Thermal-insulation fireproof composite wall and mounting method thereof
By adopting the structure design including the intermediate layer, the external mold layer, the support structure, and the reinforcement of the muscles, the combination of BIM technology and the removable composite structure solves the lack of the existing composite walls in thermal insulation and fire resistance. Realize higher stability and maintenance convenience.
Patent Information
- Application Number
- CN202411614941.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-01-21
AI Technical Summary
The existing composite walls have shortcomings in thermal insulation and fire protection performance, and are prone to errors during installation, and are not easy to disassemble and assemble, which increases the construction strength.
Adopt the design of the wall structure of the intermediate layer, the external mold layer, the support structure and the reinforced tendon, the support structure adopts the steel structure layer and the removable composite structure. The wall structure model is constructed through BIM technology Enhance the structure with cement pouring.
Improve the overall stability, carrying capacity and seismic performance of the wall, simplify the maintenance and upgrade process, and reduce the construction intensity and installation error.
Smart Images

Figure CN119332850A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of composite walls, in particular to a thermal insulation and fireproof composite wall and an installation method thereof. Background Art
[0002] In the construction industry, with the increasing requirements for building energy conservation, safety and environmental protection, traditional wall materials can no longer meet the needs of modern buildings. Especially in cold areas or places that require high fire safety, the shortcomings of traditional walls in thermal insulation and fire resistance are becoming increasingly prominent. Therefore, the development of a composite wall device with both excellent thermal insulation and high-efficiency fire resistance has become an urgent need in the industry;
[0003] A Chinese patent with authorization announcement number CN214034164U discloses a fireproof thermal insulation composite panel and wall, including a protective layer, wherein adjacent protective layers enclose a containing space; a thermal insulation layer, which is located in the containing space, wherein the thermal insulation layer is formed by plane splicing of Class A thermal insulation material and Class B thermal insulation material, and the Class B thermal insulation material is located at the end of the thermal insulation layer, and the thermal insulation layer and the end of the connecting plate are connected by a mortise and tenon structure. The thermal insulation layer of this solution is formed by plane splicing of Class A thermal insulation material and Class B thermal insulation material, and the end is provided with a mortise and tenon structure composed of Class B thermal insulation material. The Class A thermal insulation material enables this solution to be used as a fireproof isolation zone, and the mortise and tenon structure enables this solution to form an effective connection with the connecting plate, and since Class B thermal insulation material has better plasticity than Class A thermal insulation material, the mortise and tenon structure composed of Class B thermal insulation material can reduce the production difficulty of this solution;
[0004] However, this type of wall structure is constructed with a single material, such as bricks and concrete. These materials often have insufficient thermal insulation performance, resulting in high building energy consumption. At the same time, during the construction of the wall, when a certain part needs to be replaced or repaired, the corresponding components or splicing parts cannot be disassembled, but the entire wall needs to be dismantled, which increases the construction intensity. For this reason, the present invention proposes a thermal insulation and fireproof composite wall and an installation method thereof. Summary of the invention
[0005] The object of the present invention is to provide a thermal insulation and fireproof composite wall and an installation method thereof, so as to solve the problems mentioned in the above background technology that the existing composite wall has poor thermal insulation and fireproof performance and is difficult to disassemble and assemble due to errors during installation.
[0006] To achieve the above object, the present invention provides the following technical solution: a thermal insulation and fireproof composite wall, comprising:
[0007] A wall structure, the wall structure comprising an intermediate layer and an outer mold layer, the outer mold layer being symmetrically arranged along the intermediate layer;
[0008] A supporting structure, the supporting structure comprising a monomer structure or a composite structure, and the supporting structure is used to connect the outer mold layer and the middle layer;
[0009] A reinforcing rib connected to the outer mold layer and used to connect the supporting structure to provide positioning for the supporting structure;
[0010] The bearing wall, the wall structure is sequentially spliced in an array along a single direction of the installation position, and the two ends after splicing are respectively connected to the bearing wall.
[0011] Furthermore, the supporting structure includes a monomer structure, which includes a steel structure layer, the steel structure layer is hinged and fixed to the middle layer by oblique inserts, the outer mold layer is connected to the steel structure layer by reinforcing ribs, and is fixed on both sides of the middle layer by cement pouring to form a reinforced structure, and the outer mold layer is provided with a support member for auxiliary support of the outer mold layer on the side away from the middle layer.
[0012] Furthermore, the support structure includes a composite structure, the composite structure includes a detachably mounted steel structure layer, and the steel structure layer is divided into an installation component and a splicing piece;
[0013] The mounting assembly includes a mounting ball and a mounting rod. The mounting ball is provided with a plurality of threaded mounting holes on its circumference. The mounting rod is fixedly connected to the mounting ball by threaded engagement.
[0014] The splicing parts are divided into steel component one and steel component two, and the steel component one is coupled with the steel structure two. The ends of the steel component one and the steel component two that are separated from each other are respectively provided with mounting bolts. The steel component one and the steel component two are respectively provided with mounting tubes with threads through the mounting bolts. The mounting tubes are provided with hemispherical grooves for mounting balls. At the same time, mounting grooves are symmetrically provided on both sides of the mounting tubes, and the width of the mounting grooves is greater than the thread diameter of the mounting rod.
