Substation flood prevention device and combined flood prevention embankment
CN119615826AInactive Publication Date: 2025-03-14DC OPERATION INSPECTION BRANCH OF STATE GRID HENAN ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202311607827.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2025-03-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Technical Problem
In the existing flood prevention measures of substations, sandbags have long handling time and low construction efficiency. The dam body composed of scattered sandbags has low impact resistance.
Method used
By setting up a box, storage box and moving mechanism, the integrity of the dam building unit is improved, making it easy to transport, reducing the number of handling times of operators, and improving flood prevention response speed and construction efficiency.
Benefits of technology
It improves the integrity and impact resistance of the dam body, shortens the flood control reaction time, and enhances the reservoir resistance of the flood control device.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN119615826A_ABST
Abstract
The invention relates to the technical field of transformer substation flood prevention, in particular to a transformer substation flood prevention device and a combined flood prevention embank.The transformer substation flood prevention device comprises a hollow box body, the top and the bottom of the box body are each provided with an opening, and a storage box and a moving mechanism are installed in an inner cavity of the box body; the storage box is located above the moving mechanism, and the top of the storage box is open. According to the embodiment of the invention, through the arrangement of the box body, the storage box and the moving mechanism, the integrity of the dam body construction unit is improved, the dam body construction unit is easy to transfer, the carrying frequency of operators is reduced, the flood prevention response speed and construction efficiency of the operators are improved, and the safety of the operators is improved. Due to the dam body construction units with high integrity, the constructed dam body is high in impact resistance and storage resistance.