Transformer substation infrastructure crack self-balancing repairing equipment and method
Through the self-balancing and repairing equipment of substation infrastructure and the dynamic balance technology of clamping fixtures and expansion components, the cracks in the substation infrastructure are realized without dead corners and effective repair, solving the problem of crack repair and ensuring the reliability of power facilities.
Patent Information
- Application Number
- CN202411680701.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-11
AI Technical Summary
Cracks in substation infrastructure are difficult to effectively repair, especially when cracks are small and internal residues are difficult to clean up, resulting in structural corrosion and the reliability of power facilities.
A self-balancing repair equipment for cracks in the substation infrastructure is adopted, including clamping fixtures, connecting frames, expansion components and glue injection accessories. By clamping the fixing device, the tapered movable end of the expansion assembly is inserted and expanded, and the glue injection auxiliary is inserted into the crack opening, adjusting the force of the expansion assembly and clamping the fixing device to achieve dynamic balance, ensuring that there are no dead corners of the structural colloid injected into the crack.
The cracks are not filled with blind spots, ensuring that the structural colloid fully encloses the cracks, avoiding the invasion of moisture and salt, extending the service life of the substation infrastructure, and ensuring the reliability of power facilities.
Smart Images

Figure CN119593608A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building repair, and in particular to a self-balancing repair device and method for cracks in a transformer substation infrastructure. Background Art
[0002] With the continuous expansion of the power system and the rising demand for electricity, substations are being built in various regions. Substations are places in the power system that transform voltage and current, receive and distribute electric energy, and play a very important hub role.
[0003] However, during the construction and operation of substations, factors such as insufficient brickwork materials and construction quality, temperature changes, and rainwater erosion can cause cracks in the concrete structure of substations, especially in some coastal areas. Cracks not only affect the appearance and overall performance of the structure, but may also become channels for water and salt to intrude, accelerate structural corrosion, and affect the reliability of power facilities.
[0004] The existing technology mainly uses colloid to seal the cracks, but the cracks themselves are small and the residue inside the cracks is difficult to clean effectively. Moreover, the glue injection pressure alone will cause it to overflow on its own, and the internal closed cavity cannot be effectively injected. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a self-balancing repair device and method for cracks in a transformer substation infrastructure, so as to assist in implementing glue injection without dead angles inside cracks in the infrastructure and ensure the reliability of power facilities.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0007] A self-balancing repair device for cracks in a transformer substation infrastructure, comprising a clamping and fixing device, a connecting frame, an expansion component and at least two glue injection auxiliary parts;
[0008] The clamping device comprises a left clamping member and a right clamping member opposite to each other, the clamping force of the clamping device is adjustable, the expansion assembly is connected to the clamping device through the connecting frame, and the left clamping member and the right clamping member are used to clamp two sides of a side of the substation infrastructure where the crack is located;
[0009] The conical movable end of the expansion assembly can be movably arranged relative to the connecting frame, and the conical movable end of the expansion assembly is used to insert into and expand the crack of the substation infrastructure;
[0010] All of the glue injection auxiliary parts are used to be clamped at different positions on the crack opening.
[0011] In order to solve the above technical problems, another technical solution adopted by the present invention is:
[0012] A self-balancing repair method for cracks in a substation infrastructure is applied to the above-mentioned self-balancing repair device for cracks in a substation infrastructure, comprising the following steps:
[0013] S1. Clamp and fix the clamping device on both sides of the side where the crack exists on the substation infrastructure to fix the equipment;
[0014] S2, controlling the tapered movable end of the expansion component to be pressed into the crack, so that the crack expands slightly, and inserting the glue injection auxiliary parts at different positions on the crack mouth;
[0015] S3, cleaning the inside of the crack and sealing the crack mouth except for the conical movable end of the expansion component and the glue injection auxiliary component;
[0016] S4, injecting structural colloid into the crack, gradually increasing the clamping force of the clamping fixture, and adjusting the expansion component each time the clamping force of the clamping fixture is increased to ensure that the tension applied to the crack by the tapered movable end of the expansion component maintains a dynamic balance with the clamping force of the clamping fixture;
[0017] S5. After the structural colloid inside the crack is cured, the expansion component and the glue injection auxiliary component are removed, and the positions of the crack opening corresponding to the conical active end of the expansion component and the glue injection auxiliary component are filled with glue and sealed.
