Machining equipment for U-shaped double-end bolt
By designing automated U-shaped double-head bolt processing equipment, debris cleaning is achieved using sliding components and chip push components, and automatic resetting of reset components, solving the problems of manual operation risks and complex maintenance in existing equipment, improving safety and cleaning effect.
Patent Information
- Application Number
- CN202411842885.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing U-shaped double-head bolt processing equipment has a risk of manual operation when cleaning debris. The maintenance of automation equipment is complicated and the cleaning device is easily touched and the cutting device is run in synchronization with the cutting device, causing damage to the equipment.
A processing device including a processing table, a cutting assembly, a chip removal mechanism and a reset assembly is designed. The sliding component drives the chip push component to clean up debris, and uses the reset component to achieve automatic reset, reducing manual operation intensity and risk.
Automatic debris cleaning is achieved, reducing the risk of staff exposure to sharp chips, improving workplace safety, and adapting to different cutting speeds and materials to maintain cleaning results.
Smart Images

Figure CN119457968A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of U-shaped stud bolt processing, in particular to a U-shaped stud bolt processing device. Background Art
[0002] U-shaped stud bolt, also known as stud bolt, is a fastener with threads at both ends and a plain rod in the middle, named because of its U-shaped shape. It is mainly used to fix tubular objects (such as water pipes) or sheet objects (such as leaf springs of cars), and its fixing method is similar to riding a horse, so it is also called a riding bolt.
[0003] The processing steps of U-shaped stud bolts are as follows: 1. Unroll the rolled raw steel first; 2. Straighten the unfolded steel; 3. Cut the straightened steel into pieces according to the predetermined length; 4. Bend the cut steel into a U shape (the processing order varies between different factories. Some factories may make threads on both ends of the steel first and then bend it); 5. Thread the two ends of the U-shaped blank. The thread processing can be done by hot extrusion. Heat the two ends of the U-shaped blank to a softened state, and then put them into a threaded mold for extrusion (tapping can also be used); 6. Heat treat the processed threads to meet the surface hardness requirements of the U-shaped stud bolts. Heat treatment can be carried out by medium frequency quenching, high frequency quenching or oil quenching.
[0004] 7. Treat the surface of the U-shaped stud bolts, such as galvanizing or chrome plating, to improve their corrosion resistance and aesthetics.
[0005] When cutting steel, it is inevitable that a certain amount of debris will be generated. These debris need to be cleaned in time. The debris may be entangled on the tool and the workpiece, affecting the cutting accuracy. At the same time, the debris are metal fragments with sharp edges. Long-term contact with the tool makes the tool easily damaged by wear. In the existing technology, most of the debris are cleaned manually, and the edges of the metal debris can easily scratch the hands of the staff. Some equipment can achieve automatic processing through mechanical control. After the cutting device cuts the steel, the chip removal device is controlled to process the debris, and then the chip removal device is reset. However, the electronic control method makes maintenance more troublesome. When the system is stuck, the cleaning device cannot process the debris, or the cleaning device and the cutting device run synchronously, causing the cutting device and the cleaning device to touch each other, thereby causing equipment damage.
[0006] Therefore, a processing device for U-shaped stud bolts is proposed. Summary of the invention
[0007] In view of the fact that the above-mentioned or prior art technologies involve manual cleaning of debris, and the edges of metal debris can easily scratch the hands of workers, some equipment can achieve automatic processing through mechanical control. After the cutting device cuts the steel, the chip removal device is controlled to process the debris, and then the chip removal device is driven to reset. However, the electronic control method makes maintenance more troublesome. When the system is stuck, the cleaning device cannot process the debris, or the cleaning device and the cutting device operate synchronously, causing the cutting device to touch the cleaning device, thereby causing damage to the equipment. The present invention is proposed.
[0008] Therefore, an object of the present invention is to provide a processing equipment for U-shaped stud bolts.
