Interlocking control system and method for railway trestle oil discharge equipment
By designing the interlocking control system for oil unloading equipment of railway trest bridges, and using the cooperation of information monitoring units and signal indication units, the problems of low degree of operation automation and high safety risks of oil unloading equipment in the prior art have been solved, and the equipment is safe and orderly operation and operating efficiency are improved.
Patent Information
- Application Number
- CN202411781410.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-03-11
AI Technical Summary
The existing railway trest oil unloading equipment has low degree of automation, which leads to repeated operation of operators, increasing labor intensity and safety risks. Moreover, due to inadequate inspection of personnel, it is easy to cause the oil unloading equipment to not completely separate from the oil tank truck, resulting in equipment damage, oil leakage or personnel injury.
A railway trench oil unloading equipment interlocking control system is designed, including an oil unloading execution unit, an information monitoring unit and a signal indication unit. The information monitoring unit is installed near the oil discharge execution unit and is connected to the signal indication unit. When the information monitoring unit monitors that the oil discharge execution unit has not been reset, the signal indication unit gives an instruction to ensure that the equipment operates safely and orderly.
Effectively avoid abnormal situations such as equipment damage, oil leakage or personnel injury caused by inadequate inspection of personnel, such as oil unloading equipment and oil tank trucks, and the oil tank trucks are not completely separated, so as to ensure that the oil unloading operations are carried out safely and in an orderly manner, reduce the labor intensity of workers, and improve labor efficiency and operational normativeness.
Smart Images

Figure CN119596808A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of interlocking control of oil unloading equipment, and in particular to an interlocking control system and method for railway trestle oil unloading equipment. Background Art
[0002] The old-style oil supply system is generally integrated inside the factory building, with a long construction period, backward technology, low degree of automation, and cannot be relocated.
[0003] The work that needs to be completed during normal oil unloading cannot be done in one go, such as opening the oil pilot valve, listening to the oil loading situation, closing the oil pilot valve, observing the oil level in the tanker, etc. These operations need to be performed repeatedly, and some operations need to be completed in a timely manner. For example, when the oil is unloaded, if the valve is not closed in time, air reflux will occur, causing air to be sucked into the oil manifold connected to the rear end of the crane pipe, and the oil will flow back into the tanker, causing an oil return accident. The operation needs to be carried out in an orderly manner to ensure the safety of the operation process. Each operator is required to be experienced and skilled in operation, and each person cannot be responsible for too many crane positions.
[0004] According to the status analysis and the actual situation of each oil unloading station, the operation of the oil unloading station is sometimes not full and sometimes overloaded. In order to meet the needs of multiple cranes unloading at the same time and ensure the safety of the operation, each oil unloading station can only be staffed according to the full-load state of oil unloading, which has caused low staff efficiency and rising costs. At the same time, because the work of the trestle operators is complicated and labor-intensive, they also need to concentrate highly, which inevitably causes physical fatigue. In addition, there are risks of high-altitude operations and inhalation of toxic gases, which often cause safety accidents. Summary of the invention
[0005] The first object of the present invention is to provide an interlocking control system for railway trestle oil unloading equipment, which is provided with an oil unloading execution unit, an information monitoring unit and a signal indication unit, wherein the information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit. When in use, when the information monitoring unit detects that the oil unloading execution unit has not been reset, the signal indication unit gives an indication, which effectively avoids the oil unloading equipment and the oil tank truck not being completely separated due to inadequate inspection by personnel, resulting in the oil tank truck dragging the trestle, causing equipment damage, oil leakage or personnel injury and other abnormal situations, thereby ensuring that the oil unloading operation is carried out safely and orderly;
[0006] The second purpose of the present invention is to provide an interlocking control method for railway trestle oil unloading equipment. The method technically controls the risk of oil tankers dragging the trestle, facilitates operators to review and check the equipment reset status, greatly reduces the labor intensity of front-line operators, and has a positive impact on further standardizing operations and improving labor efficiency.
