FPSO upper module of integrated pipe gallery and arrangement method of FPSO upper module
By setting rotatable inner and outer connections on the pipe gallery layered in the upper FPSO module, the problem of no relative sliding capacity between the pipes and the pipe gallery is solved, and the effect of reducing pipeline deformation and reducing construction costs is achieved. .
Patent Information
- Application Number
- CN202411646217.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2025-02-14
AI Technical Summary
The FPSO's pipeline does not have relative sliding capacity between the pipeline corridor, which causes the pipeline to be easily deformed or damaged when the waves sway.
Adopting the integrated pipe gallery design, it is connected through public columns, public legs and public side beams, and an inner connection and an outer connection are arranged on the pipe gallery layered. The inner connection can be rotated to move relative to the outer connection, reducing the Deformation of small pipes.
By reducing the amount of steel and lifting weight, reducing the cost of FPSO construction and installation, reducing the risk of pipeline deformation, and improving the stability and safety of pipelines.
Smart Images

Figure CN119428954A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of FPSO, and in particular to an FPSO upper module with an integrated pipe gallery and a layout method thereof. Background Art
[0002] Floating production storage and offloading vessels (FPSO) are key facilities for offshore oil development. They receive oil, gas and water mixtures from oil wells through submarine pipelines, store qualified crude oil or natural gas in the ship's cabin after processing, and transport them to land or other destinations through shuttle tankers or pipelines when a certain amount is stored. They are mainly used for the exploitation, processing, storage and transportation of offshore oil, natural gas and other energy sources. FPSO has the following characteristics:
[0003] Strong adaptability: It can work in a wide range of water depth conditions, from shallow water to deep water.
[0004] High efficiency: It has efficient oil and gas processing capabilities and can process large amounts of crude oil and natural gas.
[0005] Strong oil storage capacity: It can store large amounts of crude oil and reduce dependence on submarine pipelines.
[0006] Good mobility: Compared with fixed platforms, FPSO can be moved more easily and is suitable for the development of different oil fields.
[0007] Strong ability to resist wind and waves: The design takes into account the impact of harsh marine environment and can withstand strong winds and waves.
[0008] FPSO is usually composed of a lower hull and an upper module. The lower hull provides buoyancy and oil and gas storage, while the upper module is used for oil and gas extraction and processing. Each module is connected via a common pipe gallery module to form a whole ship system. The upper module and pipe gallery of FPSO are usually set up separately. After the modules and pipe gallery are built, they are hoisted to the upper part of the FPSO hull by floating cranes or gantry cranes for integration. After each module and pipe gallery are in place, the pipelines and cables between the modules and the pipe gallery can be connected. The workload of hoisting integration and in-place connection is huge. At the same time, since the module pipe gallery is set up separately, it is necessary to set up columns, legs and corresponding beam grid structures separately, and the amount of steel processing and the weight of the whole FPSO ship are also increased. On the other hand, most of the pipelines of FPSO are directly fixed on the pipe gallery by buckles. When the FPSO swings with the waves and drives the pipe gallery to shake, the pipeline and the pipe gallery do not have the ability to slide relative to each other, and cannot offset the pulling of the pipe gallery on the pipeline, which is easy to cause deformation or even damage of the pipeline. Summary of the invention
[0009] The main purpose of the present invention is to provide an FPSO upper module with an integrated pipe gallery and a layout method thereof, so as to solve the problem in the related art that the pipeline and the pipe gallery do not have relative sliding ability.