[0009] In order to solve the above technical problems, the present invention provides the following technical solutions: comprising: A processing table, comprising a table body, on which a cutting assembly for cutting steel is arranged; The chip removal mechanism includes a mounting groove opened on the table body, a sliding component is arranged inside the mounting groove, a chip pushing component is connected to the sliding component, the sliding component can drive the chip pushing component to clean the debris generated by the cutting component cutting steel, and a reset component is arranged between the sliding component and the cutting component to drive the sliding component to run automatically.
[0010] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, the cutting assembly includes a cylinder arranged on a table body, the output end of the cylinder is connected to a mounting frame, and a cutter is detachably connected to the mounting frame.
[0011] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, wherein: a cutting groove is opened on the table body, and the cutting groove is a through groove; A collection box is installed at the bottom of the platform, and the collection box corresponds to the position of the cutting groove.
[0012] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, wherein: the sliding assembly includes a first spring and a first telescopic rod arranged inside the installation groove, the first spring is sleeved on the surface of the first telescopic rod, one end of the first spring and the first telescopic rod are fixedly connected to the inner wall of the installation groove, and the other ends of the first spring and the first telescopic rod are connected to the first sliding block; The first telescopic rod is divided into a tube part and a rod part, the rod part is connected to the tube part, and a buffer pad is arranged inside the tube part; The first sliding block is slidably connected to the mounting groove, and the mounting groove matches the moving track of the first sliding block.
[0013] As a preferred solution of the processing equipment of the U-shaped stud bolts of the present invention, the chip pusher assembly includes a driving plate connected to the first sliding block, a connecting piece is provided on one side of the driving plate, and a push shovel is connected to the connecting piece.
[0014] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, wherein: the chip pushing assembly further comprises a first slide groove opened on the driving plate, a slide rod is slidably arranged inside the first slide groove, and the slide rod is connected to the connecting piece; The groove surface of the first chute is an inclined surface; A track groove is provided on the surface of the platform body, and a protrusion is provided on the bottom of the push shovel. The protrusion is located inside the track groove, and the track groove matches the moving track of the protrusion.
[0015] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, wherein: the connecting member includes a bracket body and a second spring, one end of the second spring is connected to the bracket body, and the other end of the second spring is connected to the dozer; The bracket body is connected to the slide rod; The track groove is divided into a straight groove and an oblique groove, and the straight groove is connected with the oblique groove.
[0016] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, the reset assembly includes an extrusion plate rotatably connected to the mounting frame, and the extrusion plate is provided with a first inclined surface and a first plane.
[0017] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, wherein: the reset assembly further comprises a vertical groove provided on the first sliding block, a third spring is vertically arranged inside the vertical groove, one end of the third spring is connected to the inner wall of the vertical groove, and the other end of the third spring is connected to a positioning block, and the positioning block is provided with a second inclined surface and a second plane; The second inclined surface matches the first inclined surface.
[0018] As a preferred solution of the processing equipment of the U-shaped stud bolt of the present invention, the reset assembly further includes a stop block arranged inside the installation groove, the stop block is provided with a third inclined surface, and the third inclined surface matches the second inclined surface.
[0019] Beneficial effects of the U-shaped stud bolt processing equipment of the present invention: The steel can be cut by the cutting assembly. The debris generated during the cutting process will remain on the top of the table. The chip pusher assembly can be driven by the sliding assembly to move, so that the debris on the table can be processed. After the steel is cut, the reset component can automatically drive the sliding component and the chip pusher component to operate, and automatically reset the sliding component and the chip pusher component after the debris is processed, thereby reducing the work intensity of the staff, reducing the risk of operators contacting sharp chips, and improving the safety of the workplace. At the same time, it can also adapt to different cutting speeds and materials, and can maintain a good cleaning effect even in assembly line fast cutting. At the same time, when the cutting component is stuck, the sliding component and the chip pusher component will also stop, so that the cutter will not contact the chip pusher component, etc., causing damage to the chip pusher component. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0021] Figure 1 It is a schematic diagram of the overall structure of the processing equipment for U-shaped stud bolts; Figure 2 It is a schematic diagram of the overall structure of the chip removal mechanism of the U-shaped stud bolt processing equipment; Figure 3 It is a schematic diagram of the cross-sectional structure of a chip removal mechanism of a U-shaped stud bolt processing equipment; Figure 4 The schematic diagram of the chip pusher assembly structure of the U-shaped stud bolt processing equipment.
