Building material management system
Through the implementation of the building materials management system, the problems of inaccurate data and low management efficiency in traditional management methods are solved, accurate analysis and optimized management of inventory status are realized, and the overall efficiency of construction projects is improved.
Patent Information
- Application Number
- CN202411612723.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-03-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional building materials management methods rely on manual recording and manual inventory, resulting in inaccurate data, omissions or delays, and the inability to effectively analyze inventory, reducing warehouse management efficiency.
Provide a building materials management system, including information collection module, monitoring and analysis module, inventory optimization module and analysis decision-making module. The system uses real-time monitoring of inventory status information, evaluate inventory accuracy and rationality, generates comprehensive inventory evaluation coefficients, formulates optimization strategies and manages them.
Through systematic management methods, the efficiency of inventory status analysis is improved, data errors are reduced, inventory management process is optimized, and the overall efficiency of construction projects is improved.
Smart Images

Figure CN119599569A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of management analysis, and in particular to a management system for building materials. Background Art
[0002] With the rapid development of the construction industry, the scale and complexity of construction projects are increasing, and the management of construction materials is becoming increasingly important throughout the construction process. There are many types of construction materials, including cement, steel bars, sand and gravel, wood, paint, etc. Each material has different specifications, uses, storage conditions and use cycles, which brings huge challenges to the management of construction materials.
[0003] In the related technology, in the target warehouse, the traditional construction material management method usually relies on manual records and manual inventory. This method is not only inefficient, but also prone to inaccurate data, omissions or delays, and it is impossible to analyze the inventory in the target warehouse, which reduces the efficiency of warehouse management and there is room for improvement. Summary of the invention
[0004] In view of the deficiencies of the prior art, the present application provides a management system for building materials.
[0005] In a first aspect, the present application provides a management system for building materials, comprising: An information collection module, used to input the storage information corresponding to the building materials based on a preset collection device, wherein the storage information includes the type of building materials, the quantity of each type of building materials and the storage time; The monitoring and analysis module is used to monitor the inventory status information of various building materials in real time and confirm the inventory accuracy assessment coefficient of various building materials; An inventory optimization module is used to analyze and process the inventory status information and the current project construction progress information, and to perform rationality analysis on the building materials based on the results of the analysis and processing, and to formulate an optimization strategy based on the results of the rationality analysis; The analysis and decision-making module is used to respond to the optimization strategy and conduct a comprehensive analysis of the building materials, thereby generating a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and managing the building materials based on the comprehensive inventory evaluation coefficient.
[0006] Preferably, the inventory status information corresponding to each type of building material includes the actual inventory quantity, storage location and production batch corresponding to each type of building material.
[0007] Preferably, real-time monitoring of inventory status information corresponding to various building materials and confirmation of inventory accuracy assessment coefficients corresponding to various building materials also include: Record the actual inventory quantity of each type of building material in real time and mark the actual inventory quantity as the inventory count quantity , and obtain the building material storage information entered by the information collection module, and extract the corresponding quantity of each type of building material from the storage information, and mark the quantity as the initial entry quantity ,in, It is represented by the number corresponding to each building material. ; By formula , confirm the inventory accuracy assessment coefficients corresponding to various types of building materials ,in, They are respectively expressed as the preset natural loss coefficient and usage loss coefficient. All are obtained by fitting historical data; The inventory accuracy evaluation coefficients of various building materials With the preset inventory quantity valuation threshold Make a comparison; If the inventory accuracy assessment coefficients of various building materials All exceeded When the building materials inventory is entered accurately, If there is an inventory accuracy assessment coefficient corresponding to the building materials , then the error evaluation coefficient corresponding to the building material is required The inventory quantity corresponding to the building materials is adjusted, where the calculation formula of the error assessment coefficient is: .