[0010] In order to achieve the above object, according to one aspect of the present invention, a FPSO upper module of an integrated pipe gallery and a method for arranging the same are provided, comprising: a support portion, the support portion comprising a plurality of common columns, a plurality of common legs and a plurality of common side beams, the common side beams are all fixedly arranged above the common legs in the horizontal direction, and the common columns are all fixedly arranged on the common side beams in the vertical direction; A module part, the module part includes an upper module, a plurality of pipe galleries and a plurality of pipe gallery layers, the upper module is fixedly arranged on one side above the common side beam, the pipe gallery layers are fixedly arranged on the other side above the common side beam, the pipe galleries are all arranged above the pipe gallery layers, and a plurality of pipelines are arranged in the pipe gallery; There are several connecting parts, and all of them are located above the pipe gallery layer. The connecting parts include inner connecting parts and outer connecting parts. The outer connecting parts are fixedly connected to the pipe gallery layer. The inner connecting parts are rotatably arranged inside the outer connecting parts. The inner connecting parts are used to fix the pipelines. When the hull drives the outer connecting parts to shake with the waves, the inner connecting parts are pulled by the pipelines and move in the opposite direction relative to the outer connecting parts to reduce the deformation of the pipelines.
[0011] Furthermore, the external connection part includes a lower external connection part and an upper external connection part, the lower external connection part and the upper external connection part have the same structure, the lower external connection part is fixed above the pipe gallery layer, and the upper external connection part is fixed to the lower external connection part by bolts.
[0012] Furthermore, the lower outer connecting portion includes an outer tube portion and two top cover portions, and the top cover portions are fixedly arranged on both sides of the outer tube portion.
[0013] Furthermore, the outer cylinder portion includes an outer cylinder, two outer connecting plates and a plurality of outer screw holes. The outer connecting plates are respectively fixed on both sides of the outer cylinder, and the outer screw holes are all penetrated through the outer connecting plates.
[0014] Furthermore, the top cover portion includes a top cover group and a rib groove group, the top cover group includes a top cover and a plurality of triangular ribs, the top covers are fixedly arranged at both ends of the outer tube, the top cover is annular, the triangular ribs are fixedly arranged on the inner surface of the top cover, the rib groove group includes arcuate ribs and arcuate grooves, the arcuate ribs are fixedly arranged on the inner ring of the top cover, the arcuate grooves are arranged on the arcuate ribs, and the notches of the arcuate grooves face the opposite top cover portion.
[0015] Furthermore, the lower inner connecting portion includes an inner cylinder portion, two side tops and a plurality of buffer portions, the side tops are fixedly arranged at both ends of the inner cylinder portion, the buffer portions are fixedly arranged on the outside of the inner cylinder portion, and the buffer portions are rollingly connected to the inner surface of the outer cylinder.
[0016] Furthermore, the inner cylinder portion includes an inner cylinder, two inner connecting plates and a plurality of inner screw holes, the inner connecting plates are fixedly arranged on both sides of the inner cylinder, and the inner screw holes are penetrated through the inner connecting plates.
[0017] Furthermore, the side top includes a plurality of first springs and limit blocks, one end of each of the first springs is fixedly connected to the top end of the inner tube, and the other end of each of the first springs is fixedly connected to the limit blocks, and the limit blocks are slidably connected to the arc groove.
[0018] Furthermore, the buffer part includes a column group and a ball group, the column group includes an inner column, an outer column and a second spring, the top end of the outer column is fixedly connected to the outer surface of the inner cylinder, the outer column is provided with an inner cavity, the second spring is located in the inner cavity, the top end of the second spring is fixedly connected to the outer column, and the bottom end is fixedly connected to the inner column, the inner column and the outer column are slidably connected, the ball group includes a base, balls and a buffer ring, the base is fixedly provided at the bottom end of the inner column, the balls are rotatably provided at the bottom end of the base, and the buffer ring is fixedly provided at the top end of the base.
