Construction device and construction method for rotary excavating cast-in-situ bored pile in high-fill geology

By designing a high-fill geological rotary drilling pile construction device including base, extension plate, transverse studs and other components, the problems of increased foundation bearing pressure and construction safety hazards in the prior art are solved, and the safety and efficiency of construction are improved.

CN119531349APending Publication Date: 2025-02-28CHINA MCC17 GRP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411942992.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

The existing high-fill geological rotary drilling pile construction device has increased foundation bearing pressure and construction safety hazards during operation, and the construction methods are complicated and the steel cage is not lifted tightly enough, which affects the quality and stability of the pile body.

Method used

A construction device including a base, an extension plate, a transverse stud, a first threaded plate, a first motor, a first gear and a second gear is designed. Through the coordinated work of these components, the overall movement of the device and the precise movement of the construction mechanism are realized, avoiding the risk of the vehicle being directly approached by the hole, and the construction efficiency is improved by quickly switching the rotary drilling and hoisting mechanism.

Benefits of technology

It effectively avoids the risks of foundation instability and hole collapse, improves the safety and efficiency of construction, and ensures the accurate lifting of the steel cage and the stability of the pile body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119531349A_ABST
    Figure CN119531349A_ABST
Patent Text Reader

Abstract

The invention discloses a high-fill geology rotary excavating cast-in-situ bored pile construction device and method, and relates to the technical field of rotary excavating cast-in-situ bored construction.The high-fill geology rotary excavating cast-in-situ bored pile construction device comprises a base, an extension plate is arranged on one side of the upper end of the base, a transverse stud is arranged in the center of the interior of the base, and a first threaded plate is in threaded connection with the position, close to one side, of the surface of the transverse stud; and a first motor is fixedly mounted in the center of one side of the base. According to the rotary excavating cast-in-situ bored pile construction device for the high-fill geology, through the structure of the base, the extension plate, the transverse stud, the first threaded plate, the first motor, the first gear and the second gear, the device is connected with a carrier through a mounting plate, and the whole device is moved to a designated construction site through the carrier; a first motor drives a first gear and a second gear to rotate in a meshed mode, a transverse stud is driven to rotate, then a first threaded plate is made to move through threaded connection, finally, an extension plate is pushed to accurately move towards a drilling site, the extension plate drives a construction mechanism at the upper end to move to a site needing construction, and the quality problem caused by position deviation is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rotary drilling and grouting construction, in particular to a high fill geological rotary drilling and grouting pile construction device and a construction method. Background Art

[0002] High fill geological rotary bored pile construction is a foundation treatment method that uses a rotary drilling rig to drill holes in areas with large fill volumes and complex geological conditions, and then places a steel cage in the hole and pours concrete to form a stable pile structure. This method can effectively enhance the bearing capacity and stability of the foundation and is suitable for various construction projects.

[0003] The existing high-fill geological rotary drilling and grouting pile construction equipment has some obvious shortcomings in the operation process. Since most construction equipment relies on heavy vehicles for movement and operation, these vehicles themselves are heavy. When they are close to the construction holes, they not only increase the bearing pressure of the foundation, but also easily lead to the risk of vehicle rollover or hole collapse due to unstable foundation. This will not only endanger construction safety, but may also have a serious impact on project progress and cost.

[0004] At the same time, the current construction method generally adopts a batch operation mode of first rotary drilling and then hoisting the steel cage. This construction method is not only cumbersome to operate and increases the construction period, but also during the installation of the steel cage, due to the insufficient connection with the rotary drilling hole, the position of the steel cage may be offset or tilted, thereby affecting the overall quality and stability of the pile body. Summary of the invention

