It is a flow chart of the working steps of the crossbeam section construction in the present invention;

[0059] Figure 6 It is a flow chart of the working steps of the tower crown section construction in the present invention;

[0060] Figure 7 It is a structural schematic diagram of the tripod in the present invention;

[0061] Figure 8 It is a structural schematic diagram of the sleeve in the present invention;

[0062] Fig. 9 It is a schematic diagram of the structure of the protection tube in the present invention;

[0063] Fig.10 It is a structural schematic diagram of the reinforcing plate in the present invention;

[0064] In the figure: 1. longitudinal support rod; 12. transverse support rod; 13. connecting plate; 14. screw rod; 15. connecting tube; 16. sleeve; 17. protective tube; 2. collar; 21. connecting ring; 22. fixing ring; 3. slide groove; 31. reinforcement plate. DETAILED DESCRIPTION

[0065] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0066] like Figure 1 As shown, the single-tower cable-stayed bridge shuttle tower curved surface and straight surface hydraulic climbing formwork construction method described in the embodiment of the present invention, the specific steps of the construction method are as follows:

[0067] S1: Construction preparation, including early material procurement, drawing review, auxiliary materials required for hydraulic climbing formwork construction, etc.;

[0068] S2: The tower base and the starting section are constructed, and the climbing formwork system is installed after the tower base and the starting section are completed;

[0069] S3: Carry out climbing formwork construction in the middle of the cable tower in sections, and check the position of the formwork during the construction of each section;

[0070] S4: erection of beam supports and construction of beam sections;

[0071] S5: construction of the tower crown section;

[0072] S6: Cables and adjustment cables for the entire bridge.

[0073] like Figure 2 As shown, the specific steps of the climbing formwork construction in S3 are as follows:

[0074] S11: The outer formwork consists of two types of formwork: steel-wood (WISA) combination formwork and stainless steel formwork. The straight segments are made of steel-wood combination formwork, and the arc segments are made of stainless steel formwork.

[0075] S12: Due to the different curvatures of the upper and lower tower columns, the arc section stainless steel templates need to be made into multiple sets of templates with different curvatures as needed;

[0076] S13: To ensure smooth connection between steel formwork and steel-wood (WISA) combined formwork, plane overlap is adopted, the steel formwork strap is pressed on the wooden formwork purlin and tightened with hook screws;

[0077] S14: During the climbing process, the steel-wood composite formwork needs to be cut and shrunk according to the reduction of the tower section.

[0078] like Figure 3 As shown, the specific steps for installing the climbing formwork system in S2 are as follows:

[0079] S21: Assemble the tripod and platform;

[0080] S22: Install trusses and platforms;

[0081] S23: Installation of the first section of cast embedded parts;

[0082] S24: Lifting tripod;

[0083] S25: hoisting the upper truss;

[0084] S26: hoisting formwork;

[0085] S27: Installation of the second section casting embedded parts;

[0086] S28: Install the upper and lower reversing boxes and hydraulic cylinders;

[0087] S29: Install the guide rail;

[0088] S210: Install hydraulic system;

[0089] S211: Climbing frame.

[0090] like Figure 4 As shown, the specific steps of template position calibration in S3 are as follows:

[0091] S31: Draw a horizontal line on the pier concrete at the bottom of the hydraulic climbing formwork to initially level the model to ensure the verticality of the model;

[0092] S32: Use a total station to locate the axis of the pier body at the top of the pier body formwork, and re-measure and check after each model climbing;

[0093] S33: Regularly re-measure the axis of each pier;

[0094] S34: Before each concrete pouring, a dedicated person will check the model connection parts and tie rods to ensure that the model is stable and not deformed;

[0095] S35: The inner cavity formwork is constructed on-site using a steel formwork, and the chamfers are processed using a fixed-length formwork, which is connected to the outer formwork via tension screws.

