Karst collapse monitoring device and construction method

By using a height connection adjustment mechanism and a folding shrink mechanism in the karst collapse monitoring device, the solar panels are folded at night, which solves the problem of damage caused by long-term expansion of solar panels in the prior art, and achieves the effect of extending service life and reducing economic losses.

CN119533554APending Publication Date: 2025-02-28GUILIN UNIVERSITY OF TECHNOLOGY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411503718.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

The solar panels of the existing karst collapse monitoring device are also unfolded when they are not in use at night, resulting in long-term expansion and easy damage and causing economic losses.

Method used

A karst collapse monitoring device is designed, using a height connection adjustment mechanism and a folding shrink mechanism, which can fold solar panels at night, prevent damage from birds or other organisms, and enhance the installation stability of the device through an embedded mechanism.

Benefits of technology

By folding the solar panel, the probability of damage is reduced, the service life of the solar panel is extended, economic losses are reduced, and the installation efficiency and stability of the device are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119533554A_ABST
    Figure CN119533554A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of monitoring equipment, and discloses a karst collapse monitoring device and a construction method.The karst collapse monitoring device comprises a height connecting and adjusting mechanism used for changing the height of equipment and connected with other mechanisms, and an embedded mechanism arranged at the bottom of the height connecting and adjusting mechanism and connected with the height connecting and adjusting mechanism; the device comprises a height connection adjusting mechanism used for pre-installation and stabilization after installation of the height connection adjusting mechanism, a center shaft fixed to the top of the height connection adjusting mechanism and used for providing an installation and fixation position, two solar panels located on the two sides of the outer portion of the center shaft respectively and used for providing electric energy, and two monitoring control boxes located on the two sides of the outer portion of the center shaft respectively and used for monitoring the height of the height connection adjusting mechanism. And the height connecting and adjusting mechanism is arranged outside. The two solar panels are driven to be folded through contraction of the height connection adjusting mechanism, so that the solar panels can be folded when not used at night, the unfolding time is shortened, the probability that the solar panels are damaged by birds or other organisms can be reduced, and economic losses are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of monitoring equipment, and in particular to a karst collapse monitoring device and a construction method. Background Art

[0002] Karst collapse refers to the sudden deformation and destruction of the loose soil covering the karst caves under the action of external forces or human factors, which often results in the formation of conical collapse pits. This phenomenon mainly occurs in areas where soluble rocks such as carbonate rocks, calcareous clastic rocks and salt rocks are distributed. The formation of karst collapse is due to the fact that the groundwater level changes to a certain extent, breaking the three-phase mechanical equilibrium system of solid, liquid and gas, causing the overlying loose sediments to collapse suddenly.

[0003] Karst collapse monitoring devices are technical systems used to monitor the ground stability of karst areas in real time. These devices can detect small changes on the surface and underground, predict potential collapse events, and take disaster prevention and mitigation measures in a timely manner. Karst collapse monitoring devices usually include a variety of sensors and monitoring equipment that can measure relevant parameters such as ground displacement, groundwater level changes, soil moisture, vibration, etc.

[0004] The karst collapse monitoring device in the prior art mainly uses solar panels to supplement electric energy. The solar panels of the karst collapse monitoring device in the prior art are fixed, and are unfolded when not in use at night. At night, there are birds or other biological activities. Therefore, the solar panels are easily damaged during long-term unfolding, thereby causing economic losses. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a karst collapse monitoring device and a construction method, which solves the problem that the solar panels of the karst collapse monitoring device in the prior art are unfolded when not in use at night, which causes the solar panels to be easily damaged during the long-term unfolding, thereby causing economic losses.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a karst collapse monitoring device, comprising:

[0007] A height connection adjustment mechanism, which is used to change the height of the device and is connected to other mechanisms;

[0008] The embedded mechanism is arranged at the bottom of the height connection adjustment mechanism and is used for pre-installation of the height connection adjustment mechanism and for stabilization after installation;

[0009] A central axis, which is fixed to the top of the height connection adjustment mechanism and is used to provide a mounting and fixing position;

[0010] Two solar panels are located on both sides of the central axis to provide electrical energy.

[0011] Monitoring and control boxes, two in number, located outside the height connection adjustment mechanism, used for monitoring karst collapse and controlling equipment;

[0012] The folding and retracting mechanism is located outside the height connection adjustment mechanism and is used for folding the central axis and adjusting the height of the solar panel.

