Drilling, anchoring and grouting integrated equipment for road engineering construction

By designing an integrated slope reinforcement equipment with integrated drilling, anchoring and grouting functions, the problem of long equipment replacement and debugging time in the prior art is solved, and the efficiency and applicability of slope reinforcement are improved.

CN119466568AInactive Publication Date: 2025-02-18QINGDAO BAOTIAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411411094.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing slope reinforcement technology, single functional equipment is used in the drilling, anchoring and grouting processes, resulting in long time for equipment replacement and debugging and low efficiency.

Method used

Design an integrated drilling, anchoring and grouting equipment, integrating drilling, anchoring and grouting functions, and realize multi-functional operation by pushing motors, cleaning components and grouting components.

Benefits of technology

It significantly simplifies the slope reinforcement process, reduces equipment procurement and maintenance costs, improves operating efficiency, and is suitable for mountainous areas in harsh environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119466568A_ABST
    Figure CN119466568A_ABST
Patent Text Reader

Abstract

The invention relates to the field of road engineering slope protection equipment, in particular to drilling, anchoring and grouting integrated equipment for road engineering construction, which comprises a base, and an equipment bin is arranged on the base; the arm rod is arranged above the base, the bottom wall of the arm rod is connected with the base, an anchor rod bin is formed in the arm rod and used for containing an anchor rod, and an opening is formed in one end wall of the anchor rod bin; the supporting assembly is arranged between the arm rod and the base, is connected with the arm rod and the base and is used for adjusting the inclination angle of the arm rod; the pushing motor is slidably connected to the top end of the arm rod, and the end of an output shaft of the pushing motor is provided with a connecting piece used for connecting the anchor rod and the drill rod. The cleaning assembly is arranged at the bottom of the arm rod and used for cleaning muck in the drill hole; and the grouting assembly is arranged on the base and used for grouting the drill hole. The method has the effects that the efficiency of the slope reinforcing process is improved, and the road construction period is reasonably shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of road engineering slope protection equipment, and in particular to an integrated drilling, anchoring and grouting equipment for road engineering construction. Background Art

[0002] Slope refers to the slope part extending outward from the edge of the roadbed on the cross section of the road, and sometimes also refers to the slopes on both sides of the road. In road construction, slope construction is an important component, and its design and construction are very important for the stability and safety of the road, especially in mountainous road construction. The importance of slopes is particularly significant. The geological conditions in mountainous areas are complex, and slopes are easily affected by natural disasters such as landslides and mud-rock flows. Through reasonable slope design and reinforcement, the stability of the slope can be significantly improved.

[0003] The slope reinforcement process is relatively complicated. First, a scaffolding is built. After the technicians calculate the drilling angle, they use a drill rod to drill the hole, pull out the drill rod and clean the hole, and then inject grout. After the concrete slurry solidifies, subsequent slope surface reinforcement measures are taken to prevent surface collapse.

[0004] Nowadays, slope reinforcement technology has become more mature and a fixed reinforcement process system has been formed. However, the functions of the devices used in the slope reinforcement process are still relatively simple. For example, the drilling process uses drilling equipment, the grouting process uses grouting pumps and grouting pipes, and the anchoring process is usually done manually to manually send the anchor rod into the borehole.

[0005] Therefore, based on the above slope reinforcement process, if a multifunctional integrated equipment is designed and applied to the above drilling, anchoring and grouting processes, it can save the time of staff in replacing and debugging equipment and improve the efficiency of the slope reinforcement process. Summary of the invention

[0006] In order to improve the efficiency of the slope reinforcement process and reasonably shorten the road construction period, the present application provides an integrated drilling, anchoring and grouting equipment for road engineering construction.

[0007] The present application provides an integrated drilling, anchoring and grouting equipment for road engineering construction, which adopts the following technical solution: An integrated drilling, anchoring and grouting device for road engineering construction comprises a base, an equipment compartment is arranged on the base, and further comprises: An arm is arranged above the base, and its bottom wall is connected to the base. An anchor rod bin is provided in the arm, and the anchor rod bin is used to place anchor rods. One end wall of the anchor rod bin is open; A support assembly is disposed between the arm and the base, connects the arm and the base, and adjusts the tilt angle of the arm; A driving motor is slidably connected to the top of the arm, and a connecting piece for connecting an anchor rod and a drill rod is provided at the end of its output shaft; A cleaning assembly, arranged at the bottom of the arm, for cleaning the debris in the drill hole; The grouting assembly is arranged on the base and is used for injecting grout into the drill hole.