[0096] like Figure 5 As shown, the specific steps for the construction of the crossbeam section in S4 are as follows:

[0097] S41: Remove the inner climbing formwork;

[0098] S42: Installation of custom steel formwork;

[0099] S43: Carry out the construction of the lower beam;

[0100] S44: Reinstall the climbing formwork system on the lower beam;

[0101] S45: Continue the climbing construction of the main tower.

[0102] like Figure 6 As shown, the specific steps for the construction of the S5 middle tower crown section are as follows:

[0103] S51: Dismantle the inner climbing formwork system;

[0104] S52: Install the tower crown bottom mold support;

[0105] S53: Tie the tower crown reinforcement and install the customized curved steel formwork;

[0106] S54: pouring tower crown concrete.

[0107] like Figures 7 to 10As shown, a single-tower cable-stayed bridge shuttle-shaped cable tower curved surface and straight surface hydraulic climbing formwork construction device is suitable for any of the above-mentioned single-tower cable-stayed bridge shuttle-shaped cable tower curved surface and straight surface hydraulic climbing formwork construction methods, wherein the tripod described in S21 includes a longitudinal support rod 1; the middle part of the longitudinal support rod 1 is rotatably connected to a transverse support rod 12; the bottom of the transverse support rod 12 and the side wall of the longitudinal support rod 1 are hinged with a connecting plate 13; the side wall of the connecting plate 13 is connected to a screw rod 14 by bolts; a connecting tube 15 is threadedly connected between a pair of the screw rods 14; the middle part of the connecting tube 15 is symmetrically arranged and rotatably connected to a pair of sleeves 16; the middle part of the sleeve 16 is slidably connected to a protective tube 17; the middle part of the protective tube 17 is installed with a connecting assembly; the connecting assembly includes a connecting ring 21; the connecting ring 21 and the connecting plate 13 are threadedly matched; when working, a pair of screws 14 are respectively connected to a pair of connecting plates 13 Connection, since the transverse support rod 12 will be in a non-horizontal state after the tripod is installed for the first time and the climbing formwork system rises along the side wall of the curved surface of the building, it is necessary to rotate the connecting tube 15 to make a pair of screw rods 14 approach or move away from each other, so as to adjust the angle between the transverse support rod 12 and the longitudinal support rod 1, so that the transverse support rod 12 can remain horizontal during construction, and the end of the protective tube 17 is made to fit with the side wall of the connecting plate 13 by sliding the protective tube 17, and then the end of the protective tube 17 is connected to the connecting plate 13 through the connecting assembly, so that the protective tube 17 protects the internal screw rod 14. During construction, the occurrence of objects hitting the middle of the screw rod 14 and causing deformation of the screw rod 14 is reduced, thereby reducing the occurrence of difficulties in rotating and adjusting the connecting tube 15 due to deformation of the screw 14, and reducing the safety hazards caused by the transverse support rod 12 being in a non-horizontal state due to difficulty in adjustment, which causes workers to construct on an inclined plane.

[0108] like Figures 7 to 10 As shown, the connecting assembly includes a ring 2; the ring 2 is rotatably connected to the middle part of the protective tube 17; the connecting ring 21 is a pair and is symmetrically arranged on both sides of the ring 2; the middle part of the sleeve 16 is symmetrically arranged and fixed with a pair of fixing rings 22; the connecting ring 21 and the fixing ring 22 are threadedly matched; when working, the connecting ring 21 can be threadedly connected to the connecting disk 13 so that the protective tube 17 and the connecting disk 13 are kept in contact with each other to protect the screw 14, or when the screw 14 and the connecting tube 15 need to be disassembled and stored, the connecting ring 21 can be threadedly connected to the fixing ring 22 to limit the pair of protective tubes 17 to the middle part of the connecting tube 15, thereby reducing the impact caused by the random sliding of the protective tube 17 during storage, thereby improving the convenience of use of the device.

