Construction scheme generation method and device, equipment and storage medium

By receiving construction plan generation requests from construction personnel, generating and assigning sub-construction plan tasks, and using unified and standardized formwork to generate a consistent style construction plan, the problems of inefficiency and inconsistent styles in the existing technology are solved, and efficient and standardized Construction plan generated.

CN119476902AInactive Publication Date: 2025-02-18CHINA RAILWAY CONSTR GROUP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510068696.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-16
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the construction plan relies on manual generation is inefficient, the style of the construction plan generated is inconsistent, and there is no unified normativeness.

Method used

By receiving construction plan generation requests from construction personnel, sub-construction plan tasks are generated, and assigned to target construction personnel, and formwork is generated based on the unified and standardized construction plan to generate target construction plans with consistent styles.

Benefits of technology

It has achieved efficient generation of consistent style construction plans, ensuring that the construction plans are unified and standardized, and improving construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119476902A_ABST
    Figure CN119476902A_ABST
Patent Text Reader

Abstract

The invention provides a construction scheme generation method and device, equipment and a storage medium, and relates to the technical field of building construction. The method comprises the following steps: receiving a construction scheme generation request sent by a constructor; generating a first number of sub-construction scheme tasks based on the construction scheme generation request; wherein each sub-construction scheme task corresponds to at least one construction scheme generation template; distributing the first number of sub-construction scheme tasks to the corresponding number of target constructors, so that each target constructor generates a template according to at least one corresponding construction scheme, and generates a sub-construction scheme corresponding to the sub-construction scheme tasks; and generating a target construction scheme corresponding to the construction scheme generation request according to the sub-construction scheme of each target constructor. According to the embodiment provided by the invention, the template is generated by utilizing the construction scheme with the unified specification, so that the target construction scheme with the consistent style can be efficiently generated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to a method, device, equipment and storage medium for generating a construction plan. Background Art

[0002] In the field of construction, a reasonable construction plan is of great significance for improving construction efficiency, reducing construction costs and ensuring construction quality.

[0003] In the related technologies, the formulation of traditional construction plans mainly relies on the experience and expertise of engineers and project managers, who manually analyze the project requirements and write and generate them manually, which is inefficient. For example, a large construction plan project may be jointly written and generated by several engineers. However, each engineer has different expertise and different styles for generating the construction plans they are responsible for. It is impossible to ensure the consistency of the style of a complete construction plan, and it is impossible to ensure that the construction plan has unified norms. Summary of the invention

[0004] The present invention provides a method, device, equipment and storage medium for generating a construction plan, which are used to solve the defects of the prior art that the construction plan is generated manually with low efficiency, the style of the generated construction plan is inconsistent, and there is no unified standardization. By utilizing a unified and standardized construction plan generation template, a target construction plan with a consistent style can be efficiently generated.

[0005] In a first aspect, the present invention provides a method for generating a construction plan, comprising the following steps: Receive construction plan generation requests sent by construction personnel; Based on the construction plan generation request, a first number of sub-construction plan tasks are generated; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; Allocating the first number of sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generation template; According to the sub-construction plan of each target construction worker, a target construction plan corresponding to the construction plan generation request is generated.

[0006] Preferably, according to a method for generating a construction plan provided by the present invention, the construction plan generation request at least includes construction identity information and construction plan requirement information; The generating a first number of sub-construction plan tasks based on the construction plan generating request includes: Determine, according to the construction identity information, a construction plan framework corresponding to the construction identity information, and, according to the construction plan requirement information, determine a construction plan generation template corresponding to the construction plan requirement information; Based on the construction plan framework and the construction plan generation template, a first number of sub-construction plan tasks are generated.

[0007] Preferably, according to a method for generating a construction plan provided by the present invention, before the step of determining a construction plan framework corresponding to the construction identity information according to the construction identity information, and determining a construction plan generation template corresponding to the construction plan requirement information according to the construction plan requirement information, the method comprises: Matching the construction identity information of the construction personnel with the identity information in a preset identity database to determine an identity matching result that passes the security verification of the identity of the construction personnel; Determining the identity authority of the construction personnel according to the identity matching result and the construction identity information; Determine whether the identity authority of the construction personnel meets the preset authority conditions; When it is determined that the identity authority of the construction personnel meets the preset authority conditions, the steps of determining the construction plan framework corresponding to the construction identity information based on the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information are executed.