[0018] The beneficial effects of the present invention are: providing a self-balancing repair device and method for cracks in a substation infrastructure, using a clamping and fixing device to fix the entire device on the substation infrastructure, and aligning the conical active end of the expansion component with the crack of the substation infrastructure, and then controlling the expansion component to insert into the crack and slightly expand the crack to avoid affecting the effective cleaning of the internal residue due to the crack being too narrow, and during the injection of glue, the dynamic balance between the tension applied by the expansion component and the clamping force of the clamping and fixing device is achieved through adjustment, so that the injection pressure and the clamping pressure jointly help the structural colloid overflow the crack, so as to achieve dead-angle injection inside the crack and ensure the reliability of the power facilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the installation of a clamping and fixing device and a glue injection auxiliary part of a self-balancing repair device for cracks in a substation infrastructure of the present invention on the substation infrastructure;
[0020] Figure 2 A schematic diagram of the coordination of a clamping device and an expansion assembly of a self-balancing repair device for cracks in a substation infrastructure of the present invention;
[0021] Figure 3The present invention is a schematic diagram of the steps of a self-balancing repair method for cracks in a substation infrastructure.
[0022] Description of labels:
[0023] 1. Left clamping part; 2. Right clamping part; 3. Connecting frame; 4. Glue injection auxiliary part; 5. Transmission part; 6. Conical head; 7. Mounting seat; 8. Screw rod; 9. Third connecting part;
[0024] 31. First connecting member; 32. Second connecting member. DETAILED DESCRIPTION
[0025] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.
[0026] Please refer to Figure 1 and Figure 2 , a self-balancing repair device for cracks in a substation infrastructure, comprising a clamping and fixing device, a connecting frame 3, an expansion component and at least two glue injection auxiliary parts 4;
[0027] The clamping device comprises a left clamping member 1 and a right clamping member 2 which are opposite to each other. The clamping force of the clamping device is adjustable. The expansion assembly is connected to the clamping device through the connecting frame. The left clamping member 1 and the right clamping member 2 are used to clamp two sides of a side of the substation infrastructure where the crack is located.
[0028] The conical movable end of the expansion component can be movably arranged relative to the connecting frame 3, and the conical movable end of the expansion component is used to insert into and expand the crack of the substation infrastructure;
[0029] All of the glue injection auxiliary parts 4 are used to be clamped at different positions on the crack opening.
[0030] From the above description, it can be seen that the beneficial effects of the present invention are: the entire equipment is fixed on the substation infrastructure by using a clamping and fixing device, and the conical active end of the expansion component is aligned with the crack of the substation infrastructure, and then the expansion component is controlled to be inserted into the crack and slightly expand the crack to avoid the crack being too narrow and affecting the effective cleaning of the internal residue. When injecting glue, the dynamic balance between the tension applied by the expansion component and the clamping force of the clamping and fixing device is achieved through adjustment, so that the injection pressure and the clamping pressure jointly help the structural colloid overflow the crack, so as to achieve dead-angle injection inside the crack and ensure the reliability of the power facilities.
[0031] Further, the clamping and fixing device includes a transmission member 5;
[0032] The left clamping member 1 and the right clamping member 2 are disposed on the transmission member 5 , and the left clamping member 1 and the right clamping member 2 can move in a direction of being relatively close to or away from each other on the transmission member 5 .
[0033] From the above description, it can be seen that the left clamping member 1 and the right clamping member 2 move on the transmission member 5 to achieve a clamping process of approaching each other or a loosening process of moving away from each other. This is not only stable in operation, but also convenient for adjusting the clamping force through the transmission member 5.
[0034] Furthermore, the connecting frame 3 includes a first connecting member 31 and a second connecting member 32;
[0035] One end of the first connecting member 31 is hinged to the right clamping member 2, one end of the second connecting member 32 is hinged to the left clamping member 1, the other end of the first connecting member 31 is hinged to the other end of the second connecting member 32, and the expansion component is arranged at the connection point between the first connecting member 31 and the second connecting member 32.
[0036] From the above description, it can be seen that the first connecting member 31, the second connecting member 32 and the transmission member 5 form a triangular structure, and the movement of the right clamping member 2 and the left clamping member 1 can be used to affect the shape of the triangular structure, so that the change in the clamping force affects the position change of the expansion component, and the change in the active position of the conical active end of the expansion component is combined with the adjustment flexibility of the self-balancing to improve the linkage effect of the self-balancing.
[0037] Further, the expansion assembly includes a linear drive member and a conical head 6;
[0038] The conical head 6 is arranged on the movable end of the linear drive member, and the linear drive member is arranged on the connecting frame 3 .
[0039] From the above description, it can be seen that the expansion component is composed of a linear drive and a conical head 6. By controlling the linear drive, the position of the conical head 6 can be adjusted to change the tension applied to the crack, which is easy to operate.
