Device for collecting and pretreating high-humidity-heat gas

By designing a high-humidity hot gas collection and pretreatment device including a gas collecting hood, a vent pipe, a water filter section, a spiral cooling pipe and a heat sink, it is solved that the high-humidity and high-heat gases escaped from the earth's crust is difficult to effectively collect and pretreat. The problem is that the gas is effectively dehumidified and cooled, ensuring the accuracy of detection.

CN119469985AActive Publication Date: 2025-02-18BAIQUAN JUXING (BEIJING) TECH CO LTD

Patent Information

Application Number
CN202510066077.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-16
Publication Date
2025-02-18
Estimated Expiration
2045-01-16

AI Technical Summary

Technical Problem

When geological movements change drastically, high humidity and high heat gases escaped from the earth's crust are difficult to effectively collect and pretreat, resulting in gas leakage or component changes, affecting the accuracy of subsequent detection.

Method used

A high humidity hot gas collection and pretreatment device is designed, including a gas collecting cover, a vent pipe, a water filter part, a spiral cooling pipe and a heat sink. Most of the water vapor is removed through the preliminary cooling of the gas pipe and the filtration of the ceramic screen plate. Then further condense and remove water through the spiral cooling tube.

Benefits of technology

Effective collection and pretreatment of high humidity hot gases is achieved, gas leakage and component changes are avoided, and subsequent detection is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119469985A_ABST
    Figure CN119469985A_ABST
Patent Text Reader

Abstract

The invention relates to a high-humidity-heat gas collection and pretreatment device which comprises a gas collection hood, a breather pipe, a water filtering part, a spiral cooling pipe and a heat dissipation hood which are sequentially connected from bottom to top, at least two parallel gas conveying pipes are arranged in the breather pipe, and the bottoms of the gas conveying pipes are connected with the inner space of the gas collection hood in parallel; the high-humidity-heat gas entering the gas collecting hood rises along the gas conveying pipe; the top of the gas conveying pipe is detachably connected with a water filtering part, and most of water in the high-humidity-heat gas is filtered and removed; the water filtering part is connected with a gas inlet of a spiral cooling pipe, a gas outlet of the spiral cooling pipe is connected with an exhaust pipe, and the exhaust pipe extends out of the device, so that filtered gas passes through the spiral cooling pipe, is continuously condensed to remove water and is finally discharged out of the device; a first cooling fan is arranged above the spiral cooling pipe and used for outputting cooling capacity for the spiral cooling pipe, and a heat dissipation cover is arranged above the first cooling fan and used for rapidly dissipating heat of the first cooling fan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of high-humidity and hot gas collection and pretreatment, and in particular relates to a high-humidity and hot gas collection and pretreatment device. Background Art

[0002] The temperature inside the earth's crust is higher than the surface, and the gas inside the crust has a higher temperature. When the geological movement changes dramatically, the composition of the gas inside the crust will also change. The most representative is the gas that escapes or emits directly from the underground, which is of great research value. This type of gas generally has the characteristics of high humidity and high heat, such as the gas escaping from hot springs. This type of gas often needs to be dehumidified and cooled before entering the detection instrument. However, due to the conditions of the sampling site, it is impossible to build very professional dehumidification and cooling equipment. Simple dehumidification and cooling often cause gas leakage or changes in gas composition, affecting the accuracy of subsequent detection. Summary of the invention

[0003] In view of the above problems, the present invention provides a device for collecting and pre-treating high-humidity and hot gas, which comprises, from bottom to top, a gas collecting hood, a ventilation pipe, a water filter, a spiral cooling pipe and a heat dissipation hood connected in sequence, at least two mutually parallel gas transmission pipes are arranged in the ventilation pipe, and the bottom of the gas transmission pipe is connected in parallel with the inner space of the gas collecting hood, so that the high-humidity and hot gas entering the gas collecting hood rises along the gas transmission pipe; the top of the gas transmission pipe is detachably connected to the water filter to filter and remove most of the water in the high-humidity and hot gas; The water filtering part is connected to the air inlet of the spiral cooling pipe, and the air outlet of the spiral cooling pipe is connected to the exhaust pipe. The exhaust pipe extends out of the device so that the gas after water filtering passes through the spiral cooling pipe, continues to condense and remove water, and finally is discharged from the device; a cooling fan is provided above the spiral cooling pipe to output cold energy for the spiral cooling pipe, and a heat dissipation hood is above the cooling fan to quickly dissipate heat for the cooling fan.