[0007] The present invention provides an interlocking control system for railway trestle oil unloading equipment, comprising an oil unloading execution unit, an information monitoring unit and a signal indication unit;
[0008] The oil unloading execution unit includes a crane pipe, a step ladder and a fall arrester;
[0009] The information monitoring unit includes a detector group, and the detector group includes a crane pipe detector, a ladder detector group and a fall arrester detector group;
[0010] The signal indication unit comprises a central controller, and the central controller is provided with an indicator light group;
[0011] The information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit;
[0012] When the information monitoring unit detects that the oil unloading execution unit is not reset, the information monitoring unit transmits the information to the signal indication unit, and the corresponding indicator light in the indicator light group lights up.
[0013] Preferably, the ladder detector group includes a first ladder detector and a second ladder detector, and the first ladder detector and the second ladder detector are respectively installed on both sides of the ladder.
[0014] Preferably, the fall arrester detector group includes a first fall arrester detector and a second fall arrester detector, and the first fall arrester detector and the second fall arrester detector are respectively installed on both sides of the fall arrester.
[0015] Further preferably, the indicator light group includes a crane pipe indicator light, a first step ladder indicator light, a second step ladder indicator light, a first fall arrester indicator light and a second fall arrester indicator light.
[0016] Further preferably, the crane tube indicator light is connected to the crane tube detector;
[0017] The first step indicator light and the second step indicator light are connected to the first fall arrester detector and the second fall arrester detector respectively;
[0018] The first fall arrester indicator light and the second fall arrester indicator light are connected to the first fall arrester detector and the second fall arrester detector respectively.
[0019] Preferably, the signal indication unit further includes a second controller, the second controller is disposed in the security room, and the second controller is connected to the central controller.
[0020] Preferably, it also includes a power distribution cabinet, and the oil unloading execution unit, the information monitoring unit and the signal indication unit are all connected to the power distribution cabinet.
[0021] The present invention also provides a railway trestle oil unloading equipment interlocking control method, comprising the following steps:
[0022] S1: Install magnetic proximity switches, explosion-proof travel switches, operating status indicator lights and other corresponding equipment at key control points such as the trestle pedestrian ladder, oil unloading crane pipe, and trough sweeping hose;
[0023] S2: When one or more point devices are not effectively reset, the interlock indicator light of the point in the central control display screen lights up, and the release signal light next to the railway dedicated line lights up, and the railway gate barrier cannot be lifted by pressing the switch;
[0024] S3: Only after all interlocking points are reset normally, all the point interlocking indicator lights in the central control display light up, the release signal light next to the railway dedicated line lights up, and the railway gate barrier is lifted normally by pressing the switch.
[0025] Further preferably, in S2, the indicator light is displayed in red.
[0026] Further preferably, in S3, the indicator light is displayed in green.
[0027] Beneficial effects:
[0028] The technical solution of the present invention is to set an oil unloading execution unit, an information monitoring unit and a signal indication unit, wherein the information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit. When in use, when the information monitoring unit detects that the oil unloading execution unit has not been reset, the signal indication unit gives an indication, thereby effectively avoiding abnormal situations such as the oil tanker dragging the trestle due to inadequate inspection by personnel, failure to completely separate the oil unloading equipment from the tanker, causing equipment damage, oil leakage or personal injury, thereby ensuring that the oil unloading operation is carried out safely and orderly. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 A schematic diagram of a panel of a central controller in the present invention;
[0031] Figure 2 It is a structural schematic diagram of the crane tube and the crane tube detector in the present invention;
[0032] Figure 3 It is a structural schematic diagram of the step ladder and the step ladder detector group in the present invention;
[0033] Figure 4 It is a structural schematic diagram of a fall arrester and a fall arrester detector group in the present invention;
[0034] Figure 5 It is a circuit diagram of the present invention.
