Prefabricated sewage pool prefabricated structure and manufacturing method thereof
By designing a detachable mud-connecting plate and leaking vertical trough in the initial sinking part of the prefabricated sewage tank, the cleaning problems of sewage tank sediment and green algae are solved, and the centralized cleaning of sediment and the extension of the cleaning cycle is achieved.
Patent Information
- Application Number
- CN202411737833.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-02-28
AI Technical Summary
After long-term use of existing prefabricated sewage tanks, sediment accumulates at the bottom of the sewage tank and green algae grows on the side walls, resulting in regular cleaning needs and short cleaning cycles.
A prefabricated sewage tank is designed, in which the initial sinking part is equipped with a detachable mud-connecting plate, and a leaky vertical groove and a leaky hole are provided on the mud-connecting plate. The vertical groove is washed with sewage, and sediment is gathered on the mud-connecting plate for easy replacement and cleaning.
The centralized cleaning of sediment is realized, the cleaning process of sewage tanks is simplified, the cleaning cycle is extended, and the sewage treatment efficiency is improved.
Smart Images

Figure CN119531651A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment, and more specifically, to a prefabricated structure of an assembled sewage pool and a manufacturing method thereof. Background Art
[0002] Sewage treatment is the process of purifying sewage. The goal of sewage treatment is to make sewage meet the water quality requirements for discharge into a water body or reuse. In the construction process of traditional sewage treatment plants, the sewage pools are generally built using traditional construction technology, which not only has a long construction period, but also pollutes the surrounding environment. In the construction process of new sewage treatment plants, assembled sewage pools will be used, which have a short construction period and a more environmentally friendly construction process. The components of assembled sewage pools are produced in prefabrication plants, and the quality is highly controllable.
[0003] A major drawback of existing prefabricated sewage pools is that long-term sewage treatment will lead to the accumulation of more sediment at the bottom of the sewage pool, and the side walls of the sewage pool may produce more green algae, so that the sewage treatment pool needs to be cleaned regularly, and the cleaning cycle is short. For example, in the invention patent with publication number CN110821256A, it discloses a prefabricated sewage plant biochemical pool, which includes an L-shaped component, a transverse baffle and a prefabricated pad. The L-shaped component includes an integrally formed side baffle and a bottom plate. At least two L-shaped components are mirror-imaged and arranged relative to each other and assembled into a U-shaped trough structure, and the bottom plate is attached to the top surface of the prefabricated pad and installed on the prefabricated pad. The two ends of the U-shaped trough structure in the length direction are respectively blocked with transverse baffles. When the prefabricated sewage plant biochemical pool is used for sewage biochemical treatment, more sediment accumulates at the bottom of the biochemical pool, which needs to be cleaned regularly, and the cleaning cycle is short. Summary of the invention
[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.
[0005] Another object of the present invention is to provide a prefabricated structure of an assembled sewage pool, in which the sediment is collected on a detachable mud plate, which is easy to clean.
[0006] In order to achieve these purposes and other advantages according to the present invention, there is provided a prefabricated structure of an assembled sewage pool, comprising a pair of sub-prefabricated structures arranged in mirror image relative to each other, each sub-prefabricated structure comprising: A primary sinking part, wherein the top of the primary sinking part is provided with a sewage inlet, and a detachable mud receiving plate is provided inside, and the mud receiving plate is provided with a plurality of leaking vertical grooves with closed tops, and the two side walls of the leaking vertical grooves are provided with a plurality of leaking holes, and the inner walls on both sides are provided with water seepage membranes; A drainage part, which is arranged below the primary sinking part and the top of which is connected to the drainage part, and the drainage part is provided with a drainage plate inclined downward from a side away from another sub-prefabricated structure; A water storage part is arranged below the drainage part. A deep groove connected to the drainage part is provided on one side of the water storage part close to another sub-prefabricated structure. The deep groove is semi-cylindrical. A filter element and a drainage bucket are detachably arranged in sequence from bottom to top in the deep groove. A plurality of conduits connected to the inner cavity of the water storage part are provided on the deep groove. Among them, a first connecting structure connected to another sub-prefabricated structure is provided on the top of one opposite side of a pair of sub-prefabricated structures, a second connecting structure connected to another sub-prefabricated structure is provided below one opposite side of a pair of sub-prefabricated structures to realize the connection of the sub-prefabricated structures in the first direction, and a third connecting structure is provided on the top of the adjacent side of the opposite side of any sub-prefabricated structure to realize continuous connection of the sub-prefabricated structures in the second direction.
