Water pollutant attenuation monitoring device
By using a combination of rotating round rod, rotating blade and ring cleaning brush in the water pollutant attenuation monitoring device, the problem of easy attachment of moss garbage after long-term use is solved, and the automatic cleaning of the equipment and the extension of service life is achieved. .
Patent Information
- Application Number
- CN202411544573.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-02-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing water pollutant attenuation monitoring device is prone to moss and garbage after long-term use. If it is not cleaned in time, the blades will be stuck, which will affect operation and reduce the service life of the equipment.
A water pollutant attenuation monitoring device is designed, using a combination of a rotating round rod, a rotating blade, annular cleaning brush and a return spring. The rotation of the rotating round rod drives the ring cleaning brush to move back and forth on the surface of the rotating blade to remove garbage and avoid jamming. die.
It effectively avoids the problem of garbage impurities sticking to the surface of the cleaning brush, extends the service life of the equipment, and improves the automation of the device.
Smart Images

Figure CN119395248A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water pollutant attenuation monitoring, and in particular to a water pollutant attenuation monitoring device. Background Art
[0002] When preventing and controlling water pollution, it is necessary to monitor the changes in pollutant concentrations in the water in real time. Therefore, it is necessary to use water pollutant attenuation monitoring devices to promptly detect and warn of potential pollution incidents, which will help relevant departments take quick measures to prevent the spread of pollution.
[0003] The structure of the existing water pollutant attenuation monitoring device is relatively simple. When monitoring the river water, the water pollutant attenuation monitoring device mostly uses the potential energy of the river water flow to generate electricity. As time goes by, moss and garbage will adhere to the side walls of the blades when they are working. If they are not cleaned in time, the blades will get stuck. At the same time, the equipment will monitor the water flow at all times. When the gate is closed and the river water remains relatively still, it will not stop monitoring the water flow, which affects the service life of the equipment.
[0004] Therefore, in order to solve the problem that the above-mentioned monitoring device is prone to be attached with moss and garbage after long-term use, and is not cleaned in time, resulting in the blades being stuck, affecting operation and reducing the service life of the equipment, a water pollutant attenuation monitoring device can be designed. Summary of the invention
[0005] In order to overcome the problem that the monitoring device is easily attached with moss and garbage after long-term use, if it is not cleaned in time, the blades will be stuck, affecting operation and reducing the service life of the equipment.
[0006] The technical solution of the present invention is: a water pollutant attenuation monitoring device, including a sliding box; also including a float, a slide rail, a power generation mechanism, a sampling mechanism and a detection mechanism, the left and right ends of the sliding box are provided with floats, the side wall at the rear end of the sliding box is installed with a slide rail, the inside of the sliding box is installed with a power generation mechanism, the output end of the power generation mechanism is connected to the sampling mechanism, and the sampling mechanism is installed in the sliding box, the bottom end of the sliding box is installed with a detection mechanism, and the liquid outlet end of the sampling mechanism is connected to the liquid inlet end of the sampling mechanism;
[0007] The power generation mechanism includes a rotating round rod, a gearbox, a rotating blade, a fixed plate, a first return spring, a first telescopic rod, an annular cleaning brush and a generator set. The inner wall of the sliding box is rotatably connected to the rotating round rod, the right side wall of the rotating round rod is provided with a gearbox, the outer side of the rotating round rod is centrally symmetrically provided with rotating blades, the surfaces of the rotating blades are relatively provided with a fixed plate, the top end of the fixed plate is fixedly connected to the first return spring, the interior of the first return spring is sleeved with the first telescopic rod, the telescopic end of the first telescopic rod is installed with an annular cleaning brush, the left side of the rotating round rod is installed with the generator set, and the generator set is installed on the inner wall of the sliding box, the annular cleaning brush is slidably connected to the side wall of the rotating blade, and the top end of the first return spring is fixedly connected to the bottom end of the annular cleaning brush.