[0035] Description of reference numerals:
[0036] 1: Crane pipe; 2: Crane pipe detector; 3: Ladder; 4: First step ladder detector; 5: Second step ladder detector; 6: Fall arrester; 7: First fall arrester detector; 8: Second fall arrester detector; 10: Crane pipe indicator light; 11: First step ladder indicator light; 12: Second step ladder indicator light; 13: First fall arrester indicator light; 14: Second fall arrester indicator light. DETAILED DESCRIPTION
[0037] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0039] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] like Figures 1 to 5 As shown, the present invention provides an interlocking control system for railway trestle oil unloading equipment, which includes an oil unloading execution unit, an information monitoring unit and a signal indication unit. The oil unloading execution unit includes a crane pipe 1, a step ladder 3 and a fall arrester 6, the information monitoring unit includes a detector group, the detector group includes a crane pipe detector 2, a step ladder detector group and a fall arrester detector group, the signal indication unit includes a central controller, and an indicator light group is provided on the central controller. The information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit. When the information monitoring unit detects that the oil unloading execution unit is not reset, the information monitoring unit transmits information to the signal indication unit, and the corresponding indicator light in the indicator light group lights up.
[0041] The technical solution of the present invention is to set an oil unloading execution unit, an information monitoring unit and a signal indication unit, wherein the information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit. When in use, when the information monitoring unit detects that the oil unloading execution unit has not been reset, the signal indication unit gives an indication, thereby effectively avoiding abnormal situations such as the oil tanker dragging the trestle due to inadequate inspection by personnel, failure to completely separate the oil unloading equipment from the tanker, causing equipment damage, oil leakage or personal injury, thereby ensuring that the oil unloading operation is carried out safely and orderly.
[0042] The detector group of the step ladder 3 includes a first step ladder detector 4 and a second step ladder detector 5 , and the first step ladder detector 4 and the second step ladder detector 5 are respectively installed on both sides of the step ladder 3 .
[0043] The fall arrester detector group includes a first fall arrester detector 7 and a second fall arrester detector 8 , and the first fall arrester detector 7 and the second fall arrester detector 8 are respectively installed on both sides of the fall arrester 6 .
[0044] The indicator light group includes a crane pipe indicator light 10 , a first step ladder indicator light 11 , a second step ladder indicator light 12 , a first fall arrester indicator light 13 and a second fall arrester indicator light 14 .
[0045] The crane pipe indicator light 10 is connected to the crane pipe detector 2, the first step ladder indicator light 11 and the second step ladder indicator light 12 are connected to the first fall arrester detector 7 and the second fall arrester detector 8 respectively, and the first fall arrester indicator light 13 and the second fall arrester indicator light 14 are connected to the first fall arrester detector 7 and the second fall arrester detector 8 respectively.
[0046] The signal indication unit also includes a second controller, which is arranged in the security room and connected to the central controller.
[0047] The railway trestle oil unloading equipment interlocking control system also includes a power distribution cabinet, and the oil unloading execution unit, the information monitoring unit and the signal indication unit are all connected to the power distribution cabinet.
[0048] The present invention also provides a railway trestle oil unloading equipment interlocking control method, comprising the following steps:
[0049] S1: Install magnetic proximity switches, explosion-proof travel switches, operating status indicator lights and other corresponding equipment at key control points such as the trestle pedestrian ladder 3, oil unloading crane pipe 1, and trough sweeping hose;
[0050] S2: When one or more point devices are not effectively reset, the interlock indicator light of the point in the central control display screen lights up, and the release signal light next to the railway dedicated line lights up, and the railway gate barrier cannot be lifted by pressing the switch. Specifically, in S2, the indicator light is red;
[0051] S3: Only after all interlocking points are reset normally, all the point interlocking indicator lights in the central control display light up, the release signal light next to the railway dedicated line lights up, and the railway gate barrier is lifted normally by pressing the switch. Specifically, in S3, the indicator light is green.