[0015] Further, the first steel member comprises a connecting pipe and a locking pipe arranged on the outer wall of the connecting pipe, the outer wall of the locking pipe is provided with a coupling slope, a boss is provided on the upper surface of one end of the coupling slope, and a step is provided on one end of the coupling slope;
[0016] The second steel component comprises a locking rod, a coupling hole matching the coupling slope is formed on the locking rod, a slider is provided on the locking rod, a sliding member is provided on the locking rod through the matching and sliding of the slider and the slide groove, an abutment block is provided on the inner wall of the sliding member, the abutment block is located in the coupling hole and slidably connected to the locking rod, when the abutment block applies pressure to the coupling slope, the first steel component and the second steel component are unlocked, on the contrary, when the abutment block slides to a position where it cannot apply pressure to the coupling slope, the first steel component and the second steel component are locked;
[0017] The separated ends of the steel component 1 and the steel component 2 in cooperative connection can be detachably mounted with mounting cylinders, and the mounting cylinders are symmetrically provided with hemispherical grooves.
[0018] A method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall, comprising:
[0019] Step S1: Use BIM to build a wall structure model and determine the simulated wall structure;
[0020] Step S2: determining the actual dimensions of the middle layer, the outer mold layer, the supporting structure and the reinforcing ribs in the actual composite wall for installation according to the simulated wall structure;
[0021] Step S3: digging a foundation pit for paving the middle layer according to the installation position, setting the middle layer and connecting the supporting structure and the outer formwork layer in sequence;
[0022] Step S4: determining the gap between the two ends of the middle layer laid in step S3 and the bearing wall, and setting a supplementary wall to fill the gap between the middle layer and the bearing wall;
[0023] S5: Pour concrete along the foundation pit.
[0024] Furthermore, the specific steps of step S1 include:
[0025] Step S1.1: setting appropriate scanning parameters according to the specific size and shape of the installation location;
[0026] Step S1.2: Scan the installation location multiple times and stitch the point cloud data obtained from the multiple scans to form a complete three-dimensional model of the wall installation;
[0027] Step S1.3: Extract the length, width and base point coordinates of the installation location from the point cloud data for subsequent data analysis and application.
[0028] Furthermore, the specific steps of step S2 include:
[0029] Step S2.1: Obtain the design requirements and specifications of the composite wall, including its expected load-bearing capacity, thermal insulation performance, and fire resistance performance;
[0030] Step S2.2: Create a preliminary three-dimensional model of the wall using computer-aided design according to the design requirements and basic data, and adjust the size and layout of the middle layer, outer formwork layer, support structure and reinforcement according to the simulation results;
[0031] Step S2.3: Conduct a small-scale construction test based on the obtained wall model, and confirm and adjust the size of the wall based on the test results.
[0032] Furthermore, the specific steps of step S4 include:
[0033] Step S4.1: measuring the gap size and recording the width, height and depth of each gap;
[0034] Step S4.2: Design the structure of the supplementary wall and calculate the specific size of the gap, the material and strength of the load-bearing wall, the load that the supplementary wall needs to bear, and the expected durability;
[0035] Step S4.3: Prepare the type and weight of the additional wall materials according to the wall installation size;
[0036] Step S4.4: Install the supplementary wall, arrange and fix the supplementary wall materials in a predetermined order and position, and connect the supplementary wall to the load-bearing wall using mortar and concrete.
[0037] A method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall, comprising:
[0038] Step P1: Use BIM to build a wall structure model and determine the simulated wall structure;
[0039] Step P2: Determine the actual dimensions of the middle layer, outer formwork layer, support structure and reinforcement ribs in the actual composite wall for installation based on the simulated wall structure;
[0040] Step P3: dig a foundation pit for paving the middle layer according to the installation position, set the middle layer and connect the supporting structure and the outer formwork layer in sequence;
[0041] Step P4: determining the gap between the two ends of the intermediate layer laid in step S3 and the bearing wall, and setting a supplementary wall to fill the gap between the intermediate layer and the bearing wall;
[0042] P5: Pour concrete along the foundation pit.
[0043] Furthermore, the specific process of step P2 is as follows:
[0044] Step P2.1: Use BIM to construct a wall structure model, and analyze and simulate the composition of the wall structure and the connection method of the installed components in the steel structure layer, as well as the quick connection and disassembly mechanism of the splicing parts;
[0045] Step P2.2: Determine the specific dimensions of the middle layer, outer formwork layer, support structure and reinforcement ribs in the actual composite wall based on the simulated wall structure;
[0046] Step P2.3: Determine the specific number and distribution of the mounting balls and mounting rods according to the positions and requirements in the simulated wall structure, and determine the specific sizes and matching methods of the locking tubes, locking rods, sliding parts and abutment blocks according to the connection mechanism between the steel members 1 and 2;
[0047] Step P2.4: Comprehensively evaluate the intermediate layer, outer mold layer, support structure, and reinforcing ribs after determining the dimensions to ensure that all dimensions and fitting methods meet the design requirements.
