Pile foundation construction device based on bridge engineering

CN119465957APending Publication Date: 2025-02-18CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411572048.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2025-02-18

Smart Images

  • Figure CN119465957A_ABST
    Figure CN119465957A_ABST
Patent Text Reader

Abstract

The invention relates to the field of highway bridge construction, in particular to a pile foundation construction device based on bridge engineering, which comprises a support base matched with a foundation and an auxiliary positioning device arranged on the support base, the supporting base comprises a supporting transverse plate and a supporting vertical frame which are integrally formed, the supporting vertical frame is arranged at the center position of the supporting transverse plate, the supporting vertical frame is perpendicular to the supporting transverse plate, a first connecting through hole is formed in the supporting vertical frame, and a second connecting through hole is formed in the supporting vertical frame; the first connecting through hole penetrates through the supporting vertical frame and continues to penetrate through the supporting transverse plate downwards. And the auxiliary positioning device is arranged in the first connecting through hole, the auxiliary positioning device can ascend and descend in the central axis direction of the first connecting through hole and is used for bearing the pile foundation, and the technical problem that in the bridge construction process, the pile is inclined in the process of sinking to the foundation due to the influence of external factors of the pile foundation is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of highway bridge construction, and in particular to a pile foundation construction device based on bridge engineering. Background Art

[0002] A pile foundation is a deep foundation that connects the tops of several piles into a whole through a cap to jointly bear dynamic and static loads. A pile is a vertical or inclined foundation component set in the soil. Its function is to penetrate soft, highly compressible soil layers or water and transfer the load borne by the pile to a harder, denser or less compressible bearing layer of the foundation. We usually call the piles in the pile foundation foundation piles.

[0003] The pile foundation of a bridge is the load-bearing component of the bridge during the overall construction process. Structurally, it directly connects the foundation and the bridge deck. Since the pile foundation plays a very important role in the overall bridge, how to ensure that the pile foundation is firmly coordinated with the foundation has become a research topic in the field of construction.

[0004] The invention patent with Chinese patent application number 202410814555.3 discloses a pile foundation construction fixing device, which relates to the field of foundation pit construction, including a pile foundation construction base, the pile foundation construction base is used for anchoring with the ground, the pile foundation construction base is provided with a drill rod guide channel for locating the pile foundation hole, and both sides of the drill rod guide channel provided by the pile foundation construction base are provided with movable mechanisms for positioning and guiding the drill rod and can be movably arranged; the movable mechanisms all include a fixed base, the bottom end of the fixed base is connected and fixed to the pile foundation construction base on one side of the drill rod guide channel, and one end of the two fixed bases arranged oppositely is respectively provided with a guide hoop for positioning and guiding the drill rod, and the guide hoop and the fixed base are movably arranged. Through this fixing device, the "verticality" of the drill rod drilling can be observed and judged at any time, so that during the drilling of the foundation pit pile foundation, correction and adjustment can be made at any time, so as to ensure the "verticality" and quality requirements of the foundation pit pile foundation drilling. The technical solution proposed in the above invention improves the verticality of the pile foundation during the subsequent placement by ensuring the verticality of the pile foundation drilling. However, during the pile foundation placement process, there will still be external environmental factors such as crosswinds that may cause the verticality of the device to be unbalanced, thereby affecting the load-bearing performance and service life of the overall bridge in the later stage. Summary of the invention

[0005] Therefore, in order to solve the above technical problems, the present invention proposes a pile foundation construction device based on bridge engineering, which solves the technical problem that the pile foundation tilts during the process of sinking to the foundation due to external factors during bridge construction.

[0006] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a pile foundation construction device based on bridge engineering, comprising a support base for cooperating with a foundation, an auxiliary positioning device arranged on the support base, the support base is fixedly arranged on the foundation, the support base comprises an integrally formed support horizontal plate and a support vertical frame, the support vertical frame is arranged at the center position of the support horizontal plate, the support vertical frame and the support horizontal plate are perpendicular to each other, a first connecting through hole is arranged on the support vertical frame, the first connecting through hole penetrates the support vertical frame and continues to penetrate the support horizontal plate downward; The auxiliary positioning device is disposed in the first connecting through hole, and the auxiliary positioning device can be raised and lowered along the central axis direction of the first connecting through hole to receive the pile foundation.

[0007] Furthermore, the supporting transverse plate is provided with threaded holes on its four edges, and the supporting transverse plate is fixedly matched with the foundation by screws.

