Building solid waste crushing, decomposing and recycling device

By introducing multiple crushing units and magnetic suction units into the construction waste crushing device, the problems of insufficient crushing and difficult separation of metal impurities are solved, achieving sufficient crushing of construction waste and effective separation of metal impurities, and through the water curtain of the dust reduction unit Function, realizing the adsorption of dust and the cleaning and separation of sand and gravel.

CN119346226AActive Publication Date: 2025-01-24BAO QINGXIANG (SHENZHEN) PROJECT MANAGEMENT CO LTD

Patent Information

Application Number
CN202411781360.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2025-01-24
Estimated Expiration
2044-12-05

AI Technical Summary

Technical Problem

During the crushing process, existing construction waste crushing devices have problems such as insufficient crushing and difficult to separate metal impurities.

Method used

A construction solid waste crushing, decomposition and reuse device is designed, which uses multiple crushing units and magnetic suction units. Through multiple crushing and magnetic separation, it ensures that the construction waste reaches the standard particle size and effectively separates metal impurities.

Benefits of technology

Achieved sufficient crushing of construction waste and the effective separation of metal impurities, avoiding the problem of incomplete crushing and remaining metal impurities. At the same time, through the water curtain effect of the dust reduction unit, the dust adsorption in the crushing process and the cleaning separation of gravel separated in the process of crushing process were realized. Essence

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119346226A_ABST
    Figure CN119346226A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of resource recycling, in particular to a building solid waste smashing, decomposing and recycling device which comprises an operation box, connecting plates are symmetrically installed on the upper portion of an inner cavity of the operation box, supporting rods are fixedly installed between the two connecting plates, and a lower plate is jointly installed on the two supporting rods. According to the building waste crushing device, through the arrangement of multiple crushing units, large building waste which does not meet the crushing requirement can be crushed again, and it can be effectively guaranteed that building waste particles falling through screen holes in a screen plate reach the standard; and the crushed construction waste falls onto the magnetic attraction unit, metal impurities in the construction waste are adsorbed through the magnetic attraction unit, water in the cleaning box can be applied to dust falling in a circulating mode through the dust falling unit, dust and the water are fused through soaking, and finally the purpose that the construction waste is cleaned while the crushed construction waste is cleaned is achieved. And sand and dust can be separated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of resource recycling, and specifically to a device for crushing, decomposing and recycling construction solid waste. Background Art

[0002] Construction waste refers to the waste generated during the construction, demolition, and renovation of various buildings, structures, pipe networks, etc., including muck, spoil, waste materials, and silt. Construction waste can be classified into muck, concrete blocks, crushed stones, brick and tile fragments, waste mortar, slurry, etc. according to its composition.

[0003] The prior art discloses a Chinese patent with the application number CN202210895420.5, a construction waste crushing device for construction engineering with good crushing effect, which discloses that through a switch control mechanism, the automatic operation of the extrusion processing mechanism can be realized, and the device automatically performs the extrusion and stacking of construction waste. After the extrusion of the construction waste is completed, the installation bottom plate is pulled to discharge the construction waste from the discharge hole.

[0004] The above device can extrude construction waste and solve the problem of manually processing construction waste. However, there are many types of construction waste and various ways to process it. When crushing construction waste, the problem of insufficient crushing may occur, and it is difficult to separate sand and gravel in the crushed construction waste. Summary of the Invention

[0005] The purpose of the present invention is to provide a device for crushing, decomposing and recycling construction solid waste to solve the problems raised in the above background art.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] A device for crushing, decomposing and recycling construction solid waste includes an operation box. On the upper part of the inner cavity of the operation box, connecting plates are symmetrically installed. Between the two connecting plates, support rods are fixedly installed. On the two support rods, a lower plate is jointly installed. Between the two support rods, a crushing roller is rotatably installed through an electric slider. On the lower plate, a cleaning plate is installed through multiple groups of springs. Below the crushing roller, U-shaped frames connected to the side walls of the inner cavity of the operation box are symmetrically installed. Inside the U-shaped frames, rectangular blocks are fixedly installed. Between the two rectangular blocks, a central rod is fixedly installed. On both sides of the central rod, sieve plates rotatably connected to it are provided. Between the two U-shaped frames, multiple crushing units are symmetrically provided. The multiple crushing units can re-convey the construction waste that has not fallen from the sieve plate to between the two crushing rollers for multiple crushing. Below the multiple crushing units, a magnetic attraction unit connected to the operation box is provided. At the lower part of the operation box, a cleaning box is fixedly installed. In the middle of the cleaning box, a slope panel is fixedly installed. Between the operation box and the cleaning box, a dust reduction unit is jointly installed.

