Elevated bridge stand column wall-attached type self-climbing operation platform and method
By adopting adaptive wall attachment device and alternating wall attachment self-climbing power device on the overpassed bridge column-attached operating platform, the problem of insufficient work efficiency caused by repeated disassembly and assembly of traditional operating platforms during column and cover beam assembly construction is solved, and the problem of insufficient work efficiency caused by repeated disassembly and assembly of traditional operating platforms during column and cover beam assembly is achieved. Efficient and safe construction operations.
Patent Information
- Application Number
- CN202411615029.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-02-18
AI Technical Summary
During the assembly and construction of column standard sections and cover beams of overpasses, traditional operating platforms require multiple height adjustments and disassembly, resulting in insufficient work efficiency and low construction efficiency.
Multiple groups of adaptive wall attachment devices and alternating wall attachment self-climbing power devices are adopted to realize adaptive adjustment and overall circulation improvement of the operating platform, ensuring that the platform is installed in one piece at a time during construction and is flexible in place multiple times.
It improves the versatility and construction efficiency of the operating platform, reduces working hours, and ensures the safety and efficiency of construction.
Smart Images

Figure CN119465818A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to an elevated bridge column wall-attached self-climbing operating platform and a method. Background Art
[0002] In the process of urban renewal and development, the number of projects to elevate and renovate existing urban expressway networks has been increasing. In recent years, the full prefabrication and assembly of urban elevated bridges has developed rapidly. By adopting full prefabrication and assembly technology for the pile foundation, piers, columns, cap beams, box beams and other structures of elevated bridges, significant improvements in quality and efficiency can be achieved.
[0003] During the prefabrication and assembly of urban elevated bridges, there are construction operations such as hoisting positioning and sleeve grouting connection during the assembly of large-scale super-high columns and column-cap beams, which require construction personnel to arrive at the assembly location for auxiliary construction. If all the manual operations are done by traditional aerial platforms, it will be extremely dangerous. If the site is leveled around the column and temporary scaffolding is built, it is extremely time-consuming, labor-intensive, and space-consuming compared to the entire positioning, installation, and connection operations, which is extremely unfavorable for efficient and rapid construction; at present, the more popular practice is to preset a clamp-fixed operating platform at the predetermined height of the column, and use a aerial platform to realize the operation of personnel on the platform. However, this approach is still applicable to the one-time column-cap beam assembly construction, while for multi-stage construction such as super-high segmented column installation and column-cap beam assembly construction, it is necessary to adjust the height of the operating platform many times and repeatedly disassemble and assemble it, which greatly wastes working hours and especially reduces the efficiency of the nodes.
[0004] Therefore, how to provide a self-climbing operating platform attached to the wall of an elevated bridge column to solve the problem of insufficient work efficiency caused by repeated disassembly and assembly of conventional operating platforms during the assembly construction of standard sections of columns and between standard sections of columns and cap beams is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0005] The present invention provides a self-climbing operation platform attached to the wall of an elevated bridge column and a self-climbing operation method attached to the wall of an elevated bridge column, which aims to solve the problem of insufficient work efficiency caused by repeated disassembly and assembly of conventional operation platforms during the assembly and construction of standard sections of assembled elevated bridge columns, standard sections of columns and cap beams. By adopting multiple sets of adaptive wall-attached devices, active adaptive adjustment of the cross-sectional dimensions of different standard sections of columns is achieved; by adopting multiple sets of alternating wall-attached self-climbing power devices, the overall cyclic alternating lifting of the operation platform is achieved, so that the operation platform can be installed as a whole once and flexibly positioned multiple times during the entire installation and construction process; by using a self-locking device, one-way travel locking is achieved during the climbing process, ensuring the climbing anti-skid and anti-falling safety of the operation platform; and a high-efficiency, low-impact operation platform solution is provided for the assembly and construction between standard sections of super-high columns of elevated bridges, and between standard sections of columns and cap beams.
[0006] In order to solve the above technical problems, the present invention includes the following technical solutions: A self-climbing operating platform attached to a wall of an elevated bridge column is circumferentially arranged around a standard section of the column and is used for vertical assembly between adjacent standard sections of the column. The operating platform comprises: An adaptive annular support system, the adaptive annular support system comprises a ring beam, a jack, a telescopic rod and a wall attachment shoe, a pair of the wall attachment shoes are respectively arranged around the standard section of the column, adjacent wall attachment shoes in each pair of wall attachment shoes are connected by the telescopic rod, and each wall attachment shoe is connected to the ring beam by the jack; A grid paving system, wherein the grid paving system comprises a plane grid and a plane paving net, wherein the plane grid is arranged at the top of the adaptive annular support system, and the plane paving net fully paves the plane grid; A facade fence system is arranged around the grid paving system.