[0008] By adopting the above technical solution, the base is the supporting structure of the equipment components in the above technical solution, and the equipment bin is arranged on one side of the base for installing and protecting the components arranged inside the base; the arm is the main component for drilling, anchoring and grouting, and the anchor bin opened inside the arm is used to place the anchors in the anchoring process, and one end of the anchor bin is open, and the construction personnel can place the anchors in the anchor bin according to the open end of the anchors to replenish the anchors in the anchor bin; The push motor is connected to the arm rod by sliding along the length direction of the arm rod, sliding from one end of the arm rod to the other end, and the piston rod end of the push motor is connected to the anchor rod or drill rod through the connecting piece. During the drilling process, the push motor is pushed forward, and the output shaft of the push motor rotates, and the drill rod rotates and feeds to drill holes on the slope. After the drilling is completed, the push motor is retracted, and the drill rod is pulled out of the borehole. Then, the dust in the borehole is cleaned by the cleaning component, and the anchor rod in the anchor rod bin is installed on the connecting piece. The push motor is fed again to deliver the anchor rod to the borehole, and finally grouting is performed by the grouting component. To complete the above process, the construction personnel need to calculate the injection inclination angle of the anchor rod in advance, and adjust the inclination angle of the arm with the help of the support assembly according to the calculation result, so that the arm meets the injection inclination angle. The change of the inclination angle of the arm needs to be achieved by the support assembly. The support assembly connects the base and the arm, and adjusts the inclination angle of the arm under the stable support of the base.

[0009] Optionally, also include: A plurality of rack rods are arranged on two opposite side walls of the arm rod, and the plurality of rack rods are distributed along the length direction of the arm rod; The screw groove is fixedly connected to the bottom end of the frame rod, and the inner thread is connected with a screw, and the top end of the driving motor is threadedly connected to the screw.

[0010] By adopting the above technical solution, the sliding drive of the push motor along the arm is realized. If the sliding drive of the push motor is arranged in the anchor rod bin inside the arm rod, it will affect the installation and placement of the anchor rod bin. Therefore, the sliding drive of the push motor is moved out of the anchor rod bin and placed above the anchor rod bin, and supported by multiple racks. The frame rod supports the groove wall of the screw groove. The above-mentioned sliding drive component is a screw that is rotatably connected in the screw groove. The top of the pushing motor is threadedly connected to the screw. The pushing motor slides along the screw groove through the rotation of the screw. A slider that adapts to the screw groove can also be threadedly connected to the screw. The sliding drive of the pushing motor is realized by fixing the slider to the pushing motor.

[0011] Optionally, also include: A lifting frame is vertically slidably connected to the anchor rod compartment, and the lifting frame is arranged in layers, respectively used to place the anchor rod and the drill rod; A lifting power member is arranged on the bottom wall of the anchor bar bin and is used for lifting the lifting frame.

[0012] By adopting the above technical solution, the lifting frame and the lifting power part are both used to provide auxiliary installation of the anchor rod in the anchor rod bin. During the preparation work, the construction personnel place the pre-made anchor rod in the anchor rod bin through the open end of the anchor rod bin, and then adjust the angle and position of the arm rod, and the construction personnel install the anchor rod on the output shaft of the pushing motor, and push the anchor rod in the anchor rod bin into the drilled hole through the pushing motor; in the process of docking the anchor rod in the above anchor rod bin and the pushing motor, the lifting power part first lifts the lifting frame until one end of the anchor rod is aligned with the output shaft of the pushing motor, and the two are flush in height, and then the relevant personnel push the anchor rod to dock and install one end of it with the connecting piece on the output shaft of the pushing motor; In addition, in the above scheme, for the anchor rod that is aligned with the output shaft of the driving motor, a power piece can be added to the lifting frame to replace the manual pushing of the anchor rod by the construction personnel; In the above scheme, the lifting frame is arranged in layers, and the space in the anchor rod bin is divided into multiple layers, and each layer is used to pack different types of rod bodies. Since the implementation environment of this scheme is limited to slope reinforcement, usually only anchor rods and drill rods are required. Therefore, the lifting frame can be divided into two layers, one of which is used to place drill rods and the other is used to place anchor rods. Generally speaking, drill rods are placed on the upper layer of the lifting frame and anchor rods are placed on the lower layer of the lifting frame. Before the lifting power unit is operated, the lower anchor rods and the upper drill rods are stored in the anchor rod groove. The opening end of the anchor rod bin is opened corresponding to the lower layer of the frame rod, that is, before the lifting power unit is operated, the construction personnel can directly push the anchor rods into the lower lifting frame.