[0022] In the figure: 100, processing table; 101, table body; 101a, cutting groove; 101b, track groove; 102, cutting assembly; 102a, cylinder; 102b, mounting frame; 102c, cutter; 200, chip removal mechanism; 201, mounting groove; 202, sliding assembly; 202a, first spring; 202b, first telescopic rod; 202b-1, buffer pad; 202c, first slider; 203, chip pushing assembly; 203a, drive plate; 203b, connecting piece; 203b-1, bracket body; 203b-2, second spring; 203c, push shovel; 203c-1, protrusion; 203d, first slide groove; 203e, slide rod; 204, reset assembly; 204a, extrusion plate; 204b, first inclined surface; 204c, first plane; 204d, vertical groove; 204e, third spring; 204f, positioning block; 204g, second inclined surface; 204h, second plane; 204i, stop block; 204j, third inclined surface. DETAILED DESCRIPTION
[0023] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0024] Example 1, reference Figures 1 to 4 , is the first embodiment of the present invention, which provides a U-shaped stud bolt processing equipment, which includes, a processing table 100, which includes a table body 101, a cutting assembly 102 for cutting steel is arranged on the table body 101, and a chip removal mechanism 200 is also arranged on the table body 101. The chip removal mechanism 200 is located at the bottom of the cutting assembly 102. The chip removal mechanism 200 includes a mounting groove 201 opened on the table body 101, a sliding assembly 202 is arranged inside the mounting groove 201, and a chip pusher assembly 203 is connected to the sliding assembly 202. The sliding assembly 202 can drive the chip pusher assembly 203 to clean up the debris generated by the cutting assembly 102 cutting the steel, and a reset assembly 204 for driving the sliding assembly 202 to automatically operate is arranged between the sliding assembly 202 and the cutting assembly 102; The steel can be cut by the cutting assembly 102. The debris generated during the cutting process will remain on the top of the table 101. The sliding assembly 202 drives the chip pusher assembly 203 to move, so that the debris on the table 101 can be processed. After the steel is cut, the reset component 204 can automatically drive the sliding component 202 and the chip pusher component 203 to operate, and automatically reset the sliding component 202 and the chip pusher component 203 after the debris is processed, thereby reducing the work intensity of the staff, reducing the risk of operators contacting sharp chips, and improving the safety of the workplace. At the same time, it can also adapt to different cutting speeds and materials, and can maintain a good cleaning effect even at high speed or when cutting hard materials, and can maintain a good cleaning effect even in assembly line-type fast cutting. At the same time, when the cutting component 102 is stuck, the sliding component 202 and the chip pusher component 203 also stop, so that the cutter 102c will not contact the chip pusher component 203, etc., causing damage to the chip pusher component 203.
[0025] Furthermore, the cutting assembly 102 includes a cylinder 102a disposed on the platform 101, the output end of the cylinder 102a is connected to a mounting frame 102b, and a cutter 102c is detachably connected to the mounting frame 102b; First, the steel is placed (or transported by mechanical equipment) on the top of the table 101 and fixed (the fixing device is a prior art and is not shown in the figure), and then the cylinder 102a is turned on, the cylinder 102a drives the mounting frame 102b to descend, and the mounting frame 102b drives the cutter 102c to descend, so as to cut the steel on the table 101; Among them, the cutter 102c needs to use a sharper cutter 102c. Different from the cutting of some steel materials, some steel materials use a motor to drive the rotating wheel to cut the steel through the rotating wheel, while the steel for U-bolt processing is mostly directly cut at equal intervals using the cutter 102c.