[0008] A driving wheel is slidably installed in the middle of the C-shaped frame through an electric slider. Racks that are slidably connected to the C-shaped frame are meshed with the driving wheel both above and below. Through grooves are provided on both sides of the driving wheel and are opened on the C-shaped frame. A moving box is slidably installed in the through grooves. The moving boxes on both sides are respectively connected to the racks on both sides. A T-shaped groove is provided in the middle of the moving box, and a connecting block is slidably installed in the groove. One side of the connecting block is fixedly connected to a sieve plate, and a U-shaped discharge plate is jointly installed on both sides of the sieve plate.

[0009] An electric push rod is fixedly installed on the upper end surface of the rectangular block. A guide plate is jointly fixedly installed between the electric push rods on both rectangular blocks. The top of the guide plate is placed directly below the two crushing rollers. A notch is communicated with the slope surface of the guide plate. Suspension plates are symmetrically installed on both sides of the lower end surface of the C-shaped frame. A hydraulic rod is fixedly installed on one side of the suspension plate, and a receiving hopper is jointly installed between the corresponding two hydraulic rods.

[0010] A support frame fixedly connected to the inner cavity of the operation box is provided above the receiving hopper. A conveyor belt is provided in the middle of the support frame. A plurality of shovel plates are equidistantly installed on the upper part of the conveyor belt. A rotating plate is rotatably installed on one side of the receiving hopper. A plurality of L-shaped blocks fixedly connected to the receiving hopper are provided below the rotating plate, and springs fixedly connected to the rotating plate are provided on the L-shaped blocks.

[0011] The magnetic attraction unit includes a rotating rod. The rotating rod is rotatably connected to the operation box through an electric slider. A clamping plate is circumferentially installed on the outer wall of the rotating rod. A front side frame is provided on the side of the clamping plate away from the rotating rod. The front side frame is connected to the clamping plate through a spring. A magnetic attraction plate is jointly installed between the front side frame and the clamping plate. Side grooves are opened on both sides of the front side frame, and L-shaped stoppers for resisting the magnetic attraction plate are connected in the side grooves through springs.

[0012] An outer edge box is rotatably installed on one side of the operation box. A push rod that penetrates and slides in the outer edge box is provided on the outer edge box. A spring is sleeved outside the push rod. One end of the push rod is slidably installed with a scraping member through an electric slider. An outlet is opened at the lower part of the outer edge box.

[0013] The dust reduction unit includes an annular water tank placed on the upper part of the inner cavity of the operation box. A water curtain box is connected and installed below the annular water tank. A plurality of conveying pipes are equidistantly installed on one side of the annular water tank. The lower ends of the conveying pipes are placed in the cleaning box, and a conduction pipe is jointly connected and installed at the lower parts of the plurality of conveying pipes.

[0014] An air cylinder is fixedly installed on one side of the cleaning box. One end of the conduction pipe away from the conveying pipe is communicated with the air cylinder. A piston rod is slidably installed in the air cylinder. A rotating shaft rotatably connected to the operation box is provided directly below the rotating rod. A runner is fixedly installed at one end of the rotating shaft away from the operation box. A push plate is rotatably installed on one side of the runner, and one side of the push plate slides in the piston rod.

[0015] The slope panel divides the cleaning box into two spaces, and the higher side of the slope panel is close to the conveying pipe.

[0016] The rotating shaft and the rotating rod are both provided with pulleys, and the pulleys are commonly connected with a belt.

[0017] Beneficial effects of the present invention:

[0018] 1. The present invention can collect larger construction waste that does not meet the crushing requirements and transport it between two crushing rollers for re-crushing through the arrangement of multiple crushing units, thereby effectively ensuring that the construction waste particles falling through the sieve holes on the sieve plate meet the standards. The crushed construction waste falls onto the magnetic suction unit, and the metal impurities in the construction waste are adsorbed by the magnetic suction unit. At this moment, the separation and collection of metal impurities in the construction waste are completed. Compared with the existing device, the present invention can peel off the metal impurities in the construction waste when crushing it, and at the same time, crush the larger particles that do not meet the crushing requirements.

