Green sustainable full-module fabricated building
By adopting detachable and connected load-bearing wall panel components and floor frame components in prefabricated buildings, the problem of the inability to arrange circuits and waterways at the same time in the prior art is solved, and the construction time is shortened and the flexibility of house layout is improved.
Patent Information
- Application Number
- CN202510098134.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-03-18
AI Technical Summary
The existing prefabricated buildings cannot be equipped with circuits and waterways at the same time during the construction process, resulting in a longer construction time and a single house layout, making it difficult to meet multiple living needs.
A green and sustainable full-module prefabricated building solution is adopted, including detachable and connected load-bearing wall panel components, floor frame components and wall panel assembly. By first arranging water pipes and circuit pipes on the inside of the exterior wall panel during the construction process, the construction of waterways and circuits can be achieved simultaneously.
It realizes the layout of waterways and circuits at the same time during the construction process, shortens construction time, and flexibly arranges load-bearing wall panel components and floor frame components to meet a variety of living needs and improves the flexibility of the house's design and use.
Smart Images

Figure CN119640938A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of prefabricated buildings, and in particular relates to a green and sustainable full-module prefabricated building. Background Art
[0002] At present, in prefabricated buildings, in order to improve the construction effect, a construction form combining factory prefabrication and on-site assembly installation is generally adopted. The existing prefabricated buildings are large-size components that are installed as a whole on-site. In the prefabricated formwork, the structural layer, surface layer, equipment, etc. have been processed and constructed in the factory. This technology can save manpower and material resources, reduce on-site construction workload, and improve construction efficiency.
[0003] However, the existing prefabricated building structures do not consider laying circuits, water pipes and other pipes in the walls at the same time during the construction process, resulting in the need to start the construction of circuits and water pipes from scratch after the building is completed, which prolongs the time it takes for the prefabricated buildings to be put into use and fails to achieve the purpose of being ready for occupancy and use as soon as the construction is completed. At the same time, due to the single floor structure of the existing prefabricated buildings, the layout of the house is single during the design and construction stage, and it cannot be flexibly designed, making it difficult to meet the needs of various residential uses. Summary of the invention
[0004] The purpose of the present invention is to provide a green and sustainable fully modular prefabricated building to solve the above-mentioned problems, so as to achieve the purpose of flexible layout of the house structure and preliminary construction and layout of waterways and electrical circuits during the construction process.
[0005] To achieve the above object, the present invention provides the following solution: a green and sustainable fully modular prefabricated building, comprising:
[0006] A base, the top of which is detachably connected to a plurality of load-bearing wall panel assemblies via a connecting piece;
[0007] The intermediate floor assembly comprises a floor frame assembly, wherein the floor frame assembly is detachably connected to the top of the plurality of the load-bearing wall assembly assemblies through a connecting piece, wherein the floor frame assembly is detachably connected to a plurality of first connecting beams and a second connecting beam, wherein the positions of the plurality of the first connecting beams and the second connecting beams are arranged corresponding to the positions of the plurality of the load-bearing wall assembly assemblies, and a floor is detachably connected between the floor frame assembly and the plurality of the first connecting beams and the second connecting beams;
[0008] A plurality of wall panel assemblies are detachably connected between two adjacent load-bearing wall panel assemblies and the base and floor frame assemblies. The wall panel assemblies include inner wall panels and outer wall panels, and a cavity is arranged between the inner wall panels and the outer wall panels.
[0009] Preferably, the load-bearing wall panel assembly includes an L-shaped connecting plate, a plane connecting plate and a T-shaped connecting plate, the inner sides of the L-shaped connecting plate, the plane connecting plate and the T-shaped connecting plate are provided with reinforcing iron pieces, and the outer sides of the reinforcing iron pieces are wrapped with concrete;
[0010] The reinforcing iron pieces in the planar connecting plate include two groups of load-bearing columns, and the two groups of load-bearing columns are fixedly connected by a plurality of connecting rods.
[0011] Preferably, the L-shaped connecting plate, the plane connecting plate and the T-shaped connecting plate are respectively provided with connecting components, and the connecting component in the plane connecting plate includes a connecting pipe fixedly penetrated between the two load-bearing columns, and the two ends of the connecting pipe respectively pass through the two opposite side walls of the plane connecting plate.
