Power grid operation parameter control method and device, storage medium and electronic equipment
By calculating the reverse load rate and grid operation parameters, a regulation sequence is generated to control the operating parameters of distributed power users, the problems of grid instability and shortened equipment life caused by distributed photovoltaics are solved, and the stability, safety and regulation efficiency of the power grid are improved.
Patent Information
- Application Number
- CN202411728525.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-03-07
AI Technical Summary
After the distributed photovoltaic is connected to the power grid, it causes unstable voltage in the station area and reverse power transmission, affecting the difficulty of power grid management and equipment life.
By calculating the reverse load rate and grid operation parameters of the target station area, a control sequence is generated to control the operating parameters of the distributed power supply user to ensure that the power grid is not damaged under abnormal conditions.
It effectively improves the stability and safety of the power grid, extends the equipment life, ensures power supply reliability, and improves the grid regulation efficiency.
Smart Images

Figure CN119582364A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power grid control technology, and in particular to a power grid operation parameter control method, device, storage medium and electronic equipment. Background Art
[0002] With the vigorous development of clean energy, a large number of distributed photovoltaics are connected to the power grid. The randomness, intermittency and volatility of distributed photovoltaics have a series of impacts on the upper power grid, among which the voltage boost and reverse power transmission of photovoltaics are the most prominent. First, the photovoltaic voltage boost may cause the voltage in the substation to be unstable, thereby increasing the difficulty of power grid management; secondly, the photovoltaic reverse power transmission may cause the substation to be reversely overloaded, reducing the life of the transformer and the reliability of power supply in the substation. The randomness, intermittency and volatility of distributed photovoltaics have an impact on the upper power grid, targeting the instability of the photovoltaic voltage boost on the substation voltage. When the output of distributed photovoltaics is too high, the substation voltage may exceed the safety value, resulting in damage to electrical equipment or shortening of its life. Photovoltaic reverse power transmission may cause reverse heavy overload in the substation, affecting the life of the transformer and the reliability of power supply in the substation. Summary of the invention
[0003] In view of this, the present invention provides a method, device, storage medium and electronic device for controlling power grid operation parameters, the main purpose of which is to solve the current problem that when the power grid is in an abnormal state, it is easy to cause damage to electrical equipment or shorten the life of the equipment.
[0004] To solve the above problems, the present application provides a method for controlling power grid operation parameters, comprising:
[0005] Calculating and processing based on the first operating parameter of the target area in the first preset time period and the rated capacity of the target area to obtain the reverse load rate of the target area;
[0006] Calculate and process based on the first operating parameter and the preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station area;
[0007] When the number of times the reverse load rate exceeds the first upper limit regulation threshold within the first preset time period is greater than a first number threshold, or the number of times the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a regulation sequence is generated based on the real-time user parameters of each distributed power source user;
[0008] The second operating parameter of each of the distributed power users is controlled based on the real-time dynamic priority of the regulation sequence.
[0009] Optionally, the calculation based on the first operating parameter and the preset threshold coefficient to obtain the first upper limit control threshold and the first lower limit control threshold of the target substation specifically includes:
[0010] Performing calculation processing based on the first operating parameter to obtain a first mean and a first standard deviation of the first operating parameter;
[0011] Performing a multiplication operation based on the preset threshold coefficient and the first standard deviation to obtain a first product value;
[0012] Performing a subtraction operation based on the first mean value and the first product value to obtain the first upper limit control threshold;
[0013] An addition operation is performed based on the first mean value and the first product value to obtain the first lower limit control threshold.
[0014] Optionally, the generating of the control sequence based on the real-time user parameters of each distributed power source user specifically includes:
[0015] Scoring each of the distributed power users based on the real-time user parameters and different scoring dimensions of each of the distributed power users, and obtaining first scoring values of each of the different scoring dimensions corresponding to the same distributed power user;
[0016] Performing calculation based on each of the first scoring values and the preset weight coefficients corresponding to the different scoring dimensions to obtain a second scoring value corresponding to the same distributed power user;
[0017] The distributed power users are sorted based on the second scoring values to obtain the regulation sequence.
[0018] Optionally, the controlling the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence specifically includes:
[0019] When the reverse load rate exceeds the first upper limit control threshold by a number greater than a first number threshold within the first preset time period, performing a subtraction operation based on the first upper limit control threshold and a preset redundancy value to obtain a first target load rate;
[0020] Performing calculation based on the first target load rate and the rated capacity of the target area to obtain a first reverse apparent power of the target area;
[0021] Performing calculation based on the first reverse apparent power and a predetermined power factor to obtain a first calculated active power value of the target substation;
[0022] Performing a subtraction operation based on the real-time active power value of the target substation and the first calculated active power value to obtain a first target control value of the target substation;
[0023] Calculation is performed based on the first target regulation value, the basic parameters of each of the distributed power users in the regulation sequence, and the second operating parameter to obtain a first regulation index value of the distributed power user for regulating each of the distributed power users;
[0024] Based on each of the first regulation index values, the second operating parameter of each of the distributed power users is regulated one by one in the order of the second score value from large to small.
[0025] Optionally, the controlling the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence further includes:
[0026] When the number of times that the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a subtraction operation is performed based on the first lower limit regulation threshold and a preset redundancy value to obtain a second target load rate;
[0027] Performing calculation based on the second target load rate and the rated capacity of the target substation to obtain a second reverse apparent power of the target substation;
[0028] Performing calculation based on the second reverse apparent power and a predetermined power factor to obtain a second calculated active power value of the target substation;
[0029] Performing a subtraction operation based on the real-time active power value of the target substation and the second calculated active power value to obtain a second target control value of the target substation;
[0030] Performing calculation based on the second target regulation value, the basic parameters of each of the distributed power users in the regulation sequence, and the second operating parameter to obtain a second regulation index value for regulating each of the distributed power users;
[0031] Based on each of the second control index values, the second operating parameters of each of the distributed power users are regulated one by one in the order of the second score value from small to large.
[0032] Optionally, the method further includes:
[0033] Performing calculation based on the current operating parameter value of the distributed power user within the second preset time period to obtain a second mean value and a second standard deviation corresponding to the distributed power user;
[0034] Performing a multiplication operation based on the preset threshold coefficient and the second standard deviation to obtain a second product value;
[0035] Performing a subtraction operation based on the second mean value and the second product value to obtain a second control upper limit threshold;
[0036] Performing an addition operation based on the second mean value and the second product value to obtain a second control lower limit threshold;
[0037] When the current operating parameter value of the distributed power user is greater than the second regulation upper limit threshold or the current operating parameter value of the distributed power user is less than the second regulation lower limit threshold, a third regulation index value corresponding to the distributed power user is obtained by performing calculation based on the current operating parameter value of the distributed power user, the second regulation upper limit threshold or the second regulation lower limit threshold, and the rated power value;
[0038] The current operating parameter value of the distributed power source user is regulated based on the third regulation index value.