[0026] Furthermore, a cutting groove 101a is provided on the platform 101, and the cutting groove 101a is a through groove. A collecting box (not shown in the figure) is installed at the bottom of the platform 101, and the position of the collecting box corresponds to the cutting groove 101a; The cutting groove 101a is used to ensure that the cutter 102c can cut the steel material. The cutting groove 101a is set as a through groove so that some debris in the cutting process can directly pass through the cutting groove 101a into the collection box for collection; The collecting box is detachably connected to the platform 101. When the collecting box collects a certain amount of debris, the collecting box is removed and the debris inside is dumped to a suitable place, thereby reducing the waste of resources.
[0027] In summary, in this embodiment, the cutting assembly 102 drives the cutter 102c to cut the steel material, and the debris generated during the cutting process is collected to avoid wasting resources.
[0028] Example 2, reference Figures 1 to 4 , which is the second embodiment of the present invention. Different from the previous embodiment, the sliding assembly 202 provided in this embodiment includes a first spring 202a and a first telescopic rod 202b arranged inside the installation groove 201, the first spring 202a is sleeved on the surface of the first telescopic rod 202b, one end of the first spring 202a and the first telescopic rod 202b are fixedly connected to the inner wall of the installation groove 201, and the other ends of the first spring 202a and the first telescopic rod 202b are connected to the first slider 202c.
[0029] Furthermore, the chip pushing assembly 203 includes a driving plate 203a fixedly connected to the first sliding block 202c, a connecting member 203b is provided on one side of the driving plate 203a, and a pushing shovel 203c is connected to the connecting member 203b.
[0030] In this embodiment, the top of the first sliding block 202c passes through the mounting groove 201, and the connecting member 203b is a horizontal plate, which is fixedly connected to the driving plate 203a; When in use, after the cutting assembly 102 cuts the steel, the first slider 202c is manually pushed, and the first slider 202c moves toward the center of the platform 101, and the first slider 202c drives the first telescopic rod 202b to extend and the first spring 202a to be stretched. At the same time, the first slider 202c drives the push shovel 203c to move toward the cutting groove 101a through the driving plate 203a and the connecting piece 203b. Multiple push shovels 203c (as can be seen from the drawings in the specification, only one is mentioned here for ease of understanding) push the debris on the top of the platform 101 into the cutting groove 101a, so as to process the debris falling on the platform 101 during the cutting process. After completion, release your hand, and under the elastic force of the first spring 202a, the first slider 202c is reset, and the first slider 202c drives the push shovel 203c to reset.
[0031] The rest of the structure is the same as that of Example 1.
[0032] In summary, in this embodiment, the debris falling on the table 101 during the cutting process is manually handled, and the first slider 202c drives the shovel 203c to clean the surface of the table 101, so that the staff does not need to use a rag or the like to handle the debris on the table 101, thereby avoiding the problem of being scratched by the debris.
[0033] Example 3, reference Figures 1 to 4 , which is the third embodiment of the present invention. Different from the previous embodiment, the chip pusher assembly 203 provided in this embodiment also includes a first slide groove 203d provided on the driving plate 203a, a slide rod 203e is slidably provided inside the first slide groove 203d, the slide rod 203e is connected to the connecting member 203b, the groove surface of the first slide groove 203d is an inclined surface, a track groove 101b is provided on the surface of the platform 101, a protrusion 203c-1 is provided at the bottom of the push shovel 203c, the protrusion 203c-1 is located inside the track groove 101b, and the track groove 101b matches the moving track of the protrusion 203c-1; The groove surface of the first sliding groove 203d is set as an inclined surface, so that when the first sliding block 202c moves, the first sliding block 202c can more easily drive the sliding rod 203e to move through the driving plate 203a.