[0013] Optionally, the support assembly includes: A support seat is arranged above the base, and a support cylinder is hinged on the support seat; A support block is arranged at the bottom end of the arm rod. A pushing member is fixedly connected inside the support block to push the arm rod to rise and fall. The piston rod end of the support cylinder is hinged to the outer bottom wall of the support block.

[0014] By adopting the above technical solution, the support seat and the support block are used to change the inclination angle of the arm, which is achieved by the support cylinder arranged on the support seat. The support cylinder is arranged to be tilted, and the bottom end of the cylinder body is hinged, so that the inclination angle of the support cylinder body itself can be changed. The piston rod end of the support cylinder is hinged to the bottom end of the support block, and the inclination angle of the support block and the arm is controlled by controlling the extension length of the support cylinder. During the change of the arm angle, the two ends of the support cylinder are hinged so that it can rotate flexibly. A pusher is arranged in the support block, which makes the arm rise and fall on the basis of a fixed inclination angle when the inclination angle of the arm is changed, and changes the height of the arm so that different parts of the arm are aligned with different height parts of the slope.

[0015] Optionally, the cleaning component includes: An air chamber is provided at the bottom end of the arm and below the anchor chamber, and an air nozzle is provided at a portion of one end of the arm corresponding to the air chamber, and the air nozzle is connected to the air chamber; A gas rod is arranged in the gas bin, with its length direction parallel to the length direction of the gas bin, the inside of the gas rod is hollowed out, and one end of the gas rod is provided with a gas port connected to the inside of the gas rod; A sealing plate is formed at one end of the gas rod away from the gas nozzle, the size of the sealing plate is the same as the size of the gas chamber, and a portion of the sealing plate corresponding to the gas rod is pierced with a through hole connected to the inside of the gas rod; The air pump is arranged in the equipment bin and is connected to the air bin through an air pipe.

[0016] By adopting the above technical solution, the cleaning component is used to clean the dust in the hole after drilling a hole on the slope soil. The above solution uses high-pressure airflow to blow out the dust in the hole. Therefore, it is necessary to send one end of the air outlet of the cleaning component into the bottom of the hole, and the airflow mixed with dust from the bottom of the hole is blown out from the hole of the hole. The key point of the technical solution is to send the air outlet part into the bottom of the hole. It is realized through an air bin, an air rod, and an air pump. The air pump is arranged in the equipment bin on the base, and mainly plays the role of conveying airflow to the air bin through the air pipe. In the above scheme, it is used as an air source. The air bin is opened at the bottom of the arm, that is, the part below the anchor bin. The air bin and the anchor bin are not connected and are independent. Both ends of the air bin extend to both ends of the arm. The air pipe connected to the air pump is plugged into one end of the air bin, and airflow is sent into the air bin from one end of the air bin. The airflow inside the air bin can also be sucked out from the end of the air bin to increase or decrease the air pressure in the air bin. An air rod is arranged in the air bin. The air rod is a hollowed-out tube, one end of which is an air outlet. The air outlet of the air rod is arranged at the end of the air rod away from the air inlet end of the air bin. A vertically arranged sealing plate is formed at the end of the air rod away from its own air outlet, that is, the end of the air rod close to the air inlet of the air bin. The size of the sealing plate is the same as that of the air bin. The edges of the sealing plate on multiple sides are fitted with the inner wall of the corresponding side of the air bin. A perforation is arranged on the sealing plate corresponding to the air rod. Therefore, in the process of the air pipe continuously supplying air to the air bin, the air pressure on one side of the sealing plate inside the air bin gradually increases, pushing the air rod to move along the air bin to one end of the air nozzle, until the air rod extends out of the air nozzle and extends into the bottom of the drilled hole. In practical applications, sealing lips may be provided between the sealing plate and the inner walls of the gas chamber, and rubber seals in the prior art may be sufficient.

[0017] Optionally, also include: The sealing valve is arranged on the sealing plate and corresponds to the perforation of the sealing plate, and is used to block or open the perforation.