[0005] The object of the present invention is to provide a high fill geological rotary drilling bored pile construction device to solve the technical problems raised in the above background technology or to achieve better technical effects.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: A high fill geological rotary drilling bored pile construction device, comprising a base, an extension plate is provided on one side of the upper end of the base, a horizontal stud is provided in the center of the base, a first threaded plate is threadedly connected to the surface of the horizontal stud at one side, a first motor is fixedly installed at the center of one side of the base, a second gear is fixedly installed at the surface of the horizontal stud at one side, the upper end of one side of the second gear is meshedly connected to the first gear, a cross guide rod is fixedly installed at the front and rear ends of the bottom of the base, and a guide sleeve is slidably connected to the lower end of the first threaded plate on the surfaces of the two cross guide rods, a push plate is fixedly connected to the center of the top of the first threaded plate, a rotating plate is provided on one side of the top of the extension plate, a rotating column is fixedly connected to the center of the bottom of the rotating plate, a support frame is fixedly connected to one side of the lower end of the extension plate, a second motor is fixedly installed on one side of the bottom of the inner wall of the support frame, a fourth gear is fixedly installed at the center of the surface of the rotating column, a third gear is meshedly connected to one side of the fourth gear, a supporting steel ball is rollingly installed at the bottom of the rotating plate, and a rotating plate is fixedly installed on one side of the top of the rotating plate. There is a hollow vertical plate, a vertical stud is arranged on one side of the hollow vertical plate, a third motor is fixedly installed on one side of the top of the hollow vertical plate, a lifting frame is threadedly connected to the top position of the surface of the vertical stud, a vertical guide rod is fixedly installed on the front and rear ends of the other side of the bottom of the hollow vertical plate, a second movable groove is opened in the center of one side of the hollow vertical plate, one side of the lifting frame penetrates to the outside of the second movable groove, a connecting plate is fixedly connected to one side of the top of the lifting frame close to the hollow vertical plate, a groove is opened on one side of the upper end of the lifting frame, and the front and rear ends of the center of one side of the connecting plate are An electric cylinder is fixedly installed, and a translation plate is fixedly installed at one end of the two electric cylinders, the lower end of the translation plate passes through the outside of the groove, a hook is fixedly installed at the center of the bottom of the translation plate, short guide rods are fixedly installed at the front and rear ends of one side of the inner wall of the groove, one ends of the two short guide rods pass through the outside of the translation plate and are fixedly connected to the other side of the inner wall of the groove, a rotary drilling mechanism is fixedly installed on the other side of the top of the rotating plate, first moving wheels are fixedly installed at the four corners of the bottom of the base, and second moving wheels are fixedly installed at the front and rear ends of one side of the bottom of the extension plate.

[0007] Preferably, the first motor is fixedly connected to the first drive shaft through the output end at the bottom thereof, the lower end of the first drive shaft passes through the interior of the base and is fixedly connected to the center of the top of the first gear, and the two ends of the horizontal stud are movably connected to the bearings fixedly installed on both sides of the base near the top position.

[0008] Preferably, the upper end of the guide sleeve is fixedly connected to the bottom of the first threaded plate, limit blocks are fixedly installed on both sides of the surface of the cross guide rod, a first movable groove is opened at the upper end of the base, the upper end of the push plate passes through the outside of the first movable groove, and one end of the extension plate is fixedly connected to the top of one side of the push plate.

[0009] Preferably, the lower end of the rotating column passes through the outside of the extension plate and is movably connected to a bearing fixedly installed on the other side of the bottom of the support frame. The second motor is fixedly connected to the second drive shaft through the output end at its top, and the upper end of the second drive shaft is fixedly connected to the center of the bottom of the third gear.

[0010] Preferably, the number of the supporting steel balls is several, and an annular groove is opened at the top of the base corresponding to the lower part of the several supporting steel balls, and the lower ends of the several supporting steel balls penetrate into the interior of the annular groove and contact with the inner bottom of the annular groove.

[0011] Preferably, the third motor is fixedly connected to a third drive shaft through the output end at the bottom thereof, the lower end of the third drive shaft passes through the interior of the hollow vertical plate and is fixedly connected to the top of the vertical stud, the lower end of the vertical stud is movably connected to a bearing fixedly installed on one side of the bottom of the hollow vertical plate, and the upper ends of the two vertical guide rods pass through the outside of the lifting frame and are fixedly connected to the inner top of the hollow vertical plate.

[0012] Preferably, a mounting plate is fixedly connected to one side of the top of the base corresponding to the extension plate, and a plurality of mounting holes are opened on one side of the mounting plate.

[0013] The present invention also discloses a construction method of a high fill geological rotary drilling bored pile construction device, comprising the following steps:

[0014] Step one, connect the mounting plate to the carrier and move the entire device to the designated construction location, then control the first motor to make the first gear engage with the second gear to rotate, thereby driving the cross stud to rotate. The cross stud is threadedly connected to the first threaded plate during the rotation, so that the first threaded plate drives the push plate to push the extension plate toward the drilling location as the cross stud rotates, then hoist the steel cage on the hook, and the second moving wheel at the bottom of the extension plate is supported by the ground during the movement.