[0012] Preferably, the floor frame assembly includes a lower floor frame and an upper floor frame, the upper floor frame is detachably connected to the top of the lower floor frame by bolts, the inner edge of the top surface of the lower floor frame and the inner edge of the bottom surface of the upper floor frame are respectively provided with a first groove, and the side walls of the floor are respectively fixedly connected with a boss, and the boss is adapted to the first groove.
[0013] Preferably, a plurality of first through grooves are respectively opened on the side walls of the lower floor frame and the upper floor frame, and the two ends of a plurality of first connecting beams are respectively connected between two first through grooves by bolts, and a plurality of second through grooves are horizontally opened on two opposite side walls of the first connecting beams, and the two ends of the second connecting beams are respectively connected between one of the second through grooves and one of the first through grooves by bolts.
[0014] Preferably, second grooves are respectively formed at two ends of one side wall of the first connecting beam and the second connecting beam, and the second grooves are arranged corresponding to the bosses.
[0015] Preferably, a plurality of inner plug-in blocks are fixedly connected to the periphery of the inner wall panel at intervals, and a plurality of outer plug-in blocks are fixedly connected to the periphery of the outer wall panel at intervals, and the plurality of outer plug-in blocks are respectively fitted with the plurality of inner plug-in blocks;
[0016] The top edge of the base and the bottom edge of the lower floor frame are respectively provided with a plurality of first slots, and the side walls of the L-shaped connecting plate, the plane connecting plate and the T-shaped connecting plate are respectively vertically provided with second slots, and the external plug-in block and the internal plug-in block are respectively inserted into the first slot and the second slot.
[0017] Preferably, a sponge is fixedly connected to a side of the inner wall panel close to the outer wall panel, and the sponge is located in the cavity.
[0018] Preferably, the connecting member between the base and the planar connecting plate includes two groups of connecting columns vertically fixedly connected to the top surface of the base, and sockets are respectively provided at both ends of the two groups of load-bearing columns, and the sockets pass through the top and bottom surfaces of the planar connecting plate. The two groups of connecting columns on the base are respectively inserted into the two sockets at the bottom of the planar connecting plate, and the connecting columns are fixedly connected to the sockets by bolts.
[0019] Compared with the prior art, the present invention has the following advantages and technical effects: On the whole, the present invention can flexibly arrange the positions of the load-bearing wall panel components and the internal structure of the house according to the actual use requirements of the house, and can build the first connecting beam and the second connecting beam in the floor frame component according to the actual layout of the house, thereby realizing the construction of the middle floor and ensuring the structural stability of the middle floor. At the same time, when building the wall panels, by first arranging water pipes, circuit pipes and other structures on the inner side of the outer wall panels, the effect of simultaneous construction of waterways and circuits with the building can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a schematic diagram of the prefabricated building of the present invention;
[0022] Figure 2 A schematic diagram of the prefabricated building of the present invention with the wall panel assembly removed;
[0023] Figure 3 for Figure 2 A partial enlarged view in FIG.
[0024] Figure 4 A schematic diagram of the prefabricated building of the present invention with the intermediate floor slab assembly removed;
[0025] Figure 5 is a schematic diagram of a frame assembly, a first connecting beam and a second connecting beam of the present invention;
[0026] Figure 6 This is a schematic diagram of the connection between the lower floor frame and the floor of the present invention;
[0027] Figure 7 A schematic diagram of the clamping iron piece of the present invention;
[0028] Figure 8 It is a right side view of the wall panel assembly of the present invention;
[0029] Fig. 9 A top view of the wall panel assembly of the present invention;
[0030] Fig.10 It is a schematic diagram of the wall panel assembly of the present invention;
[0031] Among them, 1. base; 2. L-shaped connecting plate; 3. wall panel assembly; 4. lower floor frame; 5. upper floor frame; 6. connecting column; 7. floor; 8. first connecting beam; 9. second connecting beam; 10. first through groove; 11. first slot; 12. plane connecting plate; 13. T-shaped connecting plate; 14. first threaded hole; 15. second threaded hole; 16. boss; 17. first groove; 18. second groove; 19. second through groove; 20. load-bearing column; 21. connecting rod; 22. socket; 23. inner wall panel; 24. outer wall panel; 25. sponge; 26. outer plug-in block; 27. inner plug-in block; 28. second slot; 29. connecting pipe. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0034] Reference Figure 1-Figure 10 The present invention provides a green and sustainable fully modular prefabricated building, comprising:
[0035] A base 1, the top of which is detachably connected to a plurality of load-bearing wall panel assemblies via a connecting piece;
[0036] The intermediate floor assembly includes a floor frame assembly, which is detachably connected to the top of a plurality of load-bearing wall panel assemblies through a connecting piece, and a plurality of first connecting beams 8 and second connecting beams 9 are detachably connected in the floor frame assembly, and the positions of the plurality of first connecting beams 8 and second connecting beams 9 are arranged corresponding to the positions of the plurality of load-bearing wall panel assemblies, and a floor 7 is detachably connected between the floor frame assembly and the plurality of first connecting beams 8 and second connecting beams 9;
[0037] A plurality of wall panel assemblies are detachably connected between two adjacent load-bearing wall panel assemblies and the base 1 and the floor frame assembly. The wall panel assemblies include inner wall panels 23 and outer wall panels 24 , and a cavity is provided between the inner wall panels 23 and the outer wall panels 24 .
