Fuel gas distributing pipe with four sections
By designing a gas gas pipe with four-sections, the problem of insufficient number of gas pipe segments in the prior art is solved, and a smaller minimum thermal load and a more stable gas gas separation effect are achieved.
Patent Information
- Application Number
- CN202411800655.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-09
- Publication Date
- 2025-02-28
AI Technical Summary
The number of sections of existing gas water heaters is insufficient, resulting in a large minimum thermal load, which cannot meet the user's hot water temperature needs when the inlet temperature in summer, and the uneven gas distribution results in poor gas stability emitted by the nozzle.
A gas gas pipe having four sections is designed, including a gas pipe body, an air inlet, a foundation chamber, a first adjustment chamber and a second adjustment chamber, respectively, and a nozzle and a solenoid valve are respectively provided, and four segmentation methods are realized through the control of the solenoid valve.
A smaller minimum thermal load is achieved, meeting the user's demand for hot water, and improving the gas distribution uniformity and gas stability emitted by the nozzle through a four-stage manner.
Smart Images

Figure CN119532975A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gas pipes, and in particular to a gas distribution pipe with four sections. Background Art
[0002] The gas distribution pipe is an important component of the gas water heater. The gas enters the gas distribution pipe after being proportionally adjusted by the gas proportional valve. The gas flow is evenly distributed through the gas distribution cavity of the gas pipe. The solenoid valve on the gas distribution pipe is controlled to perform segmented combustion to achieve control of different loads.
[0003] Currently, mainstream gas water heaters are all automatic constant temperature water heaters. After the user sets the required temperature on the operation panel, the water heater will provide hot water according to the temperature set by the user. However, we found that when the water inlet temperature is high in summer, the hot water temperature will still be too high. If the user's water volume is too small, the water heater cannot reach the required temperature at all. The fundamental reason is that the existing mainstream gas distribution pipes have only 2 sections. Even if the number of nozzles is large after segmentation, the minimum heat load is still not small enough. Summary of the invention
[0004] The purpose of the present invention is to solve the above problems and to propose a gas distribution pipe with four sections.
[0005] In order to achieve the above-mentioned objectives, the present invention adopts the following technical scheme: a gas distribution pipe with four sections, comprising: a distribution pipe body, the distribution pipe body is provided with an air inlet, a basic chamber, a first regulating chamber and a second regulating chamber, the air inlet is connected to the basic chamber, the basic chamber is respectively connected to the first regulating chamber and the second regulating chamber, and the connection between the basic chamber and the first regulating chamber and the second regulating chamber is provided with an installation position, the installation position is used to install a solenoid valve, and the basic chamber, the first regulating chamber and the second regulating chamber are all provided with nozzles.
[0006] As a preferred technical solution, the base chamber is provided with two nozzles, the first regulating chamber is provided with two nozzles, and the second regulating chamber is provided with one nozzle.
[0007] As a preferred technical solution, the base chamber is connected to the first regulating chamber through an air outlet pipe, and the central axis of the air outlet pipe and the central axis of the first regulating chamber have an angle of 30-50°.
[0008] As a preferred technical solution, the gas distribution pipe body is also provided with a pressure test channel, and the pressure test channel is connected to the basic chamber.
[0009] As a preferred technical solution, a blocking cover is respectively provided at both ends of the gas distribution pipe body, and the blocking cover and the gas distribution pipe body are in interference fit.
[0010] As a preferred technical solution, a sealing ring is further provided between the solenoid valve and the mounting position, and there is line contact between the sealing ring and the mounting position.
[0011] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0012] The present invention provides a four-segment gas distribution pipe with a simple structure and a small minimum heat load power. It overcomes the defects in the prior art of the gas distribution pipe, such as a small number of segments, a large minimum heat load, and an inability to meet the user's demand for hot water, as well as the poor stability of the gas ejected from the nozzle caused by uneven gas distribution and unsatisfactory combustion conditions, and can meet the user's demand for hot water. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 An axonometric view of a gas distribution pipe provided according to an embodiment of the present invention is shown.
[0014] Figure 2 An exploded view of a gas distribution pipe provided according to an embodiment of the present invention is shown.