[0004] Optionally, the ventilation pipe is a vertical cylinder as a whole, including an outer tube shell and at least two inner gas pipes, the gas pipes are hollow cylinders, the gas pipes are arranged in parallel, the tube shell is wrapped around the outside of the gas pipes to protect the gas pipes, and there is a gap between the inner wall of the tube shell and the outer wall of the gas pipes.

[0005] Optionally, a transition pipe is provided at the upper part of the gas collecting hood, the inner diameter of the transition pipe is larger than the sum of the inner diameters of the gas transmission pipes, the bottom end of the transition pipe is connected to the hollow chamber of the gas collecting hood, and the top end is connected in parallel to the bottom ends of all the gas transmission pipes; A temperature sensor is provided in the transition tube for real-time monitoring of the original temperature of the collected gas samples.

[0006] Optionally, a three-way valve is provided at the bottom of the gas pipeline, two openings of the three-way valve can be connected to the gas pipeline, and the third opening is connected to a branch pipe, which is provided on the side of the gas pipeline and passes through the tube shell of the ventilation pipe to connect to the external space of the ventilation pipe; when there are too many water droplets in one gas pipeline, another gas pipeline is used to transport the gas sample, and the gas pipeline with too many water droplets is connected to the branch pipe, and the water droplets above the three-way valve in the gas pipeline are discharged through the branch pipe; The top end of the gas delivery pipe is detachably connected to the water filter part, so that the gas delivery pipe for conveying the gas sample can be connected to the water filter part.

[0007] Optionally, the collection and pretreatment device is provided with an equipment bin corresponding to the position of the water filter part and the spiral cooling pipe, which is used to accommodate the water filter part, the spiral cooling pipe and a cooling fan; a control rail is provided on the inner wall of the equipment bin, the spiral cooling pipe is slidably connected to the control rail, and the water filter part is connected to the air inlet at the bottom of the spiral cooling pipe through a connecting pipe, so that the water filter part can move along the control rail together with the spiral cooling pipe to switch the connected air supply pipe; The air outlet is provided on the top of the equipment bin, and the outlet on the top of the spiral cooling pipe is connected to the air outlet through a hose to prevent the movement of the spiral cooling pipe from affecting the connection between the spiral cooling pipe and the air outlet, thereby ensuring smooth exhaust at any time.

[0008] Further optionally, the top of the equipment bin is detachably connected to a heat dissipation cover, and the bottom of the equipment bin is detachably connected to the top of the ventilation pipe. A plurality of heat dissipation holes are respectively provided at the top and bottom of the equipment bin for dissipating heat for a cooling fan and facilitating air flow in the equipment bin.

[0009] Further optionally, the control guide rail includes a circle of circular tracks and two vertical tracks, the circular tracks are arranged horizontally and along the circumference of the equipment bin, the two vertical tracks are arranged at opposite positions of the inner wall of the equipment bin, the top of the vertical tracks is connected to the circular tracks, and the bottom of the vertical tracks is provided with a limit part to limit the lower limit position of the spiral cooling pipe to prevent the water filter part from hitting the top of the gas pipe; An inclined connecting rod is provided on both sides of the spiral cooling tube. The connecting rod corresponds to the vertical track one by one. The top of the connecting rod is connected to the vertical track and the circular track through a slider. The bottom of the connecting rod is fixedly connected to the spiral cooling tube. The height of the top of the connecting rod is greater than the height of the bottom to prevent water droplets condensed on the outer surface of the spiral cooling tube from flowing along the connecting rod into the control guide rail.

[0010] Optionally, the water filter comprises a base, a second cooling fan and a ceramic sieve plate, the base is annular, and the second cooling fan and the ceramic sieve plate are respectively arranged at relative positions on both sides of the base, so that the second cooling fan can face the top of one gas pipe, and the ceramic sieve plate can face the top of another gas pipe; The outer side of the ceramic sieve plate is provided with a covering shell, the top of the shell is connected to the connecting pipe, and the bottom is provided with a quick-plug interface for quick connection to the gas pipe.