[0109] like Figures 7 to 10As shown, a plurality of slide grooves 3 are provided in the middle of the sleeve 16; a plurality of reinforcing plates 31 are fixedly connected to the interior of the protective tube 17; the reinforcing plates 31 are slidably connected to the interior of the slide grooves 3; during operation, when the protective tube 17 is hit by an external object, the protective tube 17 may be deformed, thereby affecting the sliding of the protective tube 17. By providing a plurality of reinforcing plates 31, the impact resistance of the protective tube 17 can be improved, the deformation of the protective tube 17 can be reduced, and the influence of the deformation of the protective tube 17 on the use of the device can be reduced.

[0110] During operation, a pair of screw rods 14 are respectively connected to a pair of connecting plates 13. Since the transverse support rod 12 will be in a non-horizontal state after the tripod is installed for the first time and the climbing formwork system rises along the side wall of the curved surface of the building, it is necessary to rotate the connecting tube 15 to make the pair of screw rods 14 approach or move away from each other, thereby adjusting the angle between the transverse support rod 12 and the longitudinal support rod 1, so that the transverse support rod 12 can remain horizontal during construction, and the end of the protective tube 17 is made to fit with the side wall of the connecting plate 13 by sliding the protective tube 17, and then the end of the protective tube 17 is connected to the connecting plate 13 through the connecting assembly, so that the protective tube 17 protects the internal screw rod 14, and the connecting ring 21 can be threadedly connected to the connecting plate 13 so that the protective tube 17 and the connecting plate 13 remain in contact to protect the screw rod 14, or when the screw rod 14 and the connecting tube 15 need to be disassembled and stored, the connecting ring 21 can be threadedly connected to the fixing ring 22 to limit the pair of protective tubes 17 to the middle of the connecting tube 15.

[0111] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method and device for the construction of a curved and straight hydraulic climbing formwork for a shuttle tower of a single-tower cable-stayed bridge, characterized in that: The specific steps of this construction method are as follows: S1: Construction preparation, including early material procurement, drawing review, auxiliary materials required for hydraulic climbing formwork construction, etc.; S2: The tower base and the starting section are constructed, and the climbing formwork system is installed after the tower base and the starting section are completed; S3: Carry out climbing formwork construction in the middle of the cable tower in sections, and check the position of the formwork during the construction of each section; S4: erection of beam supports and construction of beam sections; S5: construction of the tower crown section; S6: Cables and adjustment cables for the entire bridge.

2. The method for constructing the curved and straight hydraulic climbing formwork of the shuttle tower of a single-tower cable-stayed bridge according to claim 1 is characterized in that: The specific steps of climbing formwork construction in S3 are as follows: S11: The outer formwork consists of two types of formwork: steel-wood (WISA) combination formwork and stainless steel formwork. The straight segments are made of steel-wood combination formwork, and the arc segments are made of stainless steel formwork. S12: Due to the different curvatures of the upper and lower tower columns, the arc section stainless steel templates need to be made into multiple sets of templates with different curvatures as needed; S13: To ensure smooth connection between steel formwork and steel-wood (WISA) combined formwork, plane overlap is adopted, the steel formwork strap is pressed on the wooden formwork purlin and tightened with hook screws; S14: During the climbing process, the steel-wood composite formwork needs to be cut and shrunk according to the reduction of the tower section.

3. The method for constructing the curved and straight hydraulic climbing formwork of the shuttle tower of a single-tower cable-stayed bridge according to claim 2 is characterized in that: The specific steps for installing the climbing formwork system in S2 are as follows: S21: Assemble the tripod and platform; S22: Install trusses and platforms; S23: Installation of the first section of cast embedded parts; S24: Lifting tripod; S25: hoisting the upper truss; S26: hoisting formwork; S27: Installation of the second section casting embedded parts; S28: Install the upper and lower reversing boxes and hydraulic cylinders; S29: Install the guide rail; S210: Install hydraulic system; S211: Climbing frame.