[0038] The main function of the load-bearing wall panel assembly is to support the middle floor slab assembly; the main function of the floor slab frame assembly is to connect the first connecting beam 8 and the second connecting beam 9 according to the actual layout position of the lower load-bearing wall panel assembly, so that the first connecting beam 8 and the second connecting beam 9 can be overlapped on the top of the load-bearing wall panel assembly, and at the same time cooperate with the first connecting beam 8 and the second connecting beam 9 to connect the corresponding floor slab 7; the main function of the cavity is to enable water pipes, circuit pipes and other structures to be arranged between the inner wall panel 23 and the outer wall panel 24. During the construction process, the water pipes, circuit pipes, etc. are first fixed on the inner side of the outer wall panel 24, and then the inner wall panel 23 is closed to conveniently realize the installation of the water pipes and circuit pipes. On the whole, the present invention can flexibly arrange the positions of the load-bearing wall panel components and the internal structure of the house according to the actual use requirements of the house, and can build the first connecting beam and the second connecting beam in the floor frame component according to the actual layout of the house, thereby realizing the construction of the middle floor and ensuring the structural stability of the middle floor. At the same time, when building the wall panels, by first arranging water pipes, circuit pipes and other structures on the inner side of the outer wall panels, the effect of simultaneous construction of waterways and circuits with the building can be achieved.
[0039] Further optimizing the scheme, the load-bearing wall panel assembly includes an L-shaped connecting plate 2, a plane connecting plate 12 and a T-shaped connecting plate 13, and the inner sides of the L-shaped connecting plate 2, the plane connecting plate 12 and the T-shaped connecting plate 13 are provided with reinforcing iron pieces, and the outer sides of the reinforcing iron pieces are wrapped with concrete;
[0040] The reinforcing iron parts in the planar connecting plate 12 include two groups of load-bearing columns 20 , and the two groups of load-bearing columns 20 are fixedly connected by a plurality of connecting rods 21 .
[0041] like Figure 2 and Figure 4 As shown, the L-shaped connecting plate 2 can be set at the corner of the building, the flat connecting plate 12 can be set between the long walls to shorten the length of the wall panel assembly and improve its durability. The T-shaped connecting plate 13 can be used to build another wall in the middle of the wall of the building, such as Figure 4 As shown, by the cooperation of two T-shaped connecting plates 13 and a group of L-shaped connecting plates 2, a smaller room can be built, rather than the conventional form of dividing the living space into two, making the house layout more flexible.
[0042] like Figure 7 As shown, during the construction process, two groups of load-bearing columns 20 are first connected by a plurality of connecting rods 21 , and then placed in a mold of a specific shape, and concrete is poured to form a planar connecting plate 12 .
[0043] Similarly, the T-shaped connecting plate 13 is formed by arranging three groups of load-bearing columns 20 in a T shape, welding the connecting rod 21, and pouring concrete in the corresponding T-shaped mold; the L-shaped connecting plate 2 is formed by arranging three groups of load-bearing columns 20 in an L shape, welding the connecting rod 21, and pouring concrete in the corresponding L-shaped mold.