[0019] 2. The present invention allows the fallen construction waste particles to fall into a cleaning box, and the water pre-injected into the cleaning box is used to soak and clean them. During the soaking and cleaning, the sand and gravel after the construction waste is crushed can be cleaned. At this time, the dust in the construction waste is integrated with the water, and can fall through the water curtain through the setting of the dust reduction unit. Therefore, a large amount of dust generated when the crushing roller crushes the construction waste is adsorbed and resisted, thereby effectively achieving dust reduction, and the water curtain that adsorbs the dust falls into the cleaning box, so that the dust is precipitated in the cleaning box. At the same time, the dust reduction unit can circulate the water in the cleaning box for dust reduction, soaking to fuse the dust and water, and finally achieving the separation of sand and gravel and dust while completing the cleaning of the crushed construction waste.

[0020] 3. The present invention enables multiple shovels to move at one time by opening the conveyor belt. When the shovel moves, the substandard construction waste that falls into the receiving bucket is scooped up and transported, and then transported to between two crushing rollers for re-crushing. The setting of multiple crushing units can effectively avoid the occurrence of incomplete crushing when the construction waste is crushed. At the same time, when the shovel scoops up the construction waste in the receiving bucket, when the shovel moves out of the receiving bucket, the rotating plate can be flipped and reset.

[0021] 4. The present invention manually pushes the push rod to move the scraper to the side away from the spring, and then the electric slider opens to make the bottom of the scraper contact with the surface of the magnetic plate, and then loosens the push rod. Under the action of the spring, the push rod drives the scraper to scrape the metal particles adsorbed on the magnetic plate into the outer edge box, and finally completes the falling collection through the discharge port.

[0022] 5. The present invention drives the rotating wheel to rotate by rotating the rotating shaft. When the rotating wheel rotates, the piston rod is driven by the push plate to perform compression movement in the air cylinder, and then the water on one side of the cleaning box is transported to the annular water tank through the delivery pipe. Then the annular water tank supplies water to the water curtain box. The water in the water curtain box falls into the working box to form a surrounding water curtain. The dust generated when the construction waste is crushed can be adsorbed and resisted through the formation of the water curtain. Finally, the water curtain falls into the cleaning box to realize circulating water supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0024] Figure 1 It is a schematic diagram of the overall front structure of the present invention;

[0025] Figure 2 It is a schematic diagram of the overall rear side structure of the present invention;

[0026] Figure 3 It is a schematic diagram of the overall left-side structure of the present invention;

[0027] Figure 4 It is a schematic diagram of the structure between the magnetic attraction unit and the working box of the present invention;

[0028] Figure 5 It is a schematic diagram of the structure of the multiple crushing unit of the present invention;

[0029] Figure 6 It is a schematic diagram of the local structure of the multiple crushing unit of the present invention;

[0030] Figure 7 It is a schematic diagram of the structure between the crushing roller and the connecting plate of the present invention;

[0031] Figure 8 It is a schematic diagram of the rear side cross-sectional structure of the present invention.

[0032] The reference numerals in the figures are as follows:

[0033] 1. Operation box; 2. Multiple crushing units; 20. Connecting plate; 201. Support rod; 202. Crushing roller; 203. Lower plate; 204. Cleaning plate; 21. Profile frame; 211. Driving wheel; 212. Rack; 213. Moving box; 214. Connecting block; 215. Screen plate; 216. Discharging plate; 22. Rectangular block; 221. Center rod; 222. Electric push rod; 223. Guide plate; 23. Hydraulic rod; 231. Receiving bucket; 232. Rotating plate; 24. Support frame; 241. Conveyor belt; 242, shovel plate; 3, magnetic unit; 31, rotating rod; 32, clamping plate; 33, front side frame; 34, magnetic plate; 35, side groove; 36, L-shaped block; 37, outer edge box; 371, push rod; 372, scraper; 373, discharge port; dust suppression unit: 4, cleaning box; 41, slope panel; 51, annular water tank; 52, water curtain box; 53, conveying pipe; 54, conduction pipe; 55, rotating shaft; 56, wheel; 57, push plate; 58, air cylinder; 59, piston rod. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] The invention discloses a device for crushing, decomposing and reusing solid construction waste, which decomposes solid waste in construction waste and recycles it as a resource. Specifically, the metal in concrete blocks is recovered by crushing, and sand and dust are separated during soaking and washing of the crushed construction waste so as to recycle the sand and gravel.