[0019] On the other hand, the present invention further provides a method for arranging an FPSO upper module of an integrated pipe gallery, which is used for any of the above-mentioned FPSO upper modules of the integrated pipe gallery, comprising the following steps: Step 1: The pipe gallery and the upper module are connected through common columns, common legs and common side beams; Step 2: The upper module body is arranged on the side close to the ship side of the FPSO, and the pipe gallery is arranged on the side close to the midship side. The position of the common side beams of the horizontal layer of the modules and the layout requirements of pipelines and cables are comprehensively considered to determine the position of the pipe gallery layering; Step 3: Unscrew the bolts in the outer screw holes and the inner screw holes respectively, remove the upper outer connecting part from the lower outer connecting part, and remove the upper inner connecting part from the lower inner connecting part; Step 4: clamp the lower inner connecting part under the pipeline in the pipe gallery 12, clamp the upper inner connecting part above the pipeline, align the inner screw holes of the two, insert the bolts into the inner screw holes and tighten them, fix the upper inner connecting part and the lower inner connecting part together, and clamp the pipeline in the middle; Step 5: Pick up the inner connecting part, insert the limit block at one end below it into the arc groove, and then insert the limit block at the other end below the inner connecting part into the corresponding arc groove, so that the lower inner connecting part is located in the corresponding lower outer connecting part; Step 6: Install the upper inner connection part in the upper outer connection part according to the method of step 5. At this time, the outer screw holes of the upper outer connection part and the lower outer connection part are aligned one by one. Insert the bolts into the outer screw holes respectively and tighten them to fix the upper outer connection part and the lower outer connection part together, and wrap the inner connection part; Step 7: Repeat the above steps and use the connecting parts to fix all pipes on the corridor layers.
[0020] Compared with the prior art, the present invention has the following beneficial effects: 1. Use common columns, common legs and common beams to connect to reduce steel usage and hoisting weight; 2. The integration of modules and pipe gallery can reduce the number of hoisting operations and reduce the construction and installation costs of FPSO; 3. The pipe gallery is arranged near the midship to reduce the impact of the hull shaking on the pipe gallery and pipelines, and is also conducive to the connection of pipelines and cables between other modules; 4. By optimizing the layers and comprehensively considering the position of the module horizontal layer side beams and the layout requirements of pipelines and cables, the amount of steel used and the weight of the pipe gallery can be further reduced; 5. The inner connection part and the outer connection part can slide relative to each other, increasing the displacement between the two, reducing the amplitude of the pipeline following the movement of the outer connection part, and reducing the risk of the pipeline being broken. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is an overall schematic diagram of the present invention; Figure 2 It is an overall schematic diagram of the connection part of the present invention; Figure 3 It is a schematic diagram of the structure of the upper connecting part of the present invention; Figure 4 This is a schematic diagram of the structure of the lower connecting part of the present invention; Figure 5 This is a schematic diagram of the structure of the external connection part of the present invention; Figure 6 This is a schematic diagram of the top cover structure of the present invention; Figure 7 This is a schematic diagram of the internal connection structure of the present invention; Figure 8 It is a schematic diagram of the structure of the buffer part of the present invention.
[0022] Illustration Description: 11. Upper module; 12. Pipe gallery; 13. Common columns; 14. Common legs; 15. Common side beams; 16. Pipe gallery stratification; 2. Lower inner connecting part; 3. Lower outer connecting part; 4. Upper outer connecting part; 5. Upper inner connecting part; 21. Inner cylinder; 22. Inner connecting plate; 23. Inner screw hole; 24. Buffer part; 25. First spring; 26. Limit block; 241. Base; 242. Ball; 243. Buffer ring; 244. Inner column; 245. Outer column; 246. Second spring; 31. Outer cylinder; 32. Top cover; 33. Outer connecting plate; 34. Outer screw hole; 321. Top cover; 322. Triangular rib; 323. Arc rib; 324. Arc groove. DETAILED DESCRIPTION
[0023] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0024] See also Figures 1 to 8 The present embodiment provides an FPSO upper module of an integrated pipe gallery and a method for arranging the same, including: a support portion, the support portion including a plurality of common columns 13, a plurality of common legs 14 and a plurality of common side beams 15, the common side beams 15 are all fixedly arranged above the common legs 14 in the horizontal direction, and the common columns 13 are all fixedly arranged on the common side beams 15 in the vertical direction; The module part includes an upper module 11, a plurality of pipe galleries 12 and a plurality of pipe gallery layers 16. The upper module 11 is fixedly arranged on one side above the common side beam 15, the pipe gallery layers 16 are fixedly arranged on the other side above the common side beam 15, the pipe galleries 12 are all arranged above the pipe gallery layers 16, and a plurality of pipelines are arranged in the pipe galleries 12; There are several connecting parts, and all of them are located above the pipe gallery layer 16. The connecting parts include an inner connecting part and an outer connecting part. The outer connecting part is fixedly connected to the pipe gallery layer 16, and the inner connecting part is rotatably arranged inside the outer connecting part. The inner connecting part is used to fix the pipeline. When the hull drives the outer connecting part to shake with the waves, the inner connecting part is pulled by the pipeline and moves in the opposite direction relative to the outer connecting part to reduce the deformation of the pipeline.