[0044] To further optimize the solution, connecting components are respectively provided in the L-shaped connecting plate 2, the planar connecting plate 12 and the T-shaped connecting plate 13. The connecting component in the planar connecting plate 12 includes a connecting pipe 29 fixedly penetrated between the two load-bearing columns 20. The two ends of the connecting pipe 29 respectively pass through the two opposite side walls of the planar connecting plate 12.
[0045] like Figure 7 As shown, the main function of the connecting pipe 29 is to facilitate the water pipe or line pipe to pass from one wall panel assembly 3 to another wall panel assembly 3. The connecting pipe 29 can be flexibly arranged from top to bottom according to the use requirements.
[0046] A further optimized solution is that the floor frame assembly includes a lower floor frame 4 and an upper floor frame 5. The upper floor frame 5 is detachably connected to the top of the lower floor frame 4 by bolts. The inner edges of the top surface of the lower floor frame 4 and the inner edges of the bottom surface of the upper floor frame 5 are respectively provided with first grooves 17. Bosses 16 are respectively fixedly connected to the side walls of the floor slab 7, and the bosses 16 are adapted to the first grooves 17.
[0047] A further optimized solution is that a plurality of first through grooves 10 are respectively opened on the side walls of the lower floor frame 4 and the upper floor frame 5, and the two ends of a plurality of first connecting beams 8 are respectively connected between the two first through grooves 10 by bolts, and a plurality of second through grooves 19 are horizontally opened on the two opposite side walls of the first connecting beam 8, and the two ends of the second connecting beam 9 are respectively connected between a second through groove 19 and a first through groove 10 by bolts.
[0048] For example Figure 4 In the layout structure shown in the figure, the first through slot 10 and the second through slot 19 are opened at the corresponding positions of the side walls of the lower floor frame 4 and the upper floor frame 5 and the corresponding positions of the first connecting beam 8 during the design stage. During the construction process, the operator first uses the threaded ends of several bolts to pass through the first through slot 10 and connect to the two ends of the first connecting beam 8, and the heads of the bolts fit on the lower floor frame 4, and tighten the bolts to make the first connecting beam 8 as shown in the figure. Figure 5 As shown, it is fixed in the lower floor frame 4 and overlapped with the T-shaped connecting plate 13 at the rear of the base 1 and the top of the middle L-shaped connecting plate 2. Afterwards, the second connecting beam 9 is fixedly connected between the second through slot 19 on the first connecting beam 8 and the first through slot 10 on the right side by bolts, so that the second connecting beam 9 is as shown in FIG. Figure 5 The position shown is fixed and overlapped on the middle L-shaped connecting plate 2 and the right T-shaped connecting plate 13.
[0049] According to a further optimized solution, second grooves 18 are respectively provided at both ends of one side wall of the first connecting beam 8 and the second connecting beam 9 , and the second grooves 18 are provided corresponding to the bosses 16 .
[0050] like Figure 5 and Figure 6 As shown, the first connecting beam 8 and the second connecting beam 9 are fixedly connected in the lower floor frame 4, and after ensuring that the second grooves 18 on the first connecting beam 8 and the second connecting beam 9 are facing upward, a floor slab 7 of an adapted size is placed thereon, and the laying of the floor slab 7 in the lower floor frame 4 is completed by overlapping the boss 16 of the side wall of the floor slab 7 in the first groove 17 or the second groove 18.
[0051] Similarly, the first connecting beam 8 and the second connecting beam 9 are respectively connected in the upper floor frame 5, and then the top of the floor slab 7 is buckled downward to the top of the lower floor frame 4. During the process, ensure that the boss 16 is inserted into the first groove 17 and the second groove 18 of the upper floor frame 5 and the first connecting beam 8 and the second connecting beam 9 fixed thereon, and the construction of the middle floor is completed, forming a structure as shown in FIG. Figure 2 Status shown.
[0052] According to a further optimized solution, a plurality of inner plug-in blocks 27 are fixedly connected to the periphery of the inner wall panel 23 at intervals, and a plurality of outer plug-in blocks 26 are fixedly connected to the periphery of the outer wall panel 24 at intervals, and the plurality of outer plug-in blocks 26 are respectively fitted with the plurality of inner plug-in blocks 27;
[0053] A plurality of first slots 11 are respectively provided on the top edge of the base 1 and the bottom edge of the lower floor frame 4, and second slots 28 are respectively vertically provided on the side walls of the L-shaped connecting plate 2, the flat connecting plate 12 and the T-shaped connecting plate 13, and the outer plug-in block 26 and the inner plug-in block 27 are respectively inserted into the first slot 11 and the second slot 28.