[0036] like Figure 1-Figure 8As shown in the figure, it includes an operation box 1. On the upper part of the inner cavity of the operation box 1, connecting plates 20 are symmetrically installed. Between the two connecting plates 20, support rods 201 are fixedly installed. A lower plate 203 is installed on the two support rods 201 together. A crushing roller 202 is rotatably installed between the two support rods 201 through an electric slider. A cleaning plate 204 is installed on the lower plate 203 through multiple groups of springs. Below the crushing roller 202, U-shaped frames 21 connected to the inner cavity side wall of the operation box 1 are symmetrically installed. Inside the U-shaped frames 21, rectangular blocks 22 are fixedly installed. A central rod 221 is fixedly installed between the two rectangular blocks 22. Sieve plates 215 rotatably connected to the central rod 221 are arranged on both sides of the central rod 221. Multiple crushing units 2 are symmetrically arranged between the two U-shaped frames 21. The multiple crushing units 2 can re-convey the construction waste that has not fallen through the sieve plates 215 to between the two crushing rollers 202 for multiple crushing. Below the multiple crushing units 2, a magnetic attraction unit 3 connected to the operation box 1 is provided. At the lower part of the operation box 1, a cleaning box 4 is fixedly installed. In the middle of the cleaning box 4, a slope panel 41 is fixedly installed. A dust reduction unit is installed between the operation box 1 and the cleaning box 4.

[0037] After starting the electric slider to drive the two crushing rollers 202 to rotate towards each other, the construction waste is put into the middle of the operation box 1. Subsequently, after being crushed by the crushing rollers 202, the construction waste evenly falls onto the two sieve plates 215. The construction waste that meets the crushing requirements falls on the sieve plates 215. Since the sieve plates 215 are inclined, when the construction waste falls onto the sieve plates 215, it falls in an inclined manner. Thus, it can ensure that the construction waste that meets the crushing requirements fully falls when spreading evenly, avoiding the situation that when the crushed construction waste falls, the construction waste that meets the crushing requirements is mixed and cannot fully fall due to accumulation. Through the setting of the multiple crushing units 2, the larger construction waste that does not meet the crushing requirements can be collected and conveyed between the two crushing rollers 202 for re-crushing, thereby effectively ensuring that the construction waste particles falling through the sieve holes on the sieve plates 215 meet the standards;

[0038] The crushed construction waste falls onto the magnetic attraction unit 3. The magnetic attraction unit 3 adsorbs the metal impurities in the construction waste. At this moment, the separation and collection of the metal impurities in the construction waste are completed. The fallen construction waste particles fall into the cleaning box 4 and are soaked and cleaned by the water pre-injected into the cleaning box 4. When soaking and cleaning, the sand and gravel after the construction waste is crushed can be cleaned. At this time, the dust in the construction waste is fused with the water. Through the setting of the dust reduction unit, it can fall through the water curtain, so as to adsorb and resist a large amount of dust and the like generated when the crushing rollers 202 crush the construction waste, thereby effectively achieving dust reduction. And the water curtain adsorbing dust falls into the cleaning box 4, making the dust precipitate in the cleaning box 4. At the same time, the dust reduction unit can recycle the water in the cleaning box 4 for dust reduction;

[0039] Compared with the existing device, the present invention can strip metal impurities from construction waste during crushing, and at the same time re-crush larger particles that do not meet the crushing requirements. By soaking, the dust is fused with water, and finally, while the crushed construction waste is being cleaned, the sand and dust can be separated.