[0011] Further optionally, the air outlet of the second cooling fan faces downward and directly faces the deactivated air pipe, and the second cooling fan blows into the air pipe to promote the water droplets inside the air pipe to quickly flow downward and be discharged through the branch pipe, thereby promoting the branch pipe to dry quickly so that it can be put into use again; A water baffle is provided above the cooling fan 2 to prevent water droplets condensed by cooling on the outer side of the spiral cooling pipe from falling onto the cooling fan 2 or into the inside of the deactivated air supply pipe.

[0012] Further optionally, a cooling fan three is provided on the inner wall of the equipment bin, the cooling fan three is lower than the circular track, and the air outlet faces the spiral cooling pipe, so as to blow the spiral cooling pipe and assist in cooling. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of a device for collecting and pre-processing high-humidity and hot gas; Figure 2 It is a structural schematic diagram of another device for collecting and pre-processing high-humidity and hot gas; Figure 3 for Figure 2 A three-dimensional cross-sectional schematic diagram of Figure 4 Schematic diagram of ceramic sieve plate.

[0014] In the accompanying drawings, 1-air collecting hood, 2-ventilation pipe, 3-water filter part, 4-spiral cooling pipe, 5-heat dissipation hood, 6-air supply pipe, 7-exhaust pipe, 8-cooling fan one, 9-cooling fan two, 10-cooling fan three, 11-transition pipe, 12-branch pipe, 13-equipment warehouse, 14-heat dissipation hole, 15-circular track, 16-vertical track, 17-connecting rod, 18-base, 19-ceramic sieve plate, 20-housing, 21-water baffle, 22-connecting pipe, 23-cooling fan four, 24-waterproof cover. DETAILED DESCRIPTION

[0015] This embodiment provides a device for collecting and pre-processing high-humidity and hot gas, such as Figure 1-Figure 4 As shown, from bottom to top, it includes an air collecting hood 1, a ventilation pipe 2, a water filter 3, a spiral cooling pipe 4 and a heat dissipation hood 5 which are connected in sequence. At least two mutually parallel air delivery pipes 6 are arranged in the ventilation pipe 2. The bottom of the air delivery pipe 6 is connected in parallel with the inner space of the air collecting hood 1, so that the high-humidity and hot gas entering the air collecting hood 1 rises along the air delivery pipe; the top of the air delivery pipe is detachably connected to the water filter 3 to filter and remove most of the moisture in the high-humidity and hot gas; The water filtering part 3 is connected to the air inlet of the spiral cooling tube 4, and the air outlet of the spiral cooling tube 4 is connected to the exhaust pipe 7. The exhaust pipe 7 extends out of the device so that the gas after water filtering passes through the spiral cooling tube 4, continues to condense and remove water, and finally is discharged from the device; a cooling fan 8 is provided above the spiral cooling tube 4 for outputting cold energy for the spiral cooling tube 4, and a heat dissipation cover 5 is above the cooling fan 8 for quickly dissipating heat for the cooling fan 8.

[0016] Optionally, the gas collecting hood 1 is in the shape of a truncated cone that is small at the top and large at the bottom, and the middle and lower parts of the gas collecting hood 1 have a hollow chamber for collecting gas samples; the upper part of the gas collecting hood 1 is solid and connected to the outer wall of the ventilation pipe 2, so that the gas collecting hood 1 and the ventilation pipe 2 are connected as one.

[0017] Optionally, the ventilation pipe 2 is a vertical cylinder as a whole, including an outer tube shell and at least two gas pipes inside, the gas pipes are hollow cylinders, the gas pipes are arranged in parallel, the tube shell is wrapped around the outside of the gas pipes to protect the gas pipes, and there is a gap between the inner wall of the tube shell and the outer wall of the gas pipes. The process of the gas collected by the gas hood 1 rising along the gas pipe is also the process of the gas gradually cooling, and the moisture contained in the gas is also condensed, and the formed water droplets flow down along the inner wall of the gas pipe (returning to the outside through the gas hood 1).

[0018] Optionally, the bottom end of the gas pipeline is connected to the hollow chamber of the gas collecting hood 1, so that the high-humidity and hot gas collected by the gas collecting hood 1 can be input into the gas pipeline and then rise along the gas pipeline.