[0007] Preferably, the sub-prefabricated structures include two types: the water storage part of the first seed prefabricated structure is provided with an integrally formed side panel, and the side panel is arranged on the side adjacent to the side where the deep groove is located, and the side panel is provided with a clean water outlet; the water storage part inner cavity of the second seed prefabricated structure passes through the two adjacent side surfaces on the side where the deep groove is located.
[0008] Preferably, a flushing pipeline is provided in the primary sinking part, which comprises: a vertical pipe which seals through the sewage inlet and extends into the primary sink; A horizontal branch pipe, which is connected to the bottom of the vertical pipe and is arranged perpendicular to the extension direction of the water leakage vertical groove; A plurality of flushing branches, which are connected to the horizontal branches and correspond to the positions of the leaking vertical grooves one by one, and any flushing branch is parallel to the extending direction of the leaking vertical groove; A plurality of flushing pipes are arranged on both sides of any flushing branch pipe and face the leaking vertical grooves corresponding to the flushing branch pipe.
[0009] Preferably, a top cover of the primary sinking portion is hinged to a side of the primary sinking portion away from the deep groove, and a distance measuring sensor facing the mud receiving plate is provided on the top cover.
[0010] Preferably, a plurality of L-shaped pads are provided at the bottom of the primary sinking part, and the vertical portion of any L-shaped pad is in contact with the side of the primary sinking part. The mud receiving plate is placed on the horizontal portion of the L-shaped pad so that the mud receiving plate is directly in contact with a pair of side surfaces of the primary sinking part and the other pair of side surfaces is indirectly in contact with the L-shaped pad.
[0011] Preferably, a matching first sealing ring and a second sealing ring are respectively provided on the inner sides of both ends of the inner cavity of the water storage part to prevent water seepage when the sub-prefabricated structure is connected in the second direction, and matching protrusions and first grooves are respectively provided on the opposite ends of the first sealing ring and the second sealing ring; and the first sealing ring is arranged to extend out of the inner cavity of the water storage part, and the first sealing ring and the second sealing ring are both made of elastic waterproof material.
[0012] Preferably, the outer side walls of a pair of deep grooves are respectively provided with a matching first sealing layer and a second sealing layer, and the opposite sides of the first sealing layer and the second sealing layer are respectively provided with a matching raised strip and a second groove; the bottoms of a pair of deep grooves are respectively provided with a matching first sealing pad layer and a second sealing pad layer, and the opposite sides of the first sealing pad layer and the second pad layer are respectively provided with a matching raised layer and a third groove to prevent water seepage when the sub-prefabricated structure is connected in the first direction, and the first sealing layer and the second sealing layer are both made of elastic waterproof material, and the first sealing pad layer and the second sealing pad layer are both made of elastic waterproof material.
[0013] Preferably, the first connection structure and the third connection structure both include: A connecting column is arranged in a recess at the top of the primary sinking part. An outer side of the connecting column and an outer side wall corresponding to the primary sinking part are located in the same vertical plane. A pair of pin holes facing the other primary sinking part are provided on the connecting column.
[0014] Preferably, the second connection structure includes a plurality of pairs of sockets and plug plates arranged on the side where the deep groove of the water storage part is located, and the sockets and plug plates of adjacent water storage parts are arranged in coordination.
[0015] The present invention further claims a method for manufacturing the prefabricated structure of the assembled sewage pool, comprising: Step 1: prefabricate the mud receiving plate, the filter element, the drainage bucket and the cavity of the sub-prefabricated structure, wherein the cavity of the sub-prefabricated structure is the structure of the sub-prefabricated structure without the mud receiving plate, the filter element and the drainage bucket; Step 2: Install a pair of sub-prefabricated structure cavities on a base, and sequentially arrange the filter element and the drainage bucket in the circular groove formed by the pair of deep grooves, wherein the bottom of the drainage bucket is connected to the inner cavity of the filter element; Step three: placing the mud receiving plate in the cavity of the sub-prefabricated structure.