[0040] In the middle of the U-shaped frame 21, a driving wheel 211 is slidably installed through an electric slider. Both the upper and lower parts of the driving wheel 211 are engaged with racks 212 that are slidably connected to the U-shaped frame 21. On both sides of the driving wheel 211, through grooves are provided on the U-shaped frame 21. A moving box 213 is slidably installed in the through grooves. The two moving boxes 213 on both sides are respectively connected to the racks 212 on both sides. A T-shaped groove is provided in the middle of the moving box 213. A connecting block 214 is slidably installed in the groove. One side of the connecting block 214 is fixedly connected to a sieve plate 215. A U-shaped discharge plate 216 is jointly installed on both sides of the sieve plate 215.

[0041] When the electric slider is started to drive the driving wheel 211 to rotate, when the driving wheel 211 rotates, it drives the two racks 212 to move closer to or away from each other. When the two racks 212 move, they respectively drive the moving boxes 213 on both sides to adjust the distance, thereby facilitating the adjustment of the inclination angles of the two sieve plates 215 on both sides. By adjusting the inclination angles of the two sieve plates 215, the screening speed of the crushed construction waste can be controlled. The larger construction waste that does not pass through the sieve plate 215 finally slides into the receiving hopper 231 through the gap between the sieve plate 215 and the discharge plate 216, thus facilitating the next round of crushing.

[0042] An electric push rod 222 is fixedly installed on the upper end surface of the rectangular block 22. A guide plate 223 is jointly fixedly installed between the electric push rods 222 on the two rectangular blocks 22. The top of the guide plate 223 is placed directly below the two crushing rollers 202. A notch is provided in the slope surface of the guide plate 223 and communicates with the middle. On both sides of the lower end surface of the U-shaped frame 21, hanging plates are symmetrically installed. A hydraulic rod 23 is fixedly installed on one side of the hanging plate. A receiving hopper 231 is jointly installed between the two corresponding hydraulic rods 23.

[0043] Through the setting of the receiving hopper 231, the construction waste that does not meet the crushing standard can be collected for re-crushing.

[0044] A support frame 24 fixedly connected to the inner cavity of the operation box 1 is provided above the receiving hopper 231. A conveyor belt 241 is provided in the middle of the support frame 24. A plurality of shovel plates 242 are equally spaced and installed on the upper part of the conveyor belt 241. A rotating plate 232 is rotatably installed on one side of the receiving hopper 231. Below the rotating plate 232, a plurality of L-shaped blocks fixedly connected to the receiving hopper 231 are provided. Springs fixedly connected to the rotating plate 232 are provided on the L-shaped blocks.

[0045] By opening the conveyor belt 241, multiple shovel plates 242 are moved at one time. When the shovel plates 242 move, they scoop up the substandard construction waste that falls into the receiving bucket 231 and transport it, and then transport it to between the two crushing rollers 202 for further crushing. The setting of multiple crushing units can effectively avoid incomplete crushing of the construction waste. At the same time, when the shovel plates 242 scoop up the construction waste in the receiving bucket 231, when the shovel plates 242 move out of the receiving bucket 231, the rotating plate 232 can be flipped over and reset.

[0046] The magnetic unit 3 includes a rotating rod 31, which is rotatably connected to the work box 1 through an electric slider. A clamping plate 32 is circumferentially installed on the outer wall of the rotating rod 31. A front side frame 33 is provided on the side of the clamping plate 32 away from the rotating rod 31. The front side frame 33 and the clamping plate 32 are connected by a spring. A magnetic plate 34 is commonly installed between the front side frame 33 and the clamping plate 32. Side grooves 35 are opened on both sides of the front side frame 33. L-shaped stoppers 36 for resisting the magnetic plate 34 are connected in the side grooves 35 by springs.

[0047] The magnetic plate 34 can be provided to absorb metal impurities in the crushed construction waste, thereby completing the separation of metal particles in the construction waste. At the same time, as the rotating rod 31 rotates, the multiple magnetic plates 34 are driven to rotate in opposite positions. On the one hand, the received construction waste can be spread out, and on the other hand, the crushed construction waste can be dumped into the cleaning box 4 for soaking and cleaning to remove dust from the sand and gravel.

[0048] An outer edge box 37 is rotatably installed on one side of the working box 1. A pushing rod 371 is provided on the outer edge box 37 and slides inside the outer edge box 37. A spring is provided on the outer sleeve of the pushing rod 371. A scraping piece 372 is slidably installed on one end of the pushing rod 371 through an electric slider. A discharge port 373 is opened at the lower part of the outer edge box 37.