[0008] Preferably, analysis and processing are performed according to the inventory status information and the current project construction progress information, and rationality analysis is performed on the building materials based on the results of the analysis and processing, and an optimization strategy is formulated based on the results of the rationality analysis, specifically including: Collect the current project construction progress information in real time within the preset time interval, and compare the current project construction progress information with the historical project construction progress information stored in the cloud database to confirm the daily demand for various types of building materials, and then confirm the demand for various types of building materials within the preset time interval. ,in, Expressed as a preset time interval; By formula , confirm the inventory rationality coefficients corresponding to various types of building materials , the inventory rationality coefficients corresponding to various types of building materials Compared with the preset inventory rationality threshold Compare the intervals; If there is a corresponding inventory rationality coefficient for building materials , it is determined that the actual inventory quantity corresponding to the building material has a risk of excess, and a first warning signal is output; If there is a corresponding inventory rationality coefficient for building materials In When the actual inventory quantity of the building materials is between , it is determined that the actual inventory quantity of the building materials is normal, and there is no need to output a warning signal; If there is a corresponding inventory rationality coefficient for building materials , it is determined that there is a risk of shortage in the actual inventory quantity corresponding to the building material, and a second warning signal is output.
[0009] Preferably, after determining that there is a risk of shortage of the actual inventory quantity corresponding to the building material and outputting the second warning signal, the method further includes: By formula , confirm the corresponding reorder points for various types of building materials ,in, Indicated as number Preset safety stock values for building materials; If the actual inventory quantity of a building material is lower than the reorder point of the building material, a replenishment warning signal is output, wherein the reorder point corresponding to each type of building material can be dynamically adjusted according to the daily demand and delivery cycle.
[0010] Preferably, a comprehensive analysis is performed on the building materials to generate a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and the building materials are managed based on the comprehensive inventory evaluation coefficient, specifically including: By formula , confirm the inventory comprehensive evaluation coefficients corresponding to various types of building materials ,in, It is expressed as the preset allowable difference of inventory accuracy assessment coefficient. Expressed as a preset weight coefficient; Substitute the inventory comprehensive assessment coefficients corresponding to various types of building materials into the formula , calculate the comprehensive inventory evaluation coefficient corresponding to the target warehouse ,in, Expressed as the number of building material types, It is expressed as the correction factor corresponding to the comprehensive evaluation coefficient of the inventory of various building materials; The inventory comprehensive evaluation coefficient corresponding to the target warehouse Combined with preset inventory assessment thresholds Make a comparison; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that the inventory management corresponding to the target warehouse is reasonable; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that there are problems with the inventory management corresponding to the target warehouse and adjustments need to be made in a timely manner.
[0011] Preferably, it also includes: Obtain inventory status information corresponding to each type of building material, extract production batches corresponding to each type of building material from the inventory status information, and obtain the remaining shelf life corresponding to each type of building material based on the production batches corresponding to each type of building material ; Get the daily demand for various building materials , and then through the formula , confirm the shelf life risk coefficients of various building materials ,in, It is expressed as the correction factor corresponding to the shelf life risk factor of various building materials; The corresponding shelf life risk coefficients of various building materials Compared with the preset shelf life risk threshold Make a comparison; If there is a shelf life risk factor corresponding to building materials , it is determined that the building materials have a high risk and an expiration warning signal is output.
[0012] In a second aspect, the present application provides a method for managing building materials, comprising the following steps: Inputting the storage information corresponding to the building materials based on the preset collection device, wherein the storage information includes the type of building materials, the quantity corresponding to each type of building materials and the storage time; Monitor the inventory status information of various building materials in real time, and confirm the inventory accuracy assessment coefficient of various building materials; Analyze and process the inventory status information and the current project construction progress information, and perform rationality analysis on the building materials based on the results of the analysis and processing, and formulate an optimization strategy based on the results of the rationality analysis; In response to the optimization strategy, a comprehensive analysis is performed on the building materials to generate a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and the building materials are managed based on the comprehensive inventory evaluation coefficient.
[0013] In a third aspect, the present application provides a computer-readable storage medium storing instructions, which, when executed on a computer, enable the computer to execute any one of the above-described management systems for building materials.