[0008] Preferably, according to a method for generating a construction plan provided by the present invention, the step of allocating the first number of sub-construction plan tasks to a corresponding number of target construction personnel includes: Determining the skill requirement information of the target construction personnel required according to the task categories of the first number of sub-construction plan tasks; According to the skill requirement information, obtaining identification information of the first number of target construction personnel matching the skill requirement information; Based on the identification information and the skill information of the target construction workers, the first number of sub-construction plan tasks are allocated to a corresponding number of the target construction workers.

[0009] Preferably, according to a method for generating a construction plan provided by the present invention, generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker includes: Counting the processing time of each target construction worker in processing the corresponding sub-construction plan task; When the processing time reaches a preset time threshold, collecting the sub-construction plans generated by each target construction worker according to at least one corresponding construction plan generation template; The plurality of sub-construction plans are combined and processed according to the construction plan framework to generate a target implementation plan corresponding to the construction plan generation request.

[0010] Preferably, according to a method for generating a construction plan provided by the present invention, after the step of generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker, the method comprises: Input the target construction plan into the trained construction plan review model, and output the target score value of the target construction plan; wherein the construction plan review model is obtained by training the neural network multiple times using a large number of construction plan samples, score samples, review standard samples, and score standard samples; Compare the target scoring value of the target construction plan with a preset scoring threshold; When the target score value of the target construction plan is greater than or equal to the preset score threshold, generating review information that the target construction plan meets the construction standards; When the target score value of the target construction plan is less than the preset score threshold, review information that the target construction plan does not meet the construction standards is generated.

[0011] In a second aspect, the present invention further provides a construction plan generation device, comprising the following modules: A construction plan generation request receiving module is used to receive a construction plan generation request sent by a construction worker; A sub-construction plan task generation module is used to generate a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; A sub-construction plan generating module is used to allocate the first number of sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generating template; A target construction plan generating module is used to generate a target construction plan corresponding to the construction plan generating request according to the sub-construction plan of each target construction worker.

[0012] In a third aspect, the present invention further provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a method for generating a construction plan as described in any one of the above is implemented.

[0013] In a fourth aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for generating a construction plan as described in any one of the above.

[0014] In a fifth aspect, the present invention further provides a computer program product, comprising a computer program, which, when executed by a processor, implements a method for generating a construction plan as described in any one of the above.

[0015] The present invention provides a method, device, equipment and storage medium for generating a construction plan, which receives a construction plan generation request sent by a construction worker; generates a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; distributes the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; generates a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker. This method is used to solve the defects of the prior art that the construction plan generation is inefficient, the style of the generated construction plan is inconsistent, and there is no unified standardization, and achieves the efficient generation of a target construction plan with a consistent style by using a unified and standardized construction plan generation template. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0017] Figure 1 It is one of the flow charts of the method for generating the construction plan provided by the present invention.

[0018] Figure 2 It is a structural schematic diagram of a device for generating a construction plan provided by the present invention.

[0019] Figure 3 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] In related technologies, the formulation of traditional construction plans mainly relies on the experience and expertise of engineers and project managers, which are manually analyzed through project requirements and manually written and generated, which is inefficient.

[0022] Combine the following Figure 1-Figure 3 The present invention describes a method, device, equipment and storage medium for generating a construction plan, which are used to solve the problems in the prior art of relying on manual generation of construction plans, such as low efficiency, inconsistent styles of generated construction plans, and lack of unified standardization. By utilizing a unified and standardized construction plan generation template, a target construction plan with a consistent style can be efficiently generated.

[0023] Figure 1 This is one of the flow charts of a method for generating a construction plan provided by the present invention, such as Figure 1 As shown, the method may include but is not limited to steps S100 to S400: S100, receiving a construction plan generation request sent by a construction worker; S200, based on the construction plan generation request, generating a first number of sub-construction plan tasks; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; S300, allocating the first number of the sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generation template; S400: Generate a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker.