[0040] Further, the linear drive member includes a mounting seat 7 and a screw rod 8;
[0041] The mounting seat 7 is provided with a threaded through hole, the screw rod 8 is threadedly connected to the threaded through hole, and the conical head 6 is arranged on one end of the screw rod 8 close to the clamping and fixing device.
[0042] From the above description, it can be seen that the screw rod 8 controls the directional movement of the conical head 6 through the threaded through hole on the mounting seat 7, and the threaded structure can be used to finely adjust the movement stroke to improve the stability and reliability of the expansion force control.
[0043] Furthermore, there are more than two of the clamping and fixing device, the connecting frame 3 and the expansion assembly.
[0044] From the above description, it can be seen that there are more than two clamping and fixing devices, connecting frames 3 and expansion components to cope with some long lengths or other situations where different positions of the infrastructure need to be clamped, thereby improving the applicability of the equipment.
[0045] Furthermore, it also includes a third connecting member 9;
[0046] One of the third connecting members 9 is detachably connected to the left clamping members 1 of different clamping and fixing devices, and another of the third connecting members 9 is detachably connected to the right clamping members 2 of different clamping and fixing devices.
[0047] It can be seen from the above description that when there are a large number of clamping and fixing devices, connecting frames 3, etc., by providing a third connecting member 9, the stability of the entire device after being used on the infrastructure can be improved.
[0048] Furthermore, the glue injection auxiliary component 4 is provided with an observation hole for observing the inside of the crack.
[0049] From the above description, it can be seen that by setting up the observation hole, the effect of crack glue injection can be easily observed to ensure the quality of glue injection.
[0050] Please refer to Figure 3 A self-balancing repair method for cracks in a substation infrastructure is applied to the above-mentioned self-balancing repair device for cracks in a substation infrastructure, comprising the following steps:
[0051] S1. Clamp and fix the clamping device on both sides of the side where the crack exists on the substation infrastructure to fix the equipment;
[0052] S2, controlling the tapered movable end of the expansion component to press into the crack, so that the crack slightly expands, and inserting the glue injection auxiliary component 4 at different positions on the crack mouth;
[0053] S3, cleaning the inside of the crack and sealing the crack mouth except for the conical movable end of the expansion component and the glue injection auxiliary component 4;
[0054] S4, injecting structural colloid into the crack, and adjusting the expansion component and the clamping device at the same time to ensure that the tension applied by the conical movable end of the expansion component on the crack and the clamping force of the clamping device maintain dynamic balance;
[0055] S5. After the structural colloid inside the crack is cured, the expansion component and the glue injection auxiliary component 4 are removed, and the positions of the conical active end of the expansion component and the glue injection auxiliary component 4 on the crack opening corresponding to the glue are filled and sealed.
[0056] From the above description, it can be seen that the beneficial effects of the present invention are: the entire equipment is fixed on the substation infrastructure by using a clamping and fixing device, and the conical active end of the expansion component is aligned with the crack of the substation infrastructure, and then the expansion component is controlled to be inserted into the crack and slightly expand the crack to avoid the crack being too narrow and affecting the effective cleaning of the internal residue. When injecting glue, the dynamic balance between the tension applied by the expansion component and the clamping force of the clamping and fixing device is achieved through adjustment, so that the injection pressure and the clamping pressure jointly help the structural colloid overflow the crack, so as to achieve dead-angle injection inside the crack and ensure the reliability of the power facilities.
[0057] Further, the removal of the expansion assembly and the glue injection auxiliary component 4 is specifically as follows:
[0058] The expansion assembly is controlled to retract, and the clamping force of the clamping and fixing device is increased until all the glue injection auxiliary parts 4 are squeezed out.
[0059] From the above description, it can be known that the clamping force of the clamping and fixing device is increased until all the glue injection auxiliary parts 4 are squeezed out, and the pressing force is maintained to facilitate subsequent glue filling and ensure the repair quality.
[0060] Please refer to Figure 1 and Figure 2 , Embodiment 1 of the present invention is:
[0061] A self-balancing repair device for cracks in a substation infrastructure comprises a clamping device, a connecting frame 3, an expansion component and at least two glue injection auxiliary parts 4; the clamping device comprises a left clamping part 1 and a right clamping part 2 relative to each other, the clamping force of the clamping device is adjustable, the expansion component is connected to the clamping device through the connecting frame 3, the left clamping part 1 and the right clamping part 2 are used to clamp the two sides of a side where the crack of the substation infrastructure is located; the tapered movable end of the expansion component can be movably arranged relative to the connecting frame 3, and the tapered movable end of the expansion component is used to insert and expand the crack of the substation infrastructure; all the glue injection auxiliary parts 4 are used to be clamped at different positions on the crack mouth. The glue injection auxiliary parts 4 are provided with observation holes for observing the inside of the crack.