[0016] The present invention has at least the following beneficial effects: First, the prefabricated structure of the assembled sewage pool provided by the present invention includes a pair of sub-prefabricated structures arranged in a mirror image relative to each other, and the pair of sub-prefabricated structures arranged in a mirror image relative to each other are connected to form an assembly module, and multiple assembly modules are sequentially connected in a direction perpendicular to the connection direction of the sub-prefabricated structures to form an assembled sewage pool, and assembled sewage pools of different sizes can be assembled according to the size of the construction site; any sub-prefabricated structure includes a primary sinking part, a drainage part and a water storage part, the primary sinking part is used to dynamically store sewage and dynamically treat and precipitate the dynamically stored sewage, the drainage part is used to drain the sewage treated by the primary sinking part into the deep groove of the water storage part for further treatment of the sewage, and the water storage part is used to introduce the treated clean water in its deep groove into its inner cavity and discharge it, wherein a detachable mud receiving plate is provided inside the primary sinking part, and after the primary sinking part dynamically treats and precipitates the sewage, the sediment is accumulated on the mud receiving plate, and the assembled sewage pool can be cleaned by replacing the mud receiving plate, and the cleaning is convenient and quick; Second, a flushing pipeline having one end connected to a sewage inlet is provided in the primary sinking part of the prefabricated structure of the assembled sewage pool provided by the present invention, and the flushing pipeline has a plurality of drainage ports, and the drainage ports are directly connected to the leaking vertical grooves arranged on the mud plate, and the leaking vertical grooves are flushed with sewage to ensure that the leakage holes of the leaking vertical grooves are unobstructed, so that the sediment in the primary sinking part is deposited and gathered on the mud receiving plate, and the mud receiving plate is replaced in time according to the sediment height fed back by the ranging sensor, thereby realizing the certainty of the cleaning cycle of the assembled sewage pool; Thirdly, the connection side of the sub-prefabricated structure of the assembled sewage pool structure provided by the present invention is provided with a waterproof sealing structure, and the connection side of the plurality of assembly modules sequentially connected along a direction perpendicular to the connection direction of the sub-prefabricated structure is also provided with a waterproof sealing structure, so that the assembled sewage pool has good sealing performance; Fourthly, each component of the assembled sewage pool structure provided by the present invention can be prefabricated, the manufacturing method is simple, and the assembled sewage pool structure can be assembled quickly.
[0017] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic cross-sectional view of the sub-prefabricated structure in one technical solution of the present invention; Figure 2 It is a structural schematic diagram of the first seed prefabricated structure in another technical solution of the present invention; Figure 3 It is a structural schematic diagram of the second seed prefabricated structure in another technical solution of the present invention; Figure 4 It is a schematic diagram of the assembly of the prefabricated structure of the assembled sewage tank in another technical solution of the present invention; Figure 5 It is a structural schematic diagram of the circular groove in another technical solution of the present invention; Figure 6 It is a schematic diagram of the installation position of the circular groove and the conduit in another technical solution of the present invention; 100, sub-prefabricated structure; 200, sewage conveying pipeline; 1, connecting column; 2, sewage inlet; 3, leakage hole; 4, primary sinking part; 5, mud receiving plate; 6, drainage part; 7, water storage part; 8, pit; 9, socket; 10, leakage vertical groove; 11, deep groove; 111, conduit; 12, drainage plate; 13, plug plate; 14, first sealing layer; 141, second groove; 15, second sealing layer; 151, raised strip; 16, first sealing cushion layer. DETAILED DESCRIPTION
[0019] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0020] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.
[0021] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial sources unless otherwise specified; in the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected, set, or detachably connected, set, or connected and set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in specific circumstances. The orientation or position relationship indicated by the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.
[0022] like Figures 1 to 6 As shown, the present invention provides a prefabricated structure of an assembled sewage pool, comprising a pair of sub-prefabricated structures 100 arranged in mirror images, and any sub-prefabricated structure 100 comprises: A primary sink 4, wherein the primary sink 4 is provided with a sewage inlet 2 at the top, a detachable mud receiving plate 5 is provided inside, a plurality of water leakage vertical grooves 10 with closed tops are provided on the mud receiving plate 5, a plurality of water leakage holes 3 are provided on the two side walls of the water leakage vertical grooves 10, and water seepage membranes are provided on the inner walls on both sides; A drainage portion 6 is provided below the primary sinking portion 4 and the top of the drainage portion 6 is connected to the drainage portion 6. A drainage plate 12 is provided inside the drainage portion 6 and is inclined downward from a side away from another sub-prefabricated structure 100. The water storage part 7 is arranged below the drainage part 6. A deep groove 11 connected to the drainage part 6 is provided on one side of the water storage part 7 close to another sub-prefabricated structure 100. The deep groove 11 is semi-cylindrical. A filter element and a drainage bucket are detachably provided in the deep groove 11 from bottom to top. A plurality of conduits 111 connected to the inner cavity of the water storage part 7 are provided on the deep groove 11. Among them, a first connecting structure connected to another sub-prefabricated structure 100 is provided on the top of one opposite side of a pair of sub-prefabricated structures 100, a second connecting structure connected to another sub-prefabricated structure 100 is provided below one opposite side of a pair of sub-prefabricated structures 100 to realize the connection of the sub-prefabricated structures 100 in the first direction, and a third connecting structure is provided on the top of the adjacent side of the opposite side of any sub-prefabricated structure 100 to realize the continuous connection of the sub-prefabricated structures 100 in the second direction.