[0024] In step S100 of some embodiments, a construction plan generation request sent by a construction worker is received.

[0025] It is understandable that the server receives the construction plan generation request sent by the construction personnel. Any construction personnel can send the construction plan generation request, and the target construction personnel are the ones who receive the sub-construction plan task and generate the sub-construction plan corresponding to the sub-construction plan task according to the construction plan generation template.

[0026] It should be noted that the construction plan generation request at least includes construction identity information and construction plan requirement information.

[0027] Furthermore, the construction identity information may include but is not limited to the construction personnel's personal information, position information, work number, title information, and other information used to identify the construction personnel.

[0028] The construction plan requirement information is the key to ensure the smooth progress of the construction project. This requirement information not only covers the basic requirements of the project, but also involves multiple aspects such as resources, technology, safety, quality, etc., which may include but are not limited to project goals and scope requirements, resource requirements, time and progress management requirements, quality control requirements, safety requirements, and environmental protection requirements.

[0029] Going further, clarify the project goals: project goals include the final results and milestone tasks for each stage. By setting specific and quantifiable goals, the team can allocate resources and time more effectively. Project scope definition: Describe all aspects of the project in detail, such as the construction area, scale, design requirements, etc., to ensure that all relevant parties have a unified understanding of the project. Human resources: Rationally allocate construction personnel according to the construction period and scale, including project managers, engineers, technical workers, etc.

[0030] Material resources: Consider the various materials and equipment required for construction, such as cement, steel bars, bricks, mechanical equipment, etc., and plan procurement channels, supplier selection, transportation and storage. Financial resources: Develop a detailed budget plan, including labor costs, material costs, equipment rental fees, etc., and conduct regular monitoring.

[0031] Create a detailed timetable: including the start and end times of each phase of the task, and set key milestones to monitor project progress.

[0032] Task allocation and deadline scheduling: Break down large projects into specific tasks and set deadlines for each task to ensure that each team member is clear about their responsibilities and schedule.

[0033] Technical plan: including schedule, key technology plan, major construction step plan, etc. Technological innovation: introducing advanced construction technology and equipment, such as BIM technology, drones and 3D printing, to improve construction efficiency and quality.

[0034] Establish quality standards: including materials, construction technology and acceptance criteria, to ensure that the project meets the design and construction specifications.

[0035] Quality monitoring: Through regular inspection and monitoring of the construction process, timely discover and correct problems to avoid affecting subsequent work. General safety requirements: Clarify the safety management regulations and operating procedures during the construction process. Emergency plan: Develop detailed response measures for possible emergencies, such as fires, industrial accidents, etc. Green construction: Use energy-saving equipment and environmentally friendly materials to reduce the impact of construction on the environment. Environmental protection measures: Develop environmental protection measures such as waste disposal and noise control to ensure that the construction process meets environmental protection requirements.

[0036] In step S200 of some embodiments, a first number of sub-construction plan tasks are generated based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template.

[0037] It can be understood that after executing step S100, the specific execution steps may be: first, determine the construction plan framework corresponding to the construction identity information based on the construction identity information, and determine the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information.

[0038] Then, based on the construction plan framework and the construction plan generation template, a first number of sub-construction plan tasks are generated.

[0039] It should be further explained that before the steps of determining the construction plan framework corresponding to the construction plan identity information according to the construction plan identity information and determining the construction plan generation template corresponding to the construction plan requirement information according to the construction plan requirement information, Matching the construction identity information of the construction personnel with the identity information in a preset identity database to determine an identity matching result that passes the security verification of the identity of the construction personnel; Determining the identity authority of the construction personnel according to the identity matching result and the construction identity information; Determine whether the identity authority of the construction personnel meets the preset authority conditions; When it is determined that the identity authority of the construction personnel meets the preset authority conditions, the steps of determining the construction plan framework corresponding to the construction identity information based on the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information are executed.

[0040] It is understandable that the construction identity information of the construction personnel is matched and compared with the preset identity information, and in case of a successful match, a result is obtained that the identity of the construction personnel has passed the security verification.

[0041] In the case where the construction identity information fails to match the identity information in the preset identity database, a result is obtained that the identity of the construction worker fails the security verification.