[0013] Preferably, the embedded mechanism is arranged at the bottom of the height connection adjusting mechanism, the middle part of the central axis is fixedly connected to the top of the height connection adjusting mechanism, the side of the solar panel close to the height connection adjusting mechanism is rotatably connected to the outside of the central axis, the folding and contracting mechanism is arranged outside the height connection adjusting mechanism, and the monitoring control box is arranged outside the folding and contracting mechanism.

[0014] Preferably, the height connection adjustment mechanism includes an outer rod, the inner bottom end of the outer rod is fixedly connected to a motor, the output end of the motor is fixedly connected to a threaded column, the external thread of the threaded column is connected to the inner rod, the outer bottom end of the inner rod is fixedly connected to two limit blocks, two sliding grooves are provided on both sides of the outside of the outer rod, the limit blocks are slidably connected to the inside of the sliding groove, and the bottom of the sliding groove is fixedly connected to a pre-installed rod.

[0015] Preferably, the embedded mechanism includes a threaded embedded seat, the bottom of the threaded embedded seat is rotatably connected to a rotating disk, the outer thread of the threaded embedded seat is threadedly connected to a movable disk, a folding frame is rotatably connected between the movable disk and the outer part of the rotating disk, the middle part of the folding frame is rotatably connected to an outer box on a side close to the threaded embedded seat, the inner side of the outer box is fixedly connected to a pressure spring on a side away from the threaded embedded seat, the pressure spring is fixedly connected to a limiting plate on a side close to the threaded embedded seat, the limiting plate is fixedly connected to a pressure rod on a side close to the threaded embedded seat, both sides of the pressure rod are slidably connected to a limiting slider, and the side of the pressure rod away from the pressure spring is fixedly connected to a pre-tightening plate, a plurality of fitting grooves are provided on the outer periphery of the threaded embedded seat, and limiting grooves are provided on both sides of the fitting grooves inside the threaded embedded seat.

[0016] Preferably, the folding and contracting mechanism includes a fixing plate, the middle part of which is fixedly connected to the outside of the inner rod, both sides of the top of the fixing plate are rotatably connected with connecting rods, the tops of the two connecting rods are rotatably connected to the bottoms of the two solar panels, the outer top of the inner rod is fixedly connected with a fixing ring, both sides of the outer side of the fixing ring are rotatably connected with driving rods, the bottoms of the two driving rods are respectively rotatably connected to one side of the two monitoring and control boxes, the outside of the outer rod is fixedly connected with four sliding rails, the side of the monitoring and control box close to the outer rod is fixedly connected with a sliding mounting block, a sliding groove is provided on the inside of the sliding mounting block close to the outer rod, and the outside of the sliding rail is slidably connected to the inside of the sliding groove.

[0017] Preferably, the exterior of the preloading rod is arranged between a plurality of pre-tightening plates, and the inner rod is slidably connected to the interior of the outer rod.

[0018] Preferably, the limiting plate is slidably connected to the inside of the outer box, and the pressing rod is arranged inside the fitting groove.

[0019] Preferably, a bottom cone is fixedly connected to the bottom of the rotating disk, and a hexagonal head is fixedly connected to the top of the movable disk.

[0020] Preferably, a non-slip pad is fixedly connected to a side of the pre-tightening plate away from the limiting plate, and the limiting sliding block is slidably connected to the inside of the limiting groove.

[0021] A construction method for a karst collapse monitoring device includes the following construction methods:

[0022] Step 1: Dig a hole in the soil first, and then use the bottom cone to insert the entire embedded mechanism into the hole;

[0023] Step 2: Place the preloading rod between multiple preloading plates, twist the moving plate upwards, thereby driving the folding frame to open, and then the preloading plate can move toward the middle to squeeze the preloading rod, thereby completing the preloading;

[0024] Step 3: Pour cement in the hole, immerse the embedded mechanism, and use the embedded mechanism to strengthen the tensile and shear resistance of the device after installation;

[0025] Step 4: After the cement dries, the installation is completed.