[0018] By adopting the above technical solution, the sealing valve is used to conduct or close the perforation on the above sealing plate. When the air pipe injects air into the air bin, the sealing valve closes the perforation, so that the air bin and the inside of the air rod are not connected. The air pressure on the air inlet side of the sealing plate gradually increases, pushing the air rod to slide. After the air outlet of the air rod extends into the bottom of the drilled hole, the sealing valve opens to blow the air out from the air outlet of the air rod. In the above process, it is necessary to reasonably control the airflow delivery speed in the gas chamber. During the sliding stage of the gas rod, the sealing valve is closed. If the airflow delivery speed is too fast at this time, the pressure in the gas chamber will increase suddenly, causing the gas rod to protrude instantly and be inserted into the drill hole, which may easily damage the hole wall of the drill hole. Therefore, during the sealing valve closing stage, the airflow velocity should be maintained in the preset speed range. When the sealing valve is opened, the airflow velocity is enhanced to blow out the dust in the drill hole.

[0019] It is recommended that the sealing valve in the above scheme be implemented by an electrically controllable solenoid valve.

[0020] Optionally, the grouting assembly comprises: A grouting bin, arranged in the equipment bin and used for containing concrete slurry; A grouting pump is arranged in the equipment compartment, and a grouting pipe is connected to a grouting outlet of the grouting pump; A winding device is arranged at the bottom of one end of the arm and is used for winding the grouting pipe.

[0021] By adopting the above technical solution, the grouting bin and the grouting pump are used for the grouting process after drilling and cleaning. The grouting bin is filled with concrete slurry. The grouting pump provides the conveying power of the concrete slurry, and outputs the concrete slurry from the grouting bin through the grouting pipe. One end of the grouting pipe is connected to the grouting bin, and the other end is wound on the winding device. During grouting, the construction personnel can remove the grouting pipe from the winding device. The winding device can be a cylindrical structure with a hollow interior, which rotates around an axis. One end of the winding device is connected to the grouting bin through a section of grouting pipe, and the other end is connected to another section of grouting pipe. Therefore, construction personnel only need to rotate the winding device to tighten and lower the grouting pipe without manual winding.

[0022] Optionally, the connecting piece includes: The connecting rod is arranged horizontally and has a threaded hole at one end; The clamping disk is fixedly connected to one end of the connecting rod close to the threaded hole, the surface of the clamping disk protrudes from the end surface of the connecting rod, and the clamping disk is composed of multiple independent parts, and the multiple independent parts slide radially.

[0023] By adopting the above technical solution, the connector provides two connection methods at the same time, namely, the threaded connection at one end of the connecting rod and the clamping of the clamping disk, wherein the threaded connection at the end of the connecting rod is used to fix the drill rod. Due to the need for drilling holes with the drill rod, if the clamping disk is used to fix the drill rod, when the drill rod rotates to drill holes, the part connected between the clamping disk and the drill rod is prone to relative rotation and friction, which damages the clamping disk and reduces the drilling effect of the slope. Therefore, a threaded connection method that is easy to disassemble and assemble is selected, a threaded hole is opened at one end of the connecting rod, and a thread that is adapted to the threaded hole is opened at the end of the drill rod, so that one end of the drill rod is threadedly connected to the connecting rod; In this technical solution, the clamping disc is used to clamp the anchor rod. In actual road engineering, the anchor rod is usually composed of multiple steel bars, and its diameter depends on the diameter and number of the steel bars. The various parts of the clamping disc slide radially to clamp the anchor rods of different diameters. The clamping disc can use a three-jaw chuck.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application integrates the three core functions of drilling, anchoring and grouting into a single device through an integrated design, which significantly simplifies the complex process of traditional slope reinforcement, reduces equipment procurement and maintenance costs, and improves operating efficiency; 2. By setting up multifunctional connectors, the drill rod and anchor rod can be quickly switched, which reduces the equipment replacement time, ensures the continuity of construction, and further improves the efficiency of slope reinforcement operations; 3. The application has a reasonable structural design and is easy to operate. It is particularly suitable for areas with harsh natural environments and complex working conditions such as mountainous areas, effectively reducing safety hazards and improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.

[0026] Figure 2 This is a cross-sectional view of the support seat made to highlight the support cylinder in the embodiment of the present application.

[0027] Figure 3 It is a structural diagram used to highlight the internal structure of the anchor bin in the embodiment of the present application.

[0028] Figure 4 It is a structural schematic diagram used to highlight the clamping disk in the embodiment of the present application.

[0029] Figure 5 It is a structural schematic diagram made to highlight the two ends of the gas rod in the embodiment of the present application.

[0030] Figure 6 It is a schematic diagram of the overall structure from another angle of the embodiment of the present application.