[0039] Optionally, the method further includes:
[0040] When the reverse load rate exceeds the first upper limit control threshold by more than the first number threshold within the first preset time period, the current operating parameter value of the target distributed power user is greater than the second control upper limit threshold, and the control sequence includes the target distributed power user,
[0041] Comparing the first regulation index value and the third regulation index value corresponding to the target distributed power user to obtain a comparison result;
[0042] When the comparison result is that the first regulation index value is greater than or equal to the third regulation index value, regulating the current operating parameter value of the target distributed power user based on the third regulation index value;
[0043] When the comparison result is that the first regulation index value is less than the third regulation index value, the current operating parameter value of the target distributed power user is regulated based on the first regulation index value.
[0044] In order to solve the above problems, the present application provides a power grid operation parameter control device, comprising:
[0045] A first calculation module, configured to perform calculation processing based on a first operating parameter of a target area within a first preset time period and a rated capacity of the target area to obtain a reverse load rate of the target area;
[0046] A second calculation module is used to perform calculation processing based on the first operating parameter and a preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station;
[0047] A generating module, configured to generate a control sequence based on the real-time user parameters of each distributed power source user when the number of times the reverse load rate exceeds the first upper control threshold in the first preset time period is greater than a first number threshold, or the number of times the reverse load rate is lower than the first lower control threshold in the first preset time period is greater than the first number threshold;
[0048] A control module is used to control the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
[0049] In order to solve the above problem, the present application provides a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned power grid operation parameter control method are implemented.
[0050] To solve the above problems, the present application provides an electronic device, which comprises at least a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps of the above-mentioned power grid operation parameter control method when executing the computer program in the memory.
[0051] Beneficial effects of this application: This application aims to achieve the healthy development of new power systems, improve the stability, safety and control efficiency of power grids, and ensure the life of equipment and overall power supply reliability. This application comprehensively considers the internal information of the substation and the influencing factors of distributed photovoltaics on the substation, selects transformer load rate and photovoltaic voltage value as key decision indicators for strategy output, comprehensively and in real time reflects the internal operation information of the substation, and then determines the substation control value, control method and control user. When a reverse heavy overload / photovoltaic voltage exceeds the limit is detected, the acquisition terminal will automatically generate a control strategy and perform real-time control through the communication module to achieve rapid response, prevent transformer overload, and ensure the life and reliability of the transformer and the entire power grid; relying on the resources of the power consumption information collection system, this solution can monitor and control low-voltage distributed photovoltaics in real time, realize fast and efficient power grid management, and improve the power grid control efficiency. This application is applied to the edge side to relieve the control pressure of the main station; the control instructions at the substation layer have a higher priority than the user layer, ensuring the integrity and coordination of power grid management; the intelligent control method based on threshold adaptation and dynamic sequence can adapt to precise control in various scenarios and ensure stable control effect.
[0052] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0054] Figure 1 A schematic diagram of a flow chart of a method for controlling power grid operation parameters provided in an embodiment of the present application is shown;
[0055] Figure 2 A schematic diagram of a flow chart of a method for controlling power grid operation parameters provided by another embodiment of the present application is shown;
[0056] Figure 3 A structural block diagram of a power grid operation parameter control device provided by another embodiment of the present application is shown;
[0057] Figure 4 A control link diagram of a collection terminal provided in another embodiment of the present application is shown. DETAILED DESCRIPTION
[0058] Various aspects and features of the present application are described herein with reference to the accompanying drawings.
[0059] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of an embodiment. Other modifications within the scope and spirit of the present application will occur to those skilled in the art.
[0060] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present application and, together with the general description of the present application given above and the detailed description of the embodiments given below, serve to explain the principles of the present application.
[0061] These and other characteristics of the present application will become apparent from the following description of a preferred form of embodiment given as a non-limiting example with reference to the accompanying drawings.
[0062] It should also be understood that although the present application has been described with reference to some specific examples, those skilled in the art will be able to readily implement many other equivalent forms of the present application.
[0063] The above and other aspects, features and advantages of the present application will become more apparent in view of the following detailed description when taken in conjunction with the accompanying drawings.
[0064] Specific embodiments of the present application are described hereinafter with reference to the accompanying drawings; however, it should be understood that the embodiments applied for are merely examples of the present application, which may be implemented in a variety of ways. Well-known and / or repeated functions and structures are not described in detail to avoid unnecessary or redundant details that obscure the present application. Therefore, the specific structural and functional details applied for herein are not intended to be limiting, but merely serve as a basis and representative basis for the claims to teach those skilled in the art to use the present application in a variety of ways with substantially any suitable detailed structure.
[0065] This specification may use the phrases "in one embodiment," "in another embodiment," "in yet another embodiment," or "in other embodiments," all of which may refer to one or more of the same or different embodiments according to the present application.
[0066] The present application provides a method for controlling power grid operation parameters. Figure 1 As shown, including:
[0067] Step S101: performing calculation based on a first operating parameter of a target area and a rated capacity of the target area to obtain a reverse load rate of the target area;
[0068] In the specific implementation of this step, the first operating parameter may be a real-time reverse apparent power value of the target substation, and a reverse load rate of the target substation is obtained by performing a division operation based on the first operating parameter and the rated capacity.
[0069] Step S102: performing calculation processing based on the first operating parameter and a preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target substation;
[0070] During the specific implementation of this step, calculation processing is performed based on the first operating parameter to obtain the first mean and the first standard deviation of the first operating parameter; multiplication processing is performed based on the preset threshold coefficient and the first standard deviation to obtain the first product value; subtraction processing is performed based on the first mean and the first product value to obtain the first upper limit control threshold; addition processing is performed based on the first mean and the first product value to obtain the first lower limit control threshold.
