Test data extraction method and system
By generating and executing data extraction task orders on the development, operation and maintenance interactive interface, extracting and desensitizing production data and importing it into the test database, the data leakage risk caused by operators' direct operation of the database is solved, and the security of data processing is improved.
Patent Information
- Application Number
- CN202510171055.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-17
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2045-02-17
AI Technical Summary
In the prior art, operators operate the database directly, and there is a risk of data leakage.
By displaying the development, operation and maintenance interactive interface, a data extraction task order is generated in response to the user's authorization trigger operation. The first user confirms the target test database instance and executes the data extraction task order, extracts production data for desensitization and imports the target test database instance.
It avoids the generation of operators' direct operation of databases and intermediate data, reduces the risk of data leakage, and improves the safety of test data desensitization.
Smart Images

Figure CN119621831A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and more specifically, to a test data extraction method and system. Background Art
[0002] The data used in information system testing operations is currently mainly selected from the production system, then decrypted and stored in the intermediate server, then anonymized and imported into the test database, or selected from the production system, then decrypted and anonymized, then stored in the intermediate server, and then imported into the test database. Specifically, there are usually the following two operation methods: (I) The operator connects the operating platform to the production database, selects the table and field to be desensitized on the operating platform, selects the desensitization algorithm to be used (such as shielding and replacement), selects the number of data rows, and if the field is stored in encrypted form, it needs to be decrypted first and then desensitized, and the desensitized data file is generated on the intermediate server; (ii) The operator logs in to the production database on the bastion host of the production environment. If the fields that need to be desensitized are stored in encrypted form, the fields that need to be desensitized are first decrypted, and then the data is desensitized using internal or external functions of the database, SQL statements, or third-party processing tools. The desensitized data file is generated on the intermediate server, and then the desensitized data file on the intermediate server is transferred to the test server and then imported into the test database.
[0003] However, in the above existing methods, since operators directly operate the database, they can access the production and / or test data before desensitization, which poses a risk of data leakage. Summary of the invention
[0004] In order to overcome the problem of data leakage risk in the above-mentioned prior art, the present invention provides a test data extraction method and system.
[0005] In order to solve the above technical problems, the technical solution of the present invention is as follows: In a first aspect, a test data extraction method comprises: Display the development and operation and maintenance interactive interface; In response to the authorization trigger operation of the second user on the data extraction task sheet creation request for the project to be managed in the development and operation and maintenance interactive interface, a data extraction task sheet is generated; wherein the data extraction task sheet creation request is used to request the first user to have the extraction operation authority for the production data corresponding to the target resource configuration information, the second user has the authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from the candidate resource configuration information for the project to be managed; In response to the first user's triggering operation on the test data management control included in the development and operation and maintenance interactive interface, displaying the test data management interactive interface corresponding to the test data management control; wherein the test data management interactive interface is used to display the candidate test database instance, as well as the data extraction task list and the corresponding target resource configuration information; In response to the first user confirming the execution of the data extraction task order and confirming the trigger operation of the target test database instance from the candidate test database instance, the production data is extracted and desensitized according to the target resource configuration information to obtain the test data and import it into the target test database instance.
[0006] In a second aspect, a test data extraction system is provided, applying the method described in the first aspect, comprising: The first interactive interface display module is used to display the development and operation and maintenance interactive interface; A first task order generation module is used to generate a data extraction task order in response to an authorization trigger operation of a second user in the development and operation and maintenance interactive interface for a data extraction task order creation request for the project to be managed; wherein the data extraction task order creation request is used to request that the first user have extraction operation authority for production data corresponding to target resource configuration information, the second user has authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from candidate resource configuration information for the project to be managed; A second interactive interface display module, configured to display a test data management interactive interface corresponding to the test data management control in response to a trigger operation by the first user on the test data management control included in the development and operation interactive interface; wherein the test data management interactive interface is used to display candidate test database instances, as well as the data extraction task list and corresponding target resource configuration information; A data extraction module is used to respond to the first user's confirmation to execute the data extraction task order, and to confirm the trigger operation of the target test database instance from the candidate test database instance, extract the production data according to the target resource configuration information for desensitization operation, obtain the test data and import it into the target test database instance.