[0014] In summary, this application includes the following beneficial technical effects: The present invention provides a management system for building materials, which analyzes the inventory status information corresponding to various types of building materials, and then confirms the inventory accuracy assessment coefficients and inventory rationality coefficients corresponding to various types of building materials, and then generates the inventory comprehensive assessment coefficients corresponding to the target warehouse based on the inventory accuracy assessment coefficients and inventory rationality coefficients corresponding to various types of building materials, and manages the building materials based on the inventory comprehensive assessment coefficients, and then effectively analyzes the inventory status in the target warehouse, thereby effectively improving the efficiency of building materials management, thereby effectively improving the overall efficiency of the construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0016] Figure 1 It is a system diagram of the management of building materials according to an embodiment of the present application.
[0017] Figure 2 It is a flow chart of the method for managing building materials in an embodiment of the present application. DETAILED DESCRIPTION
[0018] The following is combined with Figure 1-2 This application is described in further detail.
[0019] Example 1 The embodiment of the present application discloses a management system for building materials.
[0020] Reference Figure 1 , a management system for building materials, comprising: An information collection module, used to input the storage information corresponding to the building materials based on a preset collection device, wherein the storage information includes the type of building materials, the quantity of each type of building materials and the storage time; The monitoring and analysis module is used to monitor the inventory status information of various building materials in real time and confirm the inventory accuracy assessment coefficient of various building materials; An inventory optimization module is used to analyze and process the inventory status information and the current project construction progress information, and to perform rationality analysis on the building materials based on the results of the analysis and processing, and to formulate an optimization strategy based on the results of the rationality analysis; The analysis and decision-making module is used to respond to the optimization strategy and conduct a comprehensive analysis of the building materials, thereby generating a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and managing the building materials based on the comprehensive inventory evaluation coefficient.
[0021] Furthermore, the inventory status information corresponding to each type of building material includes the actual inventory quantity, storage location and production batch corresponding to each type of building material.
[0022] It should be noted that real-time monitoring of the inventory status information corresponding to various building materials and confirmation of the inventory accuracy assessment coefficients corresponding to various building materials also include: Record the actual inventory quantity of each type of building material in real time and mark the actual inventory quantity as the inventory count quantity , and obtain the building material storage information entered by the information collection module, and extract the corresponding quantity of each type of building material from the storage information, and mark the quantity as the initial entry quantity ,in, It is represented by the number corresponding to each building material. ; By formula , confirm the inventory accuracy assessment coefficients corresponding to various types of building materials ,in, They are respectively expressed as the preset natural loss coefficient and usage loss coefficient. All are obtained by fitting historical data; Specifically, the natural loss coefficient is set as the loss of building materials caused by environmental factors (such as temperature, humidity, etc.) during storage, which can be obtained through fitting analysis of historical data.
[0023] The loss coefficient is set as the loss generated by the building materials during use, or it can be estimated by fitting through historical data; The inventory accuracy evaluation coefficients of various building materials With the preset inventory quantity valuation threshold Make a comparison; If the inventory accuracy assessment coefficients of various building materials All exceeded When the building materials inventory is entered accurately, If there is an inventory accuracy assessment coefficient corresponding to the building materials , then the error evaluation coefficient corresponding to the building material is required The inventory quantity corresponding to the building materials is adjusted, where the calculation formula of the error assessment coefficient is: .
[0024] Specifically, the inventory accuracy assessment coefficient can significantly improve the accuracy and efficiency of inventory management. First, it provides managers with a quantitative indicator that can reflect the accuracy of inventory quantities in the system in real time, thereby helping companies to promptly detect potential errors in inventory quantities and avoid material shortages or surpluses caused by inaccurate inventory quantities. Secondly, the inventory accuracy assessment coefficient can effectively identify problems in inventory management, such as material loss, loss, or recording errors, by comparing the data entered into the system with the actual inventory data. The above-mentioned assessment mechanism not only improves the transparency of inventory data, but also helps companies optimize inventory management processes and reduce errors caused by human intervention, thereby avoiding construction delays or material waste caused by inaccurate inventory data.
[0025] Furthermore, by adjusting the inventory quantity through the error assessment coefficient, the difference between inventory data and actual inventory can be effectively reduced, ensuring that the inventory quantity in the system is closer to the actual situation. The error assessment coefficient helps enterprises identify problems in inventory management by quantifying the deviation between inventory data and inventory data, and dynamically adjusts inventory data based on the above error assessment coefficient. For example, when the system finds that the error assessment coefficient of a certain material is large, the enterprise can take timely measures, such as adjusting inventory records, re-inventorying, or revising procurement plans. This adjustment mechanism can reduce operational risks caused by inaccurate inventory data and avoid material shortages or over-purchases.