[0026] Working principle: First, dig a hole on the ground, then turn the bottom cone downward and insert the bottom cone into the soil. At this time, screw the movable disk downward so that the folding frame bends outward, and then drives the outer box to move outward. The outer box drives the limit plate and then drives the pressure rod to move outward, so that the pre-tightening plate moves to both sides. At this time, insert the pre-installed rod between multiple pre-tightening plates. At this time, screw the movable disk upward so that the folding frame can be unfolded, and the outer box moves toward the middle, thereby driving the pressure rod to move toward the middle, and then the pre-tightening plate can be moved toward the middle, and then the pre-installed rod can be clamped to complete the installation of the height connection adjustment mechanism. At this time, concrete is poured into the inside of the hole, so that the pre-embedded mechanism can be used to strengthen the tensile and shear resistance of the device after installation;

[0027] When the solar panel is folded, the motor is started to drive the threaded column to rotate. After the threaded column rotates, it can drive the inner rod to move downward. Therefore, after the inner rod moves downward, it can drive the central axis to move downward. Since the fixed plate is stationary, the connecting rod will not move downward. The top of the connecting rod will rotate toward the middle, and then it can drive the solar panel to fold toward the middle. Therefore, when not in use at night, the solar panel can be folded up to prevent birds from flying or landing at night and causing damage to the solar panel. When the inner rod moves downward, it can drive the fixing ring to move downward. The fixing ring moves downward and drives the driving rod to move downward, and then it can drive the monitoring control box to move downward, so that the monitoring control box can be easily inspected and repaired. Therefore, there is no need to climb up to the monitoring control box using tools, thereby eliminating safety hazards.

[0028] The present invention provides a karst collapse monitoring device and a construction method, which have the following beneficial effects:

[0029] 1. The present invention drives the central axis to move downward by contracting the height connection adjustment mechanism, thereby driving the two solar panels to fold, so that the solar panels can be folded when not in use at night, shortening the unfolding time, thereby reducing the probability of damage to the solar panels by birds or other creatures, thereby increasing the service life of the solar panels and reducing economic losses.

[0030] 2. The present invention pre-installs the height connection adjustment mechanism through the embedded mechanism, so as to prevent the device from tipping over when the cement is not dry. There is no need to cast the base first and then install the device after the cement base is dry. The device can be installed successfully at one time, thus saving time and effort and improving installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A perspective view of the present invention;

[0032] Figure 2It is a structural schematic diagram of the pre-embedded mechanism in the present invention;

[0033] Figure 3 It is a structural schematic diagram of the pressure spring in the present invention;

[0034] Figure 4 It is a schematic diagram of the structure of the limiting groove in the present invention;

[0035] Figure 5 It is a structural schematic diagram of the slideway in the present invention;

[0036] Figure 6 It is a structural schematic diagram of the sliding mounting block in the present invention;

[0037] Figure 7 It is a schematic diagram of the structure of the limit block in the present invention;

[0038] Figure 8 It is a schematic diagram of the structure of the sliding track in the present invention.

[0039] Among them, 1. height connection adjustment mechanism; 101. outer rod; 102. motor; 103. threaded column; 104. inner rod; 105. limit block; 106. sliding groove; 107. pre-installed rod; 2. embedded mechanism; 201. threaded embedded seat; 202. rotating disk; 203. moving disk; 204. folding frame; 205. outer box; 206. pressure spring; 207. limit plate; 208. pressure rod; 209. limit slider; 210. pre-tightening plate; 211. fitting groove; 212. limit groove; 213. bottom cone; 3. folding and retracting mechanism; 301. fixed plate; 302. connecting rod; 303. fixing ring; 304. driving rod; 305. sliding track; 306. sliding mounting block; 307. sliding groove; 4. central axis; 5. solar panel; 6. monitoring control box. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] Example:

[0042] Please refer to the attached Figure 1 -Attached Figure 8The embodiment of the present invention provides a karst collapse monitoring device, including a height connection adjustment mechanism 1, which is used to change the height of the equipment and is connected to other mechanisms, a pre-buried mechanism 2, which is arranged at the bottom of the height connection adjustment mechanism 1 and is used for pre-installation and post-installation stabilization of the height connection adjustment mechanism 1, a central axis 4, which is fixed to the top of the height connection adjustment mechanism 1 and is used to provide a fixed installation position, two solar panels 5, which are respectively located on both sides of the outside of the central axis 4 and are used for providing electric energy, a monitoring control box 6, which is located outside the height connection adjustment mechanism 1 and is used for monitoring karst collapse and controlling the equipment, a folding and contracting mechanism 3, which is located outside the height connection adjustment mechanism 1 and is used for folding the height of the central axis 4 and the solar panel 5. The pre-buried mechanism 2 is arranged at the bottom of the height connection adjustment mechanism 1, the middle part of the central axis 4 is fixedly connected to the top of the height connection adjustment mechanism 1, the side of the solar panel 5 close to the height connection adjustment mechanism 1 is rotatably connected to the outside of the central axis 4, the folding and contracting mechanism 3 is arranged outside the height connection adjustment mechanism 1, and the monitoring control box 6 is arranged outside the folding and contracting mechanism 3.