[0007] According to a third aspect, an electronic device includes: A memory for storing computer executable instructions or computer programs; The processor is used to implement the method described in the first aspect when executing the computer executable instructions or computer program stored in the memory.
[0008] In a fourth aspect, a computer program product comprises a computer program or computer executable instructions, wherein when the computer program or computer executable instructions are executed by a processor, the method of the first aspect is implemented.
[0009] Compared with the prior art, the technical solution of the present invention has the following beneficial effects: The present invention discloses a test data extraction method and system, wherein the method generates a data extraction task list by responding to the authorization trigger operation of a second person, and the first person confirms the target test database instance and confirms the execution of the data extraction task list, thereby extracting production data for desensitization operation, and importing the test data obtained after desensitization into the target test database instance, thereby avoiding the operator directly operating the database and the generation of intermediate data, and contacting the production and / or test data before desensitization. Compared with the prior art, the present invention improves the security of test data desensitization and effectively reduces the risk of data leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a flow chart of the test data extraction method in Example 1 of the present application; Figure 2 This is another flowchart of the test data extraction method in Example 1 of the present application; Figure 3 This is a schematic diagram of the structure of the test data extraction system in Example 2 of the present application. DETAILED DESCRIPTION
[0011] The terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged in appropriate cases, which is only to describe the distinction mode adopted by the objects of the same attributes in the embodiments of the present application when describing. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, so that the process, method, system, product or equipment containing a series of units need not be limited to those units, but may include other units that are not clearly listed or inherent to these processes, methods, products or equipment. The term "determine" widely covers various actions, and may include acquisition, calculation, calculation, processing, derivation, investigation, search (for example, search in a table, database or other data structure), ascertainment, and similar actions, and may also include receiving (for example, receiving information), accessing (for example, accessing data in a memory) and similar actions, and may also include receiving generation, creation, establishment and similar actions, as well as parsing, selection, selection and similar actions, etc. The relevant definitions of other terms will be given in the following description.
[0012] The accompanying drawings are only used for illustrative purposes and are not to be construed as limiting the present application; In order to better illustrate the present embodiment, some parts in the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.
[0013] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0014] Example 1 This embodiment provides a test data extraction method, referring to FIG1 , comprising: Display the development and operation and maintenance interactive interface; In response to the authorization triggering operation of the second user (such as an administrator or a project manager) on the data extraction task sheet creation request for the project to be managed in the development and operation and maintenance interactive interface, a data extraction task sheet is generated; wherein the data extraction task sheet creation request is used to request that the first user (such as a tester) have the extraction operation authority for the production data corresponding to the target resource configuration information, the second user has the authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from the candidate resource configuration information for the project to be managed; In response to the first user's triggering operation on the test data management control included in the development and operation and maintenance interactive interface, displaying the test data management interactive interface corresponding to the test data management control; wherein the test data management interactive interface is used to display the candidate test database instance, as well as the data extraction task list and the corresponding target resource configuration information; In response to the first user confirming the execution of the data extraction task order and confirming the trigger operation of the target test database instance from the candidate test database instance, the production data is extracted and desensitized according to the target resource configuration information to obtain the test data and import it into the target test database instance.
[0015] In this embodiment, a data extraction task sheet is generated by responding to the authorization trigger operation of the second person, and the first person confirms the target test database instance and confirms the execution of the data extraction task sheet, thereby extracting the production data for desensitization, and importing the desensitized test data into the target test database instance, thereby avoiding the operator's direct operation of the database (especially the production database) and the generation of intermediate data, effectively reducing the risk of data leakage, and solving both the risk of data leakage during data transmission and the risk of data leakage in subsequent data use.
[0016] Those skilled in the art should understand that based on the implementation of the method, the entire chain of research and development, testing and security can be opened up.