[0023] In the above technical solution, the prefabricated structure of the assembled sewage pool includes a pair of sub-prefabricated structures 100 arranged in mirror images. The pair of sub-prefabricated structures 100 arranged in mirror images form an assembly module after being connected. A plurality of assembly modules are sequentially connected in a direction perpendicular to the connection direction of the sub-prefabricated structures 100 to form an assembled sewage pool. Assembled sewage pools of different sizes can be assembled according to the size of the construction site. The assembly module can be arranged on a base, the base can be adapted to the size of the assembly module, and has the ability to be connected with another base in a direction perpendicular to the connection direction of the sub-prefabricated structure 100. The base can also be a larger integrated base. The assembly modules are arranged one by one on the integrated base, and the assembly modules can also be directly arranged on a horizontal ground. In the above technical solution, after the assembly of the plurality of assembly modules is completed, the sewage is transported to each sub-prefabricated structure 100 of each assembly module through two sewage transport pipelines 200.
[0024] In the above technical solution, the pair of sub-prefabricated structures 100 arranged in mirror image relative to each other are connected by a first connection structure and a second connection structure arranged on the connection side of the sub-prefabricated structure 100 and another sub-prefabricated structure 100. Preferably, the first connection structure is arranged on the top of the sub-prefabricated structure 100, and the second connection structure is arranged below the sub-prefabricated structure 100. During actual prefabrication, the prefabricated first connection structure can be arranged on the top and bottom of the sub-prefabricated structure 100 as needed. It should be noted that when the first connection structure is arranged at the bottom of the sub-prefabricated structure 100, the first connection structure cannot protrude from the bottom surface of the sub-prefabricated structure 100, so as to ensure that the first connection structure arranged at the bottom does not affect the sub-prefabricated structure 100 arranged on a base (such as Figure 4 as shown) or on a level surface.
[0025] In the above technical scheme, any sub-prefabricated structure 100 includes a primary settling part 4, a drainage part 6 and a water storage part 7, wherein the primary settling part 4 is used to dynamically store sewage and dynamically treat and precipitate the dynamically stored sewage, the drainage part 6 is used to drain the sewage treated by the primary settling part 4 into the deep groove 11 of the water storage part 7 for further treatment of the sewage, and the water storage part 7 is used to introduce the treated clean water in its deep groove 11 into its inner cavity and discharge it, wherein a detachable mud receiving plate 5 is provided inside the primary settling part 4, and after the primary settling part 4 dynamically treats and precipitates the sewage, the sediment gathers on the mud receiving plate 5, and the assembled sewage tank can be cleaned by replacing the mud receiving plate 5, and the cleaning is convenient and quick.
[0026] In the above technical solution, the primary settling part 4, the drainage part 6 and the water storage part 7 are integrally formed. During prefabrication, there is no partition between the primary settling part 4 and the drainage part 6. The mud receiving plate 5 is detachably arranged at the bottom of the primary settling part 4, and when the mud receiving plate 5 is installed to the bottom of the primary settling part 4, it is necessary to directly or indirectly fit with the side wall of the primary settling part 4 to realize the detachable sealing mounting seat of the mud receiving plate 5 on the bottom of the primary settling tank, that is, the installation standard of the mud receiving plate 5 is to ensure that sewage cannot flow into the drainage part 6 from the outside of the mud receiving plate 5. The drainage part 6 and the water storage part 7 directly have a barrier part as the top of the water storage part 7. Preferably, the water storage part 7 has at least a cavity and a part where the deep groove 11 is set. The drainage part 6 is provided with a drainage plate 12 to drain the sewage treated by the primary sedimentation part 4 to the deep groove 11 for secondary treatment. The drainage plate 12 is inclined downward from the side away from the other sub-prefabricated structure 100, and the deep groove 11 is set on the side of the sub-prefabricated structure 100 close to the other sub-prefabricated structure 100.
