By designing and implementing the digital management process for non-stop construction of transportation airports, the problem of untimely and accurate process management in the existing technology has been solved, and construction efficiency and data accuracy have been improved.

CN119515278APending Publication Date: 2025-02-25AVIATION DATA COMM +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411115706.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

In the prior art, the airport's non-stop construction process lacks an effective process management mechanism, resulting in untimely transmission of construction content information, poor accuracy, and difficult to meet actual work needs.

Method used

Through the design of the digital management process for non-stop construction of the transportation airport, it includes overall design, generation of visual graphics of digital construction plans, summary and confirmation of the planning information of the airport manager, and approval of the construction plan by the Civil Aviation Administration.

Benefits of technology

It improves the efficiency and data accuracy of non-stop construction of transportation airports, and ensures the timely and precise implementation of construction plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515278A_ABST
    Figure CN119515278A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for realizing a digital management process of transportation airport non-stop construction. The efficiency and the data accuracy of transportation airport non-stop construction operation in China can be improved. The method comprises the following steps: (1) carrying out overall design on a digital management process of transportation airport non-stop construction; (2) generating a visual graph of the digital construction scheme; (3) the airport management party summarizes and confirms the non-stop construction plan information; and (4) the civil aviation air administration bureau user approves the construction plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of civil transport aviation, and in particular to a method for realizing a digital management process of non-stop construction at a transport airport, and also to a device for realizing a digital management process of non-stop construction at a transport airport. Background Art

[0002] At present, domestic airports lack an effective process management mechanism for the construction process of non-stop airport flights. Specific construction content is transmitted through fax, and construction areas are marked by manually drawn schematic diagrams. The timeliness and accuracy are difficult to meet the approval of airport non-stop construction in actual work. Summary of the invention

[0003] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to provide a method for implementing the digital management process of non-stop construction at transport airports, which can improve the efficiency and data accuracy of non-stop construction operations at transport airports in my country.

[0004] The technical solution of the present invention is: a method for implementing the digital management process of the non-stop construction at the transport airport, which comprises the following steps:

[0005] (1) Overall design of the digital management process for non-stop construction at transport airports;

[0006] (2) Generate visualization graphics of digital construction plans;

[0007] (3) The airport management party summarizes and confirms the non-stop construction plan information;

[0008] (4) Civil Aviation Administration of China users shall review and approve the construction plan.

[0009] The present invention makes an overall design of the digital management process of non-stop construction at transport airports, generates visualization graphics of digital construction plans, the airport management party summarizes and confirms the non-stop construction plan information, and the civil aviation administration users approve the construction plan, thereby improving the efficiency and data accuracy of non-stop construction operations at my country's transport airports.

[0010] A device for implementing the digital management process of non-stop construction at a transport airport is also provided, which includes:

[0011] Design module, which is configured to carry out overall design of the digital management process of non-stop construction at transport airports;

[0012] A generation module configured to generate a digital construction plan visualization graphic;

[0013] The confirmation module is configured for the airport management to summarize and confirm the non-stop construction plan information; the approval module is configured for the Civil Aviation Administration users to approve the construction plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 Shown is an overall flow chart of a method for implementing a digital management process for non-stop construction at a transport airport according to the present invention.

[0015] Figure 2 Shown is a flow chart of step (1) of a method for implementing a digital management process for non-stop construction at a transport airport according to the present invention.

[0016] Figure 3 Shown is a flow chart of step (2) of the method for implementing the digital management process of non-stop construction at a transport airport according to the present invention.

[0017] Figure 4 Shown is a flow chart of step (3) of the method for implementing the digital management process of non-stop construction at a transport airport according to the present invention.