[0054] like Figure 2 , Figure 4 and Figure 8-Figure 10 As shown, after the L-shaped connecting plate 2, the plane connecting plate 12 and the T-shaped connecting plate 13 are connected to the base 1, for the wall where the water pipe or line pipe needs to be installed, first lift the outer wall panel 24, align the outer plug-in blocks 26 on the left and right sides of the outer wall panel 24 with the second through grooves 19 on both sides, then lower the outer wall panel 24, make the outer plug-in blocks 26 slide down along the second through grooves 19, and make the outer wall panel 24 contact the base 1, so that the outer plug-in blocks 26 at the bottom are inserted into the first slot 11. Then, fix the water pipe or line pipe on the outer wall panel 24, and for the pipeline that needs to be extended to the left and right sides, the pipeline can be passed through the connecting pipe 29 to enter the adjacent wall. After the pipeline is installed and fixed, the inner wall panel 23 is hoisted in the same way, so that the outer plug-in blocks 26 and the inner plug-in blocks 27 fit in the first slot 11 and the second slot 28, and the fixing of the outer wall panel 24 and the inner wall panel 23 is completed. When the middle floor assembly is finally lowered, the outer insert block 26 and the inner insert block 27 at the top are inserted into the first slot 11 at the bottom of the lower floor frame 4 .
[0055] According to a further optimized solution, a sponge 25 is fixedly connected to one side of the inner wall panel 23 close to the outer wall panel 24, and the sponge 25 is in the cavity.
[0056] The main function of the sponge 25 is to fill the gap between the inner wall panel 23 and the outer wall panel 24 to improve the thermal insulation and sound insulation performance of the wall.
[0057] A further optimized solution is that the connecting parts between the base 1 and the planar connecting plate 12 include two groups of connecting columns 6 vertically fixedly connected to the top surface of the base 1, and sockets 22 are respectively provided at both ends of the two groups of load-bearing columns 20. The sockets 22 pass through the top and bottom surfaces of the planar connecting plate 12. The two groups of connecting columns 6 on the base 1 are respectively inserted into the two sockets 22 at the bottom of the planar connecting plate 12, and the connecting columns 6 and the sockets 22 are fixedly connected by bolts.
[0058] Further optimization scheme, such as Figure 2-Figure 4 As shown, since three groups of load-bearing columns 20 are respectively arranged in the L-shaped connecting plate 2 and the T-shaped connecting plate 13, and three groups of sockets are respectively arranged at the top and the bottom thereof, correspondingly, three groups of connecting columns 6 are respectively arranged at the bottom of the base 1 and the lower floor frame 4, so as to facilitate the connection between each connecting plate and the base 1.
[0059] Similarly, if Figure 2 As shown, the top of the upper floor frame 5 is also fixedly connected with a connecting column 6 according to design requirements to facilitate continued upward construction.
[0060] Further optimization scheme, the four columns of the connecting column 6 are respectively provided with a plurality of first threaded holes 14, which can be realized by welding threaded sleeves on the inner side of the connecting column 6. The side walls of the L-shaped connecting plate 2, the plane connecting plate 12 and the T-shaped connecting plate 13 are respectively provided with a plurality of second threaded holes 15, which can be realized by fixing and embedding threaded sleeves on the side walls of the load-bearing column 20, one end of the threaded sleeve is flush with the side wall of the jack 22, and the other end is flush with the outer wall of the corresponding connecting plate. The operator fixes the connecting plate by tightening the bolts into the second threaded holes 15 and the first threaded holes 14.
[0061] Embodiment 2:
[0062] The only difference between this embodiment and the first embodiment is that through holes (not shown in the figure) are respectively opened on the lower floor frame 4 and the upper floor frame 5.
[0063] When the water pipes or circuit pipes in the outer wall panel 24 need to be extended upward or downward to another floor, since the outer plug-in blocks 26 and the inner plug-in blocks 27 are arranged at intervals, the pipes can enter the wall panel assembly 3 of the upper or lower layer through the gaps between two adjacent outer plug-in blocks 26 and two adjacent inner plug-in blocks 27 and the through holes.