[0025] The external connection part includes a lower external connection part 3 and an upper external connection part 4. The lower external connection part 3 and the upper external connection part 4 have the same structure. The lower external connection part 3 is fixed above the pipe gallery layer 16, and the upper external connection part 4 is fixed to the lower external connection part 3 by bolts.
[0026] The lower outer connecting portion 3 includes an outer tube portion and two top cover portions 32 , and the top cover portions 32 are fixedly arranged on both sides of the outer tube portion.
[0027] The outer cylinder portion includes an outer cylinder 31 , two outer connecting plates 33 and a plurality of outer screw holes 34 . The outer connecting plates 33 are fixedly arranged on both sides of the outer cylinder 31 , and the outer screw holes 34 are all penetrated through the outer connecting plates 33 .
[0028] The top cover portion 32 includes a top cover group and a rib groove group. The top cover group includes a top cover 321 and a plurality of triangular ribs 322. The top covers 321 are fixedly arranged at both ends of the outer tube 31. The top cover 321 is annular. The triangular ribs 322 are fixedly arranged on the inner surface of the top cover 321 to enhance the bearing capacity of the top cover 321. The rib groove group includes an arcuate rib 323 and an arcuate groove 324. The arcuate rib 323 is fixedly arranged at the inner ring of the top cover 321. The arcuate groove 324 is arranged on the arcuate rib 323. The notch of the arcuate groove 324 faces the opposite top cover portion 32.
[0029] The lower inner connecting part 2 includes an inner cylinder, two side tops and a plurality of buffer parts 24 . The side tops are fixedly arranged at both ends of the inner cylinder. The buffer parts 24 are fixedly arranged outside the inner cylinder. The buffer parts 24 are rollingly connected to the inner surface of the outer cylinder 31 .
[0030] The inner cylinder portion includes an inner cylinder 21 , two inner connecting plates 22 and a plurality of inner screw holes 23 . The inner connecting plates 22 are fixedly arranged on both sides of the inner cylinder 21 , and the inner screw holes 23 are penetrated through the inner connecting plates 22 .
[0031] The side top includes a plurality of first springs 25 and a stop block 26 . One end of the first spring 25 is fixedly connected to the top of the inner tube 21 , and the other end is fixedly connected to the stop block 26 . The stop block 26 is slidably connected to the arc groove 324 .
[0032] The buffer portion 24 includes a column group and a ball group. The column group includes an inner column 244, an outer column 245 and a second spring 246. The top end of the outer column 245 is fixedly connected to the outer surface of the inner cylinder 21. The outer column 245 is provided with an inner cavity. The second spring 246 is located in the inner cavity. The top end of the second spring 246 is fixedly connected to the outer column 245, and the bottom end is fixedly connected to the inner column 244. The inner column 244 and the outer column 245 are slidably connected. The ball group includes a base 241, a ball 242 and a buffer ring 243. The base 241 is fixedly arranged at the bottom end of the inner column 244, the ball 242 is rotatably arranged at the bottom end of the base 241, and the buffer ring 243 is fixedly arranged at the top end of the base 241.
