Quick assembly method of quick-assembly combined type high-strength alloy keel with keel, early-disassembly core and quick-assembly
Through the rapid assembly method of fast assembly of combined high-strength alloy keels with keels, the problems of large workload, long construction period and major safety hazards of existing building formwork are solved, and rapid, safe and efficient installation and disassembly of building formworks are achieved.
Patent Information
- Application Number
- CN202411504504.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-26
- Publication Date
- 2025-02-25
AI Technical Summary
The construction of existing building formwork is large, the construction period is long, and the safety hazards are high, and the demand for wood is large, making it difficult to fix the wooden formwork.
The rapid assembly method of keel with keel is adopted. The combination of keel early removal core quick-installation combination high-strength alloy keel is used to achieve rapid disassembly and installation through the combination of high-strength alloy early removal head, keel, wing bone and core belt, and the structural characteristics of inclined surface, groove and installation hole are used to achieve rapid disassembly and installation.
It achieves rapid installation, simple structure, and convenient disassembly and assembly, greatly saves construction period, reduces labor intensity, improves safety performance, and promotes the rapid progress of grouting construction.
Smart Images

Figure CN119507666A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building formwork, in particular to a method for quickly assembling a high-strength alloy keel with a keel with an early core removal and quick assembly. Background Art
[0002] The keel is a building material used to support the shape and fix the structure; however, the workload is too large, which greatly limits the construction period. Currently, the commonly used methods are scaffolding and wooden formwork, which are very dangerous and difficult to build. There is a great demand for wood, and it is very difficult to fix the wooden formwork.
[0003] On October 14, 2024, a search was conducted in the Chinese Patent Publication Database with "quick installation and keel and groove and tilt and support" as the abstract keywords, and the option of allowing synonym expansion was checked, but no relevant literature was found.
[0004] On October 14, 2024, an abstract search for "quick installation and keel and groove and tilt and support" was conducted on China National Knowledge Infrastructure, and no relevant literature was found.
[0005] On October 14, 2024, a search was conducted on the website of the United States Patent and Trademark Office for “Quick installation with keel with groove with tiltwith support” and no relevant literature was found; the search URL was https: / / ppubs.uspto.gov / pubwebapp / .
[0006] On October 14, 2024, a search was conducted on the Korean Patent Office for “Quick installation and keel and groove and tilt and support”, and no relevant literature was found; the search URL was http: / / eng.kipris.or.kr / enghome / main.jsp.
[0007] On October 14, 2024, a search was conducted on WIPO's https: / / patentscope2.wipo.int / for "Quick installation and keel and groove and tilt and support", and no relevant documents were found.
[0008] Therefore, the defects of the prior art are: the workload is too large, the construction period is greatly limited, it is very dangerous, and it is difficult to build. There is a great demand for wood, and it is very difficult to fix the wooden formwork. Summary of the invention
[0009] Purpose of the invention: To provide a better method for quickly assembling a combined high-strength alloy keel with early core removal and quick installation. The specific purpose can be seen in the multiple substantial technical effects of the specific implementation part.
[0010] In order to achieve the above purpose, the present invention adopts the following technical solutions:
[0011] Solution 1: Quick-installation modular high-strength alloy keel with early core removal. The core of this solution is the keel structure that can be quickly disassembled and installed.
[0012] Solution 2: A quick assembly method for a high-strength alloy keel with early core removal and quick assembly; the core content of this solution is the method;
[0013] In order to achieve the above purpose, the present invention adopts the following technical solutions:
[0014] Solution 1:
[0015] The keel is a quick-install assembled high-strength alloy keel with early core removal, which is characterized by:
[0016] The combined high-strength alloy keel comprises a high-strength alloy early-removal head 1, both sides of the high-strength alloy early-removal head 1 comprise inclined surfaces, which can fit with the side bevel 8, and a groove 4 is arranged on the high-strength alloy early-removal head 1;
[0017] It also includes a high-strength alloy keel 2 that can be docked with the high-strength alloy early-disassembly head 1, high-strength alloy wing bones 3 are arranged on both sides or one side of the high-strength alloy keel 2, and grooves 4 are also arranged on the high-strength alloy wing bones 3;
[0018] It also includes a high-strength alloy core strip 6 that can be pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy wing bone 3;
[0019] The groove 4 of the high-strength alloy wing bone 3 is provided with holes, and the high-strength alloy core band 6 is also provided with holes;
[0020] The high-strength alloy keel 2 is provided with mounting holes 7;
[0021] The high-strength alloy early removal head 1 extends downwardly with a lower support column 5.