[0008] Furthermore, the auxiliary positioning device includes a connecting main pipe and a folding plate arranged at the end of the connecting main pipe. The folding plate is arranged on the connecting main pipe in a surrounding state. In an initial state, the angle between the folding plate and the central axis of the connecting main pipe is 45°-60°. When subjected to external force, the folding plate will shrink toward the central axis of the connecting main pipe until it is parallel to the central axis of the connecting main pipe.

[0009] Furthermore, a first guide groove is provided in the first connecting through hole, a first convex strip is provided on the outer circumferential side surface of the connecting main pipe, the first convex strip and the first guide groove are engaged with each other, a positioning hole is provided on the outer circumferential side surface of the supporting stand, the positioning hole is perpendicular to the first connecting through hole and passes through the first connecting through hole.

[0010] Furthermore, a second guide groove is provided on the inner circumferential side surface of the connecting main pipe, and projections of the second guide groove and the first guide groove on the vertical plane do not overlap each other.

[0011] Furthermore, a second convex strip is provided in the second guide groove, and the second guide groove vertically penetrates upward to the upper end of the connecting main pipe.

[0012] Furthermore, a driven gear is provided on the connecting main pipe in the second guide groove, the driven gear is provided at the top position of the second guide groove, the driven gear is provided with a first transmission tooth, the second convex strip is provided with a second transmission tooth, and the gathering plate is provided with a third transmission tooth. The first transmission tooth and the second transmission tooth are both meshed with the third transmission tooth, and the second convex strip and the gathering plate are provided at the left and right ends of the driven gear.

[0013] Furthermore, an elastic ball is provided on the second convex strip, and the elastic ball is arranged on one side of the second convex strip close to the inner side surface of the connecting main pipe. When the elastic ball is not subjected to force, it protrudes outward to a height higher than the surface of the second convex strip, and when subjected to force, it shrinks inward to a height flush with the surface of the second convex strip.

[0014] Furthermore, a buffer layer is provided on one side surface of the gathering plate close to the central axis of the connecting main pipe.

[0015] Furthermore, a vibration motor is integrated in the buffer layer, and the vibration motor automatically starts to perform vibration operation after the pile foundation enters the connection main pipe and releases the elastic ball.

[0016] By adopting the above technical solution, the beneficial effects of the present invention are: 1. Compared with the existing pile foundation construction devices for bridge projects, the advantage of the present invention is that it can ensure that the bridge pile foundation, especially the prefabricated beam bridge pile foundation, can be accurately positioned and kept in a vertical state during the installation process and firmly cooperate with the foundation. Specifically, during the installation process of the present invention, a support base is pre-arranged for stable cooperation with the foundation, and then the pile foundation below is hoisted from top to bottom to cooperate with the foundation, wherein the support base includes a support cross plate for improving the support performance and a support frame for receiving the pile foundation, wherein the support cross plate increases its stability by increasing the contact area with the foundation.

[0017] 2. The supporting horizontal plate in the present invention is stably matched with the foundation by fixing with screws on all sides, wherein the screw fixing method is a relatively stable and stable method in the field of building construction.

[0018] 3. The present invention further provides an auxiliary positioning device, which serves as a main function device and is connected to the support base in a movable connection manner, which is convenient for disassembly and assembly and on-site construction.

[0019] 4. The auxiliary positioning device in the present invention includes a connecting main pipe and a retracting plate, wherein the connecting main pipe is used to stably cooperate with the supporting base, and the function of the retracting plate is to be in an open state in the initial state, and the open state can produce a larger accommodation area on the horizontal plane, that is, it can have better tolerance for pile foundations lowered from high altitudes. Although the lowered pile foundation is affected by environmental factors such as crosswinds during the lowering process, it can be guaranteed that as long as it falls into the retracting area of ​​the retracting plate, it can continue to be lowered in a perfect state to cooperate with the foundation, and as the pile foundation is continuously lowered, the retracting plate will have a process of retracting toward the central axis of the connecting main pipe, and this process can assist the pile foundation to adjust its state, so that it continues to fall in a state perpendicular to the foundation, and when it falls to enter the first connecting through hole through the connecting main pipe, the connecting main pipe and the first connecting through hole jointly provide radial auxiliary positioning for the pile foundation, so that the pile foundation can be installed in a state completely perpendicular to the supporting base.