[0018] Figure 5 Shown is a flow chart of step (4) of the method for implementing the digital management process of non-stop construction at a transport airport according to the present invention. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0020] In order to make the description of the present disclosure more detailed and complete, the following provides an illustrative description of the implementation and specific embodiments of the present invention; however, this is not the only form of implementing or using the specific embodiments of the present invention. The implementation covers the features of multiple specific embodiments and the method steps and sequences used to construct and operate these specific embodiments. However, other specific embodiments can also be used to achieve the same or equivalent functions and step sequences.

[0021] like Figure 1 As shown, the method for implementing the digital management process of the non-stop construction at the transport airport includes the following steps:

[0022] (1) Overall design of the digital management process for non-stop construction at transport airports;

[0023] (2) Generate visualization graphics of digital construction plans;

[0024] (3) The airport management party summarizes and confirms the non-stop construction plan information;

[0025] (4) Civil Aviation Administration of China users shall review and approve the construction plan.

[0026] The present invention makes an overall design of the digital management process of non-stop construction at transport airports, generates visualization graphics of digital construction plans, the airport management party summarizes and confirms the non-stop construction plan information, and the civil aviation administration users approve the construction plan, thereby improving the efficiency and data accuracy of non-stop construction operations at my country's transport airports.

[0027] Preferably, if Figure 2 As shown, the step (1) includes the following sub-steps:

[0028] (1.1) The airport construction party initiates the non-stop construction process according to the construction plan;

[0029] (1.2) Fill in the information on the start and end time of the construction and the specific content of the construction;

[0030] (1.3) For construction projects that require multiple days without stopping flights, calculate the start and end times.

[0031] Split into each specific construction date to form multiple independent TAB pages.

[0032] Preferably, if Figure 3 As shown, the step (2) includes the following sub-steps:

[0033] (2.1) Mark the status of the construction scope and construction objects on the airport electronic map and generate geographic information graphic data in a standard format;

[0034] (2.2) When there are multiple non-stop construction sites at the same time, multiple construction areas or construction objects are displayed simultaneously;

[0035] (2.3) Mark the map elements on the electronic map with serial numbers, and provide a text description for each graphic with the serial number in a list, so that the graphic and the text description are associated and matched through the serial number.

[0036] Preferably, if Figure 4 As shown, the step (3) includes the following sub-steps:

[0037] (3.1) The airport management party shall confirm and summarize the construction plans submitted by the construction party;

[0038] (3.2) Add information on construction time, construction category, and affected areas in chronological order and by construction object, to provide support for subsequent civil aviation control users to accurately evaluate and approve the construction plan;

[0039] (3.3) After confirming that all the construction information is filled in correctly, submit the process to the civil aviation control user for approval.

[0040] Preferably, if Figure 5 As shown, the step (4) includes the following sub-steps:

[0041] (4.1) Civil aviation control users carefully review and evaluate each clause of the construction process to ensure that the construction plan complies with safety standards and regulations;

[0042] (4.2) If there is a construction plan that has not passed the review, the civil aviation control user will fill in the comments and reject the process to the airport construction party for corresponding adjustments and corrections;

[0043] (4.3) After the airport user adjusts the rejected data, he / she shall submit the process to the civil aviation control user again. If there are any questions, he / she shall add his / her comments to the process and submit them together;

[0044] (4.4) All construction plans have been approved by civil aviation control users and are considered to meet the requirements, and the approval process for non-stop construction is completed.

[0045] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program can be stored in a computer-readable storage medium. When the program is executed, it includes the steps of the above-mentioned embodiment method, and the storage medium can be: ROM / RAM, disk, CD, memory card, etc. Therefore, corresponding to the method of the present invention, the present invention also includes a device for implementing the digital management process of non-stop construction at a transport airport, which is usually represented in the form of functional modules corresponding to the steps of the method. The device includes:

[0046] Design module, which is configured to carry out overall design of the digital management process of non-stop construction at transport airports;

[0047] A generation module configured to generate a digital construction plan visualization graphic;

[0048] Confirmation module, which is configured to collect and confirm the non-stop construction plan information by the airport management;

[0049] Approval module, which is configured for users of the Civil Aviation Administration to approve the construction plan.