[0027] In the above technical scheme, sewage enters the primary sinking part 4 of each sub-prefabricated structure 100 from the sewage inlet 2 respectively, and a detachable mud receiving plate 5 is provided inside the primary sinking part 4, and a plurality of leaking vertical grooves 10 with closed tops are provided on the mud receiving plate 5, and a plurality of leaking holes 3 are provided on the two side walls of the leaking vertical grooves 10, and a water-permeable membrane is provided on the inner walls on both sides, so as to intercept sewage treatment sediment in the primary sinking part 4 as much as possible, reduce the sewage treatment pressure of the water storage part 7, and the hydraulic retention time of the primary sinking part 4 is directly related to the aperture of the leaking hole 3 on the leaking vertical groove 10. The aperture of the leaking hole 3 is set according to the hydraulic retention time required for sewage treatment in the primary sinking part 4.
[0028] In the above technical solution, a deep groove 11 connected to the drainage part 6 is provided on one side of the water storage part 7 close to another sub-prefabricated structure 100. The deep groove 11 is semi-cylindrical, and a filter element and a drainage bucket are detachably provided in the deep groove 11 from bottom to top. A plurality of conduits 111 connected to the inner cavity of the water storage part 7 are provided on the deep groove 11. A plurality of conduits 111 are provided along the height direction of the deep groove 11, and a plurality of conduits 111 are also provided along the circumference direction of the deep groove 11. Figure 6 Only part of the guide rail is shown. The filter element has at least one cavity. The drainage bucket is sealed and connected to the cavity of the filter element. The diameter of the filter element should be smaller than the diameter of the deep groove 11 to ensure that there is a gap between the deep groove 11 and the filter element, so that the clean water treated by the filter element can be introduced into the inner cavity of the sub-water storage part 7 through the conduit 111 and discharged.
[0029] In the above technical scheme, in any assembly module, the sewage enters the primary sedimentation part 4 of each sub-prefabricated structure 100 from the sewage inlet 2, is collected after the channel of the water storage part 7, and is then diverted to the inner cavity of the water storage part 7 of each sub-prefabricated structure 100, thereby improving the continuous treatment cycle of the sewage.
[0030] like Figure 2 and Figure 3 In one of the technical solutions, the sub-prefabricated structures 100 include two types: the water storage part 7 of the first seed prefabricated structure 100 is provided with an integrally formed side panel, and the side panel is arranged on the side adjacent to the side where the deep groove 11 is located, and the side panel is provided with a clean water outlet, and the inner cavity of the water storage part 7 of the second seed prefabricated structure 100 runs through the two adjacent side surfaces on the side where the deep groove 11 is located. The first seed prefabricated structure 100 serves as the end connection section of the assembled sewage pool, and the second seed prefabricated structure 100 serves as the middle connection section of the assembled sewage pool, and the clean water diverted to the inner cavity of the water storage part 7 of each sub-prefabricated structure 100 is connected and discharged through the clean water outlet at the end to meet the standards.
[0031] In one of the technical solutions, a flushing pipeline is provided in the primary sinking part 4, which includes: A vertical pipe, which seals through the sewage inlet 2 and extends into the primary sink 4; A horizontal branch pipe, which is connected to the bottom of the vertical pipe and is arranged perpendicular to the extension direction of the water leakage vertical groove 10; A plurality of flushing branches, which are connected to the horizontal branch and correspond to the positions of the leaking vertical troughs 10 one by one, and any flushing branch is parallel to the extending direction of the leaking vertical troughs 10; A plurality of flushing pipes are arranged on both sides of any flushing branch pipe and face the leaking vertical grooves 10 corresponding to the flushing branch pipe.
[0032] In the above technical scheme, the flushing pipeline includes a vertical pipe, which serves as a sewage inlet pipe, one end of which is connected to the sewage conveying pipeline 200, and the other end is connected to a horizontal branch pipe, and a plurality of flushing branches are arranged on the horizontal branch pipe, and any flushing branch corresponds to a leaking vertical trough 10. A flushing pipeline with one end connected to the sewage inlet 2 is provided in the primary sedimentation part 4 of the prefabricated structure of the assembled sewage pool, and the flushing pipeline has a plurality of drainage ports, and the drainage ports are directly connected to the leaking vertical trough 10 provided on the mud plate 5. The leaking vertical trough 10 is flushed with sewage to ensure that the leakage hole 3 of the leaking vertical trough 10 is unobstructed, so that the sediment in the primary sedimentation part 4 is deposited and gathered on the mud receiving plate 5, and the mud receiving plate 5 is replaced in time according to the sediment height feedback from the ranging sensor, thereby realizing the certainty of the cleaning cycle of the assembled sewage pool.