[0049] The push rod 371 is manually pushed to move the scraper 372 to the side away from the spring, and then the electric slider is opened to make the bottom of the scraper 372 contact the surface of the magnetic plate 34, and then the push rod 371 is loosened. Under the action of the spring, the push rod 371 drives the scraper 372 to scrape the metal particles adsorbed on the magnetic plate 34 into the outer edge box 37, and finally complete the falling and collection through the discharge port 373.

[0050] The dust reduction unit includes an annular water tank 51 supported on the upper part of the inner cavity of the working box 1, and a water curtain box 52 is installed at the lower part of the annular water tank 51. A plurality of delivery pipes 53 are installed at equal intervals on one side of the annular water tank 51, and a one-way valve is provided at the lower part of the delivery pipe 53. Through the setting of the one-way valve, when the piston rod 59 is compressed, the delivery pipe 53 can only transport the water in the cleaning box 4 to the annular water tank 51, and the lower end of the delivery pipe 53 is placed in the cleaning box 4, and the lower parts of the plurality of delivery pipes 53 are connected together with a conduction pipe 54.

[0051] An air cylinder 58 is fixedly installed on one side of the cleaning box 4, and the end of the conduction tube 54 away from the delivery tube 53 is connected to the air cylinder 58. A piston rod 59 is slidably installed in the air cylinder 58. A rotating shaft 55 rotatably connected to the working box 1 is provided directly below the rotating rod 31. A rotating wheel 56 is fixedly installed on the end of the rotating shaft 55 away from the working box 1. A pushing plate 57 is rotatably installed on one side of the rotating wheel 56, and one side of the pushing plate 57 is located in the piston rod 59 and slides.

[0052] The rotation of the rotating shaft 55 drives the rotating wheel 56 to rotate. When the rotating wheel 56 rotates, the piston rod 59 is driven by the push plate 57 to perform compression movement in the air cylinder 58, and then the water on one side of the cleaning box 4 is transported to the annular water tank 51 through the delivery pipe 53. Then the annular water tank 51 supplies water to the water curtain box 52. The water in the water curtain box 52 falls into the working box 1 to form a surrounding water curtain. The formation of the water curtain can absorb and resist the dust generated when the construction waste is crushed. Finally, the water curtain falls into the cleaning box 4 to realize circulating water supply.

[0053] The slope plate 41 separates the cleaning box 4 into two spaces, and the higher side of the slope plate 41 is close to the conveying pipe 53 .

[0054] Both the rotating shaft 55 and the rotating rod 31 are provided with pulleys, and a belt is commonly connected between the pulleys.

[0055] When the present invention is in use, construction waste is put into the middle of the working box 1, and then the construction waste is crushed by the crushing roller 202 and falls evenly onto the two sieve plates 215. The construction waste that meets the crushing requirements falls on the sieve plates 215. Since the sieve plates 215 are inclined, the construction waste falls on the sieve plates 215 in an inclined manner, thereby ensuring that the construction waste that meets the crushing requirements falls fully when it is evenly spread, and avoiding the construction waste that meets the crushing requirements from being mixed and unable to be fully crushed due to accumulation when the crushed construction waste falls. When the driving wheel 211 rotates, it drives the two racks 212 to approach or turn to each other. When the two racks 212 move, they drive the moving boxes 213 on both sides to adjust the spacing, so as to facilitate the regulation of the inclination angles of the two sieve plates 215 on both sides. By adjusting the inclination angles of the two sieve plates 215, the sieving speed of the crushed construction waste can be controlled. The larger construction waste that has not been sieved by the sieve plate 215 will eventually slide between the sieve plate 215 and the discharge plate 216 into the receiving bucket 231, so as to facilitate the next round of crushing.