[0062] In this embodiment, the clamping and fixing device includes a transmission member 5; the left clamping member 1 and the right clamping member 2 are arranged on the transmission member 5, and the left clamping member 1 and the right clamping member 2 can move in a direction of relative approach or distance on the transmission member 5. Specifically, the transmission member 5 can be a threaded rod, which is threadedly connected to the left clamping member 1 and the right clamping member 2 respectively, and the left clamping member 1 and the right clamping member 2 are controlled to approach each other or move away from each other by rotating, so as to achieve clamping.
[0063] In this embodiment, one end of the first connecting member 31 is hinged to the right clamping member 2 , one end of the second connecting member 32 is hinged to the left clamping member 1 , and the other end of the first connecting member 31 is hinged to the other end of the second connecting member 32 .
[0064] like Figure 2 As shown, the first connecting member 31, the second connecting member 32 and the transmission member 5 form a triangular structure, and the expansion assembly includes a linear drive member and a conical head 6; the conical head 6 is arranged on the movable end of the linear drive member, and the linear drive member is arranged at the connection point between the first connecting member 31 and the second connecting member 32. Mounting seat 7 and screw rod 8; the mounting seat 7 is provided with a threaded through hole, the screw rod 8 is threadedly connected to the threaded through hole, and the conical head 6 is arranged on one end of the screw rod 8 close to the clamping fixture. The conical head 6 and the glue injection auxiliary member 4 can both use a conical wedge, and the observation hole is located at the center of the conical wedge.
[0065] like Figure 2 As shown, there are more than two clamping devices, connecting frames 3 and expansion components. The clamping devices, connecting frames 3 and expansion components form a set of tooling. Then, two or more sets of tooling can be set up on the same surface of the substation infrastructure, or they can be set up on different surfaces of the substation infrastructure, depending on actual needs.
[0066] In addition, a third connecting member 9 may or may not be set between different toolings; when set, one third connecting member 9 is detachably connected to the left clamping member 1 of different clamping and fixing devices, and another third connecting member 9 is detachably connected to the right clamping member 2 of different clamping and fixing devices.
[0067] Please refer to Figure 3 , Embodiment 2 of the present invention is:
[0068] A self-balancing repair method for cracks in a substation infrastructure is applied to a self-balancing repair device for cracks in a substation infrastructure in Embodiment 1, and comprises the following steps:
[0069] S1. Clamp and fix the clamping device on both sides of the side where the crack exists on the substation infrastructure to fix the equipment;
[0070] In this embodiment, the initial clamping force of the clamping fixture is only for positioning the entire device on the basic setting, and after the crack is expanded using the conical active end of the expansion component, i.e. the conical wedge, the clamping force of the clamping fixture is increased.
[0071] S2, controlling the tapered movable end of the expansion component to press into the crack, so that the crack slightly expands, and inserting the glue injection auxiliary component 4 at different positions on the crack mouth;
[0072] S3, cleaning the inside of the crack and sealing the crack mouth except for the conical movable end of the expansion component and the glue injection auxiliary part 4;
[0073] In this embodiment, a hair dryer can be used to clean the inside of the crack, and the positions on the crack mouth except all the conical wedges are sealed with sealing glue or plastic plates to prepare for glue injection.
[0074] S4. Inject structural colloid into the crack, gradually increase the clamping force of the clamping fixture, and adjust the expansion component while increasing the clamping force of the clamping fixture each time to ensure that the tension applied by the tapered movable end of the expansion component on the crack maintains a dynamic balance with the clamping force of the clamping fixture;
[0075] In this embodiment, from low to high, the structural colloid is injected into the crack from each conical wedge hole in turn under high pressure, and the left clamping member 1 and the right clamping member 2 on the transmission member 5 are adjusted to increase the clamping force. At the same time, the expansion force applied by the conical wedge on the expansion component is also adjusted accordingly to prevent it from being squeezed out and affecting the glue injection effect.
[0076] S5. After the structural colloid inside the crack is cured, the expansion component and the glue injection auxiliary component 4 are removed, and the positions of the conical active end of the expansion component and the glue injection auxiliary component 4 on the crack opening corresponding to the glue are filled and sealed.
[0077] In this embodiment, the expansion assembly is controlled to retract, and the clamping force of the clamping and fixing device is increased until all the glue injection auxiliary parts 4 are squeezed out, and then the remaining parts of the crack are filled with glue and sealed.