[0033] In one of the technical solutions, the top cover of the primary sinking part 4 is hinged on the side of the primary sinking part 4 away from the deep groove 11, and a distance sensor facing the mud receiving plate 5 is provided on the top cover, and the distance sensor is used to measure the accumulation depth of the sediment at the bottom of the mud receiving plate 5, so as to facilitate the timely replacement of the mud receiving plate 5. The top cover of the primary sinking part 4 is hinged on the side away from the deep groove 11, and the top cover can be connected to the main body of the primary sinking part 4 in the vertical direction, and there is no part protruding from the outside of the primary sinking part 4 after the connection. One implementation method is that matching plug shafts and slots are respectively provided on the bottom of the top cover and the main body of the primary sinking part 4, and the plug shaft is provided close to the edge of the top cover. After the plug shaft is inserted into the slot, the displacement of the top cover in the horizontal plane in the upper direction is limited to ensure the connection between the first connecting structure and the third connecting structure.
[0034] In one of the technical solutions, a plurality of L-shaped pads are provided at the bottom of the primary sinking part 4, and the vertical portion of any L-shaped pad is in contact with the side of the primary sinking part 4. The mud receiving plate 5 is placed on the horizontal portion of the L-shaped pad so that the mud receiving plate 5 is directly in contact with a pair of side surfaces of the primary sinking part 4 and the other pair of side surfaces is indirectly in contact with the L-shaped pad. The mud receiving plate 5 is sealed and connected to the four walls of the primary sinking part 4 to prevent sewage from directly entering the drainage part 6 from the gap between the mud receiving plate 5 and the four walls of the primary sinking part 4. Water stop strips are provided between the two sides of the vertical portion of the L-shaped pad of the primary sinking part 4 and the mud receiving plate 5 so that the mud receiving plate 5 is sealed and arranged in the primary sinking part 4.
[0035] In one of the technical solutions, a first sealing ring and a second sealing ring are respectively provided on the inner sides of both ends of the inner cavity of the water storage part 7 to prevent water seepage when the sub-prefabricated structure 100 is connected in the second direction, and matching protrusions and first grooves are respectively provided on the opposite ends of the first sealing ring and the second sealing ring; and the first sealing ring extends out of the inner cavity of the water storage part 7, and the first sealing ring and the second sealing ring are both made of elastic waterproof material, and the connecting seam between the first sealing ring and the second sealing ring is staggered with the connecting seam between the protrusion and the first groove, thereby ensuring the sealed connection between adjacent assembly modules.
[0036] like Figure 5 As shown, in one of the technical solutions, the outer side walls of a pair of deep grooves 11 are respectively provided with a matching first sealing layer 14 and a second sealing layer 15, and the opposite sides of the first sealing layer 14 and the second sealing layer 15 are respectively provided with matching raised strips 151 and second grooves 141; the bottoms of a pair of deep grooves 11 are respectively provided with a matching first sealing pad layer 16 and a second sealing pad layer, and the opposite sides of the first sealing pad layer 16 and the second pad layer are respectively provided with matching raised layers and third grooves to prevent water seepage when the sub-prefabricated structure 100 is connected in the first direction, and the first sealing layer 14 and the second sealing layer 15 are both made of elastic waterproof material, and the first sealing pad layer 16 and the second sealing pad layer are both made of elastic waterproof material. The arc length of the first sealing layer 14 is greater than the arc length of the deep groove 11, the first sealing pad layer 16 extends out of the deep groove 11, the connecting seam between the first sealing layer 14 and the second sealing layer 15 is staggered with the connecting seam between the raised strip 151 and the second groove 141, and the connecting seam between the first sealing pad layer 16 and the second sealing pad layer is staggered with the connection between the raised layer and the third groove, which fully ensures the sealing of the assembly of the sub-prefabricated structure 100.