[0031] Explanation of the accompanying drawings: 1. Base; 11. Equipment compartment; 2. Support seat; 21. Support cylinder; 22. Support block; 3. Arm; 31. Anchor compartment; 32. Frame rod; 33. Push motor; 34. Connecting rod; 35. Clamping plate; 351. Clamping block; 352. Threaded hole; 36. Lifting frame; 37. Lifting cylinder; 38. Air compartment; 381. Air nozzle; 382. Air rod; 383. Sealing plate; 384. Sealing valve; 4. Grouting pipe; 41. Winding roller. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1-6 This application is described in further detail.

[0033] The present application embodiment discloses an integrated drilling, anchoring and grouting equipment for road engineering construction. Figure 1 A drilling, anchoring and grouting integrated equipment for road engineering construction includes a base 1 and a crawler arranged under the base 1. The base 1 moves by the crawler. An equipment warehouse 11 is arranged on the base 1. A chamber for holding concrete slurry is opened in the equipment warehouse 11. The concrete slurry inside is used for the grouting process of the slope.

[0034] Reference Figure 1 and Figure 2 A support base 2 is fixedly connected to the base 1. This embodiment does not limit the shape of the support base 2. In order to improve the stability of the support base 2, one end of the support base 2 is connected to a side wall of the equipment bin 11 in this embodiment; a top groove is provided on the top part of the support base 2, and a support cylinder 21 is hinged in the top groove. One end of the cylinder bottom of the support cylinder 21 is hinged to the side wall of the top groove, and the support cylinder 21 is inclined.

[0035] Reference Figure 1 and Figure 2 An arm 3 is arranged above the base 1, the main part of the arm 3 is located above the support seat 2, one end of the arm 3 in the length direction extends to the top of the equipment bin 11, and a support block 22 is fixedly connected to the bottom wall of the arm 3 located above the support seat 2. One end of the bottom end of the support block 22 is hinged to the support seat 2, and the bottom end of the support block 22 is hinged to the piston rod end of the above-mentioned support cylinder 21. Driven by the support cylinder 21, the support block 22 and the arm 3 rotate. In order to improve the stability of the arm 3, another support cylinder 21 is arranged between the arm 3 and the equipment bin 11, the cylinder bottom of the support cylinder 21 is hinged to the outer top wall of the equipment bin 11, and the piston rod end of the support cylinder 21 is hinged to the bottom wall of the arm 3.

[0036] As a result, the piston rod of the support cylinder 21 extends, causing the end of the arm 3 above the equipment bin 11 to rotate upward, causing the arm 3 to tilt, and the piston rod of the support cylinder 21 is retracted, causing the end of the arm 3 above the equipment bin 11 to rotate downward.

[0037] Reference Figure 1 and Figure 3 , a plurality of cylinders are fixedly connected in the support block 22, and a groove for accommodating the cylinder is opened in the support block 22 corresponding to each cylinder, and the cylinder body of each cylinder is fixedly connected to the inside of the support block 22, perpendicular to the bottom wall of the support block 22, and the piston rod end of the cylinder is fixedly connected to the bottom wall of the arm 3, driving the arm 3 to rise and fall as a whole. Therefore, after the above-mentioned inclination angle of the arm 3 is fixed, the cylinder drives the arm 3 to rise and fall while maintaining the angle, changing the height of the arm 3, and improving the flexibility of the arm 3.

[0038] Reference Figure 1 and Figure 3 An anchor rod bin 31 is provided inside the arm 3 for holding anchor rods and drill rods used in the anchoring process. The arm 3 is hollowed out inside and the top wall is opened, so that the arm 3 is in a shell shape as a whole. A plurality of rack rods 32 are fixedly connected to the opposite side walls of the arm 3. The rack rods 32 on the opposite side walls are symmetrically distributed. A screw groove is fixedly connected to the top of the plurality of rack rods 32. The length direction of the screw groove is parallel to the length direction of the arm 3. The screw groove is supported by the rack rod 32 and is arranged above the arm 3 in parallel with the arm 3. The screw groove and the rack rod 32 are in a door shape, so that the part between the screw groove and the rack rod 32 is separated by a preset distance. A screw is rotatably connected in the screw groove, and the length direction of the screw is parallel to the length direction of the screw groove. A motor is rotatably connected to one end of the screw groove. The output shaft of the motor passes through the wall of the screw groove and is fixedly connected to one end of the screw. The operation of the motor drives the screw to rotate. A slider is slidably connected in the screw groove. The slider is threadedly connected to the screw. The slider is adapted to the size of the screw groove so that it can slide along the screw groove as the screw rotates. A push motor 33 is fixedly connected to the bottom of the slider to drive the push motor 33 to slide. In this embodiment, the push motor 33 slides along the arm 3 as a telescopic drive for the anchor rod and the drill rod. The construction personnel fix the drill rod to the output shaft of the push motor 33. When the push motor 33 slides along the arm 3, its output shaft rotates to drive the drill rod to rotate, completing the drilling process; the construction personnel fix the anchor rod to the output shaft of the push motor 33, and the push motor 33 slides, driving the anchor rod to slide until the anchor rod is inserted into the drill hole.