[0008] Preferably, when the rotating round rod rotates, the cooperation of the rotating blades, the first return spring and the annular cleaning brush can remove garbage from the surface of the rotating blades, preventing garbage impurities from adhering to the surface of the annular cleaning brush and causing it to get stuck and unable to work. At the same time, the potential energy of the flowing river water can be converted into electricity through the setting of the rotating round rod, rotating blades and generator set. At the same time, when the gate is closed, the river water remains relatively still, and the equipment will not sample the relatively still river water.
[0009] Preferably, the sampling mechanism includes a first gear, a belt, a second gear, a transmission rod, a rotating ring, a sampling tube, a fixed horizontal plate, a second telescopic rod, a second return spring and a sealing circular plate. The right end of the rotating rod is connected to the first gear, and the outer side of the first gear is connected to the belt.
[0010] Preferably, the rear end of the inner wall of the belt is transmission-connected to a second gear, the left side of the second gear is connected to a transmission rod, the left side of the transmission rod is rotationally connected to a rotating ring, a sampling barrel is installed at the bottom end of the rotating ring, the bottom end of the rotating ring is fixedly connected to a fixed horizontal plate, and the fixed horizontal plate is installed inside the top end of the sampling barrel.
[0011] Preferably, a second telescopic rod is arranged in the middle position of the bottom end of the fixed horizontal plate, a second return spring is sleeved on the outer side of the second telescopic rod, a sealing circular plate is arranged at the bottom end of the second telescopic rod, and the sealing circular plate is slidably connected in the sampling tube, the bottom end of the second return spring is fixedly connected to the top end of the sealing circular plate, and the liquid outlet end of the sampling tube is connected to a drain pipe.
[0012] Preferably, the detection mechanism includes a detection box, a connecting horizontal plate, a water pump, an electric push rod, a water inlet pipe, an annular slide rail, a sliding clamping cylinder, a sample storage tube, a fourth reset spring and a trigger switch. The detection box is installed at the bottom end of the sliding box, a connecting horizontal plate is installed on one side wall of the detection box, and a water pump is installed on the other side of the detection box.
[0013] Preferably, an electric push rod is installed at the internal top of the detection box, a water inlet pipe is installed at the liquid inlet end of the detection box, annular slide rails are symmetrically arranged at the bottom center of the detection box, sliding clamping cylinders are installed between the annular slide rails, and the annular slide rails and the sliding clamping cylinder are slidably connected by an electronic slider, and the sliding clamping cylinder is slidably connected to the top of the detection box.
[0014] Preferably, the interior of the sliding clamping cylinder is slidably connected to a sample storage tube, the bottom end of the sample storage tube is fixedly connected to a fourth reset spring, and the bottom end of the fourth reset spring is fixedly connected to the bottom end of the interior of the sliding clamping cylinder, a trigger switch is provided in the middle position of the bottom end of the interior of the sliding clamping cylinder, and the fourth reset spring is sleeved on the outside of the trigger switch.
[0015] Preferably, a third return spring is installed at the bottom end of the connecting transverse plate, a sliding sealing plate is fixedly connected to the bottom end of the third return spring, and the sliding sealing plate is slidably connected to the side wall of the detection box.
[0016] Preferably, the liquid inlet end of the water pump is connected to a water pumping pipe, and the water pumping pipe passes through the detection box, the liquid inlet end of the water pumping pipe is connected to an electric telescopic tube, and the electric telescopic tube is arranged inside the detection box, and the liquid outlet end of the water pump is connected to a water outlet pipe, and the water outlet pipe passes through the sliding box.
[0017] Preferably, a water pollution detection sensor is provided at the bottom end of the electric push rod, and the water pollution detection sensor is arranged in the sample storage tube, and the liquid outlet end of the water inlet pipe is connected to the drain pipe.