[0037] like Figures 1 to 4 It can be seen that in one of the technical solutions, the first connection structure and the third connection structure both include: The connecting column 1 is arranged in the pit 8 at the top of the primary sinking part 4. The outer side of the connecting column 1 is located in the same vertical plane as the outer side wall corresponding to the primary sinking part 4. The connecting column 1 is provided with a pair of pin shaft holes facing the other primary sinking part 4 to achieve abutment between assembly modules (second direction) and between sub-prefabricated structures 100 (first direction).
[0038] In one of the technical solutions, the second connection structure includes a plurality of pairs of sockets 9 and plug plates 13 arranged on the side where the deep groove 11 of the water storage part 7 is located. The sockets 9 and plug plates 13 of adjacent water storage parts 7 are arranged in coordination to achieve a sealed connection between the sub-prefabricated structures 100. A waterproof lining is provided in the socket 9.
[0039] The present invention further claims a method for manufacturing the prefabricated structure of the assembled sewage pool, comprising: Step 1: prefabricate the mud receiving plate 5, the filter element, the drainage bucket and the cavity of the sub-prefabricated structure 100, wherein the cavity of the sub-prefabricated structure 100 is the structure of the sub-prefabricated structure 100 without the mud receiving plate 5, the filter element and the drainage bucket; Step 2: Install the cavity of a pair of sub-prefabricated structures 100 on a base, and sequentially arrange the filter element and the drainage hopper in the circular groove formed by the pair of deep grooves 11, and the bottom of the drainage hopper is connected to the inner cavity of the filter element; Step three: placing the mud receiving plate 5 in the cavity of the sub-prefabricated structure 100 .
[0040] In the above technical scheme, the manufacturing method of the prefabricated structure of the assembled sewage tank includes the prefabrication of prefabricated parts, and the prefabrication includes the mud receiving plate 5 and the cavity of the sub-prefabricated structure 100. The cavity of the sub-prefabricated structure 100 is the structure of the sub-prefabricated structure 100 without the mud receiving plate 5, the filter element and the drainage bucket. The filter element and the drainage bucket are prefabricated according to the size of the deep groove 11. The mud receiving plate 5, the filter element and the drainage bucket are consumables, and multiple ones can be equipped for easy replacement.
[0041] In the above technical solution, in step 2, the cavity of a pair of sub-prefabricated structures 100 can be installed on a base or on a horizontal plane. After the cavity of a pair of sub-prefabricated structures 100 is connected, its sealing needs to be checked. In step 3, after the mud receiving plate 5 is set in the cavity of the sub-prefabricated structure 100, a waterproof strip can be filled between the mud receiving plate 5 and the hole of the primary sinking part 4 to ensure the sealed installation of the mud receiving plate 5.
[0042] The number of equipment and treatment scale described here are used to simplify the description of the present invention. The application, modification and variation of the assembled sewage prefabricated structure and the manufacturing method thereof described in the present invention are obvious to those skilled in the art.
[0043] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. Prefabricated structure of assembled sewage pool, characterized in that: It includes a pair of sub-prefabricated structures arranged in mirror image relative to each other, and each sub-prefabricated structure includes: A primary sinking part, wherein the top of the primary sinking part is provided with a sewage inlet, and a detachable mud receiving plate is provided inside, and the mud receiving plate is provided with a plurality of leaking vertical grooves with closed tops, and the two side walls of the leaking vertical grooves are provided with a plurality of leaking holes, and the inner walls on both sides are provided with water seepage membranes; A drainage part, which is arranged below the primary sinking part and the top of which is connected to the drainage part, and the drainage part is provided with a drainage plate inclined downward from a side away from another sub-prefabricated structure; A water storage part is arranged below the drainage part. A deep groove connected to the drainage part is provided on one side of the water storage part close to another sub-prefabricated structure. The deep groove is semi-cylindrical. A filter element and a drainage bucket are detachably arranged in sequence from bottom to top in the deep groove. A plurality of conduits connected to the inner cavity of the water storage part are provided on the deep groove. Among them, a first connecting structure connected to another sub-prefabricated structure is provided on the top of one opposite side of a pair of sub-prefabricated structures, a second connecting structure connected to another sub-prefabricated structure is provided below one opposite side of a pair of sub-prefabricated structures to realize the connection of the sub-prefabricated structures in the first direction, and a third connecting structure is provided on the top of the adjacent side of the opposite side of any sub-prefabricated structure to realize continuous connection of the sub-prefabricated structures in the second direction.