[0071] Step S103: when the number of times that the reverse load rate exceeds the first upper limit regulation threshold in the first preset time period is greater than the first number threshold, or the number of times that the reverse load rate is lower than the first lower limit regulation threshold in the first preset time period is greater than the first number threshold, generating a regulation sequence based on the real-time user parameters of each distributed power source user;
[0072] In the specific implementation process of this step, when the reverse load rate exceeds the first upper limit regulation threshold by a number greater than the first quantity threshold within the first preset time period, the target area is in a reverse heavy overload state; when the reverse load rate is lower than the first lower limit regulation threshold by a number greater than the first quantity threshold within the first preset time period, the target area is in a reverse heavy overload recovery state; the first preset time period can be a time range of five minutes, one minute, etc., and the first preset time period can be set according to actual needs; the first quantity threshold can be set to 5, and the first quantity threshold can be set according to actual needs; the real-time user parameters include user type parameters, real-time user behavior change parameters, device status parameters, historical regulation record parameters, and) photovoltaic power generation and load The load level parameters include non-natural person user type, natural person user type and special user type; the real-time user behavior change parameters include drastic user behavior change type, medium user behavior change type and slight user behavior change type; the equipment status parameters include normal equipment status, healthy operation and abnormal equipment status, for example, when the inverter fails, the battery is overheated, etc., the equipment status is abnormal; the historical control record parameters include: the user was frequently controlled in the past, the user was occasionally controlled in the past and the user was rarely controlled in the past. When the user was frequently controlled in the past, the number of controls was greater than the average number of controls; when the user was occasionally controlled in the past, the number of controls was close to the average number of controls; when the user was rarely controlled in the past, the number of controls was less than the average number of controls. The photovoltaic power generation and load level parameters include: large power generation or high load, medium power generation or medium load and small power generation or low load. Specifically, users that account for more than 20% of the total load of the substation can be determined as having large power generation or high load; users that account for 10%-20% of the total load of the substation can be determined as having medium power generation or medium load; users that account for less than 10% of the total load of the substation can be determined as having small power generation or low load. Specifically, each of the distributed power users is scored based on the real-time user parameters of each distributed power user and different scoring dimensions to obtain a first scoring value of each different scoring dimension corresponding to the same distributed power user; calculations are performed based on each of the first scoring values and the preset weight coefficients corresponding to each of the different scoring dimensions to obtain a second scoring value corresponding to the same distributed power user; each of the distributed power users is sorted based on each of the second scoring values to obtain the control sequence.
[0073] Step S104: controlling the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
[0074] In the specific implementation process of this step, when the number of times the reverse load rate exceeds the first upper limit control threshold within the first preset time period is greater than the first number threshold, a subtraction operation is performed based on the first upper limit control threshold and the preset redundancy value to obtain a first target load rate; a calculation is performed based on the first target load rate and the rated capacity of the target substation to obtain a first reverse apparent power of the target substation; a calculation is performed based on the first reverse apparent power and a predetermined power factor to obtain a first calculated active power value of the target substation; a subtraction operation is performed based on the real-time active power value of the target substation and the first calculated active power value to obtain a first target control value of the target substation; a calculation is performed based on the first target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameter to obtain a first control index value of the distributed power user used to control each distributed power user; and the second operating parameter of each distributed power user is controlled one by one in the order of the second score value from large to small based on each first control index value. When the number of reverse load rates lower than the first lower control threshold within the first preset time period is greater than the first number threshold, a subtraction operation is performed based on the first lower control threshold and the preset redundancy value to obtain a second target load rate; a calculation is performed based on the second target load rate and the rated capacity of the target substation to obtain a second reverse apparent power of the target substation; a calculation is performed based on the second reverse apparent power and a predetermined power factor to obtain a second calculated active power value of the target substation; a subtraction operation is performed based on the real-time active power value of the target substation and the second calculated active power value to obtain a second target control value of the target substation; a calculation is performed based on the second target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameter to obtain a second control index value for controlling each distributed power user; and the second operating parameter of each distributed power user is controlled one by one in the order of the second score value from small to large based on each second control index value.
[0075] This application aims to achieve the healthy development of new power systems, improve the stability, safety and control efficiency of power grids, and ensure the life of equipment and overall power supply reliability. This application comprehensively considers the internal information of the substation and the impact of distributed photovoltaics on the substation, selects transformer load rate and photovoltaic voltage value as key decision indicators for strategy output, comprehensively and in real time reflects the internal operation information of the substation, and then determines the substation control value, control method and control user. When a reverse heavy overload / photovoltaic voltage exceeds the limit is detected, the acquisition terminal will automatically generate a control strategy and perform real-time control through the communication module to achieve rapid response, prevent transformer overload, and ensure the life and reliability of the transformer and the entire power grid; relying on the resources of the power consumption information collection system, this solution can monitor and control low-voltage distributed photovoltaics in real time, realize fast and efficient power grid management, and improve the efficiency of power grid control. This application is applied to the edge side to relieve the control pressure of the main station; the control instructions at the substation layer have a higher priority than the user layer, ensuring the integrity and coordination of power grid management; the intelligent control method based on threshold adaptation and dynamic sequence can adapt to precise control in various scenarios to ensure stable control effect.
[0076] Another embodiment of the present application provides another method for controlling power grid operation parameters, such as Figure 2 As shown, including:
[0077] Step S201: performing calculation based on a first operating parameter of a target area and a rated capacity of the target area to obtain a reverse load rate of the target area;
[0078] In the specific implementation of this step, the first operating parameter may be the real-time reverse apparent power value S of the target station area. total , based on the first operating parameter and the rated capacity S n Perform division operation to obtain the reverse load rate P of the target area. load The mathematical expression of the reverse load rate can be expressed as follows:
[0079]
[0080] Among them, S total Indicates the reverse apparent power of the target area total meter; S n Indicates the rated capacity of the transformer in the substation; P load Indicates the reverse load ratio of the target area.