[0034] Further, the connecting member 203b includes a bracket body 203b-1 and a second spring 203b-2, one end of the second spring 203b-2 is connected to the bracket body 203b-1, and the other end of the second spring 203b-2 is connected to the dozer 203c, and the bracket body 203b-1 is connected to the slide bar 203e; The track groove 101b is divided into a straight groove and an oblique groove, the straight groove is connected to the oblique groove, and the straight groove is close to the incision; Depending on the actual situation, whether the straight line needs to be a through groove or not, for processing U-shaped stud bolts of different thicknesses, the thickness of the cut steel is also different. Therefore, the distance between the debris and the cutting groove 101a during the cutting process is also different. The end of the straight groove away from the oblique groove is close to the cutting groove 101a. For the production of some larger U-shaped stud bolts, it is easy for the debris to enter the straight groove, affecting the movement of the protrusion 203c-1 inside the track groove 101b, thereby affecting the cleaning of the debris on the surface of the table 101.
[0035] In this embodiment, the top of the first sliding block 202c still needs to pass through the installation groove 201. In the initial state, the protrusion 203c-1 is located inside the oblique groove; In the initial state, when the first slider 202c is moving, the first slider 202c drives the driving plate 203a to move, the driving plate 203a drives the sliding rod 203e to move through the first sliding groove 203d, and the sliding rod 203e drives the push shovel 203c to move through the bracket body 203b-1 and the second spring 203b-2. Under the action of the track groove 101b, the two corresponding push shovels 203c on the left and right are close to each other (from a top view). When the two push shovels 203c on the left and right are close to each other, at this time, the protrusion 203c-1 just moves to the connection between the oblique groove and the straight groove; When the first slider 202c continues to move, the first slider 202c continues to push the slide bar 203e to move through the inclined surface of the first slide groove 203d on the driving plate 203a. At this time, under the limit of the linear groove, the slide bar 203e will drive the second spring 203b-2 to be compressed through the bracket body 203b-1. At the same time, the upper and lower corresponding push shovels 203c approach each other (from a top view) and push the debris on the platform 101 into the cutting groove 101a.
[0036] The rest of the structure is the same as that of Example 2.
[0037] In summary, what is different from the second embodiment is that the pushing method of the second embodiment allows multiple push shovels 203c to be close to each other for cleaning. When the steel is being processed, since the push shovels 203c can only be distributed on both sides of the steel, and the cutter 102c is perpendicular to the steel, when pushing, the push shovel 203c is perpendicular to the cutter 102c and the cutting groove 101a. Since the width of the cutting groove 101a is normally only a few millimeters to a few centimeters, it is difficult to push the debris into the cutting groove 101a. In this embodiment, the groove surface of the first slide groove 203d is an inclined surface, and the track groove 101b and the connecting member 203b are set, so that the push shovel 203c can correspond to the long side of the cutting groove 101a when moving, and then the debris on the platform 101 can be pushed into the cutting groove 101a, and the debris processing effect is better.
[0038] Example 4, reference Figures 1 to 4 , which is the third embodiment of the present invention. Different from the previous embodiment, the reset assembly 204 provided in this embodiment includes a pressing plate 204a rotatably connected to the mounting frame 102b, and the pressing plate 204a is provided with a first inclined surface 204b and a first plane 204c; The end of the extrusion plate 204a is a curved surface.
[0039] Furthermore, the reset assembly 204 also includes a vertical groove 204d opened on the first slider 202c, and a third spring 204e is vertically arranged inside the vertical groove 204d, one end of the third spring 204e is connected to the inner wall of the vertical groove 204d, and the other end of the third spring 204e is connected to the positioning block 204f, and the positioning block 204f is provided with a second inclined surface 204g and a second plane 204h, and the second inclined surface 204g matches the first inclined surface 204b.
[0040] Furthermore, the reset assembly 204 further includes a stopper block 204i disposed inside the mounting groove 201, and a third inclined surface 204j is disposed on the stopper block 204i, and the third inclined surface 204j matches the second inclined surface 204g; The first telescopic rod 202b is divided into a tube part and a rod part, the rod part is connected to the tube part, and a buffer pad 202b-1 is arranged inside the tube part; The first sliding block 202c is slidably connected to the mounting groove 201, and the moving tracks of the mounting groove 201 and the first sliding block 202c match.