2. The prefabricated structure of the assembled sewage pool according to claim 1, characterized in that: The sub-prefabricated structures include two types: the water storage part of the first seed prefabricated structure is provided with an integrally formed side panel, and the side panel is arranged on the side adjacent to the side where the deep groove is located, and the side panel is provided with a clean water outlet; the water storage part inner cavity of the second seed prefabricated structure passes through the two adjacent side surfaces on the side where the deep groove is located.
3. The prefabricated structure of the assembled sewage pool according to claim 2, characterized in that: The primary sinking part is provided with a flushing pipeline, which comprises: a vertical pipe which seals through the sewage inlet and extends into the primary sink; A horizontal branch pipe, which is connected to the bottom of the vertical pipe and is arranged perpendicular to the extension direction of the water leakage vertical groove; A plurality of flushing branches, which are connected to the horizontal branches and correspond to the positions of the leaking vertical grooves one by one, and any flushing branch is parallel to the extending direction of the leaking vertical groove; A plurality of flushing pipes are arranged on both sides of any flushing branch pipe and face the leaking vertical grooves corresponding to the flushing branch pipe.
4. The prefabricated structure of the assembled sewage pool according to claim 3, characterized in that: The top cover of the primary sinking part is hinged on a side of the primary sinking part away from the deep groove, and a distance measuring sensor facing the mud receiving plate is arranged on the top cover.
5. The prefabricated structure of the assembled sewage pool according to claim 4, characterized in that: A plurality of L-shaped pads are provided at the bottom of the primary sinking part, and the vertical portion of any L-shaped pad is in contact with the side of the primary sinking part. The mud receiving plate is placed on the horizontal portion of the L-shaped pad so that the mud receiving plate is directly in contact with a pair of side surfaces of the primary sinking part and the other pair of side surfaces is indirectly in contact with the L-shaped pad.
6. The prefabricated structure of the assembled sewage pool according to claim 5, characterized in that: A first sealing ring and a second sealing ring are respectively provided on the inner sides of the two end portions of the inner cavity of the water storage part to prevent water seepage when the sub-prefabricated structure is connected in the second direction, and matching protrusions and first grooves are respectively provided on the opposite ends of the first sealing ring and the second sealing ring; and the first sealing ring is arranged to extend out of the inner cavity of the water storage part, and the first sealing ring and the second sealing ring are both made of elastic waterproof material.
7. The prefabricated structure of the assembled sewage pool according to claim 6, characterized in that: The outer side walls of a pair of deep grooves are respectively provided with a matching first sealing layer and a second sealing layer, and the opposite sides of the first sealing layer and the second sealing layer are respectively provided with a matching raised strip and a second groove; the bottoms of a pair of deep grooves are respectively provided with a matching first sealing cushion layer and a second sealing cushion layer, and the opposite sides of the first sealing cushion layer and the second cushion layer are respectively provided with a matching raised layer and a third groove to prevent water seepage when the sub-prefabricated structure is connected in the first direction, and the first sealing layer and the second sealing layer are both made of elastic waterproof material, and the first sealing cushion layer and the second sealing cushion layer are both made of elastic waterproof material.
8. The prefabricated structure of the assembled sewage pool according to claim 7, characterized in that: The first connection structure and the third connection structure both include: A connecting column is arranged in a recess at the top of the primary sinking part. An outer side of the connecting column and an outer side wall corresponding to the primary sinking part are located in the same vertical plane. A pair of pin holes facing the other primary sinking part are provided on the connecting column.
9. The prefabricated structure of the assembled sewage pool according to claim 8, characterized in that: The second connection structure includes a plurality of pairs of sockets and plug plates arranged on the side where the deep groove of the water storage part is located, and the sockets and plug plates of adjacent water storage parts are arranged in coordination.
10. The method for manufacturing the prefabricated structure of the assembled sewage pool according to any one of claims 1 to 9, characterized in that: include: Step 1: prefabricate the mud receiving plate, the filter element, the drainage bucket and the cavity of the sub-prefabricated structure, wherein the cavity of the sub-prefabricated structure is the structure of the sub-prefabricated structure without the mud receiving plate, the filter element and the drainage bucket; Step 2: Install a pair of sub-prefabricated structure cavities on a base, and sequentially arrange the filter element and the drainage bucket in the circular groove formed by the pair of deep grooves, wherein the bottom of the drainage bucket is connected to the inner cavity of the filter element; Step three: placing the mud receiving plate in the cavity of the sub-prefabricated structure.
Citation Information
Patent Citations
Prefabricated type sewage plant biochemical pool and installation method thereof
CN110821256A