[0039] Reference Figure 3 and Figure 4The output shaft end of the pushing motor 33 is fixedly connected to a horizontally arranged connecting rod 34, and the connecting rod 34 rotates synchronously with the output shaft. A threaded hole 352 is provided at one end of the connecting rod 34 away from the pushing motor 33; a clamping disk 35 is fixedly connected to one end of the connecting rod 34 away from the pushing motor 33, and the disk surface of the clamping disk 35 protrudes from the end of the connecting rod 34. The clamping disk 35 is disc-shaped as a whole, and a fixing hole is provided in the center part. The diameter of the fixing hole is larger than the aperture of the threaded hole 352, and the hole wall of the fixing hole is inclined toward the threaded hole 352, that is, the aperture of the fixing hole decreases in the direction close to the threaded hole 352; the clamping disk 35 is composed of a plurality of independent parts with the same angle and the same structure, and each part is fixedly connected to the connecting rod 34 at one end close to the connecting rod 34. The clamping disk 35 is composed of an elastic material, and each independent part thereof can undergo quantitative deformation. In this embodiment, the connecting piece on the output shaft of the driving motor 33 provides two connection methods, the threaded connection of the threaded hole 352 and the elastic clamping of the clamping plate 35. The threaded connection of the threaded hole 352 is more stable and is used to fix the drill rod during the drilling process. The construction personnel install the drill rod with a thread matching the threaded hole 352 into the threaded hole 352 and tighten it to fix the threaded rod; the elastic clamping of the clamping plate 35 is more convenient and is used to send the anchor rod into the drill hole during the anchoring process. During the insertion process of the anchor rod with a larger diameter in the fixing hole of the clamping plate 35, it will press against the inclined side wall of the fixing hole of the clamping plate 35, and prop open the clamping plate 35 until the anchor rod is inserted into the end of the fixing hole of the clamping plate 35 and presses against the connecting rod 34.

[0040] Reference Figure 3, a lifting frame 36 is arranged in the anchor rod bin 31 arranged inside the arm 3, and the main structure of the lifting frame 36 is composed of a plurality of lifting plates arranged horizontally, the diameters of the plurality of lifting plates are adapted to the size of the anchor rod bin 31, and the plurality of lifting plates are arranged at different heights of the anchor rod bin 31, and the top wall and the bottom wall at the corners of each lifting plate are fixed or integrally formed with supporting feet to connect each lifting plate to form a whole, which is the lifting frame 36; the lifting frame 36 divides the anchor rod bin 31 into multiple layers, which are respectively used to hold different rod-shaped structural members required for the slope reinforcement process such as anchor rods and drill rods. In this embodiment, a double-layer lifting frame 36 is used as an example. The double-layer lifting frame 36 divides the anchor rod bin 31 into two layers, wherein the upper layer is used to hold drill rods, and the lower layer is used to hold anchor rods. One end wall of the anchor rod bin 31 corresponds to the lower layer of the lifting frame 36, that is, the anchor rod layer is provided with a through hole, which is used to place the anchor rod used in the anchoring process in the anchor rod bin 31. A plurality of lifting cylinders 37 are arranged on the bottom wall of the anchor bin 31 below the lifting frame 36. The lifting cylinders 37 serve as lifting power parts. The lifting cylinders 37 are arranged perpendicular to the bottom wall of the anchor bin 31. The bottom end of the cylinder body is fixedly connected to the bottom wall of the anchor bin 31, and the end of the piston rod is fixedly connected to the bottom end of the lifting frame 36. The lifting frame 36 is pushed up and down by the piston rod of the lifting cylinder 37, so that the drill rods on the upper layer of the lifting frame 36 and the anchor rods on the lower layer can be transported upward until the ends of the anchor rods and drill rods on the lifting frame 36 are flush with the end of the output shaft on the pushing motor 33, and can be connected by relevant personnel.