[0081] Step S202: performing calculation based on the first operating parameter and a preset threshold coefficient to obtain a first upper limit control threshold of the target substation;
[0082] In the specific implementation process of this step, first, the initial threshold is set; specifically, the historical operation data of the substation under different seasons and different load conditions are analyzed to determine the appropriate initial threshold. According to the characteristics of the substation transformer and distributed photovoltaic equipment: such as rated capacity, overload capacity, etc., the initial threshold is set to ensure that the system can operate normally under certain load fluctuations. Set the initial threshold according to the design specifications of the power grid operation. For the reverse heavy overload threshold: select a reasonable initial threshold based on historical data and system design parameters. For example, the initial reverse load rate threshold can be set to 80% based on the rated capacity of the substation transformer, that is, the maximum reverse power that the transformer can withstand is 80% of the rated capacity. For the voltage threshold: set the upper and lower voltage limits according to the standards of the power system and the tolerance of the equipment. For example, for a low-voltage distribution system with a nominal voltage of 220 volts, the voltage upper limit can be set to 1.05 times the nominal voltage, that is, 231 volts. Secondly, dynamically adjust the threshold; specifically, the system should dynamically adjust the threshold according to the actual situation. During high-load periods, in order to avoid frequent regulation and waste of resources, the threshold is appropriately increased; when temporary photovoltaic power generation is too high (such as during strong sunlight at noon), the threshold is increased to avoid frequent regulation due to short-term power generation peaks. When photovoltaic power generation drops suddenly (such as on cloudy days, sudden shading, etc.), in order to avoid voltage fluctuations caused by insufficient power generation, the threshold is lowered in advance to start regulation; when the power load drops suddenly (such as a sudden drop in load at night), the threshold is lowered to avoid voltage instability due to load fluctuations. The minimum step size for threshold adjustment is 5%. In addition, the present invention also considers redundancy strategies. When adjusting the threshold, a certain redundancy value is set to cope with unforeseen emergencies. The redundancy value can leave buffer time for system regulation to avoid frequent switching or excessive regulation. Specifically, a calculation is performed based on the first operating parameter to obtain a first mean μ1 and a first standard deviation σ1 of the first operating parameter; a mean calculation is performed based on the first operating parameter to obtain the first mean μ1 and a standard deviation calculation is performed based on the first operating parameter to obtain the first standard deviation σ1; a multiplication operation is performed based on the preset threshold coefficient and the first standard deviation to obtain a first product value k×σ1; a subtraction operation is performed based on the first mean and the first product value to obtain the first upper limit control threshold The first upper limit control threshold The mathematical expression of can be expressed as follows:
[0083]
[0084] The first lower limit regulation threshold is obtained by performing an addition operation based on the first mean value and the first product value. The mathematical formula for calculating can be shown as follows:
[0085]
[0086] Wherein, μ1 represents the first mean of the data; σ1 represents the first standard deviation of the data; k represents the preset threshold coefficient; the first upper limit control threshold of this application is For regulating the reverse heavy load, the first lower limit regulation threshold of the present application Used to regulate the recovery phase of reverse heavy loads.
[0087] Step S203: when the number of times the reverse load rate exceeds the first upper limit regulation threshold within the first preset time period is greater than the first number threshold, or the number of times the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, scoring each of the distributed power users based on the real-time user parameters and different scoring dimensions of each of the distributed power users to obtain first scoring values of each different scoring dimension corresponding to the same distributed power user;
[0088] During the specific implementation of this step, when the reverse load rate exceeds the first upper control threshold in the first control threshold by a number greater than the first number threshold within the first preset time period, the operating state of the target substation is a reverse heavy overload state; the first number threshold can be 5, and the preset threshold can be set according to actual needs. When the reverse load rate is lower than the first lower control threshold by a number greater than the first number threshold within the first preset time period, the operating state of the target substation is a reverse heavy overload recovery state. The first upper control threshold and the first lower control threshold of the present application are updated in real time. Specifically, the first current operating parameter of the target substation at the current moment is obtained by real-time monitoring; the first upper control threshold and the first lower control threshold are updated in real time based on the first current operating parameter and the first historical operating parameter in the first preset time period before the current moment and the preset threshold coefficient. The same abnormal user is scored from different scoring dimensions to obtain the first scoring values of different scoring dimensions corresponding to the same distributed power user; each different scoring dimension includes user type, real-time user behavior change, equipment status, historical control records, photovoltaic power generation and load level, etc. to score each abnormal user, wherein the calculation method of the first scoring value U of the user type is: non-natural person user (enterprise user): score = 3; natural person user (family user): score = 2; special user: score = 1, and the user type of the special user can be set according to actual needs. The calculation method of the first scoring value B of the real-time user behavior change is: user behavior changes drastically (for example, a sudden increase in power generation or a sudden change in load > 20%): score = 3; user behavior changes moderately (changes between 10%-20%): score = 2; user behavior changes slightly (changes < 10%): score = 1. The calculation method of the first scoring value D of the equipment status is: normal equipment status, healthy operation: score = 1; abnormal equipment status (for example, inverter failure, battery overheating, etc.): score = 3. The calculation method of the first score value H of the historical control record is: the user was frequently controlled in the past (the number of controls> the average number of controls): score = 1; the user was occasionally controlled in the past (the number of controls is close to the average number of controls): score = 2; the user was rarely controlled in the past (the number of controls < the average number of controls): score = 3. The calculation method of the first score value P of the photovoltaic power generation and load level is: large power generation or high load (such as more than 20% of the total load of the station): score = 3; medium power generation or medium load (such as 10%-20% of the total load of the station): score = 2; small power generation or low load (such as <10% of the total load of the station): score = 1.
[0089] Step S204: performing calculation based on each of the first scoring values and the preset weight coefficients corresponding to the different scoring dimensions to obtain a second scoring value corresponding to the same distributed power user;
[0090] In the specific implementation process of this step, calculation processing is performed based on each of the first scoring values and the preset weight coefficients corresponding to each of the different scoring dimensions to obtain a second scoring value S corresponding to the same distributed power user. The calculation mathematical formula of the second scoring value S of each user can be shown as the following formula (4):
[0091] S=W1*U+W2*B+W3*D+W4*H+W5*P(4)
[0092] Among them, S is the second scoring value of the priority corresponding to the abnormal user; W1 is the weight of each factor, indicating the relative importance of the factor in the priority calculation (the sum of weights W1+W2+W3+W4+W5=1); U is the user type score; B is the real-time user behavior change score; D is the device status score; H is the historical control record score; P is the photovoltaic power generation and load level score; the preset weight coefficients corresponding to the different scoring dimensions can be shown as W1-W5, and the weight setting W i Specifically, the user type weight W1 can be set to 0.1; the real-time user behavior change weight W2 can be set to 0.2; the device status weight W3 can be set to 0.3, the historical control record weight W4 can be set to 0.2, and the photovoltaic power generation and load level weight W5 can be set to 0.1. These weights can be adjusted according to actual conditions and system requirements. A higher priority score means that the user has a greater impact on the system, so the system may prioritize the control of this user to ensure the stability and operation efficiency of the power grid.
[0093] Step S205: sorting the distributed power users based on the second scoring values to obtain a control sequence;
[0094] In the specific implementation of this step, a higher priority score means that the user has a greater impact on the system, so the system may give priority to regulating this user to ensure the stability and operating efficiency of the power grid. The dynamic priority adjustment mechanism can automatically adjust the user's regulation order according to the actual situation and data. The distributed power users are sorted based on each of the second scoring values to obtain the regulation sequence. Specifically, the distributed power users can be sorted in order from high to low in terms of score value, or they can be sorted in order from low to high in terms of score value to generate the regulation sequence.