[0026] It should be noted that the analysis and processing is performed based on the inventory status information and the current project construction progress information, and the rationality analysis of the building materials is performed based on the results of the analysis and processing, and the optimization strategy is formulated based on the results of the rationality analysis, specifically including: Collect the current project construction progress information in real time within the preset time interval, and compare the current project construction progress information with the historical project construction progress information stored in the cloud database to confirm the daily demand for various types of building materials, and then confirm the demand for various types of building materials within the preset time interval. ,in, Expressed as a preset time interval; Specifically, the current project construction progress information is compared with the historical project construction progress information stored in the cloud database, and the steps of confirming the daily demand corresponding to various types of building materials include the current project construction progress information including the task progress of each stage, construction area, construction cycle, material type and frequency of use, etc., while the historical project data in the cloud database contains the construction progress, material use records, daily demand, project scale and construction conditions of similar projects. Through the analysis of historical project data, the system can use big data analysis and machine learning technology based on the principle of similarity to identify projects similar to the current project in terms of scale, construction stage, material use pattern, etc. The system can compare the material use of the current project and the historical project at different construction stages, extract the material use pattern that best matches the current construction progress, and then derive the daily demand of various types of building materials. Specifically, the material daily demand of the current project can be predicted based on the material consumption rate of similar stages in the historical project through time series analysis, regression analysis and other methods, and updated in real time according to the dynamic changes in the construction progress. This method can not only improve the accuracy of material demand prediction, but also effectively avoid material surplus or shortage, and ensure the smooth progress of the project.
[0027] By formula , confirm the inventory rationality coefficients corresponding to various types of building materials , the inventory rationality coefficients corresponding to various types of building materials Compared with the preset inventory rationality threshold Compare the intervals; If there is a corresponding inventory rationality coefficient for building materials , it is determined that the actual inventory quantity corresponding to the building material has a risk of excess, and a first warning signal is output; If there is a corresponding inventory rationality coefficient for building materials In When the actual inventory quantity of the building materials is between , it is determined that the actual inventory quantity of the building materials is normal, and there is no need to output a warning signal; If there is a corresponding inventory rationality coefficient for building materials , it is determined that there is a risk of shortage in the actual inventory quantity corresponding to the building material, and a second warning signal is output.
[0028] Furthermore, after determining that the actual inventory quantity corresponding to the building materials has a risk of shortage and outputting a second warning signal, the method further includes: By formula , confirm the corresponding reorder points for various types of building materials ,in, Indicated as number Preset safety stock values for building materials; Specifically, the preset safety stock value is set as the additional inventory amount set to cope with demand fluctuations or supplier delays, which is usually obtained based on historical data or demand fluctuations; If the actual inventory quantity of a building material is lower than the reorder point of the building material, a replenishment warning signal is output. The reorder points of various building materials can be dynamically adjusted according to the daily demand and delivery cycle. That is, when the daily demand and delivery cycle of various building materials change, the reorder points of various building materials also change accordingly.
[0029] Specifically, changes in the daily demand and delivery cycle corresponding to each type of building material affect the demand for each type of building material within a preset time interval.
[0030] It should be noted that a comprehensive analysis of building materials is conducted to generate a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and building materials are managed based on the comprehensive inventory evaluation coefficient, specifically including: By formula , confirm the inventory comprehensive evaluation coefficients corresponding to various types of building materials ,in, It is expressed as the preset allowable difference of inventory accuracy assessment coefficient. Expressed as a preset weight coefficient; Substitute the inventory comprehensive assessment coefficients corresponding to various types of building materials into the formula , calculate the comprehensive inventory evaluation coefficient corresponding to the target warehouse ,in, Expressed as the number of building material types, It is expressed as the correction factor corresponding to the comprehensive evaluation coefficient of the inventory of various building materials; It can be obtained by fitting historical data; The inventory comprehensive evaluation coefficient corresponding to the target warehouse Combined with preset inventory assessment thresholds Make a comparison; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that the inventory management corresponding to the target warehouse is reasonable; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that there are problems with the inventory management corresponding to the target warehouse and adjustments need to be made in a timely manner.