[0048] Further, the specific process of Step P4 is as follows:
[0049] Step P4.1: Simulate the installation of the assembled composite wall in the foundation pit and simulate and test the gap sizes reserved on both sides between the composite wall and the bearing wall during the installation process;
[0050] Step P4.2: According to the reserved gap sizes obtained from the simulation, simulate the connection method of disassembling and assembling the composite wall to obtain a supplementary wall with the actual gap sizes;
[0051] Step P4.3: Simulate the assembly of the composite wall and the supplementary wall obtained from the simulation;
[0052] Step P4.4: Obtain the smoothness N of the wall according to the simulation results, set the sampling interval of the temperature as t, sample the temperature, obtain the temperature values T1 and T2 of the wall, and calculate the temperature change rate of the wall
[0053] Step P4.5: Set the effective range of smoothness as [n1, n2] and the effective range of temperature change rate as [Q1, Q2], and judge whether the structure of the simulated assembly meets the design requirements of the wall; if n1 ≤ N ≤ n2 and Q1 ≤ ΔT ≤ Q2, the result of the simulated assembly meets the design requirements; if N < n1 or N > n2 or ΔT < Q1 or ΔT > Q2, the result of the simulated assembly does not meet the design requirements, and return to Step P4.1;
[0054] Step P4.6: Output the structures of the composite wall and the supplementary wall and perform actual assembly.
[0055] The present invention has the following remarkable effects compared with the prior art: By using a steel structure layer as the support structure and fixing it to the intermediate layer by skew inserted wire hinges, the overall stability of the wall is strengthened. At the same time, the outer mold layer is inserted into the steel structure layer through reinforcing ribs and cooperates with cement pouring to form a strengthening structure, further improving the bearing capacity and seismic performance of the wall. This structural design enables the wall to maintain high safety and stability when facing external forces.
[0056] By adopting a detachable and installable steel structure layer for the composite structure in the support structure, it is divided into installation components and splicing parts. This design makes the maintenance and upgrade of the wall more convenient. When a certain part needs to be replaced or repaired, only the corresponding component or splicing part needs to be disassembled, without the need to demolish the entire wall. This not only saves maintenance costs but also extends the service life of the wall. Description of the Drawings
[0057] Figure 1 An axonometric diagram of the present invention being installed in a wall;
[0058] Figure 2 For the present invention Figure 1 Axonometric diagram of a medium thermal insulation fireproof composite wall;
[0059] Figure 3 It is a structural schematic diagram of the non-disassembly template in the present invention;
[0060] Figure 4 It is a schematic diagram of the explosion structure of steel component 1 and steel component 2 in the present invention;
[0061] Figure 5 It is a schematic diagram of the connection between the steel member 1 and the steel member 2 and the mounting ball and the mounting rod in the present invention;
[0062] Figure 6 For the present invention Figure 4 Another perspective structural diagram of;
[0063] Figure 7 For the present invention Figure 6 Schematic diagram of the cross-sectional structure after installation;
[0064] Figure 8 This is a schematic diagram of the process of Embodiment 3 of the present invention;
[0065] Fig. 9 This is a schematic diagram of a process flow in Embodiment 4 of the present invention;
[0066] Fig.10 This is another flow chart of the fourth embodiment of the present invention.
[0067] In the figure: 1. load-bearing wall; 2. composite wall; 201. middle layer; 202. supporting structure; 2021. connecting pipe; 2022. sliding member; 2023. locking pipe; 2024. coupling slope; 2025. locking rod; 2026. mounting cylinder; 2027. mounting ball; 2028. mounting rod; 203. outer mold layer; 2031. reinforcing rib; 2032. thermal insulation layer; 2033. fireproof layer. DETAILED DESCRIPTION
[0068] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0069] See also Figure 1-Figure 8 , the present invention provides the following embodiments:
[0070] Example 1
[0071] Reference Figure 1 , Figure 2 and Figure 6 , which is the first embodiment of the present invention, is a thermal insulation and fireproof composite wall, comprising:
[0072] A wall structure, wherein the wall structure comprises an intermediate layer 201 and an outer mold layer 203, wherein the outer mold layer 203 is symmetrically arranged along the intermediate layer 201; the intermediate layer 201 adopts a lightweight, high-strength inorganic thermal insulation material, such as rock wool, glass wool or silicate board, which can effectively isolate indoor and outdoor heat transfer and improve the thermal insulation efficiency of the wall; the outer mold layer 203 is divided into an insulation layer 2032 and a fireproof layer 2033, wherein the insulation layer 2032 in the outer mold layer 203 faces the intermediate layer 201 and is used to insulate the interior of the wall structure, while the fireproof layer 2033 of the outermost layer of the wall is used to prevent damage caused by burning the wall by flames, and the outer mold layer 203 adopts high-strength, corrosion-resistant reinforced concrete or precast concrete slabs, which not only provides structural support, but also enhances the overall strength and durability of the wall;
[0073] A support structure 202, wherein the support structure 202 includes a monomer structure or a composite structure, and the support structure 202 is used to connect the outer mold layer 203 and the middle layer 201;
[0074] The reinforcing ribs 2031 are connected to the outer formwork layer 203 and used to connect the supporting structure 202 to provide positioning for the supporting structure 202; the reinforcing ribs 2031 use high-strength steel bars or fiber-reinforced composite materials to improve the shear strength and seismic performance of the wall, and the reinforcing ribs 2031 are connected to the outer formwork layer 203 by embedded parts or welding, and are fixed to the steel structure layer by plugging to form a stable support system.