[0022] A further technical solution of the present invention is that the combined high-strength alloy keel is arranged as a whole in the manner of high-strength alloy keels 2 and high-strength alloy early-disassembly heads 1 arranged at intervals, and the side of the edgemost high-strength alloy keel 2 is a vertical edge 11.
[0023] A further technical solution of the present invention is that a vertical reinforcing rib 9 and a transverse reinforcing rib 11 are arranged in the middle of the high-strength alloy keel 2 .
[0024] A further technical solution of the present invention is that the high-strength alloy core strip 6 is U-shaped, and one side wall of the U-shape is an inclined wall.
[0025] A further technical solution of the present invention is that the support column 5 can be connected to the support structure below.
[0026] A further technical solution of the present invention is that the high-strength alloy wing bones 3 are welded to both sides or one side of the high-strength alloy keel 2 .
[0027] A further technical solution of the present invention is that the transverse reinforcing ribs 11 include multiple groups.
[0028] Option 2:
[0029] A quick assembly method for a high-strength alloy keel with early core removal and quick assembly is characterized by comprising the following steps:
[0030] Prepare high-strength alloy early removal head 1, high-strength alloy keel 2, high-strength alloy core belt 6;
[0031] First, the inclined surfaces on both sides of the high-strength alloy early removal head 1 are matched with the side bevel edges 8;
[0032] The high-strength alloy early-removal heads 1 and the high-strength alloy keels 2 are arranged alternately;
[0033] The high-strength alloy core strip 6 is pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy keel 2;
[0034] The alternately arranged high-strength alloy early-removal heads 1 and high-strength alloy keels 2 are fixed by bolts;
[0035] The lower support column 5 of the high-strength alloy early removal head 1 is supported on the ground;
[0036] A high-strength alloy keel with a keel early-disassembly core is used, and the combined high-strength alloy keel includes a high-strength alloy early-disassembly head 1, and both sides of the high-strength alloy early-disassembly head 1 include inclined surfaces, which can fit with the side bevel 8, and a groove 4 is arranged on the high-strength alloy early-disassembly head 1;
[0037] It also includes a high-strength alloy keel 2 that can be docked with the high-strength alloy early-disassembly head 1, high-strength alloy wing bones 3 are arranged on both sides or one side of the high-strength alloy keel 2, and grooves 4 are also arranged on the high-strength alloy wing bones 3;
[0038] It also includes a high-strength alloy core strip 6 that can be pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy wing bone 3;
[0039] The groove 4 of the high-strength alloy wing bone 3 is provided with holes, and the high-strength alloy core band 6 is also provided with holes;
[0040] The high-strength alloy keel 2 is provided with mounting holes 7;
[0041] The high-strength alloy early removal head 1 extends downwardly with a lower support column 5.
[0042] A further technical solution of the present invention is that the mounting holes 7 of the high-strength alloy keel 2 can be connected to the high-strength alloy formwork by bolts.
[0043] A further technical solution of the present invention is that the portion of the high-strength alloy core strip 6 that is not pressed into the groove 4 can fit into the end of the high-strength alloy template.
[0044] A further technical solution of the present invention is that it also includes a dedicated locking structure, which is cylindrical, with a double-walled groove 14 arranged in the middle of the cylinder, and locking holes 13 arranged on both sides of the cylinder. The double-walled groove 14 can clamp hole walls 16 of two thicknesses, and also includes an insertion part 15. The insertion part 15 can be inserted into the locking hole 13 for fixation; it can be quickly locked.