[0018] Beneficial effects of the present invention:
[0019] 1. When the river water flows, the potential energy of the river water flow can be converted into electricity through the setting of the rotating rod, the rotating blades, and the generator set. At the same time, when the gate is closed, the river water remains relatively still, and the equipment will not sample the relatively still river water; when the rotating rod rotates, the cooperation of the rotating blades, the first return spring and the annular cleaning brush can remove garbage on the surface of the rotating blades, and prevent garbage impurities from adhering to the surface of the annular cleaning brush and causing it to be stuck and unable to work. At the same time, the first gear, the belt, the second gear, the transmission rod, the rotating ring and the sampling tube drive the fixed horizontal plate to sample the river water, thereby improving the degree of automation of the device; when the sample storage tube stores the sampled river water, the cooperation of the annular slide rail, the sliding clamping tube, the sample storage tube, the fourth return spring and the trigger switch can classify and store the sampled river water in different areas, and there will be no sample mixing resulting in errors in the detection effect. At the same time, the sampled river water that has been tested inside the sample storage tube is extracted and discharged through the water pump, the water pump pipe, the electric telescopic pipe and the outlet pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 Shown is a schematic diagram of the three-dimensional structure of the water pollutant attenuation monitoring device of the present invention;
[0021] Figure 2 Shown is a schematic diagram of the internal three-dimensional structure of the water pollutant attenuation monitoring device of the present invention;
[0022] Figure 3 Shown is a schematic diagram of the three-dimensional structure of the power generation mechanism of the water pollutant attenuation monitoring device of the present invention;
[0023] Figure 4 Shown is a schematic diagram of the three-dimensional structure of the sampling mechanism of the water pollutant attenuation monitoring device of the present invention;
[0024] Figure 5 Shown is a schematic diagram of the internal three-dimensional structure of the sampling tube of the water pollutant attenuation monitoring device of the present invention;
[0025] Figure 6 Shown is a schematic diagram of the three-dimensional structure of the detection mechanism of the water pollutant attenuation monitoring device of the present invention;
[0026] Figure 7 Shown is a schematic diagram of the internal three-dimensional structure of the detection box of the water pollutant attenuation monitoring device of the present invention;
[0027] Figure 8 Shown is a schematic diagram of the three-dimensional structure inside the sliding clamping cylinder of the water pollutant attenuation monitoring device of the present invention.
[0028] Explanation of reference numerals: 1. sliding box; 2. buoy; 3. slide rail; 4. power generation mechanism; 40. rotating rod; 41. gearbox; 42. rotating blade; 43. fixed plate; 44. first return spring; 45. first telescopic rod; 46. annular cleaning brush; 47. generator set; 50. first gear; 51. belt; 5. sampling mechanism; 52. second gear; 53. transmission rod; 54. rotating ring; 55. sampling cylinder; 551. drain pipe; 56. fixed horizontal plate; 57. second Telescopic rod; 58. second return spring; 59. sealing circular plate; 6. detection mechanism; 60. detection box; 61. connecting horizontal plate; 611. third return spring; 612. sliding sealing plate; 62. water pump; 621. water pump; 622. electric telescopic tube; 623. water outlet pipe; 63. electric push rod; 631. water pollution detection sensor; 64. water inlet pipe; 65. annular slide rail; 66. sliding clamping cylinder; 67. sample storage tube; 68. fourth return spring; 69. trigger switch. DETAILED DESCRIPTION
[0029] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0030] See also Figure 1-Figure 8The present invention provides an embodiment: a water pollutant attenuation monitoring device, including a sliding box 1; also including a buoy 2, a slide rail 3, a power generation mechanism 4, a sampling mechanism 5 and a detection mechanism 6, the left and right ends of the sliding box 1 are provided with buoys 2, the side wall of the rear end of the sliding box 1 is installed with a slide rail 3, the inside of the sliding box 1 is installed with a power generation mechanism 4, the output end of the power generation mechanism 4 is connected to the sampling mechanism 5, and the sampling mechanism 5 is installed in the sliding box 1, the bottom end of the sliding box 1 is installed with a detection mechanism 6, and the liquid outlet end of the sampling mechanism 5 is connected to the liquid inlet end of the sampling mechanism 5; the power generation mechanism 4 includes a rotating round rod 40, a gearbox 41, a rotating blade 42, a fixing plate 43, a first reset spring 44, a first telescopic rod 45, an annular cleaning A cleaning brush 46 and a generator set 47, the inner wall of the sliding box 1 is rotatably connected to a rotating round rod 40, a gearbox 41 is provided on the right side wall of the rotating round rod 40, rotating blades 42 are symmetrically provided on the outer center of the rotating round rod 40, and a fixing plate 43 is relatively provided on the surface of the rotating blade 42, the top of the fixing plate 43 is fixedly connected to a first return spring 44, the interior of the first return spring 44 is sleeved with a first telescopic rod 45, and the telescopic end of the first telescopic rod 45 is installed with an annular cleaning brush 46, a generator set 47 is installed on the left side of the rotating round rod 40, and the generator set 47 is installed on the inner wall of the sliding box 1, the annular cleaning brush 46 is slidably connected to the side wall of the rotating blade 42, and the top of the first return spring 44 is fixedly connected to the bottom end of the annular cleaning brush 46.