[0033] On the other hand, the present invention further provides a method for arranging an FPSO upper module of an integrated pipe gallery, which is used for any of the above-mentioned FPSO upper modules of the integrated pipe gallery, comprising the following steps: Step 1: The pipe gallery 12 and the upper module 11 are connected through common columns 13, common legs 14 and common side beams 15; Step 2: The upper module 11 is arranged on the side of the FPSO, and the pipe gallery 12 is arranged on the side of the ship. The position of the common side beam 15 of the module horizontal layer and the layout requirements of pipelines and cables are comprehensively considered to determine the position of the pipe gallery layer 16; Step 3: Unscrew the bolts in the outer screw hole 34 and the inner screw hole 23 respectively, remove the upper outer connecting part 4 from the lower outer connecting part 3, and remove the upper inner connecting part 5 from the lower inner connecting part 2; Step 4: clamp the lower inner connecting part 2 under the pipeline in the pipe gallery 12, clamp the upper inner connecting part 5 above the pipeline, and align the inner screw holes 23 of the two, insert the bolts into the inner screw holes 23 and tighten them, fix the upper inner connecting part 5 and the lower inner connecting part 2 together, and clamp the pipeline in the middle; Step 5: Pick up the inner connecting part, insert the stopper 26 at one end below it into the arc groove 324, and then insert the stopper 26 at the other end below the inner connecting part into the corresponding arc groove 324, so that the lower inner connecting part 2 is located in the corresponding lower outer connecting part 3; Step 6: According to the method of step 5, install the upper inner connecting part 5 in the upper outer connecting part 4. At this time, the outer screw holes 34 of the upper outer connecting part 4 and the lower outer connecting part 3 are aligned one by one, and the bolts are respectively inserted into the outer screw holes 34 and tightened to fix the upper outer connecting part 4 and the lower outer connecting part 3 together, and the inner connecting part is wrapped; Step 7: Repeat the above steps and fix all pipes on the pipe gallery layer 16 with the connecting parts.
[0034] The pipe gallery 12 and the upper module 11 are connected by common columns 13, common legs 14 and common side beams 15 to reduce the amount of steel used and the weight of the hoisting. The upper module 11 body is arranged on the side of the FPSO close to the ship, and the pipe gallery 12 is arranged on the side close to the midship to reduce the impact of the hull shaking on the pipe gallery 12 and the pipelines, and at the same time it is beneficial to the connection of pipelines and cables between other modules. The pipe gallery layering 16 comprehensively considers the position of the common side beams 15 of the module horizontal layer and the requirements for the layout of pipelines and cables, which can further reduce the amount of steel used and the weight of the pipe gallery 12.
[0035] Unscrew the bolts in the outer screw hole 34 and the inner screw hole 23 respectively, remove the upper outer connection part 4 from the lower outer connection part 3, remove the upper inner connection part 5 from the lower inner connection part 2, clamp the lower inner connection part 2 under the pipeline in the pipe gallery 12, clamp the upper inner connection part 5 above the pipeline, and align the inner screw holes 23 of the two, insert the bolts into the inner screw holes 23 and tighten them, fix the upper inner connection part 5 and the lower inner connection part 2 together to form an inner connection part, and clamp the pipeline in the middle; pick up the inner connection part, insert the limit block 26 at one end below it into the arc groove 324, and squeeze it into the arc groove 324, so that the first spring 25 is compressed and contracts, so that the inner connection part The length of the connection part is smaller than that of the outer connection part, and then the limit block 26 at the other end below the inner connection part is inserted into the corresponding arc groove 324, and the inner connection part is loosened. The first spring 25 rebounds and pushes the limit block 26 into the corresponding arc groove 324, so that the lower inner connection part 2 is located in the corresponding lower outer connection part 3. According to the same method, the upper inner connection part 5 is installed in the upper outer connection part 4. At this time, the outer screw holes 34 of the upper outer connection part 4 and the lower outer connection part 3 are aligned one by one, and the bolts are respectively inserted into the outer screw holes 34 and tightened to fix the upper outer connection part 4 and the lower outer connection part 3 together, and the inner connection part is wrapped up. When the hull shakes left and right, the outer connection part The inner connection part is dragged by the pipe gallery 16 and tends to maintain its original state, so that the outer connection part and the inner connection part rotate, and the ball 242 rolls on the inner surface of the outer connection part to reduce the rotation amplitude of the inner connection part, thereby ensuring that the pipe is fixed and preventing the inner connection part from rotating too much and breaking the pipe; since there are many pipes and they are arranged at different parts of the hull, the outer connection part and the inner connection part at some parts cannot rotate coaxially, and there will be traction between the two, which compresses the buffer part 24, compresses the second spring 246, and the inner column 244 retracts into the outer column 245, reducing the distance between the outer connection part and the inner connection part. The length of the pipeline being pulled is reduced to prevent the pipeline from being broken; when the hull shakes back and forth, the outer connection part shakes with the hull, and the inner connection part tends to maintain its original state due to the pulling of the pipeline, and moves relative to the outer connection part. The ball 242 rolls on the inner surface of the outer connection part to reduce the amplitude of movement of the inner connection part, ensuring that the pipeline is fixed while avoiding excessive movement of the inner connection part to break the pipeline. The arc rib 323 squeezes the limit block 26 to shrink the first spring 25, reducing the collision force between the inner connection part and the outer connection part, preventing the top cover part 32 from being damaged, losing the restriction on the inner connection part, causing damage to the connection part, and losing the buffering effect on the pipeline.