[0075] The bearing wall 1, the wall structure is sequentially spliced in an array along a single direction of the installation position, and the two ends after splicing are respectively connected to the bearing wall 1.
[0076] Preferably, the support structure 202 includes a monomer structure, which includes a steel structure layer, which is hinged and fixed on the middle layer 201 through oblique plug wires, and the outer mold layer 203 is inserted into the steel structure layer through reinforcing ribs 2031, and is fixedly installed on both sides of the middle layer 201 in conjunction with cement pouring to form a reinforced structure. The steel structure layer in the monomer structure of the support structure 202 is made of hot-dip galvanized or stainless steel to improve its corrosion resistance and fire resistance. The oblique plug wire is made of high-strength stainless steel to ensure stable and reliable connection. At the same time, the support structure 202, as a key component connecting the outer mold layer 203 and the middle layer 201, ensures the overall stability and load-bearing capacity of the wall.
[0077] To summarize, first clean the installation position to ensure that the ground is flat and free of debris, then place the steel structure layer according to the designed position, and fix it on the middle layer 201 through oblique screw hinges, then hoist the outer mold layer 203 to the installation position in turn, connect it to the steel structure layer through reinforcing ribs 2031, ensure that the outer mold layer 203 and the middle layer 201 fit tightly, then pour high-strength cement between the outer mold layer 203 and the middle layer 201, and after the cement solidifies, form a solid reinforced structure, finally, splice the wall structure in an array in a single direction along the installation position in turn, ensure that the splicing gap is tight, and connect the two ends after splicing to the bearing wall 1 through embedded parts or expansion plugs.
[0078] Example 2
[0079] Reference Figure 1-Figure 2 , which is the second embodiment of the present invention, and is based on the previous embodiment, a thermal insulation composite wall, wherein the composite structure comprises a detachably installed steel structure layer, wherein the steel structure layer is divided into an installation component and a splicing piece;
[0080] The mounting assembly includes a mounting ball 2027 and a mounting rod 2028. The mounting ball 2027 is provided with a plurality of threaded mounting holes circumferentially, and the mounting rod 2028 is fixedly connected to the mounting ball 2027 by means of threaded fitting.
[0081] The splicing parts are divided into steel component 1 and steel component 2, and the steel component 1 is coupled to the steel structure 2. The ends of the steel component 1 and the steel component 2 that are away from each other are respectively provided with mounting bolts. The steel component 1 and the steel component 2 are respectively threaded with mounting tubes 2026 through the mounting bolts. The mounting tubes 2026 are provided with hemispherical grooves for installing the mounting balls 2027. At the same time, the mounting tubes 2026 are symmetrically provided with mounting grooves on both sides, and the width of the mounting grooves is greater than the thread diameter of the mounting rod 2028.
[0082] Preferably, the first steel member comprises a connecting pipe 2021 and a locking pipe 2023 arranged on the outer wall of the connecting pipe 2021, the outer wall of the locking pipe 2023 is provided with a coupling slope 2024, a boss is provided on the upper surface of one end of the coupling slope 2024, and a step is provided at one end of the coupling slope 2024;
[0083] The second steel component includes a locking rod 2025, a coupling hole matching the coupling slope 2024 is provided on the locking rod 2025, a slider is provided on the locking rod 2025, a sliding member 2022 is provided on the locking rod 2025 through the matching sliding of the slider and the sliding groove, an abutment block is provided on the sliding member 2022, and the abutment block unlocks or locks the steel components one and two by matching the coupling hole and the coupling slope 2024, the locking rod 2025 is provided with a coupling hole matching the coupling slope 2024, when the locking rod 2025 is inserted into the connecting pipe 2021, the coupling hole and the coupling slope 2024 are matched to achieve locking, the sliding member 2022 is slidably sleeved on the locking rod 2025, and the abutment block provided thereon matches the coupling slope 2024 through the coupling hole to unlock or lock. When unlocking is required, the abutment block can be moved to different positions in the coupling hole by moving the position of the sliding member 2022. When the abutment block is located at different positions in the coupling hole, the pressing conditions of the abutment block on the coupling slope are different. When the sliding member 2022 drives the abutment block to move to the boss position on the coupling slope 2024, the coupling slope 2024 is pressed down accordingly and remains parallel to or lower than the outer wall of the locking rod 2025. At this time, steel component one and steel component two are unlocked. Conversely, when the sliding member 2022 drives the abutment block to move to the non-boss position on the coupling slope 2024, the coupling slope 2024 will not move down, thereby being clamped in the coupling hole, so that steel component one and steel component two are locked.
[0084] The separated ends of the steel member 1 and the steel member 2 in cooperative connection are both installed with mounting cylinders 2026, and the mounting cylinders 2026 are symmetrically provided with hemispherical grooves.