[0031] See also Figure 4-Figure 5In this embodiment, the sampling mechanism 5 includes a first gear 50, a belt 51, a second gear 52, a transmission rod 53, a rotating ring 54, a sampling tube 55, a fixed horizontal plate 56, a second telescopic rod 57, a second return spring 58 and a sealing circular plate 59. The right end of the rotating rod 40 is connected to the first gear 50, and the outer side of the first gear 50 is transmission-connected to the belt 51; the rear end of the inner wall of the belt 51 is transmission-connected to the second gear 52, the left side of the second gear 52 is connected to the transmission rod 53, and the left side of the transmission rod 53 is rotationally connected to the rotating ring 54, and the bottom end of the rotating ring 54 is installed with a sampling tube 55, and the bottom end of the rotating ring 54 is fixedly connected to the fixed horizontal plate 56, and the fixed horizontal plate 56 is installed inside the top of the sampling tube 55; the fixed horizontal plate 5 A second telescopic rod 57 is provided in the middle position of the bottom end of the sampling tube 55, and a second return spring 58 is sleeved on the outer side of the second telescopic rod 57. A sealing circular plate 59 is provided at the bottom end of the second telescopic rod 57, and the sealing circular plate 59 is slidably connected to the sampling tube 55. The bottom end of the second return spring 58 is fixedly connected to the top of the sealing circular plate 59. The liquid outlet end of the sampling tube 55 is connected to a drain pipe 551. The water source inside the sampling tube 55 drives the sealing circular plate 59 to be pressed down by gravity. When the sealing circular plate 59 slides to the bottom of the drain pipe 551, the sampled water source enters the sample storage tube 67 through the drain pipe 551 and the water inlet pipe 64. When the water source inside the sampling tube 55 is discharged, the sealing circular plate 59 is driven to reset to the top of the drain pipe 551 by the second return spring 58 and the second telescopic rod 57.
[0032] See also Figure 6-Figure 8In this embodiment, the detection mechanism 6 includes a detection box 60, a connecting horizontal plate 61, a water pump 62, an electric push rod 63, a water inlet pipe 64, an annular slide rail 65, a sliding clamping cylinder 66, a sample storage tube 67, a fourth reset spring 68 and a trigger switch 69. The detection box 60 is installed at the bottom end of the sliding box 1, the connecting horizontal plate 61 is installed on one side wall of the detection box 60, and the water pump 62 is installed on the other side of the detection box 60; the electric push rod 63 is installed at the top of the detection box 60, the water inlet pipe 64 is installed at the liquid inlet end of the detection box 60, and the bottom end of the detection box 60 is installed in the detection box 60. The annular slide rails 65 are symmetrically arranged at the center, and a sliding clamping cylinder 66 is installed between the annular slide rails 65, and the annular slide rails 65 and the sliding clamping cylinder 66 are slidably connected through an electronic slider, and the sliding clamping cylinder 66 is slidably connected to the top of the detection box 60; the interior of the sliding clamping cylinder 66 is slidably connected to a sample storage tube 67, and the bottom end of the sample storage tube 67 is fixedly connected to a fourth reset spring 68, and the bottom end of the fourth reset spring 68 is fixedly connected to the bottom end of the sliding clamping cylinder 66, and a trigger switch 69 is arranged at the middle position of the bottom end of the sliding clamping cylinder 66, and the fourth reset spring 68 is sleeved. The bottom end of the connecting cross plate 61 is provided with a third return spring 611, the bottom end of the third return spring 611 is fixedly connected with a sliding sealing plate 612, and the sliding sealing plate 612 is slidably connected to the side wall of the detection box 60; the liquid inlet end of the water pump 62 is connected with