[0041] Reference Figure 3 and Figure 5An air bin 38 is provided at the bottom of the arm 3 and below the anchor bin 31. The air bin 38 is independent of the anchor bin 31 and is not connected. A perforation is provided at one end of the arm 3 corresponding to the air bin 38 to connect the air bin 38 with the outside world, and an air nozzle 381 is formed at the part of the arm 3 corresponding to the perforation; an air rod 382 is provided in the air bin 38, and the length direction of the air rod 382 is parallel to the length direction of the air bin 38. The end of the air rod 382 close to the air nozzle 381 has a smaller diameter and is a tip. The inside of the air rod 382 is hollowed out so that the air rod 382 is tubular as a whole. The tip of the air rod 382 is provided with an air port connected to the inside of the air rod 382, ​​and the end of the air rod 382 away from the air nozzle 381 is fixedly connected or integrally formed with a sealing plate 383, and the sealing plate 383 is arranged perpendicular to the bottom wall of the air bin 38, and its four side edges are pressed against the air bin 3 8 side walls, the side edges of the sealing plate 383 are sealed with the inner walls of the air bin 38 on each side, so that the air bin 38 spaces on both sides of the sealing plate 383 are blocked, and the sealing plate 383 is provided with a perforation connected to the inside of the air pipe, and the sealing plate 383 is provided with a sealing valve 384 corresponding to the perforation. In this embodiment, the sealing valve 384 adopts an electromagnetic valve, and the construction personnel can control the opening and closing of the electromagnetic valve by electric control, thereby controlling the conduction between the air bin 38 space on one side of the sealing plate 383 and the internal space of the air rod 382; the end of the arm 3 away from the air nozzle 381 is connected to the part of the air bin 38 corresponding to the air bin 38 with an air pipe, one end of the air pipe is plugged into the arm 3 and connected to the air bin 38, and the other end is plugged into the equipment bin 11, and a fan connected to the air pipe is provided in the equipment bin 11, and the air outlet of the fan supplies air to the air bin 38 through the air pipe.

[0042] Therefore, after the drilling is completed, the construction personnel align the air nozzle 381 with the drill hole in advance, and then the fan supplies air to the inside of the air bin 38, and the sealing valve 384 is closed, so that the air bin 38 space near the air pipe side of the sealing plate 383 is sealed. As the air pipe continues to input air, the air pressure in the air bin 38 increases, pushing the air rod 382 to slide to the side of the air nozzle 381, and protruding from the air nozzle 381, until the air rod 382 is transported to the inside of the drill hole. After one end of the air port of the air rod 382 extends to the bottom of the air hole, the sealing valve 384 is opened, and the air flow enters the inside of the air pipe and is output from the air port, and then the air flow is blown out from the bottom of the drill hole at high speed.

[0043] Replay Figure 1In this embodiment, the chamber inside the equipment bin 11 for holding concrete is a grouting bin. A grouting pump is also provided in the equipment bin 11. The grouting pump is connected to the grouting bin through a pipeline to extract the concrete slurry in the grouting bin; a grouting pipe 4 is provided on the base 1. One end of the grouting pipe 4 is fixed to the bin wall of the equipment bin 11 and extends into the equipment bin 11, connected to the slurry outlet of the grouting pump, and conveys the concrete slurry extracted from the grouting bin by the grouting pump. Since the grouting pipe 4 needs to extend into the bottom of the borehole during the grouting process, the length of the grouting pipe 4 needs to meet the requirements. In this embodiment, a horizontally arranged winding roller 41 is rotatably connected to one end of the arm 3 for winding the grouting pipe 4; when performing the grouting process, the construction personnel rotate the winding roller 41, remove the grouting pipe 4 and insert it into the borehole.

[0044] The implementation principle of the integrated drilling, anchoring and grouting equipment for road engineering construction in an embodiment of the present application is as follows: construction personnel operate the integrated drilling, anchoring and grouting equipment to bring it close to the slope that needs to be reinforced, and operate the structures and devices provided on the equipment to perform the drilling, anchoring and grouting processes in sequence according to the data results pre-calculated by the technicians.

[0045] First, according to the angle calculated in advance by the technicians, the construction personnel operate the support cylinder 21 to make the arm 3 have a preset tilt angle. The tilt angle of the arm 3 determines the drilling angle of the slope and the angle of the anchor rod. The construction personnel transport the anchor rod from the open end of the arm 3 to the anchor rod bin 31.

[0046] The lifting cylinder 37 operates to lift the lifting frame 36, so that the drill rod on the upper layer of the lifting frame 36 is aligned with the connecting rod 34 on the push motor 33, and the construction personnel tighten the drill rod to fix it. The screw rotates to drive the push motor 33 to slide along the arm 3, and the push motor 33 rotates while sliding, driving the drill rod to drill a hole. When the drill rod completes the drilling process, the push motor 33 is withdrawn, and the construction personnel remove the drill rod, and the drilling process is completed.