[0085] To summarize, when installing steel component 1 and steel component 2, the position and angle of the mounting ball 2027 and the mounting rod 2028 are determined according to the wall structure and installation requirements, and the mounting rod 2028 is fixed to the mounting ball 2027 by threaded cooperation. At the same time, steel component 1 and steel component 2 are respectively installed at the positions where they need to be connected. By the cooperation of the locking rod 2025 and the connecting pipe 2021, and the locking of the sliding part 2022 and the coupling slope 2024, the steel components can be quickly connected. At the same time, the hemispherical groove on the mounting cylinder 2026 is used to cooperate with the mounting ball 2027 and the mounting rod 2028 to achieve more complex connection and fixation.
[0086] When disassembling steel component 1 and steel component 2, slide the sliding member 2022 to disengage the abutment block from the locking position of the coupling slope 2024, and gently pull out the locking rod 2025 to separate steel component 1 and steel component 2. If needed, the mounting ball 2027 and the mounting rod 2028 can be removed to adjust or repair the wall structure, and the reinforcing ribs 2037 on the load-bearing wall 1 are all replaced with steel component 2.
[0087] Example 3
[0088] Reference Figure 1 to Figure 5 , which is the third embodiment of the present invention, a method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall in embodiment 1, comprising:
[0089] Step S1: Use BIM to build a wall structure model and determine the simulated wall structure; according to the specific size and shape of the installation location, use BIM technology to set appropriate scanning parameters, including scanning accuracy and scanning range, to ensure that the acquired point cloud data is accurate and complete; then scan the installation location multiple times, use the point cloud data processing function of the BIM software to splice the point cloud data obtained from multiple scans to form a complete wall installation 3D model, and extract the key information of the length, width and base point coordinates of the installation location from the spliced point cloud data for subsequent wall structure design and analysis. At the same time, use the simulation function of the BIM software to perform a preliminary simulation of the wall structure to determine the simulated wall structure.
[0090] Step S2: determining the actual sizes of the middle layer 201, the outer mold layer 203, the support structure 202 and the reinforcing ribs 2031 in the actual composite wall 2 for installation according to the simulated wall structure;
[0091] Step S3: digging a foundation pit for paving the middle layer 201 according to the installation position, setting the middle layer 201 and sequentially connecting the supporting structure 202 and the outer mold layer 203;
[0092] Step S4: determining the gaps between the two ends of the intermediate layer 201 laid in step S3 and the bearing wall 1, and setting supplementary walls to fill the gaps between the intermediate layer 201 and the bearing wall 1;
[0093] S5: Pour concrete along the foundation pit.
[0094] Preferably, the specific steps of step S1 include:
[0095] Step S1.1: setting appropriate scanning parameters according to the specific size and shape of the installation location;
[0096] Step S1.2: Scan the installation location multiple times and stitch the point cloud data obtained from the multiple scans to form a complete three-dimensional model of the wall installation;
[0097] Step S1.3: Extract the length, width and base point coordinates of the installation location from the point cloud data for subsequent data analysis and application.
[0098] Preferably, the specific steps of step S2 include:
[0099] Step S2.1: Obtaining the design requirements and specifications of the composite wall 2, including its expected load-bearing capacity, thermal insulation performance and fire resistance performance;
[0100] Step S2.2: According to the design requirements and basic data, a preliminary three-dimensional model of the wall is created using computer-aided design, and the size and layout of the middle layer 201, the outer mold layer 203, the support structure 202 and the reinforcing ribs 2031 are adjusted according to the simulation results.
[0101] Step S2.3: Conduct a small-scale test on the obtained wall model, and make final confirmation and adjustment on the wall size based on the test results. Use the simulation function of the BIM software to simulate and analyze the preliminary three-dimensional model to evaluate the wall's load-bearing capacity, thermal insulation performance, and fire resistance. Adjust the wall size and layout based on the simulation results;
[0102] Conduct a small-scale test based on the adjusted wall model. Through the test, verify the actual performance of the wall, and make final confirmation and adjustment of the wall size based on the test results.
[0103] Preferably, the specific steps of step S4 include:
[0104] Step S4.1: measuring the gap size and recording the width, height and depth of each gap; mainly measuring the gap size between the two ends of the middle layer 201 and the bearing wall 1, and recording the width, height and depth of each gap;
[0105] Step S4.2: Design the structure of the supplementary wall, and calculate the specific size of the gap, the material and strength of the load-bearing wall 1, the load that the supplementary wall needs to bear, and the expected durability; Based on the gap size, the material and strength of the load-bearing wall 1, the load that the supplementary wall needs to bear, and the expected durability, design the structure of the supplementary wall at the same time to prepare for subsequent installation;
[0106] Step S4.3: Prepare the type and weight of supplementary wall materials according to the wall installation size, such as supplementary wall materials such as concrete blocks, bricks, steel bars, mortar, connectors and waterproof layers; arrange and fix the supplementary wall materials in a predetermined order and position, and connect the supplementary wall to the load-bearing wall 1 using mortar and concrete.
[0107] Step S4.4: Install the supplementary wall, arrange and fix the supplementary wall materials in a predetermined order and position, and connect the supplementary wall to the load-bearing wall 1 using mortar and concrete.