[0078] To sum up, the present invention provides a self-balancing repair device and method for cracks in substation infrastructure. The entire device is fixed on the substation infrastructure by a clamping and fixing device, and the conical movable end of the expansion component is aligned with the crack of the substation infrastructure. The expansion component is then controlled to be inserted into the crack and slightly expand the crack to avoid the crack being too narrow and affecting the effective cleaning of the internal residue. During the injection of glue, the dynamic balance between the tension applied by the expansion component and the clamping force of the clamping and fixing device is achieved through adjustment, so that the injection pressure and the clamping pressure jointly help the structural colloid overflow the crack, so as to achieve dead-angle injection inside the crack and ensure the reliability of the power facilities.
[0079] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A self-balancing repair device for cracks in substation infrastructure, characterized in that: It includes a clamping and fixing device, a connecting frame, an expansion component and at least two glue injection auxiliary parts; The clamping device comprises a left clamping member and a right clamping member opposite to each other, the clamping force of the clamping device is adjustable, the expansion assembly is connected to the clamping device through the connecting frame, and the left clamping member and the right clamping member are used to clamp two sides of a side of the substation infrastructure where the crack is located; The conical movable end of the expansion assembly can be movably arranged relative to the connecting frame, and the conical movable end of the expansion assembly is used to insert into and expand the crack of the substation infrastructure; All of the glue injection auxiliary parts are used to be clamped at different positions on the crack opening.
2. The self-balancing repair device for cracks in substation infrastructure according to claim 1 is characterized in that: The clamping and fixing device comprises a transmission member; The left clamping member and the right clamping member are arranged on the transmission member, and the left clamping member and the right clamping member can move in a direction of being relatively close to or away from each other on the transmission member.
3. The self-balancing repair device for cracks in substation infrastructure according to claim 2 is characterized in that: The connecting frame includes a first connecting member and a second connecting member; One end of the first connecting member is hinged to the right clamping member, one end of the second connecting member is hinged to the left clamping member, the other end of the first connecting member is hinged to the other end of the second connecting member, and the expansion component is arranged at the connection point between the first connecting member and the second connecting member.
4. The self-balancing repair device for cracks in substation infrastructure according to claim 1 is characterized in that: The expansion assembly includes a linear drive and a conical head; The conical head is arranged on the movable end of the linear driving member, and the linear driving member is arranged on the connecting frame.
5. The self-balancing repair device for cracks in substation infrastructure according to claim 4 is characterized in that: The linear drive member includes a mounting seat and a screw rod; The mounting seat is provided with a threaded through hole, the screw rod is threadedly connected with the threaded through hole, and the conical head is arranged on one end of the screw rod close to the clamping and fixing device.
6. The self-balancing repair device for cracks in substation infrastructure according to claim 1 is characterized in that: There are more than two clamping and fixing devices, connecting frames and expansion components.
7. The self-balancing repair device for cracks in substation infrastructure according to claim 6 is characterized in that: Also comprising a third connecting member; One of the third connecting members is detachably connected to the left clamping members of different clamping and fixing devices, and another of the third connecting members is detachably connected to the right clamping members of different clamping and fixing devices.
8. The self-balancing repair device for cracks in substation infrastructure according to claim 1 is characterized in that: The glue injection auxiliary component is provided with an observation hole for observing the inside of the crack.
9. A self-balancing repair method for cracks in a substation infrastructure, applied to a self-balancing repair device for cracks in a substation infrastructure as claimed in any one of claims 1 to 8, characterized in that: The steps include: S1. Clamp and fix the clamping device on both sides of the side where the crack exists on the substation infrastructure to fix the equipment; S2, controlling the tapered movable end of the expansion component to be pressed into the crack, so that the crack expands slightly, and inserting the glue injection auxiliary parts at different positions on the crack mouth; S3, cleaning the inside of the crack and sealing the crack mouth except for the conical movable end of the expansion component and the glue injection auxiliary component; S4, injecting structural colloid into the crack, gradually increasing the clamping force of the clamping fixture, and adjusting the expansion component each time the clamping force of the clamping fixture is increased to ensure that the tension applied to the crack by the tapered movable end of the expansion component maintains a dynamic balance with the clamping force of the clamping fixture; S5. After the structural colloid inside the crack is cured, the expansion component and the glue injection auxiliary component are removed, and the positions of the crack opening corresponding to the conical active end of the expansion component and the glue injection auxiliary component are filled with glue and sealed.
10. A self-balancing repair method for cracks in substation infrastructure according to claim 9, characterized in that: The specific steps of removing the expansion assembly and the glue injection auxiliary component are as follows: The expansion assembly is controlled to retract, and the clamping force of the clamping and fixing device is increased until all the glue injection auxiliary parts are squeezed out.