[0042] By setting up an identity security verification mechanism, the security of the generated construction plan can be guaranteed, preventing non-construction personnel from maliciously generating erroneous or inaccurate construction plans.

[0043] For construction plan generation requests that fail to pass security identity verification, a message prompt is returned indicating that the corresponding construction personnel do not meet the conditions for using the construction plan generation system.

[0044] For construction plan generation requests sent by construction personnel who have passed security identity verification, the identity authority of the construction personnel who have passed security identity verification is further determined. For example, the authority of a project manager is different from that of a project team leader, and the information resources that can be obtained are also different.

[0045] Specifically, the identity authority of the construction personnel is determined according to the construction identity information. For example, the identity authority of the construction personnel is queried from the identity database according to the construction personnel's work number.

[0046] After determining the identity authority of the construction personnel, determine whether the construction personnel who have passed the identity security verification meet the preset authority conditions. Only if the preset authority conditions are met can the steps of determining the construction plan framework corresponding to the construction identity information based on the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information be executed.

[0047] For example, construction workers need to obtain financial plan approval from the financial leader in advance. After the financial plan is approved, an indicator of financial authority approval will be added to the identity authority of this construction worker, and the preset authority condition is set to an indicator of whether the financial authority is approved.

[0048] This embodiment is to improve the availability of the construction plan. For example, if the construction personnel have not submitted the financial plan for approval and directly generated the target construction plan, but the funds for the target construction plan far exceed the implementable funds, the generated target construction plan cannot be used and is discarded, which leads to a waste of resources. However, this problem can be avoided by further setting the authority mechanism, thereby improving the availability of the generated target construction plan.

[0049] According to the construction identity information, a construction plan framework corresponding to the construction identity information is determined, and according to the construction plan requirement information, a construction plan generation template corresponding to the construction plan requirement information is determined.

[0050] It can be understood that, based on the construction identity information, a construction plan framework with authority corresponding to the construction identity information is selected from a plurality of plan frameworks, and then based on the construction plan requirement information, a construction plan generation template that meets the construction plan requirements is selected from the construction plan template library.

[0051] The construction plan generation template can generate construction plans in a unified format and standard. For example, for the production of drawings involved in the construction plan, there is a special drawing template. You only need to fill in the drawing data corresponding to the construction requirement information into the drawing template to automatically generate drawings with the same format.

[0052] Based on the construction plan framework and the construction plan generation template, a first number of sub-construction plan tasks are generated.

[0053] After the construction plan framework and the construction plan generation template are selected, the first number of sub-construction plan tasks are generated by dividing the construction plan framework and the construction plan generation template.

[0054] For example, the construction plan framework includes the construction preparation framework, the construction execution framework, the construction quality inspection framework, and the construction environment monitoring framework. The corresponding construction plan generation templates include the construction plan text generation template, the construction plan image generation template, the construction plan 3D generation template, etc.

[0055] It should be further explained that this division can be random or based on the construction plan requirement information.

[0056] In step S300 of some embodiments, the first number of sub-construction plan tasks are assigned to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generation template.

[0057] It is understandable that, first, the skill requirement information of the target construction personnel required is determined according to the task categories of the first number of sub-construction plan tasks. Then, according to the skill requirement information, the identification information of the first number of target construction personnel matching the skill requirement information is obtained. Based on the identification information and the skill information of the target construction personnel, the first number of sub-construction plan tasks are allocated to the corresponding number of the target construction personnel.

[0058] It should be noted that the task categories include beam construction, foundation construction, and environmental protection construction. The skill requirement information includes, for example, proficient foundation construction knowledge and skills, proficient beam construction knowledge and skills, and proficient environmental protection construction skills. According to the skill requirement information of the construction plan, construction personnel who meet the corresponding skill requirement information are selected from the current idle personnel and are used as target construction personnel.

[0059] A first number of sub-construction plan tasks are assigned to corresponding target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generation template.

[0060] When the first number of sub-construction plan tasks are assigned to the corresponding target construction personnel, partial permissions are granted to the target construction personnel, so that they can query the construction plan framework and the corresponding construction plan generation template, and can query the corresponding construction knowledge graph library. This can improve the accuracy and efficiency of construction plan generation.