[0036] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. An FPSO upper module with integrated pipe gallery, characterized in that: include: A support portion, the support portion comprising a plurality of common columns (13), a plurality of common legs (14) and a plurality of common side beams (15), the common side beams (15) being fixedly arranged above the common legs (14) in the horizontal direction, and the common columns (13) being fixedly arranged on the common side beams (15) in the vertical direction; A module part, the module part comprising an upper module (11), a plurality of pipe galleries (12) and a plurality of pipe gallery layers (16), the upper module (11) being fixedly arranged on one side above a common side beam (15), the pipe gallery layers (16) being fixedly arranged on the other side above the common side beam (15), the pipe galleries (12) being arranged above the pipe gallery layers (16), and the pipe galleries (12) having a plurality of pipelines therein; A connecting part, wherein there are a plurality of connecting parts, and all of the connecting parts are located above the pipe gallery layer (16), wherein the connecting part comprises an inner connecting part and an outer connecting part, wherein the outer connecting part is fixedly connected to the pipe gallery layer (16), and the inner connecting part is rotatably arranged inside the outer connecting part, and the inner connecting part is used to fix the pipeline, and when the hull drives the outer connecting part to shake with the waves, the inner connecting part is pulled by the pipeline and moves in the opposite direction relative to the outer connecting part, thereby reducing the deformation of the pipeline.
2. The FPSO upper module of the integrated pipe gallery according to claim 1 is characterized in that: The external connection part comprises a lower external connection part (3) and an upper external connection part (4), the lower external connection part (3) and the upper external connection part (4) having the same structure, the lower external connection part (3) being fixedly arranged above the pipe gallery layer (16), and the upper external connection part (4) being fixed to the lower external connection part (3) by means of bolts.
3. The FPSO upper module of the integrated pipe gallery according to claim 2 is characterized in that: The lower outer connecting portion (3) comprises an outer tube portion and two top cover portions (32), wherein the top cover portions (32) are fixedly arranged on both sides of the outer tube portion.
4. The FPSO upper module of the integrated pipe gallery according to claim 3 is characterized in that: The outer cylinder portion comprises an outer cylinder (31), two outer connecting plates (33) and a plurality of outer screw holes (34); the outer connecting plates (33) are respectively fixedly arranged on both sides of the outer cylinder (31); and the outer screw holes (34) are all arranged through the outer connecting plates (33).
5. The FPSO upper module of the integrated pipe gallery according to claim 4 is characterized in that: The top cover portion (32) comprises a top cover group and a rib groove group. The top cover group comprises a top cover (321) and a plurality of triangular ribs (322). The top covers (321) are fixedly arranged at both ends of the outer cylinder (31). The top cover (321) is annular. The triangular ribs (322) are fixedly arranged on the inner surface of the top cover (321). The rib groove group comprises an arcuate rib (323) and an arcuate groove (324). The arcuate rib (323) is fixedly arranged on the inner ring of the top cover (321). The arcuate groove (324) is arranged on the arcuate rib (323). The notch of the arcuate groove (324) faces the top cover portion (32).