[0019] Optionally, a transition pipe 11 is provided at the upper part of the gas collecting hood 1, the inner diameter of the transition pipe 11 is larger than the sum of the inner diameters of the gas transmission pipes, the bottom end of the transition pipe 11 is connected to the hollow chamber of the gas collecting hood 1, and the top end is connected in parallel to the bottom ends of all the gas transmission pipes; A temperature sensor is provided in the transition pipe 11 for real-time monitoring of the original temperature of the collected gas sample.

[0020] Optionally, a three-way valve is provided at the bottom of the gas pipeline, two openings of the three-way valve can be connected to the gas pipeline, and the third opening is connected to the branch pipe 12, which is provided on the side of the gas pipeline and passes through the tube shell of the ventilation pipe 2 to connect to the external space of the ventilation pipe 2; when there are too many water droplets in one gas pipeline, another gas pipeline is used to transport the gas sample, and the gas pipeline with too many water droplets is connected to the branch pipe, and the water droplets above the three-way valve in the gas pipeline are discharged through the branch pipe; The top end of the gas delivery pipe is detachably connected to the water filter part 3 , so that the gas delivery pipe for conveying the gas sample can be connected to the water filter part 3 .

[0021] Therefore, the two gas pipes are used in one standby mode and the other in another mode. After the temperature of the gas sample is measured in the transition pipe 11, it enters the gas pipe connected to the three-way valve, and the gas rises along the gas pipe until it reaches the water filter 3. Due to the long-term transportation of high-humidity and hot gas in the other gas pipe, there is too much water vapor inside the gas pipe. If the gas continues to be transported, it will be detrimental to the dehumidification and cooling of the gas. Therefore, it is necessary to stop dehumidifying. The three-way valve connects the upper part of the gas pipe with its own branch pipe and cuts off the bottom of the gas pipe, so that the new gas in the gas collecting hood 1 cannot enter the closed gas pipe, but enters the gas pipe opened next to it. The water droplets in the disabled gas pipe flow down along its own inner wall and are then discharged through the branch pipe. The two gas pipes of the present invention are used alternately for alternate dehumidification.

[0022] Optionally, the collection and pretreatment device is provided with an equipment bin 13 corresponding to the position of the water filter part 3 and the spiral cooling tube 4, which is used to accommodate the water filter part 3, the spiral cooling tube 4 and the cooling fan 8; a control rail is provided on the inner wall of the equipment bin 13, and the spiral cooling tube 4 is slidably connected to the control rail, and the water filter part 3 is connected to the air inlet at the bottom of the spiral cooling tube 4 through a connecting tube 22, so that the water filter part 3 can move along the control rail together with the spiral cooling tube 4 to switch the connected air supply pipe; The exhaust pipe 7 is provided on the top of the equipment compartment 13, and the air outlet on the top of the spiral cooling pipe 4 is connected to the exhaust pipe through a hose to prevent the movement of the spiral cooling pipe 4 from affecting the connection between the spiral cooling pipe 4 and the exhaust pipe, thereby ensuring smooth exhaust at any time.

[0023] Further optionally, the spiral cooling tube 4 is formed by spirally winding a circle of pipes, maintaining equal intervals in the vertical direction and winding in a circle in the horizontal direction. The gas passing through the water filtering section 3 is further cooled while rising along the spiral cooling tube 4. The cooling fan 8 blows downward to promote cooling. Water droplets condensed from the gas flow down along the inner wall of the spiral cooling tube 4 to the water filtering section 3. The dehumidified and cooled gas is discharged from the exhaust pipe. The exhaust pipe is connected to an external gas collecting device for collecting gas samples after cooling and dehumidification to facilitate subsequent detection of gas components.

[0024] Further optionally, the top end of the equipment compartment 13 is detachably connected to the heat dissipation cover 5, and the bottom end of the equipment compartment 13 is detachably connected to the top of the ventilation pipe 2. The top and bottom of the equipment compartment 13 are respectively provided with a plurality of heat dissipation holes 14 for dissipating heat for the cooling fan 8 and facilitating air flow in the equipment compartment 13.