[0017] In some preferred embodiments, referring to FIG. 2 , the process of generating a data extraction task order creation request includes: In response to the first user's triggering operation on the resource management control included in the development and operation and maintenance interactive interface, displaying a resource management interactive interface corresponding to the resource management control; wherein the resource management interactive interface is used to display candidate resource configuration information of the project to be managed; In response to the trigger operation of the first user confirming the target resource configuration information from the candidate resource configuration information, displaying a candidate desensitization algorithm interaction interface; wherein the candidate desensitization algorithm interaction interface is used to display candidate desensitization operation algorithms, and the candidate desensitization operation algorithms are used to indicate the desensitization operation for the production data corresponding to the target resource configuration information; In response to the first user confirming the triggering operation of the target desensitizing operation algorithm from the candidate desensitizing operation algorithms, the data extraction task order creation request is generated.
[0018] It should be noted that the static desensitization method is adopted in the above preferred embodiment. The first user selects various required resources, such as database tables, data fields, etc., from the candidate resource configuration information for the test project, and then selects the appropriate target desensitization operation algorithm, and finally forms a data extraction task order creation request and submits it to the second user for authorization.
[0019] In some optional embodiments, the candidate resource configuration information includes a production database instance and data volume associated with the project to be managed, and at least one of a database table and a data field.
[0020] In some specific implementation processes, when selecting a production database instance, priority is given to selecting a disaster recovery production database or a backup machine of a production database.
[0021] Furthermore, the database table and the data fields are determined according to a project requirement analysis document associated with the project to be managed.
[0022] Those skilled in the art should understand that the data required for testing (database tables and data fields) are obtained from the project requirement analysis document, which ensures the relevance and integrity of the required data and ensures that too much production data is not extracted.
[0023] Those skilled in the art should understand that, during the project requirements analysis phase, R&D personnel often obtain the database tables and fields required for the project to be managed based on the business requirements analysis, and register them in the requirements analysis document, and record them in the test data information table (including database tables and fields) configured in the candidate resource configuration information. Therefore, by reading the requirements analysis document and / or reading the test data information table in the candidate resource configuration information and through operations such as selection and confirmation in the resource management interactive interface, the database tables, data fields, data sensitivity and other information involved in the production data of the project to be managed can be automatically obtained. Based on this, some of the results formed in the requirements analysis in the R&D phase can be directly selected in the testing phase and other downstream phases, which improves the efficiency of test data generation and the data availability of the entire process.
[0024] In some specific implementations, the requirement analysis document is formed by displaying a requirement form template to a specific user (such as a product manager role user) and receiving input from the specific user on the requirement form template. Based on the requirement analysis document, an iterative version log and version change content related to the requirement analysis document are formed, and other users (such as tester role users) can extract data more accurately for testing based on the iterative version log and the version change content.
[0025] In other specific implementation processes, a requirement creation interface with controls such as addition, modification, deletion, annotation, and sensitivity level setting is displayed to specific users, and input from specific users is received based on an interactive view, and finally a requirement analysis document is generated based on the formed interactive form.
[0026] Furthermore, the method further comprises: The data sensitivity of each of the database tables and / or the data fields is determined according to the project requirement analysis document, and sensitive information prompts are displayed on the resource management interactive interface according to a preset classification and grading strategy.
[0027] In some optional embodiments, the method further comprises: Before extracting the production data for desensitization according to the target resource configuration information, obtaining a decryption key associated with the production data and performing a decryption operation on the production data; and / or, After the production data is desensitized and before it is stored in the target test database instance, an encryption key corresponding to the decryption key is obtained to encrypt the test data.
[0028] In some specific implementation processes, the decryption keys required for decrypting production data and the encryption keys required for encrypting test data are managed by a third user (such as an information security manager) (including key import, association, name definition, etc.) to prevent key leakage, and other personnel can only choose to use them; more specifically, the third user triggers the display of the key management interface based on the data encryption and decryption key management controls contained in the development and operation interface; the key management interface is used to display key operation controls (such as key import controls, key deletion controls, key association controls, etc.) and a list of currently available keys.
[0029] It should be noted that, since information security requires that sensitive data must be encrypted and stored in the production database, and since the test version of the information system needs to be consistent with the production version of the production environment, the original sensitive data in the test data also needs to be encrypted and stored in the test database, and the encryption and decryption algorithms and keys of these encrypted sensitive test data are also consistent with the production environment. Based on this, in the above embodiment, non-designated users (such as the first user who is not an information security management user) cannot access sensitive files (such as encryption and decryption keys) and sensitive data (such as production data and / or test data before decryption and desensitization), so that sensitive data does not fall to the ground.