[0015] Step 2, controlling the second motor to operate so that the third gear meshes with the fourth gear to rotate, so that the fourth gear drives the rotating plate to rotate, so that the rotary drilling mechanism on the rotating plate moves to the right, and drills the ground through its drill bit.

[0016] Step three, after the drilling work is completed, control the second motor again to drive the rotating plate to rotate, so that the hollow vertical plate rotates to the right, and then install the steel cage. First, control the third motor to drive the vertical stud to rotate. Since the vertical stud is threadedly connected to one end of the lifting frame, the lifting frame moves downward with the rotation of the vertical stud, thereby sending the hoisted steel cage into the drill hole. While placing the steel cage, control the electric cylinder to push the translation plate to move horizontally on the two short guide rods, so as to adjust the position of the hoisted steel cage. When the steel cage is accurately placed at the predetermined position in the drill hole, stop the operation of the third motor and the electric cylinder, and then install the steel cage. After the installation of the steel cage is completed, finally pour the concrete and carry out subsequent work.

[0017] Compared with the prior art, the beneficial effects of the present invention include:

[0018] The high fill geological rotary drilling and bored pile construction device connects the device to the carrier through the design of a base, an extension plate, a transverse stud, a first threaded plate, a first motor, a first gear and a second gear. The device is moved as a whole to a designated construction site by the carrier. The first motor drives the first gear and the second gear to rotate in meshing, thereby driving the transverse stud to rotate, and then the first threaded plate is moved through a threaded connection, and finally the extension plate is pushed to move accurately toward the drilling site. The extension plate drives the upper construction mechanism to move to the site where construction is required. This design effectively avoids the risks of directly operating the construction mechanism through the carrier in the traditional method, which may cause unstable foundation and hole collapse due to the excessive weight of the carrier and directly approaching the hole. The second moving wheel at the bottom of the extension plate is supported by the ground, so that the carrier can be parked in a safe position far away from the hole, and the device itself can be accurately moved to the construction site for operation. The rotating plate, the rotating column, the second motor, the third gear The design of the wheel, the fourth gear, the hollow vertical plate, the vertical stud, the third motor, the lifting frame, the connecting plate, the electric cylinder, the translation plate, the hook and the rotary drilling mechanism. The second motor drives the third gear and the fourth gear to engage and transmit, so that the rotating column drives the rotating plate to rotate. This design enables rapid switching between the rotary drilling mechanism and the lifting mechanism, avoiding the need to use different devices for batch construction, greatly reducing the waiting time during the construction process, and improving the flexibility of the device and the overall construction efficiency. The third motor drives the vertical stud to rotate, thereby controlling the lifting of the lifting frame, thereby achieving rapid and accurate lifting of the steel cage. This operation method reduces the uncertainty and error of manual operation and further improves construction efficiency. The electric cylinder and the translation plate enable the steel cage to be accurately adjusted to the left and right position during the lifting process. This fine-tuning function ensures that the steel cage can be accurately placed in the predetermined position, avoiding quality problems caused by position deviation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the present invention;

[0020] Figure 2 For the present invention Figure 1 A is a partial enlarged schematic diagram;

[0021] Figure 3 It is a structural stereogram of the lifting frame of the present invention;

[0022] Figure 4 It is a structural stereogram of the translation plate of the present invention;

[0023] Figure 5 It is the front view of the structure of the present invention.

[0024] In the figure: 1. base; 2. extension plate; 3. horizontal stud; 4. first threaded plate; 5. first motor; 6. first gear; 7. second gear; 8. horizontal guide rod; 9. guide sleeve; 10. limit block; 11. first movable groove; 12. push plate; 13. rotating plate; 14. rotating column; 15. second motor; 16. third gear; 17. fourth gear; 18. supporting steel ball; 19. hollow vertical plate; 20. vertical stud; 21. third motor; 22. lifting frame; 23. vertical guide rod; 24. connecting plate; 25. groove; 26. short guide rod; 27. electric cylinder; 28. translation plate; 29. ​​hook; 30. second movable groove; 31. rotary drilling mechanism; 32. mounting plate; 33. first movable wheel; 34. second movable wheel. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] Example