[0052] Specifically, in this embodiment, two groups of central control display screens are provided, one group is provided near the railway trestle, and the other group is provided in the security room, and an emergency stop button is also provided in the central control display system of the security room, so as to ensure environmental safety and personnel safety during the operation process.
[0053] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. An interlocking control system for railway trestle oil unloading equipment, characterized in that: It includes an oil unloading execution unit, an information monitoring unit and a signal indication unit; The oil unloading execution unit includes a crane pipe, a step ladder and a fall arrester; The information monitoring unit includes a detector group, and the detector group includes a crane pipe detector, a ladder detector group and a fall arrester detector group; The signal indication unit comprises a central controller, and the central controller is provided with an indicator light group; The information monitoring unit is installed near the oil unloading execution unit, and the information monitoring unit is connected to the signal indication unit; When the information monitoring unit detects that the oil unloading execution unit is not reset, the information monitoring unit transmits the information to the signal indication unit, and the corresponding indicator light in the indicator light group lights up.
2. The railway trestle oil unloading equipment interlocking control system according to claim 1 is characterized in that: The step detector group comprises a first step detector and a second step detector, and the first step detector and the second step detector are respectively installed on both sides of the step ladder.
3. The railway trestle oil unloading equipment interlocking control system according to claim 1 is characterized in that: The fall arrester detector group comprises a first fall arrester detector and a second fall arrester detector, wherein the first fall arrester detector and the second fall arrester detector are respectively installed at two sides of the fall arrester.
4. The railway trestle oil unloading equipment interlocking control system according to claim 3 is characterized in that: The indicator light group includes a crane pipe indicator light, a first step ladder indicator light, a second step ladder indicator light, a first fall arrester indicator light and a second fall arrester indicator light.
5. The railway trestle oil unloading equipment interlocking control system according to claim 4 is characterized in that: The crane tube indicator light is connected to the crane tube detector; The first step indicator light and the second step indicator light are connected to the first fall arrester detector and the second fall arrester detector respectively; The first fall arrester indicator light and the second fall arrester indicator light are connected to the first fall arrester detector and the second fall arrester detector respectively.
6. The railway trestle oil unloading equipment interlocking control system according to claim 1 is characterized in that: The signal indication unit further includes a second controller, which is disposed in the security room and connected to the central controller.
7. The railway trestle oil unloading equipment interlocking control system according to claim 1 is characterized in that: It also includes a power distribution cabinet, and the oil unloading execution unit, the information monitoring unit and the signal indication unit are all connected to the power distribution cabinet.
8. An interlocking control method for an interlocking control system for railway trestle oil unloading equipment based on any one of claims 1 to 7, characterized in that: The following steps are involved: S1: Install magnetic proximity switches, explosion-proof travel switches, operating status indicator lights and other corresponding equipment at key control points of ladders, crane pipes and fall arresters; S2: When one or more point devices are not effectively reset, the indicator light of the point in the display screen of the central controller lights up, and the release signal light next to the railway dedicated line lights up, indicating a no release signal, and the railway gate barrier cannot be lifted by pressing the switch; S3: Only after all interlocking points are reset normally, all the point interlocking indicator lights in the central control display light up, the release signal light next to the railway dedicated line lights up, showing the release signal, and the railway gate barrier is lifted normally by pressing the switch.
9. The railway trestle oil unloading equipment interlocking control method according to claim 8, characterized in that: In S2, the indicator light and the release signal light are displayed in red.
10. The railway trestle oil unloading equipment interlocking control method according to claim 8, characterized in that: In S3, the indicator light and the release signal light are green.
Citation Information
Patent Citations
Soapstock and acidified oil loading and unloading system
CN111634879A
Interlocking control system of intelligent loading and unloading vehicle for hazardous chemical substances
CN115231506A
Intelligent falling protector, intelligent falling protection system and falling protector state recognition method
CN117011996A
Device based on automatic control of receiving, unloading, conveying and transferring of liquid in railway tank truck
CN219194512U
Novel train oil unloading ladder non-homing detection prompt alarm device
CN221253810U