[0031] Furthermore, it also includes: Obtain inventory status information corresponding to each type of building material, extract production batches corresponding to each type of building material from the inventory status information, and obtain the remaining shelf life corresponding to each type of building material based on the production batches corresponding to each type of building material ; Get the daily demand for various building materials , and then through the formula , confirm the shelf life risk coefficients of various building materials ,in, It is expressed as the correction factor corresponding to the shelf life risk factor of various building materials; The corresponding shelf life risk coefficients of various building materials Compared with the preset shelf life risk threshold Make a comparison; If there is a shelf life risk factor corresponding to building materials , it is determined that the building materials have a high risk and an expiration warning signal is output.
[0032] Example 2 The embodiment of the present application also discloses a method for managing building materials.
[0033] Reference Figure 2 , a method for managing building materials, comprising the following steps: Inputting the storage information corresponding to the building materials based on the preset collection device, wherein the storage information includes the type of building materials, the quantity corresponding to each type of building materials and the storage time; Monitor the inventory status information of various building materials in real time, and confirm the inventory accuracy assessment coefficient of various building materials; Analyze and process the inventory status information and the current project construction progress information, and perform rationality analysis on the building materials based on the results of the analysis and processing, and formulate an optimization strategy based on the results of the rationality analysis; In response to the optimization strategy, a comprehensive analysis is performed on the building materials to generate a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and the building materials are managed based on the comprehensive inventory evaluation coefficient.
[0034] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention, they should all fall within the protection scope of the present invention.
[0035] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0036] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well.
Claims
1. A management system for building materials, characterized in that: include: An information collection module, used to input the storage information corresponding to the building materials based on a preset collection device, wherein the storage information includes the type of building materials, the quantity of each type of building materials and the storage time; The monitoring and analysis module is used to monitor the inventory status information of various building materials in real time and confirm the inventory accuracy assessment coefficient of various building materials; An inventory optimization module is used to analyze and process the inventory status information and the current project construction progress information, and to perform rationality analysis on the building materials based on the results of the analysis and processing, and to formulate an optimization strategy based on the results of the rationality analysis; The analysis and decision-making module is used to respond to the optimization strategy and conduct a comprehensive analysis of the building materials, thereby generating a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and managing the building materials based on the comprehensive inventory evaluation coefficient.
2. A building materials management system according to claim 1, characterized in that: The inventory status information corresponding to each type of building material includes the actual inventory quantity, storage location and production batch corresponding to each type of building material.
3. A building materials management system according to claim 2, characterized in that: Real-time monitoring of the inventory status information of various building materials, and confirmation of the inventory accuracy assessment coefficients of various building materials, including: Record the actual inventory quantity of each type of building material in real time and mark the actual inventory quantity as the inventory count quantity , and obtain the building material storage information entered by the information collection module, and extract the corresponding quantity of each type of building material from the storage information, and mark the quantity as the initial entry quantity ,in, It is represented by the number corresponding to each building material. ; By formula , confirm the inventory accuracy assessment coefficients corresponding to various types of building materials ,in, They are respectively expressed as the preset natural loss coefficient and usage loss coefficient. All are obtained by fitting historical data; The inventory accuracy evaluation coefficients of various building materials With the preset inventory quantity valuation threshold Make a comparison; If the inventory accuracy assessment coefficients of various building materials All exceeded When the building materials inventory is entered accurately, If there is an inventory accuracy assessment coefficient corresponding to the building materials , then the error evaluation coefficient corresponding to the building material is required The inventory quantity corresponding to the building materials is adjusted, where the calculation formula of the error assessment coefficient is: .