[0041] In this embodiment, the first sliding block 202c is located inside the installation groove 201, and its top is located inside the installation groove 201, and the top of the positioning block 204f passes through the installation groove 201; The width of the extrusion plate 204a is greater than the slot width of the mounting slot 201; In the initial state, the end of the rod of the first telescopic rod 202b away from the first slider 202c contacts the buffer pad 202b-1 (when the first telescopic rod 202b is reset under the action of the first spring 202a, the rod will directly hit the tube, and the buffer pad 202b-1 buffers the impact force and protects the tube); When in use, when the cylinder 102a drives the cutter 102c to descend through the mounting frame 102b, the mounting frame 102b drives the extrusion plate 204a to move away from the end of the mounting frame 102b toward the positioning block 204f, so that the first inclined surface 204b on the extrusion plate 204a squeezes the second inclined surface 204g on the positioning block 204f. At this time, since the end of the rod of the first telescopic rod 202b away from the first slider 202c contacts the buffer pad 202b-1, the first slider 202c cannot move, at this time, the positioning block 204f is squeezed, the positioning block 204f drops, and the positioning block 204f squeezes the third spring 204e, causing the third spring 204e to contract. When the extrusion plate 204a and the positioning block 204f are misaligned, at this time, under the elastic force of the third spring 204e, the positioning block 204f is reset, and the second plane 204h on the positioning block 204f is in contact with the first plane 204c on the extrusion plate 204a, and at this time, the cutter 102c has completed cutting the steel; When the cylinder 102a drives the cutter 102c to rise through the mounting frame 102b, the mounting frame 102b drives the end of the extrusion plate 204a that is in contact with the positioning block 204f to move toward the direction of the cutting groove 101a (at this time, the extrusion plate 204a rotates to a certain extent, which does not affect the operation of the device), the extrusion plate 204a drives the first slider 202c to move toward the direction of the cutting groove 101a through the positioning block 204f, and the first slider 202c drives the push shovel 203c to push the debris on the surface of the platform 101 into the cutting groove 101a; When the positioning block 204f contacts the stop block 204i, when the extrusion plate 204a drives the positioning block 204f to move, the positioning block 204f will drop due to the action of the third inclined surface 204j on the stop block 204i, and the positioning block 204f squeezes the third spring 204e, causing the third spring 204e to contract. As the extrusion plate 204a continues to drive the positioning block 204f to move, the positioning block 204f continues to drop. When the top of the positioning block 204f is flush with the top of the mounting groove 201, the positioning block 204f is misaligned with the extrusion plate 204a. Under the elastic force of the first spring 202a, the first slider 202c drives the positioning block 204f back to the initial position, and under the elastic force of the third spring 204e, the end of the positioning block 204f away from the third spring 204e passes through the mounting groove 201.
[0042] The rest of the structure is the same as that of Example 3.
[0043] In summary, what is different from the prior art is that when resetting the component 204, automatic chip removal is achieved. When the cutting component 102 completes cutting, it can automatically drive the sliding component 202 and the chip pusher component 203 to operate, and process the debris on the surface of the table 101. When the cutting component 102 is stuck, the sliding component 202 and the chip pusher component 203 also stop, so that the cutter 102c will not contact the chip pusher component 203, causing damage to the chip pusher component 203, and a good cleaning effect can be maintained even in assembly line fast cutting.
[0044] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A U-shaped stud bolt processing equipment, characterized in that: include, A processing table (100), comprising a table body (101), wherein a cutting assembly (102) for cutting steel is arranged on the table body (101); The chip removal mechanism (200) comprises a mounting groove (201) provided on a platform (101), a sliding assembly (202) being arranged inside the mounting groove (201), a chip pushing assembly (203) being connected to the sliding assembly (202), the sliding assembly (202) being capable of driving the chip pushing assembly (203) to clean up the chips generated by the cutting assembly (102) when cutting steel, and a reset assembly (204) for driving the sliding assembly (202) to automatically operate being arranged between the sliding assembly (202) and the cutting assembly (102).