[0061] In step S400 of some embodiments, a target construction plan corresponding to the construction plan generation request is generated according to the sub-construction plan of each target construction worker.

[0062] It is understandable that after executing step S300, the specific execution step may be to count the processing time of each target construction worker in processing the corresponding sub-construction plan task.

[0063] When the processing time reaches a preset time threshold, the sub-construction plans generated by each target construction worker according to at least one corresponding construction plan generation template are collected.

[0064] The plurality of sub-construction plans are combined and processed according to the construction plan framework to generate a target implementation plan corresponding to the construction plan generation request.

[0065] In order to generate the target implementation plan in a timely and efficient manner, the processing time of each target construction personnel in handling the corresponding sub-construction plan tasks is counted. When the processing time reaches the preset time threshold, the corresponding sub-construction plans are collected, and then the collected multiple sub-construction plans are combined and processed according to the previous division principles to splice them into the target construction plan.

[0066] It should be further explained that before collecting the sub-construction plans of each target construction worker, the completion progress of the sub-construction plans is collected at preset intervals, such as every 4 hours. When the completion progress of a target construction worker does not reach the preset progress threshold, the reason for the non-completion is obtained and analyzed, and the corresponding sub-construction plan tasks are promptly divided and assigned to new target construction workers, so that the new target construction workers and the original target construction workers can jointly complete the sub-construction plan tasks whose completion progress does not reach the preset progress threshold. In this way, it can be ensured that each sub-construction plan can be completed efficiently, thereby improving the generation efficiency of the corresponding target construction plan.

[0067] In some embodiments of the present invention, after the step of generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker, the method includes: Input the target construction plan into the trained construction plan review model, and output the target score value of the target construction plan; wherein the construction plan review model is obtained by training the neural network multiple times using a large number of construction plan samples, score samples, review standard samples, and score standard samples; Compare the target scoring value of the target construction plan with a preset scoring threshold; When the target score value of the target construction plan is greater than or equal to the preset score threshold, generating review information that the target construction plan meets the construction standards; When the target score value of the target construction plan is less than the preset score threshold, review information that the target construction plan does not meet the construction standards is generated.

[0068] It can be understood that in order to detect the feasibility of the target construction plan, the target construction plan is tested and its corresponding target score value is measured.

[0069] For example, if the preset scoring threshold is 80 points and the target scoring value is 90 points, then by comparison, it can be seen that the target scoring value of the target construction plan is greater than the preset scoring threshold, so the audit information generated indicates that the target construction plan meets the construction standards.

[0070] For example, if the target score is 60 points, then by comparison, it can be seen that the target score of the target construction plan is less than the preset score threshold. Therefore, the audit information that the target construction plan does not meet the construction standards is generated.

[0071] In this way, after generating the target construction plan, we can quickly know the accuracy of this target construction plan, its compliance with the standard value, and its feasibility, thus providing better suggestions for subsequent construction.

[0072] Furthermore, for target construction plans that do not meet construction standards, we need to further analyze the reasons for non-compliance and the non-compliant parts, and make corrections and improvements in a timely manner.

[0073] The present invention provides a method, device, equipment and storage medium for generating a construction plan, which receives a construction plan generation request sent by a construction worker; generates a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; distributes the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; generates a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker. This method is used to solve the defects of the prior art that the construction plan generation is inefficient, the style of the generated construction plan is inconsistent, and there is no unified standardization, and achieves the efficient generation of a target construction plan with a consistent style by using a unified and standardized construction plan generation template.

[0074] The following is a description of a device for generating a construction plan provided by the present invention. The device for generating a construction plan described below and the method for generating a construction plan described above can be referred to in correspondence with each other.

[0075] like Figure 2 The figure is a schematic diagram of the structure of a construction scheme generation device provided by the present invention, a construction scheme generation device, comprising the following modules: A construction plan generation request receiving module 210 is used to receive a construction plan generation request sent by a construction worker; A construction plan sub-task generating module 220 is used to generate a first number of construction plan sub-tasks based on the construction plan generating request; wherein each of the construction plan sub-tasks corresponds to at least one construction plan generating template; A sub-construction plan generating module 230 is used to assign the first number of sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generating template; The target construction plan generating module 240 is used to generate a target construction plan corresponding to the construction plan generating request according to the sub-construction plan of each target construction worker.