[0095] Step S206: controlling the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence;
[0096] In the specific implementation process of this step, when the reverse load rate exceeds the first upper limit control threshold by more than the first number threshold within the first preset time period, a subtraction operation is performed based on the first upper limit control threshold and the preset redundancy value to obtain a first target load rate; a calculation is performed based on the first target load rate and the rated capacity of the target substation to obtain a first reverse apparent power of the target substation; a calculation is performed based on the first reverse apparent power and a predetermined power factor to obtain a first calculated active power value P of the target substation. need ; Based on the real-time active power value P of the target area actual And the first calculated active power value P need Subtraction operation is performed to obtain the first target control value of the target area; the calculation formula of the first target control value can be expressed as the following formula (5):
[0097] ΔP=P actual -P need (5)
[0098] Among them, ΔP is the first target control value. Based on the first target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameter, a calculation is performed to obtain the first control index value of the distributed power user used to control each distributed power user; specifically, the first control index value of the user is calculated according to the voltage-power curve relationship; the voltage sensitivity analysis can be performed according to the voltage and power curve of the user, and the correlation analysis can be performed to generate a voltage-power curve, that is, the power value corresponding to the voltage, based on which the data that the user should generate power (the current actual power generation data minus the data that needs to be reduced) can be determined, and then the specific control instructions can be further calculated according to the rated power. Based on each of the first control index values, the second operating parameters of each distributed power user are regulated one by one in the order of the second score value from large to small. When the target area is in the reverse heavy overload control stage, the sorted control sequence is traversed to determine the rigid and flexible category of the current user. If it is a rigid user, the user is cut off; if it is a flexible user, the power factor is dynamically adjusted, and the active power percentage is gradually reduced as needed. When executing the control, the system will update the user's status and operation records in real time to ensure that each round of control is based on the latest data. If the power factor and active percentage of the flexible user have been adjusted to the lower limit, the control instruction of the current user is stored, and the abnormal user sequence is continued to be traversed until the calculation result shows that the total table of the target area no longer has a reverse heavy overload. The second operating parameters of the distributed power users are controlled one by one based on the second scoring values of each distributed power user in the regulation sequence from high to low; the second operating parameter can be a voltage value, and the target area is adjusted according to the first target regulation value by adjusting the second operating parameter of each distributed power user, and the current first operating parameter is reduced to below the first regulation upper limit. Voltage is one of the core indicators of power quality and grid stability. Distributed photovoltaic power generation may cause local voltage fluctuations or abnormal increases (voltage over-limit) due to its randomness, intermittency and volatility. By monitoring the voltage value of photovoltaic users, voltage abnormalities caused by photovoltaic power generation can be detected and responded to in a timely manner to ensure the safe operation of the power grid. An increase in photovoltaic power generation will cause voltage to rise, while a sudden drop in power generation may cause voltage to drop. Especially in scenarios with low power load or long transmission lines, voltage fluctuations caused by photovoltaic power generation are more obvious. Therefore, by monitoring the voltage value of photovoltaic power generation, the impact of photovoltaic power generation on the power grid can be directly reflected, and regulatory measures can be taken in a timely manner. When voltage abnormalities occur in the power grid, monitoring the voltage values of each photovoltaic user can help quickly locate the source of the problem. By detecting the voltage point by point, it is possible to determine which photovoltaic user or users caused the voltage fluctuation, so that regulatory measures can be taken more accurately.By monitoring the voltage values of PV users, the power grid can better understand the actual impact of PV power generation on the power grid, quickly identify and locate problems, implement efficient control strategies, and ensure the safety of equipment and users. This makes the voltage value a key monitoring indicator that helps maintain the stability and operating efficiency of the power grid. Finally, the system will issue all stored control instructions to complete the control task; the system dynamically adjusts the priority of PV users based on the latest data and updates the sorting rules in real time. This update process will continue to reflect the latest user behavior and equipment status, thereby optimizing the control effect. Throughout the control process, the system continuously evaluates and optimizes the priority sorting to ensure the fairness of resource allocation and maximize benefits.
[0099] When the number of the reverse load rate lower than the first lower limit control threshold in the first preset time period is greater than the first number threshold, a subtraction operation is performed based on the first lower limit control threshold and the preset redundancy value to obtain a second target load rate; a calculation is performed based on the second target load rate and the rated capacity of the target area to obtain a second reverse apparent power of the target area; a calculation is performed based on the second reverse apparent power and the predetermined power factor to obtain a second calculated active power value of the target area; a subtraction operation is performed based on the real-time active power value of the target area and the second calculated active power value to obtain a second target control value of the target area; a calculation is performed based on the second target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameter to obtain a second control index value for controlling each distributed power user; and the second operating parameter of each distributed power user is controlled one by one in the order of the second score value from small to large based on each second control index value. The second operating parameter may be a voltage value, and the target area is adjusted according to the second target control value by adjusting the second operating parameter of each distributed power user, so that the current first operating parameter is increased to above the first control lower limit.
[0100] Step S207: performing calculation processing based on the current operating parameter value of the distributed power user within the second preset time period to obtain a second mean value and a second standard deviation corresponding to the distributed power user;
[0101] During the specific implementation of this step, the current operating parameter value of the distributed power user is the voltage value data acquired in real time, and the mean calculation is performed on the voltage value data within the second preset time period to obtain the second mean value μ2; the standard deviation calculation is performed on the voltage value data within the second preset time period to obtain the second standard deviation σ2.
[0102] Step S208: performing a multiplication operation based on the preset threshold coefficient and the second standard deviation to obtain a second product value;
[0103] In the specific implementation process of this step, a multiplication operation is performed based on the preset threshold coefficient and the second standard deviation to obtain a second product value k×σ2.
[0104] Step S209: performing a subtraction operation based on the second mean value and the second product value to obtain a second control upper limit threshold;
[0105] In the specific implementation process of this step, a subtraction operation is performed based on the second mean value and the second product value to obtain the second control upper limit threshold value. The second regulation upper limit threshold The mathematical expression of can be shown as follows:
[0106]
[0107] Wherein, μ2 represents the second mean of the data; σ2 represents the second standard deviation of the data; and k represents the preset threshold coefficient.
[0108] Step S210: performing an addition operation based on the second mean value and the second product value to obtain a second control lower limit threshold;
[0109] In the specific implementation process of this step, an addition operation is performed based on the second mean value and the second product value to obtain the second lower limit regulation threshold. The mathematical formula for calculating can be shown as follows:
[0110]
[0111] The second upper limit control threshold of this application Used to regulate the voltage value of the distributed power user when it exceeds the second upper limit regulation threshold, the second lower limit regulation threshold of this application Used to regulate the voltage value of distributed power users that is lower than the second lower limit regulation threshold.