[0043] The height connection adjustment mechanism 1 includes an outer rod 101, the inner bottom end of the outer rod 101 is fixedly connected to a motor 102, the motor 102 can provide power for height adjustment, the output end of the motor 102 is fixedly connected to a threaded column 103, the outer thread of the threaded column 103 is connected to an inner rod 104, the outer bottom end of the inner rod 104 is fixedly connected to two limit blocks 105, two sliding grooves 106 are provided on both sides of the outer side of the outer rod 101, and the limit blocks 105 slide inside the sliding grooves 106 to play a limiting role. To prevent the inner rod 104 from rotating with the threaded column 103, the limit block 105 is slidably connected to the inside of the sliding groove 106, and the bottom of the sliding groove 106 is fixedly connected to a pre-installed rod 107. The pre-installed rod 107 can facilitate the pre-installation of the embedded mechanism 2. The outside of the pre-installed rod 107 is arranged between multiple pre-tightening plates 210. The inner rod 104 is slidably connected to the inside of the outer rod 101, and the motor 102 is started, so that the threaded column 103 can be driven to rotate. After the threaded column 103 rotates, it can drive the inner rod 104 to move downward.

[0044] The embedded mechanism 2 includes a threaded embedded seat 201, which provides an installation position. The bottom of the threaded embedded seat 201 is rotatably connected to a rotating disk 202, which provides an installation position. The outer thread of the threaded embedded seat 201 is threadedly connected to a movable disk 203, and a folding frame 204 is rotatably connected between the movable disk 203 and the outer portion of the rotating disk 202. After the movable disk 203 is twisted, it can drive the folding frame 204 to fold or unfold. The middle part of the folding frame 204 is rotatably connected to an outer box 205 on one side close to the threaded embedded seat 201, and the outer box 205 provides an installation position. The inner side of the outer box 205 away from the threaded embedded seat 201 is fixedly connected to a pressure spring 206, and the pressure spring 206 has The preload rod 107 or the embedded mechanism 2 is elastic, so even if it is squeezed too tightly, it will not cause damage to the preload rod 107 or the embedded mechanism 2. The side of the pressure spring 206 close to the threaded embedded seat 201 is fixedly connected to the limit plate 207, and the limit plate 207 has a limiting function. The side of the limit plate 207 close to the threaded embedded seat 201 is fixedly connected to a pressure rod 208, and both sides of the pressure rod 208 are slidably connected to a limit slider 209. The side of the pressure rod 208 away from the pressure spring 206 is fixedly connected to a preload plate 210. The outer periphery of the threaded embedded seat 201 is provided with a plurality of fitting grooves 211, and the interior of the threaded embedded seat 201 is provided with limiting grooves 212 on both sides of the fitting grooves 211. The limit plate 207 is slidably connected to the outer box 205. The limiting slider 209 slides inside the limiting groove 212 to prevent the pressing rod 208 from moving the pre-tightening plate 210 downward under the action of gravity, thereby preventing the pressing rod 208 from tilting. The pressing rod 208 is arranged inside the fitting groove 211. The bottom of the rotating disk 202 is fixedly connected with a bottom cone 213, and the top of the movable disk 203 is fixedly connected with a hexagonal head. The side of the pre-tightening plate 210 away from the limiting plate 207 is fixedly connected with an anti-skid pad. The limiting slider 209 is slidably connected to the inside of the limiting groove 212, and the bottom cone 213 is facing downward and inserted into the soil. At this time, the movable disk 203 is twisted downward, so that the folding frame 204 is bent outward, thereby driving the outer box 205 to move. The outer box 205 drives the limit plate 207 and then drives the pressure rod 208 to move outward, so that the pre-tightening plate 210 moves to both sides. At this time, the pre-installed rod 107 is inserted between multiple pre-tightening plates 210. At this time, the movable plate 203 is twisted upward, so that the folding frame 204 can be unfolded, so that the outer box 205 moves toward the middle, thereby driving the pressure rod 208 to move toward the middle, and then driving the pre-tightening plate 210 to move toward the middle, and then the pre-installed rod 107 can be clamped to complete the installation of the height connection adjustment mechanism 1. At this time, concrete is poured into the interior of the pit, so that the embedded mechanism 2 can be used to strengthen the tensile and shear resistance of the device after installation.