[0076] According to a construction plan generation device provided by the present invention, the construction plan generation request at least includes construction identity information and construction plan requirement information; the sub-construction plan generation task module 220 is specifically used to determine the construction plan framework corresponding to the construction identity information according to the construction identity information, and determine the construction plan generation template corresponding to the construction plan requirement information according to the construction plan requirement information; Based on the construction plan framework and the construction plan generation template, a first number of sub-construction plan tasks are generated.

[0077] According to a construction plan generation device provided by the present invention, before the step of determining the construction plan framework corresponding to the construction identity information according to the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information according to the construction plan requirement information, the device is specifically further used to match the construction identity information of the construction personnel with the identity information in a preset identity database, and determine the identity matching result of the construction personnel passing the security verification; Determining the identity authority of the construction personnel according to the identity matching result and the construction identity information; Determine whether the identity authority of the construction personnel meets the preset authority conditions; When it is determined that the identity authority of the construction personnel meets the preset authority conditions, the steps of determining the construction plan framework corresponding to the construction identity information based on the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information are executed.

[0078] According to a construction plan generation device provided by the present invention, a sub-construction plan task generation module 220 is specifically used to determine the skill requirement information of the target construction personnel required according to the task categories of the sub-construction plan tasks of the first number; According to the skill requirement information, obtaining identification information of the first number of target construction personnel matching the skill requirement information; Based on the identification information and the skill information of the target construction workers, the first number of sub-construction plan tasks are allocated to a corresponding number of the target construction workers.

[0079] According to a construction plan generation device provided by the present invention, a target construction plan generation module 240 is specifically used to count the processing time of each target construction personnel processing the corresponding sub-construction plan task; When the processing time reaches a preset time threshold, collecting the sub-construction plans generated by each target construction worker according to at least one corresponding construction plan generation template; The plurality of sub-construction plans are combined and processed according to the construction plan framework to generate a target implementation plan corresponding to the construction plan generation request.

[0080] According to a construction plan generation device provided by the present invention, after the step of generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker, the device is further specifically used to input the target construction plan into a trained construction plan review model, and output a target score value of the target construction plan; wherein the construction plan review model is obtained by training a neural network multiple times using a large number of construction plan samples, score samples, review standard samples, and score standard samples; Compare the target scoring value of the target construction plan with a preset scoring threshold; When the target score value of the target construction plan is greater than or equal to the preset score threshold, generating review information that the target construction plan meets the construction standards; When the target score value of the target construction plan is less than the preset score threshold, review information that the target construction plan does not meet the construction standards is generated.

[0081] The present invention provides a method, device, equipment and storage medium for generating a construction plan, which receives a construction plan generation request sent by a construction worker; generates a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; distributes the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; generates a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker. This method is used to solve the defects of the prior art that the construction plan generation is inefficient, the style of the generated construction plan is inconsistent, and there is no unified standardization, and achieves the efficient generation of a target construction plan with a consistent style by using a unified and standardized construction plan generation template.

[0082] Figure 3 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 3As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320 and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the method for generating a construction plan, which method includes: receiving a construction plan generation request sent by a construction worker; generating a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; allocating the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; and generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker.

[0083] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0084] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the construction plan generation method provided by the above-mentioned methods, which includes: receiving a construction plan generation request sent by a construction worker; generating a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; allocating the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; and generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker.

[0085] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the construction plan generation method provided by the above-mentioned methods, the method comprising: receiving a construction plan generation request sent by a construction worker; generating a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; allocating the first number of sub-construction plan tasks to a corresponding number of target construction workers, so that each of the target construction workers generates a sub-construction plan corresponding to the sub-construction plan task according to the corresponding at least one construction plan generation template; and generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each of the target construction workers.

[0086] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0087] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0088] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for generating a construction plan, characterized in that: include: Receive construction plan generation requests sent by construction personnel; Based on the construction plan generation request, a first number of sub-construction plan tasks are generated; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; Allocating the first number of sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generation template; According to the sub-construction plan of each target construction worker, a target construction plan corresponding to the construction plan generation request is generated.