4. A building materials management system according to claim 2, characterized in that: Analyze and process the inventory status information and the current project construction progress information, and perform rationality analysis on the building materials based on the results of the analysis and processing, and formulate an optimization strategy based on the results of the rationality analysis, specifically including: Collect the current project construction progress information in real time within the preset time interval, and compare the current project construction progress information with the historical project construction progress information stored in the cloud database to confirm the daily demand for various types of building materials, and then confirm the demand for various types of building materials within the preset time interval. ,in, Expressed as a preset time interval; By formula , confirm the inventory rationality coefficients corresponding to various types of building materials , the inventory rationality coefficients corresponding to various types of building materials Compared with the preset inventory rationality threshold Compare the intervals; If there is a corresponding inventory rationality coefficient for building materials , it is determined that the actual inventory quantity corresponding to the building material has a risk of excess, and a first warning signal is output; If there is a corresponding inventory rationality coefficient for building materials In When the actual inventory quantity of the building materials is between , it is determined that the actual inventory quantity of the building materials is normal, and there is no need to output a warning signal; If there is a corresponding inventory rationality coefficient for building materials , it is determined that there is a risk of shortage in the actual inventory quantity corresponding to the building material, and a second warning signal is output.
5. A building materials management system according to claim 4, characterized in that: After determining that the actual inventory quantity corresponding to the building materials has a risk of shortage and outputting the second warning signal, the following further includes: By formula , confirm the corresponding reorder points for various types of building materials ,in, Indicated as number Preset safety stock values for building materials; If the actual inventory quantity of a building material is lower than the reorder point of the building material, a replenishment warning signal is output, wherein the reorder point corresponding to each type of building material can be dynamically adjusted according to the daily demand and delivery cycle.
6. A building material management system according to claim 4, characterized in that: Comprehensively analyze the building materials to generate the inventory comprehensive evaluation coefficient corresponding to the target warehouse, and manage the building materials based on the inventory comprehensive evaluation coefficient, including: By formula , confirm the inventory comprehensive evaluation coefficients corresponding to various types of building materials ,in, It is expressed as the preset allowable difference of inventory accuracy assessment coefficient. Expressed as a preset weight coefficient; Substitute the inventory comprehensive assessment coefficients corresponding to various types of building materials into the formula , calculate the comprehensive inventory evaluation coefficient corresponding to the target warehouse ,in, Expressed as the number of building material types, It is expressed as the correction factor corresponding to the comprehensive evaluation coefficient of the inventory of various building materials; The inventory comprehensive evaluation coefficient corresponding to the target warehouse Combined with preset inventory assessment thresholds Make a comparison; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that the inventory management corresponding to the target warehouse is reasonable; If the inventory comprehensive evaluation coefficient corresponding to the target warehouse , then it is determined that there are problems with the inventory management corresponding to the target warehouse and adjustments need to be made in a timely manner.
7. A building material management system according to claim 4, characterized in that: Also includes: Obtain inventory status information corresponding to each type of building material, extract production batches corresponding to each type of building material from the inventory status information, and obtain the remaining shelf life corresponding to each type of building material based on the production batches corresponding to each type of building material ; Get the daily demand for various building materials , and then through the formula , confirm the shelf life risk coefficients of various building materials ,in, It is expressed as the correction factor corresponding to the shelf life risk factor of various building materials; The corresponding shelf life risk coefficients of various building materials Compared with the preset shelf life risk threshold Make a comparison; If there is a shelf life risk factor corresponding to building materials , it is determined that the building materials have a high risk and an expiration warning signal is output.
8. A method for managing building materials, applied to a building materials management system as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: Inputting the storage information corresponding to the building materials based on the preset collection device, wherein the storage information includes the type of building materials, the quantity corresponding to each type of building materials and the storage time; Monitor the inventory status information of various building materials in real time, and confirm the inventory accuracy assessment coefficient of various building materials; Analyze and process the inventory status information and the current project construction progress information, and perform rationality analysis on the building materials based on the results of the analysis and processing, and formulate an optimization strategy based on the results of the rationality analysis; In response to the optimization strategy, a comprehensive analysis is performed on the building materials to generate a comprehensive inventory evaluation coefficient corresponding to the target warehouse, and the building materials are managed based on the comprehensive inventory evaluation coefficient.
9. A computer-readable storage medium, characterized in that: Instructions are stored, and when the instructions are executed on a computer, the computer is enabled to execute a building materials management system as claimed in any one of claims 1 to 7.