[0045] The folding and contracting mechanism 3 includes a fixing plate 301, which provides an installation position. The middle part of the fixing plate 301 is fixedly connected to the outside of the inner rod 104. Both sides of the top of the fixing plate 301 are rotatably connected to connecting rods 302. The connecting rods 302 can fold the solar panel 5 when the inner rod 104 moves downward. The tops of the two connecting rods 302 are rotatably connected to the bottoms of the two solar panels 5. The outer top of the inner rod 104 is fixedly connected to a fixing ring 303. The fixing ring 303 can provide an installation position. Both sides of the outer side of the fixing ring 303 are rotatably connected to driving rods 304. The driving rod 304 drives the monitoring control box 6 to move downward, and the bottoms of the two driving rods 304 are respectively rotatably connected to one side of the two monitoring control boxes 6. The outside of the outer rod 101 is fixedly connected with four sliding rails 305, and the side of the monitoring control box 6 close to the outer rod 101 is fixedly connected with a sliding mounting block 306. The sliding mounting block 306 is provided with a sliding groove 307 on the side close to the outer rod 101. The outside of the sliding rail 305 is slidably connected to the inside of the sliding groove 307. The sliding of the sliding rail 305 in the inside of the sliding groove 307 can limit the movement trajectory of the sliding mounting block 306.

[0046] A construction method for a karst collapse monitoring device includes the following construction methods:

[0047] Step 1: first dig a hole in the soil, and then use the bottom cone 213 to insert the entire embedded mechanism 2 into the hole;

[0048] Step 2: Place the preloading rod 107 between the multiple preloading plates 210, and twist the movable plate 203 upwards, thereby driving the folding frame 204 to open, and then the preloading plate 210 can move toward the middle to squeeze the preloading rod 107, thereby completing the preloading;

[0049] Step 3: pour cement in the hole, immerse the embedded mechanism 2, and use the embedded mechanism 2 to strengthen the tensile and shear resistance of the device after installation;

[0050] Step 4: After the cement dries, the installation is completed.

[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A karst collapse monitoring device, characterized in that: include: A height connection adjustment mechanism (1), which is used to change the height of the device and is connected to other mechanisms; A pre-buried mechanism (2), which is arranged at the bottom of the height connection adjustment mechanism (1) and is used for pre-installation of the height connection adjustment mechanism (1) and for stabilization after installation; A central shaft (4) fixed to the top of the height connection adjustment mechanism (1) for providing a location for installation and fixing; Two solar panels (5) are provided, each located on two sides of the central axis (4) for providing electric energy; Monitoring and control boxes (6), two in number, located outside the height connection adjustment mechanism (1), used for monitoring karst collapse and controlling equipment; The folding and contracting mechanism (3) is located outside the height connection adjustment mechanism (1) and is used for adjusting the height of the folding central axis (4) and the solar panel (5).

2. A karst collapse monitoring device according to claim 1, characterized in that: The embedded mechanism (2) is arranged at the bottom of the height connection adjustment mechanism (1), the middle of the central axis (4) is fixedly connected to the top of the height connection adjustment mechanism (1), the solar panel (5) is rotatably connected to the outside of the central axis (4) on one side close to the height connection adjustment mechanism (1), the folding and contracting mechanism (3) is arranged outside the height connection adjustment mechanism (1), and the monitoring control box (6) is arranged outside the folding and contracting mechanism (3).