[0030] In some specific implementations, the method is implemented by a computer device, and the intermediate data generated by the implementation of the method is stored in the memory of the computer device; after the implementation of the method, the intermediate data is cleared; In some other specific implementation processes, the method is implemented through a computer system, the intermediate data generated by the implementation of the method is stored on the hard disk of the computer device, and the access rights to the intermediate data are managed by a file management system installed on the computer device; after the implementation of the method, the intermediate data is cleared.
[0031] In some preferred embodiments, the test data management interactive interface is further provided with a historical data management control; The method further comprises: In response to the triggering operation of the history data management control by the first user, a test data generation history management interface is displayed; the test data generation history management interface is used to display a test data generation history list, the test data generation history list includes test data items and corresponding current retention status information; wherein the current retention status information is used to indicate whether the corresponding test data item is cleared; the test data item that has not been cleared is bound to a data belonging test item viewing control; In response to the first user's triggering operation on the data attribution test item viewing control, data attribution test item information is displayed.
[0032] In some optional embodiments, the test data items that have not been cleared are bound to a data clearing application control; the test data management interactive interface is also used to display a data clearing task list; The method further comprises: In response to the triggering operation of the data clearing application control by the first user, creating a data clearing task sheet creation request for the corresponding test data pointed to by the test data item; In response to the second user's authorization triggering operation on the data clearing task order creation request, generating a data clearing task order; In response to the first user confirming in the test data management interactive interface to execute the triggering operation of the data clearing task list, obtaining the target resource configuration information and the target test database instance associated with the test data corresponding to the data clearing task list, and clearing the corresponding test data from the target test database instance according to the target resource configuration information; After the clearing is completed, the current retention status information of the test data item is updated, and the corresponding data clearing application control is unbound.
[0033] Example 2 This embodiment provides a test data extraction system. The method described in Embodiment 1, referring to FIG3 , includes: The first interactive interface display module is used to display the development and operation and maintenance interactive interface; A first task order generation module is used to generate a data extraction task order in response to an authorization trigger operation of a second user in the development and operation and maintenance interactive interface for a data extraction task order creation request for the project to be managed; wherein the data extraction task order creation request is used to request that the first user have extraction operation authority for production data corresponding to target resource configuration information, the second user has authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from candidate resource configuration information for the project to be managed; A second interactive interface display module, configured to display a test data management interactive interface corresponding to the test data management control in response to a trigger operation by the first user on the test data management control included in the development and operation interactive interface; wherein the test data management interactive interface is used to display candidate test database instances, as well as the data extraction task list and corresponding target resource configuration information; A data extraction module is used to respond to the first user's confirmation to execute the data extraction task order, and to confirm the trigger operation of the target test database instance from the candidate test database instance, extract the production data according to the target resource configuration information for desensitization operation, obtain the test data and import it into the target test database instance.
[0034] It can be understood that the device / system of this embodiment corresponds to the method of the above-mentioned embodiment 1, and the options in the above-mentioned embodiment 1 are also applicable to this embodiment, so they are not described repeatedly here.
[0035] Example 3 This embodiment provides a computer-readable storage medium, on which is stored at least one instruction, at least one program, code set or instruction set, and the at least one instruction, at least one program, code set or instruction set is loaded and executed by a processor, so that the processor executes part or all of the steps of the method provided in Example 1 of the present application.
[0036] It is understood that the storage medium may be transient or non-transient. Exemplarily, the storage medium includes, but is not limited to, a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0037] Exemplarily, the processor may be a central processing unit (CPU), a microprocessor (MPU), a digital signal processor (DSP), or a field programmable gate array (FPGA).
[0038] In some examples, a computer program product is provided, which can be implemented in hardware, software or a combination thereof. As a non-limiting example, the computer program product can be embodied as the storage medium, or as a software product, such as an SDK (Software Development Kit).