[0025] Further optionally, the control guide rail includes a circle of circular tracks 15 and two vertical tracks 16, the circular tracks 15 are arranged horizontally and around the circumference of the equipment bin 13, the two vertical tracks 16 are respectively arranged at opposite positions of the inner wall of the equipment bin 13, the top of the vertical tracks 16 are connected to the circular tracks 15, and the bottom of the vertical tracks 16 is provided with a limit part to limit the lower limit position of the spiral cooling tube 4 to prevent the water filter part 3 from hitting the top of the gas pipe; An inclined connecting rod 17 is provided on both sides of the spiral cooling tube 4, and the connecting rod 17 corresponds to the vertical track 16 one by one. The top of the connecting rod 17 is connected to the vertical track 16 and the circular track 15 through a slider, and the bottom of the connecting rod 17 is fixedly connected to the spiral cooling tube 4. The height of the top of the connecting rod 17 is greater than the height of the bottom, so as to prevent water droplets condensed on the outer surface of the spiral cooling tube 4 from flowing into the control guide rail along the connecting rod 17.

[0026] Optionally, the water filter 3 includes a base 18, a cooling fan 9 and a ceramic sieve plate 19, the base 18 is annular, and the cooling fan 9 and the ceramic sieve plate 19 are respectively arranged at relative positions on both sides of the base 18, so that the cooling fan 9 can face the top of one gas pipe, and the ceramic sieve plate 19 can face the top of another gas pipe; An outer shell 20 is provided on the outside of the ceramic sieve plate 19. The top of the shell 20 is connected to a connecting pipe 22, and the bottom is provided with a quick-plug interface for quick connection to a gas pipeline.

[0027] Further optionally, the ceramic sieve plate 19 is in the shape of a circular plate and is evenly and densely covered with through holes. The ceramic sieve plate 19 is located in the cross-section of the gas channel and is used to filter most of the moisture and impurities in the gas. The intercepted water droplets can return to the gas pipe along the inner wall of the outer shell and then flow down along the gas pipe. The filtered gas is input into the bottom of the spiral cooling tube 4 through the connecting pipe 22.

[0028] Further optionally, the air outlet of the cooling fan 2 9 is downward and directly facing the deactivated air pipe, and the cooling fan 2 9 blows into the air pipe to promote the water droplets inside the air pipe to flow downward quickly and be discharged through the branch pipe, so as to promote the branch pipe to dry quickly so that it can be put into use again; A water baffle 21 is provided above the cooling fan 2 9 to prevent water droplets condensed by cooling on the outer side of the spiral cooling pipe 4 from falling onto the cooling fan 2 9 or into the inside of the deactivated air delivery pipe.

[0029] When in use, the gas pipe for conveying gas samples is connected to the bottom of the shell through a quick-plug interface, so that the gas path of the gas pipe, the water filter part 3 and the spiral cooling tube 4 is unobstructed. The high-humidity and hot gas collected by the gas collecting hood 1 is initially cooled by the gas pipe, and then filtered by the ceramic sieve plate 19 to remove most of the water vapor, and then enters the spiral cooling tube 4; under the purge of the cooling fan 8, the gas in the spiral cooling tube 4 is further cooled, and the resulting water droplets flow down along the inner wall of the spiral cooling tube 4, and then flow into the shell through the connecting pipe, and then flow down to the gas pipe through the ceramic sieve plate 19, and the gas after drying and cooling is discharged from the exhaust pipe. The outer wall of the spiral cooling tube 4 will also condense to produce water droplets. Under the purge of the cooling fan 8, this part of the water droplets fall, pass through the water filter part 3 or the side wall of the equipment compartment 13, and finally be discharged from the heat dissipation holes at the bottom of the equipment compartment 13. The water baffle 21 and the shell can protect the gas inside the cooling fan 29 and the ceramic sieve plate 19 from being affected by the falling water in the equipment compartment 13. The heat dissipation holes at the top and bottom of the equipment compartment 13 can also provide air intake and air outlet for the two cooling fans, so that the fans can operate normally and dissipate heat for the fans at the same time.

[0030] The water baffle 21 is close to the cooling fan 2 9 and also serves as a heat sink for the cooling fan 2 9 . Water droplets falling on the water baffle 21 can also cool the water baffle 21 , which is beneficial to the cooling of the water baffle 21 and the heat dissipation of the cooling fan 2 9 .