[0027] See also Figure 1-5The present invention provides a technical solution: a high fill geological rotary drilling bored pile construction device, comprising a base 1, an extension plate 2 is arranged on one side of the upper end of the base 1, a horizontal stud 3 is arranged in the center of the base 1, a first threaded plate 4 is threadedly connected to the surface of the horizontal stud 3 at one side, a first motor 5 is fixedly installed at the center of one side of the base 1, a second gear 7 is fixedly installed on the surface of the horizontal stud 3 at one side, a first gear 6 is meshedly connected to the upper end of one side of the second gear 7, a horizontal guide rod 8 is fixedly installed at the front end and the rear end of the bottom of the base 1, and the surfaces of the two horizontal guide rods 8 are slidably connected to the lower end of the first threaded plate 4 A guide sleeve 9 is provided, a push plate 12 is fixedly connected to the center of the top of the first threaded plate 4, a rotating plate 13 is arranged on one side of the top of the extension plate 2, a rotating column 14 is fixedly connected to the center of the bottom of the rotating plate 13, a support frame is fixedly connected to one side of the lower end of the extension plate 2, a second motor 15 is fixedly installed on one side of the bottom of the inner wall of the support frame, a fourth gear 17 is fixedly installed on the surface of the rotating column 14 at a center position, a third gear 16 is meshedly connected to one side of the fourth gear 17, a supporting steel ball 18 is rollingly installed on the bottom of the rotating plate 13, a hollow vertical plate 19 is fixedly installed on one side of the top of the rotating plate 13, and a hollow vertical plate 19 is fixedly installed inside the hollow vertical plate 19. A vertical stud 20 is arranged on the side, a third motor 21 is fixedly installed on one side of the top of the hollow vertical plate 19, a lifting frame 22 is threadedly connected to the top position of the surface of the vertical stud 20, and a vertical guide rod 23 is fixedly installed at the front and rear ends of the other side of the bottom of the hollow vertical plate 19. A second movable groove 30 is opened in the center of one side of the hollow vertical plate 19, and one side of the lifting frame 22 penetrates to the outside of the second movable groove 30. A connecting plate 24 is fixedly connected to one side of the top of the lifting frame 22 near the hollow vertical plate 19, a groove 25 is opened on one side of the upper end of the lifting frame 22, and an electric cylinder 27 is fixedly installed at the front and rear ends of the center of one side of the connecting plate 24 A translation plate 28 is fixedly installed at one end of the two electric cylinders 27, and the lower end of the translation plate 28 passes through the outside of the groove 25. A hook 29 is fixedly installed at the center of the bottom of the translation plate 28. Short guide rods 26 are fixedly installed at the front and rear ends of one side of the inner wall of the groove 25. One ends of the two short guide rods 26 pass through the outside of the translation plate 28 and are fixedly connected to the other side of the inner wall of the groove 25. A rotary drilling mechanism 31 is fixedly installed on the other side of the top of the rotating plate 13. First moving wheels 33 are fixedly installed at the four corners of the bottom of the base 1, and second moving wheels 34 are fixedly installed at the front and rear ends of one side of the bottom of the extension plate 2.

[0028] The first motor 5 is fixedly connected to the first drive shaft through the output end at the bottom thereof, the lower end of the first drive shaft passes through the interior of the base 1 and is fixedly connected to the center of the top of the first gear 6, and the two ends of the horizontal stud 3 are movably connected to the bearings fixedly installed on both sides of the base 1 near the top position.

[0029] The upper end of the guide sleeve 9 is fixedly connected to the bottom of the first threaded plate 4, and limit blocks 10 are fixedly installed on both sides of the surface of the cross guide rod 8. A first movable groove 11 is opened at the upper end of the base 1, and the upper end of the push plate 12 passes through the outside of the first movable groove 11. One end of the extension plate 2 is fixedly connected to the top of one side of the push plate 12.

[0030] The lower end of the rotating column 14 passes through the outside of the extension plate 2 and is movably connected to a bearing fixedly installed on the other side of the bottom of the support frame. The second motor 15 is fixedly connected to the second drive shaft through its top output end, and the upper end of the second drive shaft is fixedly connected to the center of the bottom of the third gear 16.

[0031] A number of supporting steel balls 18 are provided, and an annular groove is provided below the top of the base 1 corresponding to the supporting steel balls 18. The lower ends of the supporting steel balls 18 penetrate into the interior of the annular groove and contact with the inner bottom of the annular groove. The supporting steel balls 18 roll in the annular groove to support the rotating plate 13 during rotation and ensure its stability.