[0056] The conveyor belt 241 is opened to allow the multiple shovel plates 242 to be displaced and moved at one time. When the shovel plates 242 move, the substandard construction waste that falls into the receiving bucket 231 is scooped up and transported, and then transported to between the two crushing rollers 202 for re-crushing. The setting of multiple crushing units can effectively avoid the situation that the construction waste is not completely crushed when being crushed. At the same time, when the shovel plates 242 scoop up the construction waste in the receiving bucket 231, when the shovel plates 242 move out of the receiving bucket 231, the rotating plate 232 can be reversed and reset. The setting of the magnetic suction plate 34 can absorb the metal impurities in the crushed construction waste to complete the separation of the metal particles in the construction waste. At the same time, as the rotating rod 31 rotates, the multiple magnetic suction plates 34 are driven to rotate in different positions. On the one hand, the received construction waste can be spread out, and on the other hand, the crushed construction waste can be dumped into the cleaning box 4 for soaking and cleaning to remove dust in the sand and gravel.

[0057] The push rod 371 is manually pushed to move the scraper 372 to the side away from the spring, and then the electric slider is opened to make the bottom of the scraper 372 contact the surface of the magnetic plate 34, and then the push rod 371 is loosened. Under the action of the spring, the push rod 371 drives the scraper 372 to scrape the metal particles adsorbed on the magnetic plate 34 into the outer edge box 37, and finally completes the falling collection through the discharge port 373. The rotation of the rotating shaft 55 drives the rotating wheel 56 to rotate. When the rotating wheel 56 rotates, it drives the piston rod 59 to perform compression movement in the air cylinder 58 through the push plate 57, and then the water on one side of the cleaning box 4 is transported to the annular water tank 51 through the delivery pipe 53. Then the annular water tank 51 supplies water to the water curtain box 52, and the water in the water curtain box 52 falls into the working box 1 to form a surrounding water curtain. The formation of the water curtain can adsorb and resist the dust generated when the construction waste is crushed, and finally the water curtain falls into the cleaning box 4 to realize circulating water supply.

[0058] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A construction solid waste crushing, decomposition and recycling device, comprising an operation box (1), characterized in that: On the upper part of the inner cavity of the operation box (1), connecting plates (20) are symmetrically installed. Between the two connecting plates (20), support rods (201) are fixedly installed. A lower plate (203) is installed on the two support rods (201) together. A crushing roller (202) is rotationally installed between the two support rods (201) through an electric slider. A cleaning plate (204) is installed on the lower plate (203) through multiple groups of springs. Below the crushing roller (202), U-shaped frames (21) connected to the inner cavity side wall of the operation box (1) are symmetrically installed. Inside the U-shaped frame (21), a rectangular block (22) is fixedly installed. Between the two rectangular blocks (22), a central rod (221) is fixedly installed; On both sides of the central rod (221), there are sieve plates (215) rotatably connected thereto. Between the two U-shaped frames (21), multiple crushing units (2) are symmetrically arranged. The multiple crushing units (2) can re-convey the construction waste that has not fallen from the sieve plates (215) to between the two crushing rollers (202) for multiple crushing. Below the multiple crushing units (2), a magnetic attraction unit (3) connected to the operation box (1) is provided. At the lower part of the operation box (1), a cleaning box (4) is fixedly installed. In the middle of the cleaning box (4), a slope plate (41) is fixedly installed. A dust reduction unit is installed between the operation box (1) and the cleaning box (4).

2. The device for crushing, decomposing and recycling construction solid waste according to claim 1, characterized in that: In the middle of the U-shaped frame (21), a driving wheel (211) is slidably installed through an electric slider. Above and below the driving wheel (211), there are racks (212) slidably connected to the U-shaped frame (21) engaged therewith. On both sides of the driving wheel (211), there are through grooves opened on the U-shaped frame (21). Inside the through grooves, moving boxes (213) are slidably installed. The moving boxes (213) on both sides are respectively connected to the racks (212) on both sides. In the middle of the moving box (213), a groove arranged in a T shape is opened. Inside the groove, a connecting block (214) is slidably installed. One side of the connecting block (214) is fixedly connected to the sieve plate (215). On both sides of the sieve plate (215), a U-shaped discharge plate (216) is installed together.

3. The device for crushing, decomposing and recycling construction solid waste according to claim 1, characterized in that: On the upper end surface of the rectangular block (22), an electric push rod (222) is fixedly installed. Between the electric push rods (222) on the two rectangular blocks (22), a guide plate (223) is fixedly installed together. The top of the guide plate (223) is placed directly below the two crushing rollers (202). The slope of the guide plate (223) is provided with a notch communicating with the middle. On both sides of the lower end surface of the U-shaped frame (21), suspension plates are symmetrically installed. On one side of the suspension plate, a hydraulic rod (23) is fixedly installed. Between the corresponding two hydraulic rods (23), a receiving hopper (231) is installed together.