[0045] A further technical solution of the present invention is that the insertion portion 15 is a right-angle structure.
[0046] The present invention adopting the above technical solution has the following beneficial effects compared with the prior art: quick installation, simple structure, convenient assembly and disassembly, can greatly save construction time, reduce the intensity of manual labor, has good safety performance, and is faster in grouting and construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to further illustrate the present invention, the following is further described in conjunction with the accompanying drawings:
[0048] Figure 1 A structural diagram of the invention;
[0049] Figure 2 The structural diagram of the invented high-strength alloy keel with beveled edges;
[0050] Figure 3 It is a side cross-sectional view of the overall structure;
[0051] Figure 4 It is a cross-sectional view of a high-strength alloy wing bone;
[0052] Figure 5 It is a side view of the high-strength alloy wing bone;
[0053] Figure 6 It is a high-strength alloy keel with beveled edges on both sides;
[0054] Figure 7 It is a high-strength alloy keel with a beveled edge on one side and a flat edge on the other side;
[0055] Figure 8 This is the structural diagram of the high-strength alloy core belt;
[0056] Fig. 9 is a cross-sectional view of a high-strength alloy core strip;
[0057] Fig.10 It is the preferred structural diagram of the fixed structure;
[0058] Among them: 1. High-strength alloy early-disassembly head; 2. High-strength alloy keel; 3. High-strength alloy wing bone; 4. Groove; 5. Lower support column; 6. High-strength alloy core belt; 7. Installation hole; 8. Side bevel; 9. Vertical reinforcement ribs; 10. Horizontal reinforcement ribs; 11. Vertical edge; 12. Fixing structure; 13. Fixing hole; 14. Double-wall groove; 15. Insertion part; 16. Hole wall. DETAILED DESCRIPTION
[0059] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In the description of the present invention, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", "top", "bottom", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific circumstances.
[0060] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0061] This patent provides a variety of parallel solutions. The different expressions are improved solutions or parallel solutions based on the basic solution. Each solution has its own unique characteristics. In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. The fixing method not described in the text can be any fixing method such as thread fixing, bolt fixing or glue bonding.
[0062] Embodiment 1: Combined with all the drawings; a high-strength alloy keel with early core removal and quick assembly, characterized in that:
[0063] The combined high-strength alloy keel comprises a high-strength alloy early-removal head 1, both sides of the high-strength alloy early-removal head 1 comprise inclined surfaces, which can fit with the side bevel 8, and a groove 4 is arranged on the high-strength alloy early-removal head 1;
[0064] It also includes a high-strength alloy keel 2 that can be docked with the high-strength alloy early-disassembly head 1, high-strength alloy wing bones 3 are arranged on both sides or one side of the high-strength alloy keel 2, and grooves 4 are also arranged on the high-strength alloy wing bones 3;
[0065] It also includes a high-strength alloy core strip 6 that can be pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy wing bone 3;
[0066] The groove 4 of the high-strength alloy wing bone 3 is provided with holes, and the high-strength alloy core band 6 is also provided with holes;
[0067] The high-strength alloy keel 2 is provided with mounting holes 7;
[0068] The high-strength alloy early-disassembly head 1 extends downward with a lower support column 5. The substantial technical effect and implementation process of the technical solution herein, i.e., the basic function, are as follows: a method for quickly assembling a high-strength alloy keel with a keel early-disassembly core and a quick-installation assembly, characterized in that it comprises the following steps:
[0069] Prepare high-strength alloy early removal head 1, high-strength alloy keel 2, high-strength alloy core belt 6;
[0070] First, the inclined surfaces on both sides of the high-strength alloy early removal head 1 are matched with the side bevel edges 8;
[0071] The high-strength alloy early-removal heads 1 and the high-strength alloy keels 2 are arranged alternately;
[0072] The high-strength alloy core strip 6 is pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy keel 2;
[0073] The alternately arranged high-strength alloy early-removal heads 1 and high-strength alloy keels 2 are fixed by bolts;
[0074] The lower support column 5 of the high-strength alloy early removal head 1 is supported on the ground.