[0007] The two groups of the adaptive annular support systems are alternately locked around the standard sections of the columns through hoops.
[0008] An operation method for the wall-attached self-climbing of an elevated bridge column, the operation method comprising the following steps: Step S1, providing the viaduct bridge column wall-attached self-climbing operating platform for standby; Step S2, installing the first column standard section on the upper surface of the base; Step S3, installing the viaduct bridge column wall-attached self-climbing operating platform on the outer wall at the bottom of the first column standard section, and starting alternate climbing so that the operating platform reaches the upper part of the first column standard section; Step S4, hoist the second column standard section, and transport the construction workers to the operating platform by a climbing vehicle to complete the assembly between the first column standard section and the second column standard section; Step S5, start the alternate climbing so that the operating platform reaches the upper part of the standard section of the second column; Step S6, repeating the steps S4 and S5, after completing the installation of the standard section of the top column, hoisting the cap beam, and transporting the construction workers to the operating platform by a aerial platform vehicle to complete the assembly of the standard section of the top column and the cap beam.
[0009] Compared with the prior art, the present invention has the following advantages and beneficial effects: The present invention provides a self-climbing operating platform attached to a wall of an elevated bridge column, which is circumferentially arranged around a standard section of a column and is used for vertical assembly between adjacent standard sections of the column. The operating platform comprises: An adaptive annular support system, the adaptive annular support system comprises a ring beam, a jack, a telescopic rod and a wall attachment shoe, a pair of the wall attachment shoes are respectively arranged around the standard section of the column, adjacent wall attachment shoes in each pair of wall attachment shoes are connected by the telescopic rod, and each wall attachment shoe is connected to the ring beam by the jack; A grid paving system, wherein the grid paving system comprises a plane grid and a plane paving net, wherein the plane grid is arranged at the top of the adaptive annular support system, and the plane paving net fully paves the plane grid; The facade fence system is arranged around the grid paving system. The operating platform can actively and adaptively adjust the cross-sectional dimensions of different standard sections of columns by adopting a multi-legged adaptive self-locking wall-attached device, thereby improving the versatility of the operating platform; multiple groups of multi-legged alternating wall-attached self-climbing power devices can alternately and cyclically lift the operating platform as a whole, thereby realizing one-time overall installation and multiple flexible positioning of the operating platform during the entire installation and construction process; through the self-locking device, one-way travel locking is realized during the climbing process to ensure the climbing anti-skid and anti-fall safety of the operating platform. It provides a high-efficiency and low-impact operating platform solution for the assembly construction between standard sections of super-high columns of elevated bridges, and between standard sections of columns and cap beams. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a structural schematic diagram of a self-climbing operating platform attached to a wall of an elevated bridge column according to an embodiment of the present invention; Figure 2 It is a structural schematic diagram of an adaptive annular support system in a self-climbing operating platform attached to a wall of an elevated bridge column according to an embodiment of the present invention; Figure 3 It is a structural schematic diagram of a grid paving system in a self-climbing operating platform attached to a wall of an elevated bridge column according to an embodiment of the present invention; Figures 4 to 8 The present invention is a construction flow chart of steps S2 to S6 in the wall-attached self-climbing operation method of an elevated bridge column in one embodiment of the present invention.
[0011] In the figure: 1- Standard section of column, 2- Ring beam, 3- Jack, 4- Telescopic rod, 5- Wall boot, 6- Plane grid, 7- Plane laying net, 8- Vertical fence system, 9- Capping platform, 10- Cap beam. DETAILED DESCRIPTION
[0012] The following is a further detailed description of a self-climbing operating platform and method for an elevated bridge column attached to a wall provided by the present invention in conjunction with the accompanying drawings and specific embodiments. Based on the following description, the advantages and features of the present invention will become clearer. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention. Embodiment 1
[0013] Combine the following Figures 1 to 8 , detailed description of the structural composition of the self-climbing operating platform attached to the wall of the elevated bridge column.