[0112] Step S211: when the current operating parameter value of the distributed power user is greater than the second regulation upper limit threshold or the current operating parameter value of the distributed power user is less than the second regulation lower limit threshold, a third regulation index value corresponding to the distributed power user is obtained by performing calculation based on the current operating parameter value of the distributed power user, the second regulation upper limit threshold or the second regulation lower limit threshold, and the rated power value;
[0113] In the specific implementation process of this step, when the current operating parameter value of the distributed power user is greater than the second regulation upper limit threshold or the current operating parameter value of the distributed power user is less than the second regulation lower limit threshold, the third regulation index value corresponding to the distributed power user is obtained based on the current operating parameter value of the distributed power user, the second regulation upper limit threshold or the second regulation lower limit threshold, and the rated power value. Specifically, the control value of the user is calculated according to the voltage-power curve relationship; the voltage sensitivity analysis and correlation analysis can be performed according to the voltage and power curves of the user, and a voltage-power curve can be generated, that is, the corresponding power value is obtained through the voltage value, based on which the data that the user should generate electricity (the current actual power generation data minus the data that needs to be reduced) can be determined, and then the specific control instructions are further calculated according to the rated power to obtain the third control index value corresponding to the distributed power user.
[0114] Step S212: regulating the current operating parameter value of the distributed power source user based on the third regulation index value.
[0115] During the specific implementation of this step, when no reverse heavy overload occurs and no reverse heavy overload is recovered within the first preset time period, the current operating parameter value of the distributed power user is regulated based on the third control index value; when the number by which the reverse load rate exceeds the first upper limit control threshold within the first preset time period is greater than the first number threshold, the current operating parameter value of the target distributed power user is greater than the second control upper limit threshold, and the target distributed power user is included in the control sequence, the first control index value and the third control index value corresponding to the target distributed power user are compared to obtain a comparison result; when the comparison result is that the first control index value is greater than or equal to the third control index value, the current operating parameter value of the target distributed power user is regulated based on the third control index value; when the comparison result is that the first control index value is less than the third control index value, the current operating parameter value of the target distributed power user is regulated based on the first control index value. When the number by which the reverse load rate exceeds the first upper control threshold within the first preset time period is greater than the first number threshold, the current operating parameter value of the target distributed power user is greater than the second control upper limit threshold, and the target distributed power user is included in the control sequence, the current operating parameter value of the target distributed power user is regulated based on the smaller indicator value between the third control index value and the first control index value.
[0116] This application aims to achieve the healthy development of new power systems, improve the stability, safety and control efficiency of power grids, and ensure the life of equipment and overall power supply reliability. This application comprehensively considers the internal information of the substation and the impact of distributed photovoltaics on the substation, selects the transformer reverse load rate and photovoltaic voltage value as the key decision indicators of the strategy output, comprehensively and in real time reflects the internal operation information of the substation, and then determines the substation control value, control method and control user. When it is detected that the target substation is in the reverse heavy overload stage or the photovoltaic voltage exceeds the limit, the voltage value of each distributed power user is automatically regulated to ensure the life and reliability of the transformer and the entire power grid; relying on the resources of the power consumption information collection system, this application can monitor and control low-voltage distributed photovoltaics in real time, realize fast and efficient power grid management, and improve the power grid control efficiency. The solution is applied to the edge side, which can alleviate the control pressure of the main station; the control instructions of the target substation have a higher priority than the distributed power users, ensuring the integrity and coordination of power grid management; intelligent control based on real-time updated threshold adaptation and dynamic priority user sequence can adapt to precise control in various scenarios and ensure stable control effect.
[0117] The application of this application method is explained below in conjunction with specific application scenarios:
[0118] This method can be applied to the application built into the acquisition terminal, supported by the 22 version I type concentrator, and implemented in the substation. The application communicates with the protocol converter through the communication module to achieve real-time monitoring and control of low-voltage distributed photovoltaics.
[0119] When the acquisition terminal detects a reverse heavy overload or voltage over-limit regulation demand, it will autonomously generate a regulation strategy, transmit these strategies to related equipment through the photovoltaic acquisition monitoring unit or the smart IoT power meter, and perform corresponding control. The area layer edge self-control refers to the way that when the acquisition terminal detects a reverse heavy overload or there is a demand for energy balance in the area, it autonomously generates a regulation strategy and controls it through the photovoltaic acquisition monitoring unit or the smart IoT power meter. The control link is as follows Figure 3 shown.
[0120] Another embodiment of the present application provides a power grid operation parameter control device, such as Figure 4 As shown, including:
[0121] A first calculation module 1, configured to perform calculation processing based on a first operating parameter of a target area within a first preset time period and a rated capacity of the target area to obtain a reverse load rate of the target area;
[0122] A second calculation module 2, configured to perform calculation processing based on the first operating parameter and a preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station;
[0123] A generating module 3, configured to generate a control sequence based on the real-time user parameters of each distributed power source user when the number of times the reverse load rate exceeds the first upper control threshold in the first preset time period is greater than a first number threshold, or the number of times the reverse load rate is lower than the first lower control threshold in the first preset time period is greater than the first number threshold;
[0124] The control module 4 is used to control the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
[0125] During the specific implementation process, the second calculation module 2 is specifically used to: perform calculation processing based on the first operating parameter to obtain the first mean and the first standard deviation of the first operating parameter; perform multiplication processing based on the preset threshold coefficient and the first standard deviation to obtain a first product value; perform subtraction processing based on the first mean and the first product value to obtain the first upper limit control threshold; perform addition processing based on the first mean and the first product value to obtain the first lower limit control threshold.
[0126] In the specific implementation process, the generation module 3 is specifically used to: score each of the distributed power users based on the real-time user parameters and different scoring dimensions of each distributed power user, and obtain a first scoring value of each different scoring dimension corresponding to the same distributed power user; perform calculations based on each of the first scoring values and the preset weight coefficients corresponding to each different scoring dimension to obtain a second scoring value corresponding to the same distributed power user; sort each of the distributed power users based on each of the second scoring values to obtain the control sequence.
[0127] In the specific implementation process, the control module 4 is specifically used for: when the reverse load rate exceeds the first upper limit control threshold by a number greater than the first number threshold within the first preset time period, performing a subtraction operation based on the first upper limit control threshold and a preset redundancy value to obtain a first target load rate; performing a calculation based on the first target load rate and the rated capacity of the target substation to obtain a first reverse apparent power of the target substation; performing a calculation based on the first reverse apparent power and a predetermined power factor to obtain a first calculated active power value of the target substation; performing a subtraction operation based on the real-time active power value of the target substation and the first calculated active power value to obtain a first target control value of the target substation; performing a calculation based on the first target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameter to obtain a first control index value of the distributed power user used to control each distributed power user; and regulating the second operating parameters of each distributed power user one by one in the order of the second score value from large to small based on each of the first control index values.