[0050] Preferably, the design module performs the following sub-steps:

[0051] (1.1) The airport construction party initiates the non-stop construction process according to the construction plan;

[0052] (1.2) Fill in the information on the start and end time of the construction and the specific content of the construction;

[0053] (1.3) For construction projects that require multiple days without stopping flights, calculate the start and end times.

[0054] Split into each specific construction date to form multiple independent TAB pages.

[0055] Preferably, the generating module performs the following sub-steps:

[0056] (2.1) Mark the status of the construction scope and construction objects on the airport electronic map and generate geographic information graphic data in a standard format;

[0057] (2.2) When there are multiple non-stop construction sites at the same time, multiple construction areas or construction objects are displayed simultaneously;

[0058] (2.3) Mark the map elements on the electronic map with serial numbers, and provide a text description for each graphic with the serial number in a list, so that the graphic and the text description are associated and matched through the serial number.

[0059] Preferably, the confirmation module performs the following sub-steps:

[0060] (3.1) The airport management party shall confirm and summarize the construction plans submitted by the construction party;

[0061] (3.2) Add information on construction time, construction category, and affected areas in chronological order and by construction object, to provide support for subsequent civil aviation control users to accurately evaluate and approve the construction plan;

[0062] (3.3) After confirming that all the construction information is filled in correctly, submit the process to the civil aviation control user for approval.

[0063] Preferably, the approval module performs the following sub-steps:

[0064] (4.1) Civil aviation control users carefully review and evaluate each clause of the construction process to ensure that the construction plan complies with safety standards and regulations;

[0065] (4.2) If there is a construction plan that has not passed the review, the civil aviation control user will fill in the comments and reject the process to the airport construction party for corresponding adjustments and corrections;

[0066] (4.3) After the airport user adjusts the rejected data, he / she shall submit the process to the civil aviation control user again. If there are any questions, he / she shall add his / her comments to the process and submit them together;

[0067] (4.4) All construction plans have been approved by civil aviation control users and are considered to meet the requirements, and the approval process for non-stop construction is completed.

[0068] This application has no similar patents in my country. Compared with the relevant non-stop construction management methods for transport airports abroad, this application designs the process design of the non-stop construction plan for transport airports, the automatic generation of digital construction plan visualization graphics, the airport management party's summary and confirmation of non-stop construction plan information, and the Civil Aviation Administration's approval of the construction plan, which is more in line with the actual operation requirements of my country's civil aviation airport operations.

[0069] The technologies and methods related to this application provide beneficial technical exploration and preparation for the digital management of aviation information of my country's civil aviation, and provide the most direct and effective reference technology cases.

[0070] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. A method for implementing a digital management process for non-stop construction at a transport airport, characterized by: It includes the following steps: (1) Overall design of the digital management process for non-stop construction at transport airports; (2) Generate visualization graphics of digital construction plans; (3) The airport management party summarizes and confirms the non-stop construction plan information; (4) Civil Aviation Administration of China users shall review and approve the construction plan.

2. The method for implementing the digital management process of non-stop construction at a transport airport according to claim 1 is characterized by: The step (1) comprises the following sub-steps: (1.1) The airport construction party initiates the non-stop construction process according to the construction plan; (1.2) Fill in the information on the start and end time of the construction and the specific content of the construction; (1.3) For construction plans that need to last for multiple days without stopping flights, calculate the start and end times and split them into each specific construction date to form multiple independent TAB pages.

3. The method for implementing the digital management process of non-stop construction at a transport airport according to claim 2 is characterized by: The step (2) comprises the following sub-steps: (2.1) Mark the status of the construction scope and construction objects on the airport electronic map and generate geographic information graphic data in a standard format; (2.2) When there are multiple non-stop construction sites at the same time, multiple construction areas or construction objects are displayed simultaneously; (2.3) Mark the map elements on the electronic map with serial numbers, and provide a text description for each graphic with the serial number in a list, so that the graphic and the text description are associated and matched through the serial number.