[0014] Please refer to Figures 1 to 8 A self-climbing operating platform attached to the wall of an elevated bridge column is circumferentially arranged around the standard section 1 of the column and is used for vertical assembly between adjacent standard sections 1 of the column. The operating platform includes: an adaptive annular support system, a grid paving system and a facade fence system. The adaptive annular support system includes a ring beam 2, a jack 3, a telescopic rod 4 and a wall boot 5. A pair of wall boots 5 are respectively arranged around the standard section 1 of the column. Adjacent wall boots 5 in each pair of wall boots 5 are connected by a telescopic rod 4, and each wall boot 5 is connected to the ring beam 2 by a jack 3; the grid paving system includes a plane grid 6 and a plane paving net 7. The plane grid 6 is arranged at the top of the adaptive annular support system, and the plane paving net 7 fully paves the plane grid 6; the facade fence system is arranged around the grid paving system. The operating platform adopts a multi-legged adaptive self-locking wall-attached device, which can actively and adaptively adjust the cross-sectional dimensions of different column standard sections, thereby improving the versatility of the operating platform; multiple groups of multi-legged alternating wall-attached self-climbing power devices can alternately and cyclically lift the operating platform as a whole, thereby achieving one-time overall installation and multiple flexible positioning of the operating platform during the entire installation and construction process; through the self-locking device, one-way travel locking is achieved during the climbing process to ensure the climbing anti-skid and anti-fall safety of the operating platform. It provides a high-efficiency, low-impact operating platform solution for the assembly construction between standard sections of super-high columns of elevated bridges, and between standard sections of columns and cap beams.
[0015] In this embodiment, more preferably, the two sets of adaptive annular support systems are alternately locked around the standard section 1 of the column through clamps.
[0016] Please continue to refer to Figures 1 to 8 This embodiment provides a method for operating a viaduct bridge column with a wall-attached self-climbing structure, the method comprising the following steps: Step S1, providing the viaduct bridge column wall-attached self-climbing operating platform for standby; Step S2, installing the first column standard section 1 on the upper surface of the base 9; Step S3, installing the elevated bridge column wall-attached self-climbing operating platform on the bottom outer wall of the first column standard section 1, and starting the alternating climbing so that the operating platform reaches the upper part of the first column standard section; Step S4, hoist the second column standard section 1, and transport the construction workers to the operating platform by a climbing vehicle to complete the assembly between the first column standard section 1 and the second column standard section 1; Step S5, start the alternate climbing so that the operating platform reaches the upper part of the second column standard section 1; Step S6, repeating the steps S4 and S5, after completing the installation of the top column standard section, hoisting the cap beam 10, and transporting the construction workers to the operating platform by a aerial platform vehicle to complete the assembly of the top column standard section 1 and the cap beam 10.
[0017] The above examples are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. The above embodiments only express several embodiments of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A self-climbing operating platform attached to a wall of an elevated bridge column, which is circumferentially arranged around the standard section of the column and is used for vertical assembly between adjacent standard sections of the column, characterized in that: The operating platform comprises: An adaptive annular support system, the adaptive annular support system comprises a ring beam, a jack, a telescopic rod and a wall attachment shoe, a pair of the wall attachment shoes are respectively arranged around the standard section of the column, adjacent wall attachment shoes in each pair of wall attachment shoes are connected by the telescopic rod, and each wall attachment shoe is connected to the ring beam by the jack; A grid paving system, wherein the grid paving system comprises a plane grid and a plane paving net, wherein the plane grid is arranged at the top of the adaptive annular support system, and the plane paving net fully paves the plane grid; A facade fence system is arranged around the grid paving system.
2. The elevated bridge column wall-attached self-climbing operating platform according to claim 1 is characterized in that: The two groups of the adaptive annular support systems are alternately locked around the standard sections of the columns through hoops.
3. The method for self-climbing of a viaduct bridge column attached to a wall according to claim 1 or 2, characterized in that: The steps include: Step S1, providing the viaduct bridge column wall-attached self-climbing operating platform for standby; Step S2, installing the first column standard section on the upper surface of the base; Step S3, installing the viaduct bridge column wall-attached self-climbing operating platform on the outer wall at the bottom of the first column standard section, and starting alternate climbing so that the operating platform reaches the upper part of the first column standard section; Step S4, hoist the second column standard section, and transport the construction workers to the operating platform by a climbing vehicle to complete the assembly between the first column standard section and the second column standard section; Step S5, start the alternate climbing so that the operating platform reaches the upper part of the standard section of the second column; Step S6, repeating the steps S4 and S5, after completing the installation of the standard section of the top column, hoisting the cap beam, and transporting the construction workers to the operating platform by a aerial platform vehicle to complete the assembly of the standard section of the top column and the cap beam.
Citation Information
Cited By
Automatic climbing platform and construction method thereof
CN121295901A