[0108] In summary, firstly, the BIM technology is used to construct the wall structure model. By accurately setting the scanning parameters, scanning multiple times and splicing the point cloud data, a complete three-dimensional model of the wall installation is formed, and the size information is extracted. Then, according to the design requirements, CAD is used to create a three-dimensional model of the wall. After simulation tests and small-scale construction tests, the size and layout of the middle layer, outer formwork layer, supporting structure and reinforcement are adjusted to ensure that the load-bearing capacity, thermal insulation performance and fire resistance of the wall meet the requirements. At the same time, according to the adjusted model size, the foundation pit is dug and the middle layer is paved, and the supporting structure and the outer formwork layer are connected in turn. After the paving is completed, the gap size between the two ends of the middle layer and the load-bearing wall is accurately measured, and the corresponding supplementary wall structure is designed, and the necessary materials, including concrete blocks, bricks and steel bars, are prepared. Finally, the supplementary wall is installed in the predetermined order and position, and it is firmly connected to the load-bearing wall with mortar and concrete.
[0109] Example 4
[0110] Reference Figure 1 to Figure 5 , which is the fourth embodiment of the present invention, a method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall in embodiment 2, comprising:
[0111] Step P1: Use BIM to build a wall structure model and determine the simulated wall structure;
[0112] Step P2: determining the actual dimensions of the middle layer 201, the outer mold layer 203, and the support structure 202 in the actual composite wall 2 for installation according to the simulated wall structure;
[0113] Step P3: digging a foundation pit for paving the middle layer 201 according to the installation position, setting the middle layer 201 and sequentially connecting the supporting structure 202 and the outer mold layer 203;
[0114] Step P4: determining the gaps between the two ends of the intermediate layer 201 laid in step S3 and the bearing wall 1, and setting supplementary walls to fill the gaps between the intermediate layer 201 and the bearing wall 1;
[0115] P5: Pouring concrete along the foundation pit
[0116] Preferably, the specific process of step P2 is:
[0117] Step P2.1: Use BIM to construct a wall structure model, and analyze and simulate the composition of the wall structure and the connection method of the installed components in the steel structure layer, as well as the quick connection and disassembly mechanism of the splicing parts;
[0118] Step P2.2: Determine the specific dimensions of the middle layer 201, the outer mold layer 203, and the support structure 202 in the actual composite wall 2 according to the simulated wall structure;
[0119] Step P2.3: Determine the specific quantity and distribution of the installation balls 2027 and installation rods 2028 according to the positions and requirements in the simulated wall structure. Meanwhile, determine the specific dimensions and mating methods of the locking pipes 2023, locking rods 2025, sliding members 2022 and abutting blocks according to the connection mechanism between the first steel member and the second steel member.
[0120] Step P2.4: Conduct a comprehensive evaluation of the determined intermediate layer 201, outer mold layer 203, support structure 202 and reinforcing ribs 2031 to ensure that all dimensions and mating methods meet the design requirements.
[0121] Preferably, the specific process of step P4 is as follows:
[0122] Step P4.1: Simulate the installation of the completed composite wall 2 in the foundation pit, and test through CAD the sizes of the gaps reserved on both sides between the composite wall 2 and the bearing wall 1 during the installation process.
[0123] Step P4.2: According to the sizes of the reserved gaps obtained from the simulation, simulate the connection method of disassembling and assembling the composite wall 2 to obtain a supplementary wall with the actual gap size.
[0124] Step P4.3: Conduct a simulated assembly according to the composite wall 2 and the supplementary wall obtained from the simulation.
[0125] Step P4.4: Obtain the smoothness N of the wall according to the simulation results, set the sampling interval of the temperature as t, sample the temperature, obtain the temperature values T1 and T2 of the wall, and calculate the temperature change rate of the wall
[0126] Step P4.5: Set the effective range of the smoothness as [n1, n2], and the effective range of the temperature change rate as [Q1, Q2], and determine whether the structure of the simulated assembly meets the design requirements of the wall; if n1 ≤ N ≤ n2 and Q1 ≤ ΔT ≤ Q2, the result of the simulated assembly meets the design requirements; if N < n1 or N > n2 or ΔT < Q1 or ΔT > Q2, the result of the simulated assembly does not meet the design requirements, and return to step P4.1;
[0127] Step P4.6: Output the structures of the composite wall 2 and the supplementary wall, and conduct an actual assembly.
[0128] Before the actual assembly, it is necessary to confirm that the structure of the simulated assembly meets the design requirements of the wall, and select appropriate wall materials according to the size, shape and load to be borne by the supplementary wall; meanwhile, determine the construction process of the supplementary wall and necessary reinforcement measures.