4. The construction solid waste crushing, decomposition and recycling device according to claim 3 is characterized in that: Above the receiving hopper (231), a support frame (24) fixedly connected to the inner cavity of the operation box (1) is provided. In the middle of the support frame (24), a conveyor belt (241) is provided. On the upper part of the conveyor belt (241), a plurality of shoveling plates (242) are installed at equal intervals. On one side of the receiving hopper (231), a rotating plate (232) is rotationally installed. Below the rotating plate (232), a plurality of L-shaped blocks fixedly connected to the receiving hopper (231) are provided. On the L-shaped blocks, there are springs fixedly connected to the rotating plate (232).

5. The construction solid waste crushing, decomposition and recycling device according to claim 1, characterized in that: The magnetic attraction unit (3) comprises a rotating rod (31), the rotating rod (31) is rotatably connected to the working box (1) through an electric slider, a clamping plate (32) is circumferentially mounted on the outer wall of the rotating rod (31), a front side frame (33) is arranged on the side of the clamping plate (32) away from the rotating rod (31), the front side frame (33) and the clamping plate (32) are connected by a spring, a magnetic attraction plate (34) is installed between the front side frame (33) and the clamping plate (32), side grooves (35) are arranged on both sides of the front side frame (33), and an L-shaped stopper (36) for resisting the magnetic attraction plate (34) is connected in the side groove (35) by a spring.

6. The construction solid waste crushing, decomposition and recycling device according to claim 5, characterized in that: An outer edge box (37) is rotatably mounted on one side of the working box (1), and a push rod (371) is provided on the outer edge box (37) and penetrates and slides inside the outer edge box (37). A spring is provided on the outer sleeve of the push rod (371), and a scraper (372) is slidably mounted on one end of the push rod (371) via an electric slider, and a discharge port (373) is provided at the lower part of the outer edge box (37).

7. The construction solid waste crushing, decomposition and recycling device according to claim 1, characterized in that: The dust reduction unit comprises an annular water tank (51) supported on the upper part of the inner cavity of the working box (1); a water curtain box (52) is installed in communication with the lower part of the annular water tank (51); a plurality of conveying pipes (53) are installed at equal intervals on one side of the annular water tank (51); the lower ends of the conveying pipes (53) are placed in the cleaning box (4); and a conduction pipe (54) is installed in communication with the lower parts of the plurality of conveying pipes (53).

8. The construction solid waste crushing, decomposition and recycling device according to claim 7, characterized in that: A gas cylinder (58) is fixedly mounted on one side of the cleaning box (4); one end of the conducting tube (54) away from the delivery tube (53) is connected to the gas cylinder (58); a piston rod (59) is slidably mounted in the gas cylinder (58); a rotating shaft (55) rotatably connected to the working box (1) is provided directly below the rotating rod (31); a rotating wheel (56) is fixedly mounted on one end of the rotating shaft (55) away from the working box (1); a pushing plate (57) is rotatably mounted on one side of the rotating wheel (56); one side of the pushing plate (57) is located in the piston rod (59) and slides.

9. The construction solid waste crushing, decomposition and recycling device according to claim 1, characterized in that: The slope panel (41) separates the cleaning box (4) into two spaces, and the higher side of the slope panel (41) is close to the conveying pipe (53).

10. The construction solid waste crushing, decomposition and recycling device according to claim 8, characterized in that: The rotating shaft (55) and the rotating rod (31) are both provided with pulleys, and a belt is commonly connected between the pulleys.

Citation Information

Patent Citations

  • Construction waste crushing device with good crushing effect for construction engineering

    CN115888903A

  • Construction waste resource crushing and recycling device

    CN115870047A

  • Device for removing scrap metal in construction waste

    CN212524268U

  • Building solid waste crushing device

    CN216879587U

  • An environmental protection device for shredding solid waste

    DE212019000067U1

Cited By

  • Particle pollution treatment device for comprehensive utilization and treatment of construction waste

    CN120695569A

  • A granular pollution treatment device for comprehensive utilization and treatment of construction waste

    CN120695569B