[0015] Figure 3 A cross-sectional view of a gas distribution pipe provided according to an embodiment of the present invention is shown.
[0016] Legend:
[0017] 1. Air distribution pipe body; 2. Air inlet; 3. Basic chamber; 31. Air outlet pipe; 4. First adjustment chamber; 5. Second adjustment chamber; 6. Installation position; 7. Solenoid valve; 8. Nozzle; 9. Pressure test channel; 10. Plug cover; 11. Sealing ring; 12. Sealing screw. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the technical solution of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described in conjunction with the drawings of specific embodiments of the present invention. The same figure marks in the drawings represent the same parts. It should be noted that the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] Embodiment 1
[0020] like Figure 1-3As shown, this embodiment discloses a gas distribution pipe with four sections, including: a gas distribution pipe body 1, the gas distribution pipe body 1 is provided with an air inlet 2, a basic chamber 3, a first regulating chamber 4 and a second regulating chamber 5, the air inlet 2 is connected to the basic chamber 3 for passing gas into the basic chamber 3, the basic chamber 3 is respectively connected to the first regulating chamber 4 and the second regulating chamber 5, the gas passed into the basic chamber 3 can flow into the first regulating chamber 4 and the second regulating chamber 5, and a mounting position 6 is provided at the connection between the basic chamber 3 and the first regulating chamber 4 and the second regulating chamber 5, the mounting position 6 is used to install a solenoid valve 7, the solenoid valve 7 is used to open and cut off the connection between the basic chamber 3 and the first regulating chamber 4 and the second regulating chamber 5, the basic chamber 3, the first regulating chamber 4 and the second regulating chamber 5 are all provided with a nozzle 8, and the gas passed into each chamber is finally sprayed out from the nozzle 8.
[0021] The operating principle and use process of this embodiment:
[0022] The present invention provides a gas distribution pipe with four sections, which can realize four sectioning modes. The first mode is to close the two solenoid valves 7. At this time, the connection between the basic chamber 3 and the first regulating chamber 4 and the second regulating chamber 5 is cut off, and the gas entering the basic chamber 3 can only be sprayed out from the nozzle 8 of the basic chamber 3; the second mode is to open the solenoid valve 7 between the basic chamber 3 and the first regulating chamber 4, and close the solenoid valve 7 between the basic chamber 3 and the second regulating chamber 5. At this time, the basic chamber 3 is connected to the first regulating chamber 4, and the connection between the basic chamber 3 and the second regulating chamber 5 is cut off. The gas can be sprayed out from the basic chamber 3 and the first regulating chamber 4. The third method is to close the solenoid valve 7 between the basic chamber 3 and the first regulating chamber 4, and open the solenoid valve 7 between the basic chamber 3 and the second regulating chamber 5. At this time, the basic chamber 3 is connected to the second regulating chamber 5, and the connection between the basic chamber 3 and the first regulating chamber 4 is cut off, and the gas can be sprayed from the nozzles 8 in the basic chamber 3 and the second regulating chamber 5; the fourth method is to open the two solenoid valves 7 at the same time. At this time, the connection between the basic chamber 3 and the first regulating chamber 4 and the second regulating chamber 5 is opened, and the gas can be sprayed from the nozzles 8 of the basic chamber 3, the first regulating chamber 4 and the second regulating chamber 5 at the same time. It should be noted that the number of nozzles 8 of the first regulating chamber 4 and the second regulating chamber 5 should be different to form differentiation.
[0023] Embodiment 2
[0024] This embodiment is developed on the basis of the above embodiment. Specifically, this embodiment limits the number of nozzles 8 in each chamber, such as Figure 1-3As shown, the base chamber 3 is provided with two nozzles 8, the first regulating chamber 4 is provided with two nozzles 8, and the second regulating chamber 5 is provided with one nozzle 8. With this arrangement, in the first mode of the above embodiment, there are a total of two nozzles 8 working, in the second mode, there are a total of four nozzles 8 working, in the third mode, there are a total of three nozzles 8 working, and in the fourth mode, there are a total of five nozzles 8 working. Each segmented mode differs by only one nozzle 8, and the load overlap area is large, which avoids the load interruption phenomenon that may be caused by segmented combustion, and improves the operation stability of the high and low pressure of the water heater.