[0032] The third motor 21 is fixedly connected to the third drive shaft through the output end at the bottom thereof, the lower end of the third drive shaft passes through the interior of the hollow vertical plate 19 and is fixedly connected to the top of the vertical stud 20, the lower end of the vertical stud 20 is movably connected to a bearing fixedly installed on one side of the bottom inner side of the hollow vertical plate 19, and the upper ends of the two vertical guide rods 23 both pass through the outside of the lifting frame 22 and are fixedly connected to the inner top of the hollow vertical plate 19.

[0033] A mounting plate 32 is fixedly connected to one side of the top of the base 1 corresponding to the extension plate 2 , and a plurality of mounting holes are provided on one side of the mounting plate 32 for connecting with the carrier by passing bolts through the mounting holes.

[0034] Specifically, a construction method of a high fill geological rotary drilling bored pile construction device comprises the following steps:

[0035] Step one, connect the mounting plate 32 with the carrier, move the entire device to the designated construction location, then control the first motor 5 to make the first gear 6 engage with the second gear 7 to rotate, thereby driving the horizontal stud 3 to rotate. The horizontal stud 3 is threadedly connected with the first threaded plate 4 during the rotation, so that the first threaded plate 4 drives the push plate 12 to push the extension plate 2 to the drilling location as the horizontal stud 3 rotates, and then hoist the steel cage on the hook 29. During the movement of the extension plate 2, the second moving wheel 34 at the bottom is supported by the ground.

[0036] Step 2, control the second motor 15 to operate so that the third gear 16 engages with the fourth gear 17 to rotate, so that the fourth gear 17 drives the rotating plate 13 to rotate, and the rotary drilling mechanism 31 on the rotating plate 13 moves to the right side, and drills the ground through its drill bit.

[0037] Step three, after the drilling work is completed, control the second motor 15 again to drive the rotating plate 13 to rotate, so that the hollow vertical plate 19 rotates to the right, and then install the steel cage. First, control the third motor 21 to drive the vertical stud 20 to rotate. Since the vertical stud 20 is threadedly connected to one end of the lifting frame 22, the lifting frame 22 moves downward with the rotation of the vertical stud 20, thereby sending the hoisted steel cage into the drill hole. While placing the steel cage, control the electric cylinder 27 to push the translation plate 28 to move horizontally on the two short guide rods 26, so as to adjust the position of the hoisted steel cage. When the steel cage is accurately placed at the predetermined position in the drill hole, stop the operation of the third motor 21 and the electric cylinder 27, and then install the steel cage. After the steel cage is installed, pour the concrete and carry out subsequent work.

[0038] In summary, the high fill geological rotary drilling bored pile construction device, through the design of the base 1, extension plate 2, transverse stud 3, first threaded plate 4, first motor 5, first gear 6 and second gear 7, connects the device to the carrier through the mounting plate 32, and uses the carrier to move the device as a whole to the designated construction site, and drives the first gear 6 and the second gear 7 to rotate through the first motor 5, drives the transverse stud 3 to rotate, and then moves the first threaded plate 4 through the threaded connection, and finally pushes the extension plate 2 to move accurately to the drilling site, and the extension plate 2 drives the upper construction mechanism to move to the site where construction is required. This design effectively avoids the risks of directly operating the construction mechanism through the carrier in the traditional method, and the risks of unstable foundation and hole collapse caused by the carrier being too heavy and directly approaching the hole. The second moving wheel 34 at the bottom of the extension plate 2 is supported by the ground, so that the carrier can be parked in a safe position far away from the hole, and the device itself can be accurately moved to the construction site for operation, the rotating plate 13, the rotating column 14, the second motor 15, the third gear 16, the fourth gear The design of the wheel 17, the hollow vertical plate 19, the vertical stud 20, the third motor 21, the lifting frame 22, the connecting plate 24, the electric cylinder 27, the translation plate 28, the hook 29 and the rotary drilling mechanism 31 is realized by the second motor 15 driving the meshing transmission of the third gear 16 and the fourth gear 17, so that the rotating column 14 drives the rotating plate 13 to rotate. This design enables rapid switching between the rotary drilling mechanism 31 and the lifting mechanism, avoiding the need to use different devices for batch construction, greatly reducing the waiting time during the construction process, and improving the flexibility of the device and the overall construction efficiency. The third motor 21 drives the vertical stud 20 to rotate, thereby controlling the lifting and lowering of the lifting frame 22, thereby realizing rapid and accurate lifting of the steel cage. This operation method reduces the uncertainty and error of manual operation and further improves the construction efficiency. The electric cylinder 27 and the translation plate 28 enable the precise adjustment of the left and right position of the steel cage during the lifting process. This fine-tuning function ensures that the steel cage can be accurately placed in the predetermined position, avoiding quality problems caused by position deviation.