a water pumping pipe 621, and the water pumping pipe 621 passes through the detection box 60, the liquid inlet end of the water pumping pipe 621 is connected with an electric telescopic pipe 622, and the electric telescopic pipe 622 is arranged inside the detection box 60, and the liquid outlet end of the water pump 62 is connected with a water outlet pipe 623, and the water outlet pipe 623 passes through the sliding box 1 A water pollution detection sensor 631 is provided at the bottom end of the electric push rod 63, and the water pollution detection sensor 631 is arranged in the sample storage tube 67. The liquid outlet end of the water inlet pipe 64 is connected to the drain pipe 551. By starting the electric telescopic tube 622 to enter the interior of the sample storage tube 67, the water pump 62 is started, and the water pump 62 draws out the water source inside the sample storage tube 67 through the water pumping pipe 621 and the electric telescopic tube 622, and discharges it through the water outlet pipe 623, so that there is always an empty sample storage tube 67 inside the detection box 60 to collect the sampled river water, thereby improving the degree of automation of the device.
[0033] Embodiment 1
[0034] The staff installs the equipment on the dam wall through the slide rail 3. The cooperation between the buoy 2 and the slide rail 3 makes the equipment always float on the water surface. When the river water is flowing, the water flow hits the surface of the rotating blade 42, and the rotating blade 42 drives the rotating round rod 40 to rotate. When the rotating round rod 40 rotates, it drives the generator set 47 to work. The potential energy generated by the river flow is converted into electronic storage. When the rotating blade 42 rotates, the centrifugal force drives the annular cleaning brush 46 to move on the surface of the rotating blade 42. The first reset spring 44 elastically drives the annular cleaning brush 46 to reset, so that the annular cleaning brush 46 reciprocates on the surface of the rotating blade 42 to brush the side wall of the rotating blade 42, so as to prevent impurities and garbage in the water from adhering to the surface of the rotating blade 42, and the staff does not need to clean it. At the same time, the setting of the first telescopic rod 45 prevents the annular cleaning brush 46 from moving out of the surface of the rotating blade 42.
[0035] Embodiment 2
[0036] When the river water flows, the rotating rod 40 drives the transmission rod 53 to rotate through the first gear 50, the belt 51 and the second gear 52. The setting of the gearbox 41 can effectively reduce the rotation speed of the transmission rod 53. When the transmission rod 53 rotates to the bottom, the transmission rod 53 drives the sampling tube 55 to enter under the water surface through the rotating ring 54 and the fixed horizontal plate 56 to sample the water area. When the transmission rod 53 rotates to the top, the transmission rod 53 drives the sampling tube 55 to rise through the rotating ring 54 and the fixed horizontal plate 56 to complete the sampling of the water area. When the sampling tube 55 rises, it drives the drainage pipe 551 to rise, and the drainage pipe 551 drives the sliding sealing plate 612 upward The drain pipe 551 is connected with the water inlet pipe 64 by the lifting, and the water source inside the sampling tube 55 drives the sealing circular plate 59 to be pressed down by gravity. When the sealing circular plate 59 slides to the bottom of the drain pipe 551, the sampled water enters the sample storage tube 67 through the drain pipe 551 and the water inlet pipe 64. After the water source inside the sampling tube 55 is discharged, the sealing circular plate 59 is driven to reset to the top of the drain pipe 551 by the second reset spring 58 and the second telescopic rod 57. When the sampling tube 55 is away from the detection box 60, the third reset spring 611 elastically drives the sliding sealing plate 612 to reset and seal the water inlet pipe 64 to prevent river water from entering the detection box 60 at will.