[0128] In the specific implementation process, the control module 4 is also used for: when the number of the reverse load rate lower than the first lower limit control threshold within the first preset time period is greater than the first number threshold, performing subtraction processing based on the first lower limit control threshold and the preset redundancy value to obtain a second target load rate; performing calculation processing based on the second target load rate and the rated capacity of the target substation to obtain a second reverse apparent power of the target substation; performing calculation processing based on the second reverse apparent power and the predetermined power factor to obtain a second calculated active power value of the target substation; performing subtraction processing based on the real-time active power value of the target substation and the second calculated active power value to obtain a second target control value of the target substation; performing calculation processing based on the second target control value, the basic parameters of each distributed power user in the control sequence, and the second operating parameters to obtain a second control index value for controlling each distributed power user; and controlling the second operating parameters of each distributed power user one by one in the order of the second score value from small to large based on each second control index value.
[0129] In the specific implementation process, the device also includes a second control module, which is specifically used to: perform calculation processing based on the current operating parameter value of the distributed power user within a second preset time period to obtain a second mean and a second standard deviation corresponding to the distributed power user; perform multiplication processing based on the preset threshold coefficient and the second standard deviation to obtain a second product value; perform subtraction processing based on the second mean and the second product value to obtain a second regulation upper limit threshold; perform addition processing based on the second mean and the second product value to obtain a second regulation lower limit threshold; when the current operating parameter value of the distributed power user is greater than the second regulation upper limit threshold or the current operating parameter value of the distributed power user is less than the second regulation lower limit threshold, perform calculation processing based on the current operating parameter value of the distributed power user, the second regulation upper limit threshold or the second regulation lower limit threshold, and the rated power value to obtain a third regulation index value corresponding to the distributed power user; and regulate the current operating parameter value of the distributed power user based on the third regulation index value.
[0130] During the specific implementation process, the device also includes a third control module, which is specifically used to: when the number by which the reverse load rate exceeds the first upper limit control threshold within the first preset time period is greater than the first number threshold, the current operating parameter value of the target distributed power user is greater than the second control upper limit threshold, and the target distributed power user is included in the control sequence, compare the first control index value and the third control index value corresponding to the target distributed power user to obtain a comparison result; when the comparison result is that the first control index value is greater than or equal to the third control index value, regulate the current operating parameter value of the target distributed power user based on the third control index value; when the comparison result is that the first control index value is less than the third control index value, regulate the current operating parameter value of the target distributed power user based on the first control index value.
[0131] This application aims to achieve the healthy development of new power systems, improve the stability, safety and control efficiency of power grids, and ensure the life of equipment and overall power supply reliability. This application comprehensively considers the internal information of the substation and the impact of distributed photovoltaics on the substation, selects the transformer reverse load rate and photovoltaic voltage value as the key decision indicators of the strategy output, comprehensively and in real time reflects the internal operation information of the substation, and then determines the substation control value, control method and control user. When it is detected that the target substation is in the reverse heavy overload stage or the photovoltaic voltage exceeds the limit, the voltage value of each distributed power user is automatically regulated to ensure the life and reliability of the transformer and the entire power grid; relying on the resources of the power consumption information collection system, this application can monitor and control low-voltage distributed photovoltaics in real time, realize fast and efficient power grid management, and improve the power grid control efficiency. The solution is applied to the edge side, which can alleviate the control pressure of the main station; the control instructions of the target substation have a higher priority than the distributed power users, ensuring the integrity and coordination of power grid management; intelligent control based on real-time updated threshold adaptation and dynamic priority user sequence can adapt to precise control in various scenarios and ensure stable control effect.
[0132] Another embodiment of the present application provides a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a processor, the following method steps are implemented:
[0133] Step 1: Calculate and process the first operating parameter of the target area within the first preset time period and the rated capacity of the target area to obtain the reverse load rate of the target area;
[0134] Step 2: Calculate and process based on the first operating parameter and the preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station;
[0135] Step 3: when the number of times the reverse load rate exceeds the first upper limit regulation threshold within the first preset time period is greater than the first number threshold, or the number of times the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a regulation sequence is generated based on the real-time user parameters of each distributed power source user;
[0136] Step 4: Control the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
[0137] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0138] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0139] The specific implementation process of the above method steps can refer to the embodiments of any of the above-mentioned power grid operation parameter control methods, and this embodiment will not be repeated here.
[0140] This application aims to achieve the healthy development of new power systems, improve the stability, safety and control efficiency of power grids, and ensure the life of equipment and overall power supply reliability. This application comprehensively considers the internal information of the substation and the impact of distributed photovoltaics on the substation, selects the transformer reverse load rate and photovoltaic voltage value as the key decision indicators of the strategy output, comprehensively and in real time reflects the internal operation information of the substation, and then determines the substation control value, control method and control user. When it is detected that the target substation is in the reverse heavy overload stage or the photovoltaic voltage exceeds the limit, the voltage value of each distributed power user is automatically regulated to ensure the life and reliability of the transformer and the entire power grid; relying on the resources of the power consumption information collection system, this application can monitor and control low-voltage distributed photovoltaics in real time, realize fast and efficient power grid management, and improve the power grid control efficiency. The solution is applied to the edge side, which can alleviate the control pressure of the main station; the control instructions of the target substation have a higher priority than the distributed power users, ensuring the integrity and coordination of power grid management; intelligent control based on real-time updated threshold adaptation and dynamic priority user sequence can adapt to precise control in various scenarios and ensure stable control effect.
[0141] Another embodiment of the present application provides an electronic device, which may be a server, and the electronic device includes a processor, a memory, a network interface, and a database connected via a system bus. The processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile and / or volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the electronic device is used to communicate with an external client via a network connection. When the electronic device program is executed by the processor, it implements the functions or steps of a power grid operation parameter control method server side.
[0142] In one embodiment, an electronic device is provided, which may be a client. The electronic device includes a processor, a memory, a network interface, a display screen, and an input device connected via a system bus. The processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the electronic device is used to communicate with an external server via a network connection. When the electronic device program is executed by the processor, the functions or steps on the client side of a power grid operation parameter control method are implemented.