[0047] The piston rod of the lifting cylinder 37 continues to extend, so that the anchor rod on the lower layer of the lifting frame 36 is aligned with the connecting rod 34, and the anchor rod is clamped by the clamping plate 35, pushing the motor 33 to slide, driving the anchor rod to move downward and be inserted into the drill hole.

[0048] Then the construction personnel take down the grouting pipe 4 from the winding roller 41 and insert the grouting pipe 4 into the drill hole to complete the grouting process.

[0049] Finally, the construction workers replenished the anchor rods immediately.

[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An integrated drilling, anchoring and grouting device for road engineering construction, comprising a base (1), wherein an equipment compartment (11) is arranged on the base (1), characterized in that: Also includes: An arm (3) is arranged above the base (1), and its bottom wall is connected to the base (1). An anchor rod bin (31) is provided in the arm (3), and the anchor rod bin (31) is used to place anchor rods. One end wall of the anchor rod bin (31) is open. A support assembly is arranged between the arm (3) and the base (1), connects the arm (3) and the base (1), and adjusts the inclination angle of the arm (3); A driving motor (33) is slidably connected to the top of the arm (3), and a connecting piece for connecting an anchor rod and a drill rod is provided at the end of the output shaft thereof; A cleaning assembly, arranged at the bottom of the arm (3) and used for cleaning the debris in the drill hole; The grouting assembly is arranged on the base (1) and is used for injecting grout into the drilled hole.

2. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: Also includes: A plurality of rack rods (32) are arranged on two opposite side walls of the arm rod (3), and the plurality of rack rods (32) are distributed along the length direction of the arm rod (3); The screw groove is fixedly connected to the bottom end of the frame rod (32), and is internally threadedly connected with a screw, and the top end of the driving motor (33) is threadedly connected to the screw.

3. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: Also includes: A lifting frame (36) is vertically slidably connected to the anchor rod bin (31), and the lifting frame (36) is arranged in layers and is used to place anchor rods and drill rods respectively; A lifting power member is arranged on the inner bottom wall of the anchor bar bin (31) and is used to lift the lifting frame (36).

4. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: The support assembly comprises: A support seat (2) is arranged above the base (1), and a support cylinder (21) is hingedly connected to the support seat (2); A support block (22) is arranged at the bottom end of the arm (3), a pushing member is fixedly connected inside the support block (22) to push the arm (3) to move up and down, and the piston rod end of the support cylinder (21) is hinged to the outer bottom wall of the support block (22).

5. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: The cleaning component includes: An air chamber (38) is provided at the bottom end of the arm (3) and below the anchor chamber (31); an air nozzle (381) is provided at a portion of one end of the arm (3) corresponding to the air chamber (38); and the air nozzle (381) is connected to the air chamber (38); A gas rod (382) is arranged in the gas bin (38), and its length direction is parallel to the length direction of the gas bin (38). The inside of the gas rod (382) is hollowed out, and one end of the gas rod is provided with a gas port connected to the inside of the gas rod (382); A sealing plate (383) is formed at an end of the gas rod (382) away from the gas nozzle (381), the size of the sealing plate (383) is the same as the size of the gas chamber (38), and a portion of the sealing plate (383) corresponding to the gas rod (382) is provided with a through hole communicating with the interior of the gas rod (382); An air pump is arranged in the equipment bin (11) and is connected to the air bin (38) via an air pipe.

6. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 5, characterized in that: Also includes: The sealing valve (384) is arranged on the sealing plate (383) and corresponds to the perforation of the sealing plate (383), and is used to block or open the perforation.

7. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: The grouting assembly comprises: A grouting bin, arranged in the equipment bin (11) and used for containing concrete slurry; A grouting pump is arranged in the equipment compartment (11), and a grouting outlet of the grouting pump is connected to a grouting pipe (4); A winding device is arranged at the bottom of one end of the arm (3) and is used for winding the grouting pipe (4).

8. The integrated drilling, anchoring and grouting equipment for road engineering construction according to claim 1, characterized in that: The connecting piece comprises: A connecting rod (34) is arranged horizontally and has a threaded hole (352) at one end thereof; The clamping disk (35) is fixedly connected to one end of the connecting rod (34) close to the threaded hole (352), the surface of the clamping disk (35) protrudes from the end surface of the connecting rod (34), and the clamping disk (35) is composed of multiple independent parts, and the multiple independent parts slide radially.