[0129] According to the simulation results, prepare the required supplementary wall materials, connectors, fixtures, and necessary construction tools and equipment, mark the installation position of the supplementary wall on the load-bearing wall 1, ensure that the installation position is accurate, install the supplementary walls one by one into the reserved gaps in accordance with the simulated loading method, and use connectors and fixtures to firmly fix them on the load-bearing wall 1. At the same time, during the installation process, perform real-time inspections on the installation quality of the supplementary walls to ensure that the wall installation is flat, firm, and meets the design requirements;
[0130] After the installation of the supplementary wall is completed, continue to sample and monitor the temperature of the wall to ensure that the temperature change rate of the wall is within the design range to avoid cracking or deformation of the wall due to temperature changes. At the same time, use measuring tools to monitor the smoothness of the wall to ensure that the smoothness of the wall meets the design requirements to improve the overall aesthetics and service life of the wall;
[0131] Conduct detailed analysis of temperature and smoothness monitoring data to identify possible problems or deficiencies. Based on the analysis results, make necessary adjustments and optimizations to the installation location, connection method or material selection of the supplementary wall to ensure the overall performance and stability of the wall;
[0132] In summary, in step P4, the size of the gap between the composite wall and the load-bearing wall is tested through CAD simulation, and the corresponding supplementary wall is designed. During the simulated loading process, not only the structural stability and smoothness of the wall are tested, but also temperature monitoring is added to ensure that the temperature change rate of the wall is within the design range. At the same time, the material and process selection of the supplementary wall, the actual installation steps, and the temperature and smoothness monitoring methods are described in detail. These measures jointly ensure the installation quality of the thermal insulation and fireproof composite wall and improve the overall performance and stability of the wall.
[0133] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A thermal insulation and fireproof composite wall, characterized in that: include: A wall structure, the wall structure comprising an intermediate layer (201) and an outer mold layer (203), wherein the outer mold layer (203) is symmetrically arranged along the intermediate layer (201); A support structure (202), wherein the support structure (202) comprises a single structure or a composite structure, and the support structure (202) is used to connect the outer mold layer (203) and the middle layer (201); A reinforcing rib (2031), wherein the reinforcing rib (2031) is connected to the outer mold layer (203) and is used to connect the supporting structure (202) to provide positioning for the supporting structure (202); A load-bearing wall (1), wherein the wall structure is sequentially spliced in an array along a single direction of the installation position, and the two ends after splicing are respectively connected to the load-bearing wall (1).
2. A thermal insulation and fireproof composite wall according to claim 1, characterized in that: The supporting structure of the single structure comprises a steel structure layer, which is hingedly fixed on the middle layer (201) by oblique plug wires, and the outer mold layer (203) is inserted into the steel structure layer by reinforcing ribs (2031) and is fixedly installed on both sides of the middle layer (201) by cement pouring to form a reinforced structure.
3. The thermal insulation and fireproof composite wall according to claim 1, characterized in that: The composite structure includes a detachably installed steel structure layer, wherein the steel structure layer is divided into an installation component and a splicing component; The mounting assembly comprises a mounting ball (2027) and a mounting rod (2028); a plurality of threaded mounting holes are circumferentially formed on the mounting ball (2027); and the mounting rod (2028) is fixedly connected to the mounting ball (2027) by means of threaded engagement; The splicing piece is divided into steel component 1 and steel component 2, the steel component 1 is coupled to the steel structure 2, and the ends of the steel component 1 and the steel component 2 that are separated from each other are respectively provided with mounting bolts, and the steel component 1 and the steel component 2 are respectively provided with mounting tubes (2026) threadedly through the mounting bolts, and the mounting tubes (2026) are provided with hemispherical grooves for installing mounting balls (2027), and at the same time, the mounting tubes (2026) are symmetrically provided with mounting grooves on both sides, and the width of the mounting grooves is greater than the thread diameter of the mounting rod (2028).
4. A thermal insulation and fireproof composite wall according to claim 3, characterized in that: The first steel component comprises a connecting pipe (2021) and a locking pipe (2023) arranged on the outer wall of the connecting pipe (2021); the outer wall of the locking pipe (2023) is provided with a coupling slope (2024); a boss is provided on the upper surface of one end of the coupling slope (2024); and a step is provided at one end of the coupling slope (2024); The second steel component comprises a locking rod (2025), a coupling hole for matching the coupling slope (2024) is provided on the locking rod (2025), the locking rod (2025) is provided with a slider, a sliding member (2022) is provided on the locking rod (2025) through the matching sliding of the slider and the sliding groove, an abutment block is provided on the inner wall of the sliding member (2022), the abutment block is located in the coupling hole and is slidably connected to the locking rod (2025), when the abutment block applies pressure to the coupling slope (2024), the first steel component and the second steel component are unlocked, on the contrary, when the abutment block slides to a position where it cannot apply pressure to the coupling slope (2024), the first steel component and the second steel component are locked; The separated ends of the steel component one and the steel component two under cooperative connection are both detachably mounted with mounting cylinders (2026), and the mounting cylinders (2026) are symmetrically provided with hemispherical grooves.
5. A method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall as claimed in claim 2, characterized in that: include: Step S1: Use BIM to build a wall structure model and determine the simulated wall structure; Step S2: determining the actual dimensions of the middle layer (201), the outer mold layer (203), the support structure (202) and the reinforcing ribs (2031) in the actual composite wall (2) for installation according to the simulated wall structure; Step S3: digging a foundation pit for paving the middle layer (201) according to the installation position, arranging the middle layer (201) and sequentially connecting the supporting structure (202) and the outer mold layer (203); Step S4: determining the gaps between the two ends of the intermediate layer (201) laid in step S3 and the bearing wall (1), and setting up supplementary walls to fill the gaps between the intermediate layer (201) and the bearing wall (1); S5: Pour concrete along the foundation pit.