[0037] Embodiment 3
[0038] During operation, after the sampled river water enters the sample storage tube 67 through the water inlet pipe 64, the sampled river water in the sample storage tube 67 is collected and then the sample storage tube 67 is pressed down by gravity until the trigger switch 69 is triggered. The trigger switch 69 controls the annular slide rail 65 to start, and the annular slide rail 65 drives the sample storage tube 67 to rotate through the sliding clamping cylinder 66. When the sampled river water in the sample storage tube 67 moves to the bottom of the water pollution detection sensor 631, the electric push rod 63 is started, and the electric push rod 63 drives the water pollution detection sensor The device 631 enters the sample storage tube 67 to detect water pollution. When the annular slide rail 65 drives the sample storage tube 67 to continue to move to the inside of the electric telescopic tube 622, the electric telescopic tube 622 is started to enter the sample storage tube 67, and the water pump 62 is started. The water pump 62 draws out the water source in the sample storage tube 67 through the water pumping pipe 621 and the electric telescopic tube 622, and discharges it through the outlet pipe 623, so that there is always an empty sample storage tube 67 in the detection box 60 to collect the sampled river water, thereby improving the degree of automation of the device.
[0039] Through the above steps, when the rotating round rod 40 rotates, the cooperation of the rotating blades 42, the first return spring 44 and the annular cleaning brush 46 can remove the garbage on the surface of the rotating blades 42, and prevent the garbage impurities from adhering to the surface of the annular cleaning brush 46 and causing it to get stuck and unable to work. At the same time, the potential energy of the river water flow can be converted into electricity through the setting of the rotating round rod 40, the rotating blades 42 and the generator set 47. At the same time, when the gate is closed, the river water remains relatively still, and the equipment will not sample the relatively still river water; this solves the problem that the monitoring device is prone to be attached with moss and garbage after long-term use, and is not cleaned in time, resulting in the blades getting stuck, affecting operation and reducing the service life of the equipment.
[0040] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the spirit of the present invention.
Claims
1. A water pollutant attenuation monitoring device, comprising a sliding box (1); characterized in that: It also includes a float (2), a slide rail (3), a power generation mechanism (4), a sampling mechanism (5) and a detection mechanism (6), wherein the left and right ends of the sliding box (1) are both provided with floats (2), the side wall at the rear end of the sliding box (1) is installed with a slide rail (3), the inside of the sliding box (1) is installed with a power generation mechanism (4), the output end of the power generation mechanism (4) is connected to the sampling mechanism (5), and the sampling mechanism (5) is installed in the sliding box (1), the bottom end of the sliding box (1) is installed with a detection mechanism (6), and the liquid outlet end of the sampling mechanism (5) is connected to the liquid inlet end of the sampling mechanism (5); The power generation mechanism (4) comprises a rotating rod (40), a gearbox (41), a rotating blade (42), a fixing plate (43), a first return spring (44), a first telescopic rod (45), an annular cleaning brush (46) and a generator set (47); the inner wall of the sliding box (1) is rotatably connected to the rotating rod (40); the right side wall of the rotating rod (40) is provided with a gearbox (41); the outer side of the rotating rod (40) is provided with a rotating blade (42) symmetrically; the surface of the rotating blade (42) is provided with a fixing plate (43) opposite to the rotating blade (42). ), the top end of the fixed plate (43) is fixedly connected to a first return spring (44), the interior of the first return spring (44) is sleeved with a first telescopic rod (45), the telescopic end of the first telescopic rod (45) is installed with an annular cleaning brush (46), a generator set (47) is installed on the left side of the rotating round rod (40), and the generator set (47) is installed on the inner wall of the sliding box (1), the annular cleaning brush (46) is slidably connected to the side wall of the rotating blade (42), and the top end of the first return spring (44) is fixedly connected to the bottom end of the annular cleaning brush (46).
2. The water pollutant attenuation monitoring device according to claim 1, characterized in that: The sampling mechanism (5) comprises a first gear (50), a belt (51), a second gear (52), a transmission rod (53), a rotating ring (54), a sampling tube (55), a fixed horizontal plate (56), a second telescopic rod (57), a second return spring (58) and a sealing circular plate (59); the right end of the rotating rod (40) is connected to the first gear (50), and the outer side of the first gear (50) is transmission-connected to the belt (51).