[0031] The inner diameter of the equipment compartment 13 is larger than the inner diameter of the ventilation pipe 2 , so that in addition to the portion of the bottom of the equipment compartment 13 connected to the ventilation pipe 2 , there is also a portion of the area for heat dissipation holes.

[0032] When there are too many water droplets on the wall of a gas pipeline, it will affect the dehumidification of the gas sample in the gas pipeline, that is, the high-humidity and hot gas may lead the water vapor to move back to the ceramic sieve plate 19, causing the water vapor above the ceramic sieve plate 19 to increase, affecting the dehumidification efficiency of the gas sample. At this time, it is necessary to replace another gas pipeline to transport the gas sample, and the gas pipeline with more water vapor is dried.

[0033] When switching, the three-way valve of the original gas pipeline is connected to its own branch pipe to cut off the gas supply; the slider of the connecting rod 17 of the spiral cooling tube 4 moves upward along the vertical track 16 to the circumferential track 15, at which time the shell equipped with the ceramic sieve plate 19 also moves upward and is disconnected from the originally connected gas pipeline; the two sliders move along the circumferential track 15, thereby driving the spiral cooling tube 4 and the water filter 3 to rotate 180°, so that the shell equipped with the ceramic sieve plate 19 rotates to the top of another gas pipeline, and at the same time, the cooling fan 29 rotates to the top of the original gas pipeline; at this time, the two sliders correspond to the vertical track 16 respectively, and the two sliders move downward along the vertical track 16, thereby driving the spiral cooling tube 4 and the water filter 3 to move downward, so that the quick-plug interface at the bottom of the shell is connected to the gas pipeline to be used, and the three-way valve of the gas pipeline is connected to the bottom and the top of the gas pipeline, so that the gas sample can be transported, and the gas path of the ceramic sieve plate 19 and the spiral cooling tube 4 is also connected. Since the air outlet of the spiral cooling tube 4 is connected to the exhaust pipe through a hose of a certain length, the spiral cooling tube 4 rotates and pulls the hose, but does not affect the connection with the exhaust pipe. When the air supply pipe needs to be switched again, the spiral cooling tube 4 can be turned back in the opposite direction to reset the hose.

[0034] When drying, the cooling fan 29 is directly above the original gas pipe and starts to supply air to blow the water droplets in the gas pipe to the bottom of the gas pipe and then discharge them through the branch pipe until the gas pipe is dry and the next use is ready, then the cooling fan 29 is stopped.

[0035] Optionally, the heat dissipation cover 5 is in the shape of a truncated cone with a small top and a large bottom. The inner diameter of the heat dissipation cover 5 is larger than the inner diameter of the equipment compartment 13 . The larger heat dissipation compartment area is beneficial to the heat dissipation of the cooling fan in the equipment compartment 13 .

[0036] The air collecting hood 1, the ventilation pipe 2, the equipment compartment 13, the spiral cooling pipe 4, the base 18, and the heat dissipation hood 5 are all concentrically arranged.

[0037] Further optionally, a cooling fan 3 10 is provided on the inner wall of the equipment bin 13, the cooling fan 3 10 is lower than the circular track 15, and the air outlet faces the spiral cooling pipe 4, so as to blow the spiral cooling pipe 4 and assist in cooling.

[0038] Since the cooling fan three 10 is located at the side of the spiral cooling tube 4, it is not affected by the water drops outside the spiral cooling tube 4. The cooling fan three 10 can use the heat dissipation holes above and below the equipment compartment 13 to dissipate heat.

[0039] Further optionally, a cooling fan four 23 is provided between the spiral cooling pipe 4 and the water filter part, and the air outlet of the cooling fan four is upward, blowing air directly towards the spiral cooling pipe 4 to assist cooling; preferably, a waterproof cover is provided above the cooling fan four, and the waterproof cover 24 can cover the space above the cooling fan four and the water filter part to prevent water droplets falling from the outer side of the spiral cooling pipe from falling on the fan blades or motor of the cooling fan four and the water filter part, and a gap is left between the edge of the waterproof cover and the inner wall of the equipment compartment to allow water droplets to fall and the air supply of the cooling fan four to flow upward. At this time, the water filter part is not provided with a water baffle 21, and the connecting pipe 22 passes through the waterproof cover and is then connected to the spiral cooling pipe.