[0075] It can quickly achieve support, which is safer and more reliable.
[0076] Can greatly increase the strength of the overall structure.
[0077] Embodiment 2: As a further improved solution or parallel solution or optional independent solution, the combined high-strength alloy keel is arranged as a whole in the manner of high-strength alloy keel 2 and high-strength alloy early removal head 1 arranged at intervals, and the side of the high-strength alloy keel 2 at the edge is a vertical edge 11. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: the straight edge that does not need to be connected at the edge is a straight edge.
[0078] Embodiment 3: As a further improved solution or parallel solution or optional independent solution, vertical reinforcing ribs 9 and transverse reinforcing ribs 11 are arranged in the middle of the high-strength alloy keel 2. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: Therefore, the overall strength is very high.
[0079] Embodiment 4: As a further improved solution or parallel solution or optional independent solution, the high-strength alloy core strip 6 is U-shaped, and one side wall of the U-shaped is an inclined wall. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: Figure 5 and Figure 6 , can be quickly pressed and fixed.
[0080] Embodiment 5: As a further improved solution or parallel solution or optional independent solution, the support column 5 can be connected to the support structure below. The substantial technical effect and implementation process of the technical solution here, i.e. the basic function, are as follows: thereby achieving rapid support on the ground.
[0081] Embodiment 6: As a further improved solution or a parallel solution or an optional independent solution, the high-strength alloy wing bones 3 are welded to both sides or one side of the high-strength alloy keel 2 .
[0082] Embodiment 7: As a further improved solution or parallel solution or optional independent solution, the transverse reinforcing ribs 11 include multiple groups. The substantial technical effects and implementation process of the technical solution herein, namely the basic functions, are as follows: better strength.
[0083] Option 2:
[0084] Embodiment 8: As a further improved solution or parallel solution or optional independent solution, a high-strength alloy keel with a keel early-disassembly core quick-assembly is used, and the combined high-strength alloy keel includes a high-strength alloy early-disassembly head 1, and the high-strength alloy early-disassembly head 1 includes inclined surfaces on both sides, which can fit with the side bevel 8, and a groove 4 is arranged on the high-strength alloy early-disassembly head 1;
[0085] It also includes a high-strength alloy keel 2 that can be docked with the high-strength alloy early-disassembly head 1, high-strength alloy wing bones 3 are arranged on both sides or one side of the high-strength alloy keel 2, and grooves 4 are also arranged on the high-strength alloy wing bones 3;
[0086] It also includes a high-strength alloy core strip 6 that can be pressed into the groove 4 of the high-strength alloy early-removal head 1 and the high-strength alloy wing bone 3;
[0087] The groove 4 of the high-strength alloy wing bone 3 is provided with holes, and the high-strength alloy core band 6 is also provided with holes;
[0088] The high-strength alloy keel 2 is provided with mounting holes 7;
[0089] The high-strength alloy early removal head 1 extends downwardly with a lower support column 5.
[0090] Embodiment 9: As a further improved solution or parallel solution or optional independent solution, the mounting hole 7 of the high-strength alloy keel 2 can be connected to the high-strength alloy formwork by bolts. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: This embodiment is a parallel solution of some of the following solutions.
[0091] Embodiment 10: As a further improved solution or parallel solution or optional independent solution, the portion of the high-strength alloy core strip 6 not pressed in the groove 4 can fit the end of the high-strength alloy template. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: Therefore, the overall structure has a high degree of fit and good integrity.
[0092] Embodiment 11: As a further improved solution or a parallel solution or an optional independent solution, it also includes a dedicated locking structure. The locking structure 12 is cylindrical, and a double-walled groove 14 is arranged in the middle of the cylinder. Fixing holes 13 are arranged on both sides of the cylinder. The double-walled groove 14 can hold hole walls 16 of two thicknesses, and also includes an insertion portion 15. The insertion portion 15 can be inserted into the fixing hole 13 for fixation; it can be quickly fixed. The substantial technical effect of the technical solution here and its implementation process, that is, the basic function, are as follows: Referring to the last figure, it can be quickly inserted and then fixed. The double-walled groove 14 can fit tightly with the metal walls of two adjacent different components to achieve stable insertion and fixation.