[0025] Embodiment 3
[0026] This embodiment is developed on the basis of the above embodiment. Specifically, Figure 1-3 As shown, the basic chamber 3 is connected to the first regulating chamber 4 through the air outlet pipe 31, and the central axis of the air outlet pipe 31 has an angle of 30-50° with the central axis of the first regulating chamber 4. Setting an angle between the central axis of the air outlet pipe 31 and the central axis of the first regulating chamber 4 is considered from the processing technology, which can reduce the core pulling process and reduce the manufacturing difficulty.
[0027] Embodiment 4
[0028] This embodiment is developed on the basis of the above embodiment to solve the problem of how to test the air pressure of each segment. Specifically, Figure 1-3 As shown, the gas distribution pipe body 1 is also provided with a pressure test channel 9, and the pressure test channel 9 is connected to the basic chamber 3. The pressure test channel 9 can be connected to a pressure measuring device (such as a U-type pressure gauge, a micromanometer, etc.) to facilitate the detection of the gas pressure in each segment state and facilitate production debugging. The pressure test channel 9 is provided with a blocking screw 12, which can be installed after the debugging is completed for easy operation.
[0029] Embodiment 5
[0030] This embodiment is developed on the basis of the above embodiment to solve the sealing problem of the trachea body. Specifically, Figure 1-3 As shown, a plugging cover 10 is respectively provided at both ends of the air distribution pipe body 1. The plugging cover 10 and the air distribution pipe body 1 are in interference fit. The plugging cover 10 is used to seal the ends of the first regulating chamber 4 and the second regulating chamber 5 to prevent air leakage. The interference fit can ensure the stability of the seal, and the structure is simple and reliable.
[0031] Embodiment 6
[0032] This embodiment is developed on the basis of the above embodiment to solve the sealing problem of the trachea body. Specifically, Figure 1-3As shown, a sealing ring 11 is further provided between the solenoid valve 7 and the mounting position 6, and there is line contact between the sealing ring 11 and the mounting position 6. The solenoid valve 7 and the sealing ring 11 are used for sealing, which can reduce the number of plugging covers 10, reduce the processing steps and reduce the risk points of air leakage, and has a simple structure.
[0033] The above description of the embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A gas distribution pipe with four sections, characterized in that: include: An air distribution pipe body (1), the air distribution pipe body (1) is provided with an air inlet (2), a basic chamber (3), a first regulating chamber (4) and a second regulating chamber (5), the air inlet (2) is connected to the basic chamber (3), the basic chamber (3) is connected to the first regulating chamber (4) and the second regulating chamber (5), respectively, and a mounting position (6) is provided at the connection between the basic chamber (3) and the first regulating chamber (4) and the second regulating chamber (5), the mounting position (6) is used to install a solenoid valve (7), and the basic chamber (3), the first regulating chamber (4) and the second regulating chamber (5) are all provided with nozzles (8).
2. A gas distribution pipe with four sections according to claim 1, characterized in that The base chamber (3) is provided with two nozzles (8), the first regulating chamber (4) is provided with two nozzles (8), and the second regulating chamber (5) is provided with one nozzle (8).
3. The four-segment gas distribution pipe according to claim 1, characterized in that The base chamber (3) is connected to the first regulating chamber (4) through an air outlet pipe (31), and the central axis of the air outlet pipe (31) and the central axis of the first regulating chamber (4) have an angle of 30-50°.
4. The four-segment gas distribution pipe according to claim 1, characterized in that The gas distribution pipe body (1) is also provided with a pressure test channel (9), and the pressure test channel (9) is connected to the basic chamber (3).
5. The four-segment gas distribution pipe according to claim 1, characterized in that A blocking cover (10) is provided at each end of the gas distribution pipe body (1), and the blocking cover (10) and the gas distribution pipe body (1) are in interference fit.
6. The four-segment gas distribution pipe according to claim 1, characterized in that A sealing ring (11) is also provided between the solenoid valve (7) and the mounting position (6), and there is line contact between the sealing ring (11) and the mounting position (6).