[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high fill geological rotary drilling bored pile construction device, comprising a base (1), characterized in that: An extension plate (2) is provided on one side of the upper end of the base (1), a transverse stud (3) is provided in the center of the base (1), a first threaded plate (4) is threadedly connected to a position on one side of the surface of the transverse stud (3), a first motor (5) is fixedly installed at the center of one side of the base (1), a second gear (7) is fixedly installed on a position on one side of the surface of the transverse stud (3), and an upper end of one side of the second gear (7) is meshedly connected to the first gear (6), The front end and the rear end of the bottom of the base (1) are fixedly mounted with a cross-guide rod (8); the surfaces of the two cross-guide rods (8) are slidably connected with a guide sleeve (9) corresponding to the lower end of the first threaded plate (4); the center of the top of the first threaded plate (4) is fixedly connected with a push plate (12); a rotating plate (13) is provided on one side of the top of the extension plate (2); a rotating column (14) is fixedly connected to the center of the bottom of the rotating plate (13); a support frame is fixedly connected to one side of the lower end of the extension plate (2); a second motor (15) is fixedly mounted on one side of the bottom of the inner wall of the support frame; A fourth gear (17) is fixedly mounted at a center position on the surface of the rotating column (14); one side of the fourth gear (17) is meshedly connected with a third gear (16); a supporting steel ball (18) is rollingly mounted at the bottom of the rotating plate (13); a hollow vertical plate (19) is fixedly mounted on one side of the top of the rotating plate (13); a vertical stud (20) is provided on one side of the hollow vertical plate (19); and a third motor (21) is fixedly mounted on one side of the top of the hollow vertical plate (19).

2. According to claim 1, a high fill geological rotary drilling bored pile construction device is characterized by: A lifting frame (22) is threadedly connected to the top position of the surface of the vertical stud (20); a vertical guide rod (23) is fixedly installed at the front end and the rear end of the other side of the bottom of the hollow vertical plate (19); a second movable groove (30) is opened in the center of one side of the hollow vertical plate (19); one side of the lifting frame (22) penetrates to the outside of the second movable groove (30); a connecting plate (24) is fixedly connected to the top of the lifting frame (22) near the hollow vertical plate (19); a groove (25) is opened on one side of the upper end of the lifting frame (22); an electric cylinder (27) is fixedly installed at the front end and the rear end of the center of one side of the connecting plate (24); one end of the two electric cylinders (27) is fixedly installed A translation plate (28) is provided, the lower end of the translation plate (28) penetrates to the outside of the groove (25), a hook (29) is fixedly installed at the center of the bottom of the translation plate (28), the front end and the rear end of one side of the inner wall of the groove (25) are fixedly installed with short guide rods (26), one end of the two short guide rods (26) penetrates to the outside of the translation plate (28) and is fixedly connected to the other side of the inner wall of the groove (25), a rotary drilling mechanism (31) is fixedly installed on the other side of the top of the rotating plate (13), first moving wheels (33) are fixedly installed at the four corners of the bottom of the base (1), and second moving wheels (34) are fixedly installed at the front end and the rear end of one side of the bottom of the extension plate (2).

3. The high fill geological rotary drilling bored pile construction device according to claim 2 is characterized by: The first motor (5) is fixedly connected to a first drive shaft via an output end at the bottom thereof, the lower end of the first drive shaft passes through the interior of the base (1) and is fixedly connected to the center of the top of the first gear (6), and the two ends of the transverse stud (3) are movably connected to bearings fixedly installed on both sides of the base (1) near the top.