[0093] Embodiment 12: As a further improved solution or parallel solution or optional independent solution, the inserting part 15 is a right-angle structure. The substantial technical effect and implementation process of the technical solution here, namely the basic function, are as follows: it can be quickly installed and disassembled.
[0094] The high-strength alloy in this article is an alloy material with relatively high strength.
[0095] Innovatively, each of the above effects exists independently, and a set of structures can be used to combine the above results.
[0096] It should be noted that the multiple solutions provided by this patent include the basic solution itself, which are independent of each other and do not restrict each other, but they can also be combined with each other without conflict to achieve multiple effects together.
[0097] The basic principle, main features and advantages of the present invention are shown and described above. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the protection required.
Claims
1. A quick assembly method for a high-strength alloy keel with early core removal and quick assembly, characterized in that: It includes the following steps: Prepare a high-strength alloy early-removal head (1), a high-strength alloy keel (2), and a high-strength alloy core strip (6); firstly make the inclined surfaces on both sides of the high-strength alloy early-removal head (1) fit with the side bevels (8); and alternately arrange the high-strength alloy early-removal head (1) and the high-strength alloy keel (2); The high-strength alloy core strip (6) is pressed into the groove (4) of the high-strength alloy early-removal head (1) and the high-strength alloy keel (2); Bolts are used to fix alternately arranged high-strength alloy early-removal heads (1) and high-strength alloy keels (2); The lower support column (5) of the high-strength alloy early removal head (1) is supported on the ground; A quick-assembled assembled high-strength alloy keel with an early-disassembly core is used, wherein the assembled high-strength alloy keel comprises a high-strength alloy early-disassembly head (1), both sides of the high-strength alloy early-disassembly head (1) comprise inclined surfaces which can fit with the side bevels (8), and a groove (4) is arranged on the high-strength alloy early-disassembly head (1); It also comprises a high-strength alloy keel (2) capable of being docked with the high-strength alloy early-disassembly head (1), high-strength alloy wing bones (3) are arranged on both sides or one side of the high-strength alloy keel (2), and a groove (4) is also arranged on the high-strength alloy wing bone (3); It also comprises a high-strength alloy core strip (6) that can be pressed into the groove (4) of the high-strength alloy early-removal head (1) and the high-strength alloy wing bone (3); The groove (4) of the high-strength alloy wing bone (3) is provided with holes, and the high-strength alloy core band (6) is also provided with holes; The high-strength alloy keel (2) is provided with mounting holes (7); The high-strength alloy early removal head (1) extends downwards and has a lower support column (5).
2. The rapid assembly method of the high-strength alloy keel with early core removal and quick assembly as claimed in claim 1 is characterized in that: The mounting hole (7) of the high-strength alloy keel (2) can be connected to the high-strength alloy template by bolts.
3. The rapid assembly method of the high-strength alloy keel with early core removal and quick assembly as claimed in claim 1 is characterized in that: The portion of the high-strength alloy core strip (6) not pressed into the groove (4) can fit into the end of the high-strength alloy template.
4. The rapid assembly method of the high-strength alloy keel with early core removal and quick assembly as claimed in claim 1 is characterized in that: The invention also comprises a special locking structure, wherein the locking structure (12) is cylindrical, a double-wall groove (14) is arranged in the middle of the cylinder, and locking holes (13) are arranged on both sides of the cylinder. The double-wall groove (14) can hold hole walls (16) of two thicknesses, and further comprises an insertion part (15). The insertion part (15) can be inserted into the locking hole (13) for fixing; and quick locking can be performed.
5. The rapid assembly method of the high-strength alloy keel with early core removal and quick assembly as claimed in claim 1 is characterized in that: The inserting part (15) is a right-angle structure.