6. The method for installing a thermal insulation and fireproof composite wall according to claim 5, characterized in that: The specific steps of step S1 include: Step S1.1: setting appropriate scanning parameters according to the specific size and shape of the installation location; Step S1.2: Scan the installation location multiple times and stitch the point cloud data obtained from the multiple scans to form a complete three-dimensional model of the wall installation; Step S1.3: Extract the length, width and base point coordinates of the installation location from the point cloud data for subsequent data analysis and application.
7. The method for installing a thermal insulation and fireproof composite wall according to claim 5, characterized in that: The specific steps of step S2 include: Step S2.1: Obtaining the design requirements and specifications of the composite wall (2), including its expected load-bearing capacity, thermal insulation performance and fire resistance performance; Step S2.2: according to the design requirements and basic data, a preliminary three-dimensional model of the wall is created using computer-aided design, and the size and layout of the middle layer (201), the outer mold layer (203), the support structure (202) and the reinforcing ribs (2031) are adjusted according to the simulation results; Step S2.3: Conduct a small-scale construction test based on the obtained wall model, and confirm and adjust the size of the wall based on the test results.
8. The method for installing a thermal insulation and fireproof composite wall according to claim 5, characterized in that: The specific steps of step S4 include: Step S4.1: measuring the gap size and recording the width, height and depth of each gap; Step S4.2: Design the structure of the supplementary wall and calculate the specific size of the gap, the material and strength of the load-bearing wall (1), the load that the supplementary wall needs to bear, and the expected durability; Step S4.3: Prepare the type and weight of the additional wall materials according to the wall installation size; Step S4.4: Install the supplementary wall, arrange and fix the supplementary wall materials in a predetermined order and position, and connect the supplementary wall with the load-bearing wall (1) using mortar and concrete.
9. A method for installing a thermal insulation and fireproof composite wall, applied to a thermal insulation and fireproof composite wall as claimed in claim 3, characterized in that: include: Step P1: Use BIM to build a wall structure model and determine the simulated wall structure; Step P2: determining the actual dimensions of the middle layer (201), the outer mold layer (203), the support structure (202) and the reinforcing ribs (2031) in the actual composite wall (2) for installation according to the simulated wall structure; Step P3: Excavate a foundation pit for paving the intermediate layer (201) according to the installation position, install the intermediate layer (201) and sequentially connect the support structure (202) and the outer formwork layer (203); Step P4: Determine the gaps between the two ends of the intermediate layer (201) laid based on Step S3 and the load-bearing wall (1), and set up supplementary walls to fill the gaps with the load-bearing wall (1); P5: Pour concrete along the foundation pit.
10. The method for installing a thermal insulation and fireproof composite wall according to claim 9, characterized in that: The specific process of Step P2 is as follows: Step P2.1: Construct a wall structure model through BIM, and analyze and simulate the composition of the wall structure, the connection method of the installation components in the steel structure layer, and the quick connection and disassembly mechanism of the splicing parts; Step P2.2: Determine the specific dimensions of the intermediate layer (201), the outer formwork layer (203), the support structure (202), and the reinforcing ribs (2031) in the actual composite wall (2) according to the simulated wall structure; Step P2.3: Determine the specific quantity and distribution of the installation balls (2027) and the installation rods (2028) according to the positions and requirements in the simulated wall structure. At the same time, according to the connection mechanism of the first steel component and the second steel component, determine the specific dimensions and matching methods of the locking pipe (2023), the locking rod (2025), the sliding part (2022), and the abutting block; Step P2.4: Conduct a comprehensive evaluation of the intermediate layer (201), the outer formwork layer (203), the support structure (202), and the reinforcing ribs (2031) with determined dimensions to ensure that all dimensions and matching methods meet the design requirements.
11. The method for installing a thermal insulation and fireproof composite wall according to claim 9, characterized in that: The specific process of Step P4 is as follows: Step P4.1: Simulate the installation of the completed composite wall (2) in the foundation pit, and test the gaps reserved on both sides of the composite wall (2) during the installation process with the load-bearing wall (1) through simulation; Step P4.2: According to the reserved gap sizes obtained from the simulation, simulate the connection method of disassembling and assembling the composite wall (2) to obtain a supplementary wall with the actual gap sizes; Step P4.3: Conduct a simulated installation according to the composite wall (2) and the supplementary wall obtained from the simulation; Step P4.4: Obtain the smoothness N of the wall based on the simulation results, set the temperature sampling interval to t, sample the temperature, obtain the wall temperature values T1 and T2, and calculate the temperature change rate of the wall Step P4.5: Set the effective range of smoothness as [n1, n2] and the effective range of temperature change rate as [Q1, Q2], and determine whether the structure of the simulated installation meets the design requirements of the wall; if n1 ≤ N ≤ n2 and Q1 ≤ ΔT ≤ Q2, the result of the simulated installation meets the design requirements; if N < n1 or N > n2 or ΔT < Q1 or ΔT > Q2, the result of the simulated installation does not meet the design requirements, and return to Step P4.1; Step P4.6: Output the structures of the composite wall (2) and the supplementary wall, and conduct an actual installation.
Citation Information
Patent Citations
Fireproof thermal insulation composite board and wall body
CN214034164U