[0143] Another embodiment of the present application provides an electronic device, comprising at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the following method steps when executing the computer program in the memory:
[0144] Step 1: Calculate and process the first operating parameter of the target area within the first preset time period and the rated capacity of the target area to obtain the reverse load rate of the target area;
[0145] Step 2: Calculate and process based on the first operating parameter and the preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station;
[0146] Step 3: when the number of times the reverse load rate exceeds the first upper limit regulation threshold within the first preset time period is greater than the first number threshold, or the number of times the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a regulation sequence is generated based on the real-time user parameters of each distributed power source user;
[0147] Step 4: Control the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
[0148] The specific implementation process of the above method steps can refer to the embodiments of any of the above-mentioned power grid operation parameter control methods, and this embodiment will not be repeated here.
[0149] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.
Claims
1. A method for controlling power grid operation parameters, characterized in that: include: Calculating and processing based on the first operating parameter of the target area in the first preset time period and the rated capacity of the target area to obtain the reverse load rate of the target area; Calculate and process based on the first operating parameter and the preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station area; When the number of times the reverse load rate exceeds the first upper limit regulation threshold within the first preset time period is greater than a first number threshold, or the number of times the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a regulation sequence is generated based on the real-time user parameters of each distributed power source user; The second operating parameter of each of the distributed power users is controlled based on the real-time dynamic priority of the regulation sequence.
2. The method according to claim 1, characterized in that The calculating and processing based on the first operating parameter and the preset threshold coefficient to obtain the first upper limit control threshold and the first lower limit control threshold of the target station specifically includes: Performing calculation processing based on the first operating parameter to obtain a first mean and a first standard deviation of the first operating parameter; Performing a multiplication operation based on the preset threshold coefficient and the first standard deviation to obtain a first product value; Performing a subtraction operation based on the first mean value and the first product value to obtain the first upper limit control threshold; An addition operation is performed based on the first mean value and the first product value to obtain the first lower limit control threshold.
3. The method according to claim 1, characterized in that The generating of the control sequence based on the real-time user parameters of each distributed power source user specifically includes: Scoring each of the distributed power users based on the real-time user parameters and different scoring dimensions of each of the distributed power users, and obtaining first scoring values of each of the different scoring dimensions corresponding to the same distributed power user; Performing calculation based on each of the first scoring values and the preset weight coefficients corresponding to the different scoring dimensions to obtain a second scoring value corresponding to the same distributed power user; The distributed power users are sorted based on the second scoring values to obtain the regulation sequence.
4. The method according to claim 3, characterized in that The controlling of the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence specifically includes: When the reverse load rate exceeds the first upper limit control threshold by a number greater than a first number threshold within the first preset time period, performing a subtraction operation based on the first upper limit control threshold and a preset redundancy value to obtain a first target load rate; Performing calculation based on the first target load rate and the rated capacity of the target area to obtain a first reverse apparent power of the target area; Performing calculation based on the first reverse apparent power and a predetermined power factor to obtain a first calculated active power value of the target substation; Performing a subtraction operation based on the real-time active power value of the target substation and the first calculated active power value to obtain a first target control value of the target substation; Calculation is performed based on the first target regulation value, the basic parameters of each of the distributed power users in the regulation sequence, and the second operating parameter to obtain a first regulation index value of the distributed power user for regulating each of the distributed power users; Based on each of the first regulation index values, the second operating parameter of each of the distributed power users is regulated one by one in the order of the second score value from large to small.
5. The method according to claim 3, characterized in that The controlling of the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence further includes: When the number of times that the reverse load rate is lower than the first lower limit regulation threshold within the first preset time period is greater than the first number threshold, a subtraction operation is performed based on the first lower limit regulation threshold and a preset redundancy value to obtain a second target load rate; Performing calculation based on the second target load rate and the rated capacity of the target substation to obtain a second reverse apparent power of the target substation; Performing calculation based on the second reverse apparent power and a predetermined power factor to obtain a second calculated active power value of the target substation; Performing a subtraction operation based on the real-time active power value of the target substation and the second calculated active power value to obtain a second target control value of the target substation; Performing calculation based on the second target regulation value, the basic parameters of each of the distributed power users in the regulation sequence, and the second operating parameter to obtain a second regulation index value for regulating each of the distributed power users; Based on each of the second control index values, the second operating parameters of each of the distributed power users are controlled one by one in the order of the second score value from small to large.
6. The method according to claim 4, characterized in that The method further comprises: Performing calculation based on the current operating parameter value of the distributed power user within the second preset time period to obtain a second mean value and a second standard deviation corresponding to the distributed power user; Performing a multiplication operation based on the preset threshold coefficient and the second standard deviation to obtain a second product value; Performing a subtraction operation based on the second mean value and the second product value to obtain a second control upper limit threshold; Performing an addition operation based on the second mean value and the second product value to obtain a second control lower limit threshold; When the current operating parameter value of the distributed power user is greater than the second regulation upper limit threshold or the current operating parameter value of the distributed power user is less than the second regulation lower limit threshold, a third regulation index value corresponding to the distributed power user is obtained by performing calculation based on the current operating parameter value of the distributed power user, the second regulation upper limit threshold or the second regulation lower limit threshold, and the rated power value; The current operating parameter value of the distributed power source user is regulated based on the third regulation index value.
7. The method according to claim 6, characterized in that The method further comprises: When the reverse load rate exceeds the first upper limit control threshold by more than the first number threshold within the first preset time period, the current operating parameter value of the target distributed power user is greater than the second control upper limit threshold, and the control sequence includes the target distributed power user, Comparing the first regulation index value and the third regulation index value corresponding to the target distributed power user to obtain a comparison result; When the comparison result is that the first regulation index value is greater than or equal to the third regulation index value, regulating the current operating parameter value of the target distributed power user based on the third regulation index value; When the comparison result is that the first regulation index value is less than the third regulation index value, the current operating parameter value of the target distributed power user is regulated based on the first regulation index value.
8. A power grid operation parameter control device, characterized in that: include: A first calculation module, configured to perform calculation processing based on a first operating parameter of a target area within a first preset time period and a rated capacity of the target area to obtain a reverse load rate of the target area; A second calculation module is used to perform calculation processing based on the first operating parameter and a preset threshold coefficient to obtain a first upper limit control threshold and a first lower limit control threshold of the target station; A generating module, configured to generate a control sequence based on the real-time user parameters of each distributed power source user when the number of times the reverse load rate exceeds the first upper control threshold in the first preset time period is greater than a first number threshold, or the number of times the reverse load rate is lower than the first lower control threshold in the first preset time period is greater than the first number threshold; A control module is used to control the second operating parameter of each of the distributed power users based on the real-time dynamic priority of the regulation sequence.
9. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the power grid operation parameter control method described in any one of claims 1 to 7 are implemented.
10. An electronic device, characterized in that: The method comprises at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for controlling the operation parameters of the power grid according to any one of claims 1 to 7 when executing the computer program on the memory.