2. The U-shaped stud bolt processing equipment according to claim 1, characterized in that: The cutting assembly (102) comprises a cylinder (102a) arranged on a platform (101); an output end of the cylinder (102a) is connected to a mounting frame (102b); and a cutter (102c) is detachably connected to the mounting frame (102b).
3. The U-shaped stud bolt processing equipment according to claim 2, characterized in that: The platform (101) is provided with a cutting groove (101a), and the cutting groove (101a) is a through groove; A collection box is installed at the bottom of the platform (101), and the position of the collection box corresponds to the cutting groove (101a).
4. The U-shaped stud bolt processing equipment according to claim 3, characterized in that: The sliding assembly (202) comprises a first spring (202a) and a first telescopic rod (202b) which are arranged inside the installation groove (201); the first spring (202a) is sleeved on the surface of the first telescopic rod (202b); one end of the first spring (202a) and the first telescopic rod (202b) are fixedly connected to the inner wall of the installation groove (201); and the other ends of the first spring (202a) and the first telescopic rod (202b) are connected to the first sliding block (202c); The first telescopic rod (202b) is divided into a tube portion and a rod portion, the rod portion is connected to the tube portion, and a buffer pad (202b-1) is arranged inside the tube portion; The first sliding block (202c) is slidably connected to the mounting groove (201), and the moving tracks of the mounting groove (201) and the first sliding block (202c) match.
5. The U-shaped stud bolt processing equipment according to claim 4, characterized in that: The chip pushing assembly (203) comprises a driving plate (203a) connected to the first sliding block (202c), a connecting piece (203b) is provided on one side of the driving plate (203a), and a pushing shovel (203c) is connected to the connecting piece (203b).
6. The U-shaped stud bolt processing equipment according to claim 5, characterized in that: The chip pushing assembly (203) further comprises a first slide groove (203d) provided on the driving plate (203a), a slide rod (203e) being slidably arranged inside the first slide groove (203d), and the slide rod (203e) is connected to the connecting member (203b); The groove surface of the first sliding groove (203d) is an inclined surface; A track groove (101b) is provided on the surface of the platform (101), a protrusion (203c-1) is provided at the bottom of the push shovel (203c), the protrusion (203c-1) is located inside the track groove (101b), and the movement track of the track groove (101b) matches that of the protrusion (203c-1).
7. The U-shaped stud bolt processing equipment according to claim 6, characterized in that: The connecting member (203b) comprises a bracket body (203b-1) and a second spring (203b-2), one end of the second spring (203b-2) is connected to the bracket body (203b-1), and the other end of the second spring (203b-2) is connected to the dozer (203c); The support body (203b-1) is connected to the sliding rod (203e); The track groove (101b) is divided into a straight groove and an oblique groove, and the straight groove is connected to the oblique groove.
8. The U-shaped stud bolt processing equipment according to claim 7, characterized in that: The resetting assembly (204) comprises an extrusion plate (204a) rotatably connected to the mounting frame (102b), and the extrusion plate (204a) is provided with a first inclined surface (204b) and a first plane (204c).
9. The U-shaped stud bolt processing equipment according to claim 8, characterized in that: The reset component (204) further comprises a vertical groove (204d) provided on the first sliding block (202c), a third spring (204e) being vertically arranged inside the vertical groove (204d), one end of the third spring (204e) being connected to the inner wall of the vertical groove (204d), and the other end of the third spring (204e) being connected to a positioning block (204f), and the positioning block (204f) being provided with a second inclined surface (204g) and a second plane (204h); The second inclined surface (204g) matches the first inclined surface (204b).
10. The U-shaped stud bolt processing equipment according to claim 9, characterized in that: The resetting assembly (204) further comprises a stop block (204i) arranged inside the installation groove (201), the stop block (204i) being provided with a third inclined surface (204j), and the third inclined surface (204j) matches the second inclined surface (204g).