[0039] As a non-limiting example, a computer program product is provided, the computer program product includes a computer program or a computer executable instruction, the computer program or the computer executable instruction is stored in a computer-readable storage medium. A processor of an electronic device reads the computer program or the computer executable instruction from the computer-readable storage medium, and the processor executes the computer executable instruction, so that the electronic device performs some or all steps of the method described in the embodiment of the present application.
[0040] In some examples, a computer program is provided, comprising a computer-readable code, and when the computer-readable code is run in a computer device, a processor in the computer device executes a part or all of the steps in the method.
[0041] This embodiment also proposes an electronic device, including a memory and a processor, wherein the memory stores at least one instruction, at least one program, a code set or an instruction set, and when the processor executes the at least one instruction, at least one program, a code set or an instruction set, it implements part or all of the steps of the method described in Example 1.
[0042] In some examples, a hardware entity of the electronic device is provided, including: a processor, a memory and a communication interface; wherein the processor generally controls the overall operation of the electronic device; the communication interface is used to enable the electronic device to communicate with other terminals or servers through a network; the memory is configured to store instructions and applications executable by the processor, and can also cache data to be processed or processed by the processor and various modules in the electronic device (including but not limited to image data, audio data, voice communication data and video communication data), which can be implemented by flash memory (FLASH), electrically erasable programmable read-only memory (EEPROM, Electrically Erasable Programmable Read-Only Memory) or random access memory (RAM, Random Access Memory).
[0043] The processor may include one or more processing elements. Thus, the processor may include one or more integrated circuits (ICs) configured to perform the functions of the processor. In addition, each integrated circuit may include circuits (e.g., a first circuit, a second circuit, and other circuits, etc.) configured to perform the functions of the processor.
[0044] Furthermore, data may be transmitted between the processor, the communication interface and the memory via a bus, which may include any number of interconnected buses and bridges, and the bus connects various circuits of one or more processors and memories together.
[0045] It can be understood that the options in the above-mentioned embodiment 1 are also applicable to this embodiment, so they will not be described again here.
[0046] The same or similar reference numerals correspond to the same or similar components; The terms used to describe the positional relationship in the drawings are only used for illustrative purposes and should not be construed as limiting the present application; It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other.
[0047] In different specific implementations, the method or system described in the present application can be implemented in software, hardware or a combination thereof. In addition, the order of the steps of the method can be changed, and various elements can be added, reordered, combined, omitted, modified, etc.
[0048] Obviously, the above-mentioned embodiments of the present application are merely examples for clearly illustrating the present application, and are not intended to limit the implementation methods of the present application, and are not intended to limit the present application. For those of ordinary skill in the art, other different forms of changes or modifications can be made based on the above description. Each discrete structure / function module or unit can be integrated together to form an independent part, or each module can exist separately, or two or more modules can be integrated to form an independent part, and the structure and function of the discrete components can be implemented as a combined structure or component. It is not necessary and impossible to enumerate all the implementation methods here. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the claims of the present application.
Claims
1. A test data extraction method, characterized in that: include: Display the development and operation and maintenance interactive interface; In response to the authorization trigger operation of the second user on the data extraction task sheet creation request for the project to be managed in the development and operation and maintenance interactive interface, a data extraction task sheet is generated; wherein the data extraction task sheet creation request is used to request the first user to have the extraction operation authority for the production data corresponding to the target resource configuration information, the second user has the authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from the candidate resource configuration information for the project to be managed; In response to the first user's triggering operation on the test data management control included in the development and operation and maintenance interactive interface, displaying the test data management interactive interface corresponding to the test data management control; wherein the test data management interactive interface is used to display the candidate test database instance, as well as the data extraction task list and the corresponding target resource configuration information; In response to the first user confirming the execution of the data extraction task order and confirming the trigger operation of the target test database instance from the candidate test database instance, the production data is extracted and desensitized according to the target resource configuration information to obtain the test data and import it into the target test database instance.