6. The FPSO upper module of the integrated pipe gallery according to claim 5, characterized in that: The lower inner connecting portion (2) comprises an inner cylinder portion, two side top portions and a plurality of buffer portions (24), wherein the side top portions are fixedly arranged at both ends of the inner cylinder portion, and the buffer portions (24) are fixedly arranged outside the inner cylinder portion, and the buffer portions (24) are rollingly connected to the inner surface of the outer cylinder (31).
7. The FPSO upper module of the integrated pipe gallery according to claim 6, characterized in that: The inner cylinder portion comprises an inner cylinder (21), two inner connecting plates (22) and a plurality of inner screw holes (23); the inner connecting plates (22) are fixedly arranged on both sides of the inner cylinder (21); and the inner screw holes (23) are penetrated through the inner connecting plates (22).
8. The FPSO upper module of the integrated pipe gallery according to claim 6, characterized in that: The side top portion comprises a plurality of first springs (25) and a stop block (26); one end of each of the first springs (25) is fixedly connected to the top end of the inner cylinder (21); the other end of each of the first springs (25) is fixedly connected to the stop block (26); and the stop block (26) is slidably connected to the arc groove (324).
9. The FPSO upper module of the integrated pipe gallery according to claim 7, characterized in that: The buffer portion (24) comprises a column group and a ball group, the column group comprises an inner column (244), an outer column (245) and a second spring (246), the top end of the outer column (245) is fixedly connected to the outer surface of the inner cylinder (21), the outer column (245) is provided with an inner cavity, the second spring (246) is located in the inner cavity, the top end of the second spring (246) is fixedly connected to the outer column (245), and the bottom end is fixedly connected to the inner column (244), the inner column (244) and the outer column (245) are slidably connected, the ball group comprises a base (241), a ball (242) and a buffer ring (243), the base (241) is fixedly arranged at the bottom end of the inner column (244), the ball (242) is rotatably arranged at the bottom end of the base (241), and the buffer ring (243) is fixedly arranged at the top end of the base (241).
10. A method for arranging an FPSO upper module of an integrated pipe gallery, used for the FPSO upper module of an integrated pipe gallery according to any one of claims 1 to 9, characterized in that: The steps include: Step 1: The pipe gallery (12) and the upper module (11) are connected via a common column (13), a common support leg (14) and a common side beam (15); Step 2: The upper module (11) is arranged on the side close to the ship, and the pipe gallery (12) is arranged on the side close to the midship. The position of the common side beam (15) of the module horizontal layer and the layout requirements of pipelines and cables are comprehensively considered to determine the position of the pipe gallery layer (16); Step 3: Unscrew the bolts in the outer screw hole (34) and the inner screw hole (23) respectively, remove the upper outer connecting part (4) from the lower outer connecting part (3), and remove the upper inner connecting part (5) from the lower inner connecting part (2); Step 4: clamp the lower inner connecting part (2) below the pipeline in the pipe gallery 12, clamp the upper inner connecting part (5) above the pipeline, align the inner screw holes (23) of the two, insert the bolts into the inner screw holes (23) and tighten them, fix the upper inner connecting part (5) and the lower inner connecting part (2) together, and clamp the pipeline in the middle; Step 5: Pick up the inner connecting part, insert the stopper (26) at one end below it into the arc-shaped groove (324), and then insert the stopper (26) at the other end below the inner connecting part into the corresponding arc-shaped groove (324), so that the lower inner connecting part (2) is located in the corresponding lower outer connecting part (3); Step 6: According to the method of step 5, the upper inner connecting part (5) is installed in the upper outer connecting part (4), and the outer screw holes (34) of the upper outer connecting part (4) and the lower outer connecting part (3) are aligned one by one. Bolts are respectively inserted into the outer screw holes (34) and tightened to fix the upper outer connecting part (4) and the lower outer connecting part (3) together, and the inner connecting part is wrapped; Step 7: Repeat the above steps and use the connecting parts to fix all the pipes on the pipe gallery layer (16).