4. The high fill geological rotary drilling bored pile construction device according to claim 2, characterized in that: The upper end of the guide sleeve (9) is fixedly connected to the bottom of the first threaded plate (4), and limit blocks (10) are fixedly installed on both sides of the surface of the cross guide rod (8). The upper end of the base (1) is provided with a first movable groove (11), and the upper end of the push plate (12) passes through the outside of the first movable groove (11), and one end of the extension plate (2) is fixedly connected to the top of one side of the push plate (12).

5. The high fill geological rotary drilling bored pile construction device according to claim 2, characterized in that: The lower end of the rotating column (14) passes through the outside of the extension plate (2) and is movably connected to a bearing fixedly installed on the other side of the bottom of the support frame. The second motor (15) is fixedly connected to a second drive shaft through its top output end, and the upper end of the second drive shaft is fixedly connected to the center of the bottom of the third gear (16).

6. The high fill geological rotary drilling bored pile construction device according to claim 2, characterized in that: The number of the supporting steel balls (18) is several, and an annular groove is provided at the top of the base (1) below the several supporting steel balls (18), and the lower ends of the several supporting steel balls (18) penetrate into the interior of the annular groove and contact the inner bottom of the annular groove.

7. The high fill geological rotary drilling bored pile construction device according to claim 2, characterized in that: The third motor (21) is fixedly connected to a third drive shaft through the output end at the bottom thereof, the lower end of the third drive shaft passes through the interior of the hollow vertical plate (19) and is fixedly connected to the top of the vertical stud (20), the lower end of the vertical stud (20) is movably connected to a bearing fixedly installed on one side of the bottom of the hollow vertical plate (19), and the upper ends of the two vertical guide rods (23) pass through the exterior of the lifting frame (22) and are fixedly connected to the inner top of the hollow vertical plate (19).

8. The high fill geological rotary drilling bored pile construction device according to claim 2, characterized in that: A mounting plate (32) is fixedly connected to one side of the top of the base (1) corresponding to the extension plate (2), and a plurality of mounting holes are provided on one side of the mounting plate (32).

9. A construction method of a high fill geological rotary drilling bored pile construction device, comprising a high fill geological rotary drilling bored pile construction device according to any one of claims 1 to 8, characterized in that: The steps include: Step 1: Connect the mounting plate (32) with the carrier and move the entire device to the designated construction site. Then, control the first motor (5) to make the first gear (6) mesh with the second gear (7) to rotate, thereby driving the horizontal stud (3) to rotate. The horizontal stud (3) is threadedly connected with the first threaded plate (4) during the rotation process, so that the first threaded plate (4) drives the push plate (12) to push the extension plate (2) to move toward the drilling site as the horizontal stud (3) rotates. Then, the steel cage is hoisted on the hook (29). During the movement of the extension plate (2), the second moving wheel (34) at the bottom thereof is supported by the ground. Step 2, controlling the second motor (15) to operate so that the third gear (16) engages with the fourth gear (17) to rotate, so that the fourth gear (17) drives the rotating plate (13) to rotate, so that the rotary drilling mechanism (31) on the rotating plate (13) moves to the right side, and the drill bit thereof drills a hole in the ground; Step 3: After the drilling work is completed, the second motor (15) is controlled again to drive the rotating plate (13) to rotate, so that the hollow vertical plate (19) rotates to the right, and then the steel cage is installed. First, the third motor (21) is controlled to drive the vertical stud (20) to rotate. Since the vertical stud (20) is threadedly connected to one end of the lifting frame (22), the lifting frame (22) moves downward with the rotation of the vertical stud (20), thereby sending the hoisted steel cage into the drill hole. While the steel cage is being placed, the electric cylinder (27) is controlled to push the translation plate (28) to move horizontally on the two short guide rods (26), thereby adjusting the position of the hoisted steel cage. When the steel cage is accurately placed at the predetermined position in the drill hole, the operation of the third motor (21) and the electric cylinder (27) is stopped, and then the steel cage is subsequently installed. After the steel cage is installed, concrete pouring and subsequent work are finally carried out.

Citation Information

Patent Citations

  • Pile drilling machine tool for reinforcing soft foundation in tunnel

    CN116877109A

  • Cast-in-place pile construction device

    CN117108198A

  • Cast-in-place pile drilling device for road and bridge construction

    CN215632740U

  • Device for drilling hole for bored screw pile forming

    RU2261955C2

  • Intelligent core drilling monitoring system having early-warning function and monitoring method

    WO2023078334A1