2. A test data extraction method according to claim 1, characterized in that: The process of generating the data extraction task order creation request includes: In response to the first user's triggering operation on the resource management control included in the development and operation and maintenance interactive interface, displaying a resource management interactive interface corresponding to the resource management control; wherein the resource management interactive interface is used to display candidate resource configuration information of the project to be managed; In response to the trigger operation of the first user confirming the target resource configuration information from the candidate resource configuration information, displaying a candidate desensitization algorithm interaction interface; wherein the candidate desensitization algorithm interaction interface is used to display candidate desensitization operation algorithms, and the candidate desensitization operation algorithms are used to indicate the desensitization operation for the production data corresponding to the target resource configuration information; In response to the first user confirming the triggering operation of the target desensitizing operation algorithm from the candidate desensitizing operation algorithms, the data extraction task order creation request is generated.
3. A test data extraction method according to claim 2, characterized in that: The candidate resource configuration information includes a production database instance and data volume associated with the project to be managed, and at least one of a database table and a data field.
4. A test data extraction method according to claim 3, characterized in that: The database table and the data fields are determined according to a project requirement analysis document associated with the project to be managed.
5. A test data extraction method according to claim 2, characterized in that: The method further comprises: Before extracting the production data according to the target resource configuration information and performing a desensitization operation, obtaining a decryption key associated with the production data and performing a decryption operation on the production data; After the production data is desensitized and before it is stored in the target test database instance, an encryption key corresponding to the decryption key is obtained to encrypt the test data.
6. A test data extraction method according to any one of claims 1 to 5, characterized in that: The test data management interactive interface is also provided with a historical data management control; The method further comprises: In response to the triggering operation of the history data management control by the first user, a test data generation history management interface is displayed; the test data generation history management interface is used to display a test data generation history list, the test data generation history list includes test data items and corresponding current retention status information; wherein the current retention status information is used to indicate whether the corresponding test data item is cleared; the test data item that has not been cleared is bound to a data belonging test item viewing control; In response to the first user's triggering operation on the data attribution test item viewing control, data attribution test item information is displayed.
7. A test data extraction method according to claim 6, characterized in that: The test data items that have not been cleared are bound to a data clearing application control; the test data management interactive interface is also used to display a data clearing task list; The method further comprises: In response to the triggering operation of the data clearing application control by the first user, creating a data clearing task sheet creation request for the corresponding test data pointed to by the test data item; In response to the second user's authorization triggering operation on the data clearing task order creation request, generating a data clearing task order; In response to the first user confirming in the test data management interactive interface to execute the triggering operation of the data clearing task list, obtaining the target resource configuration information and the target test database instance associated with the test data corresponding to the data clearing task list, and clearing the corresponding test data from the target test database instance according to the target resource configuration information; After the clearing is completed, the current retention status information of the test data item is updated, and the corresponding data clearing application control is unbound.
8. A test data extraction system, applying the method according to any one of claims 1 to 7, characterized in that: include: The first interactive interface display module is used to display the development and operation and maintenance interactive interface; A first task order generation module is used to generate a data extraction task order in response to an authorization trigger operation of a second user in the development and operation and maintenance interactive interface for a data extraction task order creation request for the project to be managed; wherein the data extraction task order creation request is used to request that the first user have extraction operation authority for production data corresponding to target resource configuration information, the second user has authorization authority to associate the first user with the production data, and the target resource configuration information is confirmed from candidate resource configuration information for the project to be managed; A second interactive interface display module, configured to display a test data management interactive interface corresponding to the test data management control in response to a trigger operation by the first user on the test data management control included in the development and operation interactive interface; wherein the test data management interactive interface is used to display candidate test database instances, as well as the data extraction task list and corresponding target resource configuration information; A data extraction module is used to respond to the first user's confirmation to execute the data extraction task order, and to confirm the trigger operation of the target test database instance from the candidate test database instance, extract the production data according to the target resource configuration information for desensitization operation, obtain the test data and import it into the target test database instance.
9. An electronic device, characterized in that: include: A memory for storing computer executable instructions or computer programs; A processor, used to implement the method according to any one of claims 1 to 7 when executing the computer executable instructions or computer program stored in the memory.
10. A computer program product comprising a computer program or computer executable instructions, characterized in that: When the computer program or computer executable instructions are executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Data processing method and device, computing equipment and storage medium
CN113127919A
Data desensitization method and device, equipment and storage medium
CN117272388A
Software logistic for learning applications
US20200175336A1
Method and device for data processing
WO2017024957A1
Data processing method
WO2024139031A1