[0020] 5. The pile foundation in the present invention will pass through the retracting plate and then contact the elastic ball on the second convex strip during the lowering process, and the elastic ball will begin to play a positioning role, that is, when the elastic ball is subjected to the gravity generated by the falling of the pile foundation, it will drive the second convex strip to move downward, and the downward movement of the second convex strip will drive the driven gear to rotate, and further drive the third transmission tooth on the retracting plate to rotate. At this time, the retracting plate will synchronously produce an inward retracting action, and when the retracting plate retracts inward to surround the pile foundation, it stops working. At this time, the pile foundation continues to move downward, and the elastic ball that continues to be stressed will shrink inward into the second convex strip, which will not affect the falling installation process of the pile foundation.

[0021] 6. In the present invention, a buffer layer is provided on one side of the gathering plate close to the central axis of the connecting main pipe. The purpose of the buffer layer is to protect the outer surface of the pile foundation from damage while also protecting the gathering plate from damage, thereby providing a flexible contact surface for buffering between the two.

[0022] 7. The present invention integrates a vibration motor in the buffer layer, and the vibration motor works in conjunction with an elastic ball bearing, which serves as a starting point for driving the second convex strip to work. That is, when the folding plate contracts inward, the vibration motor starts to work, driving the folding plate to vibrate. The purpose of the vibration of the folding plate is to assist the pile foundation to quickly move toward the center when it contacts the side wall of the folding plate. At the same time, when the vibration of the folding plate is transmitted to the pile foundation, it can also shake off impurities on the outer surface of the pile foundation, so that it can smoothly enter the first connecting through hole on the connecting main pipe and the support base for construction and installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings: Figure 1It is a three-dimensional diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the front structure of the present invention; Figure 3 This is a cross-sectional view of the internal structure of the connecting pipe of the present invention; Figure 4 for Figure 3 Enlarged view of point A in the middle; Figure 5 It is a schematic diagram of the top view of the connecting main pipe in the present invention. DETAILED DESCRIPTION

[0024] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0025] See also Figure 1-Figure 5 The present invention provides a pile foundation construction device based on bridge engineering, comprising a support base 1 for cooperating with a foundation, an auxiliary positioning device 2 arranged on the support base 1, the support base 1 is fixedly arranged on the foundation, the support base 1 comprises an integrally formed support horizontal plate 11 and a support stand 12, the support stand 12 is arranged at the center of the support horizontal plate 11, the support stand 12 and the support horizontal plate 11 are perpendicular to each other, a first connecting through hole 122 is arranged on the support stand 12, the first connecting through hole 122 penetrates the support stand 12 and continues to penetrate the support horizontal plate 11 downward; The auxiliary positioning device 2 is arranged in the first connecting through hole 122. The auxiliary positioning device 2 can be raised and lowered along the central axis direction of the first connecting through hole 122 to support the pile foundation. The supporting cross plate 11 is provided with threaded holes 111 on its four edges. The supporting cross plate 11 is fixed to the foundation by screws.

[0026] The auxiliary positioning device 2 includes a connecting main pipe 21 and a folding plate 22 arranged at the end of the connecting main pipe 21. The folding plate 22 is arranged on the connecting main pipe 21 in a surrounding state. In the initial state, the folding plate 22 and the central axis of the connecting main pipe 21 form an angle of 45°. Under the action of external force, the folding plate 22 will shrink toward the central axis of the connecting main pipe 21 until it is parallel to the central axis of the connecting main pipe 21. A first guide groove 3 is arranged in the first connecting through hole 122. A first convex strip 31 is arranged on the outer circumferential side surface of the connecting main pipe 21. The first convex strip 31 and the first guide groove 3 are engaged with each other. A positioning hole 121 is arranged on the outer circumferential side surface of the supporting stand 12. The positioning hole 121 is perpendicular to the first connecting through hole 122 and passes through the first connecting through hole 122.

[0027] A second guide groove 211 is provided on the inner circumferential side surface of the connecting main pipe 21, and the projections of the second guide groove 211 and the first guide groove 3 on the vertical plane do not overlap each other. A second convex strip 5 is provided in the second guide groove 211, and the second guide groove 211 vertically penetrates upward to the upper end of the connecting main pipe 21. A driven gear 4 is provided in the second guide groove 211 on the connecting main pipe 21, and the driven gear 4 is arranged at the top position of the second guide groove 211. A first transmission tooth 41 is provided on the driven gear 4, and a second transmission tooth 51 is provided on the second convex strip 5. A third transmission tooth 221 is provided on the gathering plate 22, and the first transmission tooth 41 and the second transmission tooth 51 are provided on the second convex strip 5. 221 are meshed with the third transmission tooth 51, the second convex strip 5 and the gathering plate 22 are arranged at the left and right ends of the driven gear 4, the second convex strip 5 is provided with an elastic ball 6, the elastic ball 6 is arranged on the second convex strip 5 on the side close to the inner side of the connecting main pipe 21, the elastic ball 6 protrudes outward to a height higher than the surface of the second convex strip 5 when no force is applied, and shrinks inward to a height flush with the surface of the second convex strip 5 when force is applied, a buffer layer is provided on one side of the gathering plate 22 close to the central axis of the connecting main pipe 21, a vibration motor is integrated in the buffer layer, and the vibration motor automatically starts to perform vibration operation after the pile foundation enters the connecting main pipe and the elastic ball is released.