3. The water pollutant attenuation monitoring device according to claim 2 is characterized by: The rear end of the inner wall of the belt (51) is transmission-connected to a second gear (52), the left side of the second gear (52) is connected to a transmission rod (53), the left side of the transmission rod (53) is rotationally connected to a rotating ring (54), the bottom end of the rotating ring (54) is mounted with a sampling barrel (55), the bottom end of the rotating ring (54) is fixedly connected to a fixed horizontal plate (56), and the fixed horizontal plate (56) is mounted inside the top end of the sampling barrel (55).
4. The water pollutant attenuation monitoring device according to claim 3 is characterized by: A second telescopic rod (57) is arranged at the middle position of the bottom end of the fixed horizontal plate (56), a second return spring (58) is sleeved on the outer side of the second telescopic rod (57), a sealing circular plate (59) is arranged at the bottom end of the second telescopic rod (57), and the sealing circular plate (59) is slidably connected to the inside of the sampling tube (55), the bottom end of the second return spring (58) is fixedly connected to the top end of the sealing circular plate (59), and the liquid outlet end of the sampling tube (55) is connected to a drain pipe (551).
5. The water pollutant attenuation monitoring device according to claim 1, characterized in that: The detection mechanism (6) includes a detection box (60), a connecting horizontal plate (61), a water pump (62), an electric push rod (63), a water inlet pipe (64), an annular slide rail (65), a sliding clamping cylinder (66), a sample storage tube (67), a fourth reset spring (68) and a trigger switch (69). The detection box (60) is installed at the bottom end of the sliding box (1), the connecting horizontal plate (61) is installed on one side wall of the detection box (60), and the water pump (62) is installed on the other side of the detection box (60).
6. The water pollutant attenuation monitoring device according to claim 5, characterized in that: An electric push rod (63) is installed at the top of the detection box (60), a water inlet pipe (64) is installed at the liquid inlet end of the detection box (60), an annular slide rail (65) is symmetrically arranged at the bottom of the detection box (60), a sliding clamping cylinder (66) is installed between the annular slide rails (65), and the annular slide rail (65) and the sliding clamping cylinder (66) are slidably connected via an electronic slider, and the sliding clamping cylinder (66) is slidably connected to the top of the detection box (60).
7. The water pollutant attenuation monitoring device according to claim 6, characterized in that: The interior of the sliding clamping cylinder (66) is slidably connected to a sample storage tube (67), the bottom end of the sample storage tube (67) is fixedly connected to a fourth reset spring (68), and the bottom end of the fourth reset spring (68) is fixedly connected to the bottom end of the sliding clamping cylinder (66), a trigger switch (69) is provided at the middle position of the bottom end of the sliding clamping cylinder (66), and the fourth reset spring (68) is sleeved on the outside of the trigger switch (69).
8. The water pollutant attenuation monitoring device according to claim 5, characterized in that: A third return spring (611) is installed at the bottom end of the connecting transverse plate (61), a sliding sealing plate (612) is fixedly connected to the bottom end of the third return spring (611), and the sliding sealing plate (612) is slidably connected to the side wall of the detection box (60).
9. The water pollutant attenuation monitoring device according to claim 5, characterized in that: The liquid inlet end of the water pump (62) is connected to a water pumping pipe (621), and the water pumping pipe (621) passes through the detection box (60); the liquid inlet end of the water pumping pipe (621) is connected to an electric telescopic pipe (622), and the electric telescopic pipe (622) is arranged inside the detection box (60); the liquid outlet end of the water pump (62) is connected to a water outlet pipe (623), and the water outlet pipe (623) passes through the sliding box (1).
10. The water pollutant attenuation monitoring device according to claim 5, characterized in that: A water pollution detection sensor (631) is provided at the bottom end of the electric push rod (63), and the water pollution detection sensor (631) is arranged in the sample storage tube (67), and the liquid outlet end of the water inlet pipe (64) is connected to the drain pipe (551).
Citation Information
Cited By
Water environment ecology real-time monitoring device
CN119959326A