4. The method for implementing the digital management process of non-stop construction at a transport airport according to claim 3 is characterized by: The step (3) comprises the following sub-steps: (3.1) The airport management party shall confirm and summarize the construction plans submitted by the construction party; (3.2) Add information on construction time, construction category, and affected areas in chronological order and by construction object, to provide support for subsequent civil aviation control users to accurately evaluate and approve the construction plan; (3.3) After confirming that all the construction information is filled in correctly, submit the process to the civil aviation control user for approval.

5. The method for implementing the digital management process of non-stop construction at a transport airport according to claim 4 is characterized by: The step (4) comprises the following sub-steps: (4.1) Civil aviation control users carefully review and evaluate each clause of the construction process to ensure that the construction plan complies with safety standards and regulations; (4.2) If there is a construction plan that has not passed the review, the civil aviation control user will fill in the comments and reject the process to the airport construction party for corresponding adjustments and corrections; (4.3) After the airport user adjusts the rejected data, he / she shall submit the process to the civil aviation control user again. If there are any questions, he / she shall add his / her comments to the process and submit them together; (4.4) All construction plans have been approved by civil aviation control users and are considered to meet the requirements, and the approval process for non-stop construction is completed.

6. A device for realizing the digital management process of non-stop construction at a transport airport, characterized by: It includes: Design module, which is configured to carry out overall design of the digital management process of non-stop construction at transport airports; A generation module configured to generate a digital construction plan visualization graphic; Confirmation module, which is configured to collect and confirm the non-stop construction plan information by the airport management; Approval module, which is configured for users of the Civil Aviation Administration to approve the construction plan.

7. The device for realizing the digital management process of non-stop construction at a transport airport according to claim 6 is characterized by: The design module performs the following sub-steps: (1.1) The airport construction party initiates the non-stop construction process according to the construction plan; (1.2) Fill in the information on the start and end time of the construction and the specific content of the construction; (1.3) For construction plans that need to last for multiple days without stopping flights, calculate the start and end times and split them into each specific construction date to form multiple independent TAB pages.

8. The device for realizing the digital management process of non-stop construction at a transport airport according to claim 7 is characterized by: The generation module performs the following sub-steps: (2.1) Mark the status of the construction scope and construction objects on the airport electronic map and generate geographic information graphic data in a standard format; (2.2) When there are multiple non-stop construction sites at the same time, multiple construction areas or construction objects are displayed simultaneously; (2.3) Mark the map elements on the electronic map with serial numbers, and provide a text description for each graphic with the serial number in a list, so that the graphic and the text description are associated and matched through the serial number.

9. The device for realizing the digital management process of non-stop construction at a transport airport according to claim 8, characterized in that: The confirmation module performs the following sub-steps: (3.1) The airport management party shall confirm and summarize the construction plans submitted by the construction party; (3.2) Add information on construction time, construction category, and affected areas in chronological order and by construction object, to provide support for subsequent civil aviation control users to accurately evaluate and approve the construction plan; (3.3) After confirming that all the construction information is filled in correctly, submit the process to the civil aviation control user for approval.

10. The device for realizing the digital management process of non-stop construction at a transport airport according to claim 9, characterized in that: The approval module performs the following sub-steps: (4.1) Civil aviation control users carefully review and evaluate each item of the construction process to ensure that the construction plan complies with safety standards and regulations; (4.2) If there is a construction plan that has not passed the review, the civil aviation control user will fill in the comments and reject the process to the airport construction party for corresponding adjustments and corrections; (4.3) After the airport user adjusts the rejected data, he / she shall submit the process to the civil aviation control user again. If there are any questions, he / she shall add his / her comments to the process and submit them together; (4.4) All construction plans have been approved by civil aviation control users and are considered to meet the requirements, and the approval process for non-stop construction is completed.