[0040] Further optionally, a temperature sensor is provided in the equipment compartment 13 for real-time monitoring of the temperature in the equipment compartment, and indirectly guiding the power or speed of the cooling fan 1 and the cooling fan 3; The lines of the temperature sensor, cooling fan 1 and cooling fan 3 pass through the side wall of the equipment compartment and are connected to an external power supply.

[0041] The water droplets falling from the spiral cooling tube 4 will be discharged from the heat dissipation holes at the bottom of the equipment compartment 13, and the rest will fall into the ventilation pipe 2. The bottom of the ventilation pipe 2 is sealed with a gas collecting hood 1, and the water will accumulate in the ventilation pipe 2, so that the bottom of the gas pipe (where the gas sample temperature is relatively high) is immersed in the condensed water of the ventilation pipe 2 for heat exchange, thereby cooling the gas in the gas pipe. The water will preferentially gather at the bottom and lower part of the ventilation pipe 2, and the corresponding gas temperature at the bottom and lower part of the gas pipe is also relatively high, which can achieve good heat exchange. The water in the ventilation pipe 2 can accumulate to the upper part of the ventilation pipe 2. According to the gas temperature at the sampling point, the position of the drain port of the ventilation pipe 2 is reasonably set to discharge the accumulated water in the ventilation pipe 2 and promote water renewal. The drain port can be located at the lower, middle or upper part of the ventilation pipe 2.

Claims

1. A device for collecting and pre-processing high-humidity and hot gas, characterized in that: From bottom to top, it includes an air collecting hood, a ventilation pipe, a water filter, a spiral cooling pipe and a heat dissipation hood connected in sequence. At least two mutually parallel air delivery pipes are arranged in the ventilation pipe. The bottom of the air delivery pipe is connected in parallel with the inner space of the air collecting hood, so that the high-humidity and hot gas entering the air collecting hood rises along the air delivery pipe; the top of the air delivery pipe is detachably connected to the water filter to filter and remove most of the moisture in the high-humidity and hot gas; The water filtering part is connected to the air inlet of the spiral cooling pipe, and the air outlet of the spiral cooling pipe is connected to the exhaust pipe. The exhaust pipe extends out of the device so that the gas after water filtering passes through the spiral cooling pipe, continues to condense and remove water, and finally is discharged from the device; a cooling fan is provided above the spiral cooling pipe to output cold energy for the spiral cooling pipe, and a heat dissipation hood is above the cooling fan to quickly dissipate heat for the cooling fan.

2. The device for collecting and pre-processing high-humidity hot gas according to claim 1, characterized in that: The ventilation pipe is a vertical cylinder as a whole, including an outer tube shell and at least two inner gas pipes. The gas pipes are hollow cylinders and arranged in parallel. The tube shell is wrapped around the outside of the gas pipes to protect the gas pipes. There is a gap between the inner wall of the tube shell and the outer wall of the gas pipes.

3. The device for collecting and pre-processing high-humidity hot gas according to claim 2, characterized in that: A transition pipe is provided at the upper part of the gas collecting hood, the inner diameter of the transition pipe is larger than the sum of the inner diameters of the gas transmission pipes, the bottom end of the transition pipe is connected to the hollow chamber of the gas collecting hood, and the top end is connected in parallel to the bottom ends of all the gas transmission pipes; A temperature sensor is provided in the transition tube for real-time monitoring of the original temperature of the collected gas samples.

4. The device for collecting and pre-processing high-humidity hot gas according to claim 2, characterized in that: A three-way valve is provided at the bottom of the gas pipeline, two openings of the three-way valve can be connected to the gas pipeline, and the third opening is connected to a branch pipe, which is provided on the side of the gas pipeline and passes through the tube shell of the ventilation pipe to connect to the external space of the ventilation pipe; when there are too many water droplets in one gas pipeline, another gas pipeline is used to transport the gas sample, and the gas pipeline with too many water droplets is connected to the branch pipe, and the water droplets above the three-way valve in the gas pipeline are discharged through the branch pipe; The top end of the gas delivery pipe is detachably connected to the water filter part, so that the gas delivery pipe for conveying the gas sample can be connected to the water filter part.