4. The method for constructing the curved and straight hydraulic climbing formwork of the shuttle tower of a single-tower cable-stayed bridge according to claim 3 is characterized in that: The specific steps for template position calibration in S3 are as follows: S31: Draw a horizontal line on the pier concrete at the bottom of the hydraulic climbing formwork to initially level the model and ensure the verticality of the model; S32: Use a total station to locate the axis of the pier body at the top of the pier body formwork, and re-measure and check after each model climbing; S33: Regularly re-measure the axis of each pier; S34: Before each concrete pouring, a dedicated person will check the model connection parts and tie rods to ensure that the model is stable and not deformed; S35: The inner cavity formwork is constructed on-site using a steel formwork, and the chamfers are processed using a fixed-length formwork, which is connected to the outer formwork via tension screws.

5. The method for constructing the curved and straight hydraulic climbing formwork of the shuttle tower of a single-tower cable-stayed bridge according to claim 4 is characterized in that: The specific steps for the construction of the crossbeam section in S4 are as follows: S41: Remove the inner climbing formwork; S42: Installation of custom steel formwork; S43: Carry out the construction of the lower beam; S44: Reinstall the climbing formwork system on the lower beam; S45: Continue the climbing construction of the main tower.

6. The method for constructing the curved and straight hydraulic climbing formwork of the shuttle tower of a single-tower cable-stayed bridge according to claim 5 is characterized in that: The specific steps for the construction of the S5 middle tower crown section are as follows: S51: Dismantle the inner climbing formwork system; S52: Install the tower crown bottom mold support; S53: Tie the tower crown reinforcement and install the customized curved steel formwork; S54: pouring tower crown concrete.

7. A hydraulic climbing formwork construction device for curved and straight surfaces of a shuttle-shaped cable tower of a single-tower cable-stayed bridge, the climbing formwork construction device being applicable to any hydraulic climbing formwork construction method for curved and straight surfaces of a shuttle-shaped cable tower of a single-tower cable-stayed bridge in claims 1-6, characterized in that: The tripod described in S21 includes a longitudinal support rod (1); the middle part of the longitudinal support rod (1) is rotatably connected to a transverse support rod (12); the bottom of the transverse support rod (12) and the side wall of the longitudinal support rod (1) are both hinged with a connecting plate (13); the side wall of the connecting plate (13) is connected to a screw rod (14) by bolts; a connecting tube (15) is threadedly connected between a pair of the screw rods (14); the middle part of the connecting tube (15) is symmetrically arranged and rotatably connected to a pair of sleeves (16); the middle part of the sleeve (16) is slidably connected to a protective tube (17); a connecting assembly is installed in the middle part of the protective tube (17); the connecting assembly includes a connecting ring (21); the connecting ring (21) and the connecting plate (13) are threadedly matched.

8. The curved and straight surface hydraulic climbing formwork construction device for the shuttle-shaped tower of a single-tower cable-stayed bridge according to claim 7 is characterized in that: The connection assembly comprises a collar (2); the collar (2) is rotatably connected to the middle of the protective tube (17); the connecting ring (21) is a pair and is symmetrically arranged on both sides of the collar (2); a pair of fixing rings (22) are symmetrically arranged and fixed to the middle of the sleeve (16); the connecting ring (21) and the fixing ring (22) are threadedly matched.

9. The curved and straight surface hydraulic climbing formwork construction device for the shuttle-shaped tower of a single-tower cable-stayed bridge according to claim 8 is characterized in that: A plurality of slide grooves (3) are provided in the middle of the sleeve (16); a plurality of reinforcing plates (31) are fixedly connected inside the protection tube (17); and the reinforcing plates (31) are slidably connected inside the slide grooves (3).

Citation Information

Cited By

  • Temporary construction platform for hydraulic creeping formwork and use method of temporary construction platform

    CN121250786A

  • A temporary construction platform for hydraulic formwork and method of use thereof

    CN121250786B