3. A karst collapse monitoring device according to claim 1, characterized in that: The height connection adjustment mechanism (1) comprises an outer rod (101), the inner bottom end of the outer rod (101) is fixedly connected to a motor (102), the output end of the motor (102) is fixedly connected to a threaded column (103), the outer thread of the threaded column (103) is connected to an inner rod (104), the outer bottom end of the inner rod (104) is fixedly connected to two limit blocks (105), two sliding grooves (106) are provided on both sides of the outer side of the outer rod (101), the limit blocks (105) are slidably connected to the inside of the sliding groove (106), and the bottom of the sliding groove (106) is fixedly connected to a pre-installed rod (107).

4. The karst collapse monitoring device according to claim 1, characterized in that: The pre-embedded mechanism (2) comprises a threaded pre-embedded seat (201), the bottom of the threaded pre-embedded seat (201) is rotatably connected to a rotating disk (202), the outer portion of the threaded pre-embedded seat (201) is threadably connected to a movable disk (203), a folding frame (204) is rotatably connected between the movable disk (203) and the outer portion of the rotating disk (202), a middle portion of the folding frame (204) close to the threaded pre-embedded seat (201) is rotatably connected to an outer box (205), an inner portion of the outer box (205) away from the threaded pre-embedded seat (201) is fixedly connected to a pressure spring (206), the pressure spring (206) A limiting plate (207) is fixedly connected to one side of the threaded embedded seat (206) close to the threaded embedded seat (201), a pressure rod (208) is fixedly connected to one side of the limiting plate (207) close to the threaded embedded seat (201), both sides of the pressure rod (208) are slidably connected to limiting sliders (209), a side of the pressure rod (208) away from the pressure spring (206) is fixedly connected to a pre-tightening plate (210), a plurality of fitting grooves (211) are provided on the outer periphery of the threaded embedded seat (201), and limiting grooves (212) are provided on both sides of the fitting grooves (211) inside the threaded embedded seat (201).

5. The karst collapse monitoring device according to claim 3, characterized in that: The folding and contracting mechanism (3) comprises a fixing plate (301), the middle part of which is fixedly connected to the outside of the inner rod (104), the top of the fixing plate (301) is rotatably connected to connecting rods (302) on both sides, the tops of the two connecting rods (302) are rotatably connected to the bottoms of the two solar panels (5), the outer top of the inner rod (104) is fixedly connected to a fixing ring (303), and the outer sides of the fixing ring (303) are rotatably connected to driving rods (304), The bottoms of the two driving rods (304) are rotatably connected to one side of the two monitoring control boxes (6), respectively; the outside of the outer rod (101) is fixedly connected with four sliding rails (305); the side of the monitoring control box (6) close to the outer rod (101) is fixedly connected with a sliding mounting block (306); the inside of the sliding mounting block (306) is provided with a sliding groove (307) on the side close to the outer rod (101); the outside of the sliding rail (305) is slidably connected to the inside of the sliding groove (307).

6. The karst collapse monitoring device according to claim 3, characterized in that: The outside of the preloading rod (107) is arranged between a plurality of pre-tightening plates (210), and the inner rod (104) is slidably connected to the inside of the outer rod (101).

7. The karst collapse monitoring device according to claim 4, characterized in that: The limiting plate (207) is slidably connected to the inside of the outer box (205), and the pressing rod (208) is arranged inside the fitting groove (211).

8. The karst collapse monitoring device according to claim 4, characterized in that: The bottom of the rotating disk (202) is fixedly connected with a bottom cone (213), and the top of the moving disk (203) is fixedly connected with a hexagonal head.

9. The karst collapse monitoring device according to claim 4, characterized in that: An anti-skid pad is fixedly connected to the side of the pre-tightening plate (210) away from the limiting plate (207), and the limiting sliding block (209) is slidably connected to the inside of the limiting groove (212).

10. A construction method of a karst collapse monitoring device, according to a karst collapse monitoring device according to any one of claims 1 to 9, characterized in that: The following construction methods are included: Step 1: first dig a hole in the soil, and then use the bottom cone (213) to insert the entire embedded mechanism (2) into the hole; Step 2: Place the preloading rod (107) between the multiple preloading plates (210), and twist the movable plate (203) upwards, thereby driving the folding frame (204) to open, and then the preloading plate (210) can move toward the middle to squeeze the preloading rod (107), thereby completing the preloading; Step 3: pour cement in the hole, immerse the embedded mechanism (2), and use the embedded mechanism (2) to strengthen the tensile and shear resistance of the device after installation; Step 4: After the cement dries, the installation is completed.