5. The device for collecting and pre-processing high-humidity hot gas according to claim 1, characterized in that: The collection and pretreatment device is provided with an equipment bin corresponding to the position of the water filter and the spiral cooling pipe, which is used to accommodate the water filter, the spiral cooling pipe and the cooling fan; a control rail is provided on the inner wall of the equipment bin, the spiral cooling pipe is slidably connected to the control rail, and the water filter is connected to the air inlet at the bottom of the spiral cooling pipe through a connecting pipe, so that the water filter can move along the control rail together with the spiral cooling pipe to switch the connected air supply pipe; The air outlet is provided on the top of the equipment bin, and the outlet on the top of the spiral cooling pipe is connected to the air outlet through a hose to prevent the movement of the spiral cooling pipe from affecting the connection between the spiral cooling pipe and the air outlet, thereby ensuring smooth exhaust at any time.

6. The device for collecting and pre-processing high-humidity hot gas according to claim 5, characterized in that: The control guide rail includes a circle of circular tracks and two vertical tracks. The circular tracks are arranged horizontally and along the circumference of the equipment bin. The two vertical tracks are arranged at opposite positions of the inner wall of the equipment bin. The top of the vertical tracks is connected to the circular tracks. The bottom of the vertical tracks is provided with a limit part to limit the lower limit position of the spiral cooling pipe to prevent the water filter part from hitting the top of the gas transmission pipe. An inclined connecting rod is provided on both sides of the spiral cooling tube. The connecting rod corresponds to the vertical track one by one. The top of the connecting rod is connected to the vertical track and the circular track through a slider. The bottom of the connecting rod is fixedly connected to the spiral cooling tube. The height of the top of the connecting rod is greater than the height of the bottom to prevent water droplets condensed on the outer surface of the spiral cooling tube from flowing along the connecting rod into the control guide rail.

7. The device for collecting and pre-treating high-humidity hot gas according to claim 5, characterized in that: The water filter part includes a base, a second cooling fan and a ceramic sieve plate. The base is annular. The second cooling fan and the ceramic sieve plate are respectively arranged at relative positions on both sides of the base, so that the second cooling fan can face the top of one gas pipeline, and the ceramic sieve plate can face the top of another gas pipeline. The outer side of the ceramic sieve plate is provided with a covering shell, the top of the shell is connected to the connecting pipe, and the bottom is provided with a quick-plug interface for quick connection to the gas pipe.

8. The device for collecting and pre-treating high-humidity hot gas according to claim 7, characterized in that: The air outlet of the second cooling fan faces downward and is directly opposite to the deactivated air pipe. The second cooling fan blows into the air pipe to promote the water droplets inside the air pipe to flow downward quickly and be discharged through the branch pipe, so as to promote the branch pipe to dry quickly so that it can be put into use again. A water baffle is provided above the cooling fan 2 to prevent water droplets condensed by cooling on the outer side of the spiral cooling pipe from falling onto the cooling fan 2 or into the idle air supply pipe.

9. The device for collecting and pre-processing high-humidity hot gas according to claim 6, characterized in that: A cooling fan three is arranged on the inner wall of the equipment bin. The cooling fan three is lower than the circular track, and the air outlet of the cooling fan three faces the spiral cooling pipe to blow the spiral cooling pipe and assist in cooling.

10. The device for collecting and pre-processing high-humidity hot gas according to claim 5, characterized in that: The top of the equipment bin is detachably connected to the heat dissipation cover, and the bottom of the equipment bin is detachably connected to the top of the ventilation pipe. The top and bottom of the equipment bin are respectively provided with a plurality of heat dissipation holes for dissipating heat for the cooling fan and facilitating air flow in the equipment bin.

Citation Information

Patent Citations

  • Hot spring escape gas collecting and analyzing equipment and monitoring system

    CN118603204A

  • Cooling and dewatering treatment device for hot spring gas detection

    CN221594511U

  • Dehumidifier for gas analysis

    JP2003194680A

  • Waste gas treatment and waste gas treatment method

    JP2005131509A

  • Portable Gas Monitor

    US20190070646A1

Cited By

  • Hot spring gas collection and pretreatment device

    CN120213563A

  • Hot spring gas collection and pretreatment device

    CN120213563B