2. The method for generating a construction plan according to claim 1, characterized in that: The construction plan generation request includes at least construction identity information and construction plan requirement information; The generating a first number of sub-construction plan tasks based on the construction plan generating request includes: Determine, according to the construction identity information, a construction plan framework corresponding to the construction identity information, and, according to the construction plan requirement information, determine a construction plan generation template corresponding to the construction plan requirement information; Based on the construction plan framework and the construction plan generation template, the first number of sub-construction plan tasks are generated.

3. The method for generating a construction plan according to claim 2, characterized in that: Before the step of determining a construction plan framework corresponding to the construction identity information according to the construction identity information, and determining a construction plan generation template corresponding to the construction plan requirement information according to the construction plan requirement information, the method includes: Matching the construction identity information of the construction personnel with the identity information in a preset identity database to determine an identity matching result that passes the security verification of the identity of the construction personnel; Determining the identity authority of the construction personnel according to the identity matching result and the construction identity information; Determine whether the identity authority of the construction personnel meets the preset authority conditions; When it is determined that the identity authority of the construction personnel meets the preset authority conditions, the steps of determining the construction plan framework corresponding to the construction identity information based on the construction identity information, and determining the construction plan generation template corresponding to the construction plan requirement information based on the construction plan requirement information are executed.

4. The method for generating a construction plan according to any one of claims 1 to 3, characterized in that: The allocating the first number of the sub-construction plan tasks to a corresponding number of target construction personnel includes: Determining the skill requirement information of the target construction personnel required according to the task categories of the first number of sub-construction plan tasks; According to the skill requirement information, obtaining identification information of the first number of target construction personnel matching the skill requirement information; Based on the identification information and the skill information of the target construction workers, the first number of sub-construction plan tasks are allocated to a corresponding number of the target construction workers.

5. The method for generating a construction plan according to claim 2, characterized in that: The step of generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker includes: Counting the processing time of each target construction worker in processing the corresponding sub-construction plan task; When the processing time reaches a preset time threshold, collecting the sub-construction plans generated by each target construction worker according to at least one corresponding construction plan generation template; The plurality of sub-construction plans are combined and processed according to the construction plan framework to generate a target implementation plan corresponding to the construction plan generation request.

6. The method for generating a construction plan according to any one of claims 1 to 3, characterized in that: After the step of generating a target construction plan corresponding to the construction plan generation request according to the sub-construction plan of each target construction worker, the method includes: Input the target construction plan into the trained construction plan review model, and output the target score value of the target construction plan; wherein the construction plan review model is obtained by training the neural network multiple times using a large number of construction plan samples, score samples, review standard samples, and score standard samples; Compare the target scoring value of the target construction plan with a preset scoring threshold; When the target score value of the target construction plan is greater than or equal to the preset score threshold, generating review information that the target construction plan meets the construction standards; When the target score value of the target construction plan is less than the preset score threshold, review information that the target construction plan does not meet the construction standards is generated.

7. A construction plan generating device, characterized in that: include: A construction plan generation request receiving module is used to receive a construction plan generation request sent by a construction worker; A sub-construction plan task generation module is used to generate a first number of sub-construction plan tasks based on the construction plan generation request; wherein each of the sub-construction plan tasks corresponds to at least one construction plan generation template; A sub-construction plan generating module is used to allocate the first number of sub-construction plan tasks to a corresponding number of target construction personnel, so that each of the target construction personnel generates a sub-construction plan corresponding to the sub-construction plan task according to at least one corresponding construction plan generating template; A target construction plan generating module is used to generate a target construction plan corresponding to the construction plan generating request according to the sub-construction plan of each target construction worker.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the program, the method for generating a construction plan as described in any one of claims 1 to 6 is implemented.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for generating a construction plan as described in any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for generating a construction plan as described in any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • A construction scheme generation method and device

    CN109902974A

  • Construction technology management system and method

    CN111242457A

  • Construction progress adjustment prediction method based on Nash equilibrium, medium and system

    CN116976636A

  • Automatically updating work schedules

    US20150339619A1