[0028] The buffer layer is a rubber layer, which is directly covered on the outer surface of the gathering plate 22 by hot-melt method, and the vibration motor is arranged in the buffer layer in an integrated manner.

[0029] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0030] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A pile foundation construction device based on bridge engineering, comprising a support base for cooperating with a foundation, and an auxiliary positioning device arranged on the support base, characterized in that: The support base is fixedly arranged on the foundation, and the support base includes an integrally formed support horizontal plate and a support vertical frame, the support vertical frame is arranged at the center position of the support horizontal plate, the support vertical frame and the support horizontal plate are perpendicular to each other, and a first connecting through hole is arranged on the support vertical frame, and the first connecting through hole penetrates the support vertical frame and continues to penetrate the support horizontal plate downward; The auxiliary positioning device is disposed in the first connecting through hole, and the auxiliary positioning device can be raised and lowered along the central axis direction of the first connecting through hole to receive the pile foundation.

2. A pile foundation construction device based on bridge engineering according to claim 1, characterized in that: The supporting transverse plate is provided with threaded holes on its four edges, and the supporting transverse plate is fixedly matched with the foundation by screws.

3. A pile foundation construction device based on bridge engineering according to claim 2, characterized in that: The auxiliary positioning device includes a connecting main pipe and a retracting plate arranged at the end of the connecting main pipe. The retracting plate is arranged on the connecting main pipe in a surrounding state. In an initial state, the angle between the retracting plate and the central axis of the connecting main pipe is 45°-60°. Under the action of external force, the retracting plate will shrink toward the central axis of the connecting main pipe until it is parallel to the central axis of the connecting main pipe.

4. A pile foundation construction device based on bridge engineering according to claim 3, characterized in that: A first guide groove is arranged in the first connecting through hole, a first convex strip is arranged on the outer circumferential side surface of the connecting main pipe, the first convex strip and the first guide groove are engaged with each other, a positioning hole is arranged on the outer circumferential side surface of the supporting stand, the positioning hole is perpendicular to the first connecting through hole and passes through the first connecting through hole.

5. A pile foundation construction device based on bridge engineering according to claim 4, characterized in that: A second guide groove is arranged on the inner circumferential side surface of the connecting main pipe, and projections of the second guide groove and the first guide groove on the vertical plane do not overlap each other.

6. A pile foundation construction device based on bridge engineering according to claim 5, characterized in that: A second convex strip is arranged in the second guide groove, and the second guide groove penetrates upward to the upper end of the connecting main pipe in the vertical direction.

7. A pile foundation construction device based on bridge engineering according to claim 6, characterized in that: A driven gear is arranged on the connecting main pipe in the second guide groove, the driven gear is arranged at the top position of the second guide groove, the driven gear is arranged with a first transmission tooth, the second convex strip is arranged with a second transmission tooth, the gathering plate is arranged with a third transmission tooth, the first transmission tooth and the second transmission tooth are both meshed with the third transmission tooth, and the second convex strip and the gathering plate are arranged at the left and right ends of the driven gear.

8. A pile foundation construction device based on bridge engineering according to claim 7, characterized in that: An elastic ball is arranged on the second convex strip, and the elastic ball is arranged on one side of the second convex strip close to the inner side surface of the connecting main pipe. When the elastic ball is not subjected to force, it protrudes outward to a height higher than the surface of the second convex strip, and when subjected to force, it shrinks inward to a height flush with the surface of the second convex strip.

9. A pile foundation construction device based on bridge engineering according to claim 8, characterized in that: A buffer layer is arranged on one side surface of the gathering plate close to the central axis of the connecting main pipe.

10. A pile foundation construction device based on bridge engineering according to claim 9, characterized in that: A vibration motor is integrated in the buffer layer, and the vibration motor automatically starts to perform vibration operation after the pile foundation enters the connecting main pipe and releases the elastic ball.