[0064] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0065] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A green and sustainable fully modular prefabricated building, characterized in that: include: A base (1), the top of the base (1) being detachably connected to a plurality of load-bearing wall panel assemblies via connecting pieces; An intermediate floor assembly comprises a floor frame assembly, wherein the floor frame assembly is detachably connected to the top of a plurality of the load-bearing wall assembly assemblies through a connecting piece, a plurality of first connecting beams (8) and a second connecting beam (9) are detachably connected in the floor frame assembly, the positions of the plurality of the first connecting beams (8) and the second connecting beams (9) are arranged correspondingly to the positions of the plurality of the load-bearing wall assembly assemblies, and a floor (7) is detachably connected between the floor frame assembly and the plurality of the first connecting beams (8) and the second connecting beams (9); A plurality of wall panel assemblies are provided, wherein the plurality of wall panel assemblies are detachably connected between two adjacent load-bearing wall panel assemblies and the base (1) and the floor frame assembly, wherein the wall panel assemblies include an inner wall panel (23) and an outer wall panel (24), and a cavity is provided between the inner wall panel (23) and the outer wall panel (24).
2. A green and sustainable fully modular prefabricated building according to claim 1, characterized in that: The load-bearing wall panel assembly comprises an L-shaped connecting plate (2), a plane connecting plate (12) and a T-shaped connecting plate (13), wherein the inner sides of the L-shaped connecting plate (2), the plane connecting plate (12) and the T-shaped connecting plate (13) are provided with reinforcing iron pieces, and the outer sides of the reinforcing iron pieces are wrapped with concrete; The reinforcing iron parts in the planar connecting plate (12) include two groups of load-bearing columns (20), and the two groups of load-bearing columns (20) are fixedly connected via a plurality of connecting rods (21).
3. A green and sustainable fully modular prefabricated building according to claim 2, characterized in that: The L-shaped connecting plate (2), the plane connecting plate (12) and the T-shaped connecting plate (13) are respectively provided with connecting components, and the connecting component in the plane connecting plate (12) comprises a connecting pipe (29) fixedly arranged between the two load-bearing columns (20), and the two ends of the connecting pipe (29) respectively penetrate the two opposite side walls of the plane connecting plate (12).
4. A green and sustainable fully modular prefabricated building according to claim 2, characterized in that: The floor frame assembly comprises a lower floor frame (4) and an upper floor frame (5); the upper floor frame (5) is detachably connected to the top of the lower floor frame (4) by bolts; the inner side edge of the top surface of the lower floor frame (4) and the inner side edge of the bottom surface of the upper floor frame (5) are respectively provided with a first groove (17); the side walls of the floor (7) are respectively fixedly connected with bosses (16); the bosses (16) are adapted to the first grooves (17).
5. A green and sustainable fully modular prefabricated building according to claim 4, characterized in that: A plurality of first through grooves (10) are respectively provided on the side walls of the lower floor frame (4) and the upper floor frame (5), and the two ends of a plurality of the first connecting beams (8) are respectively connected between the two first through grooves (10) by bolts, and a plurality of second through grooves (19) are horizontally provided on the two opposite side walls of the first connecting beam (8), and the two ends of the second connecting beam (9) are respectively connected between one of the second through grooves (19) and one of the first through grooves (10) by bolts.
6. A green and sustainable fully modular prefabricated building according to claim 4, characterized in that: Second grooves (18) are respectively provided at both ends of one side wall of the first connecting beam (8) and the second connecting beam (9), and the second grooves (18) are arranged corresponding to the bosses (16).
7. The green and sustainable fully modular prefabricated building according to claim 4 is characterized by: A plurality of inner insert blocks (27) are fixedly connected at intervals around the inner wall panel (23), and a plurality of outer insert blocks (26) are fixedly connected at intervals around the outer wall panel (24), wherein the plurality of outer insert blocks (26) are respectively fitted with the plurality of inner insert blocks (27); A plurality of first slots (11) are respectively provided on the top edge of the base (1) and the bottom edge of the lower floor frame (4); second slots (28) are respectively vertically provided on the side walls of the L-shaped connecting plate (2), the plane connecting plate (12) and the T-shaped connecting plate (13); and the outer plug-in block (26) and the inner plug-in block (27) are respectively plugged into the first slots (11) and the second slots (28).
8. The green and sustainable fully modular prefabricated building according to claim 1, characterized in that: A sponge (25) is fixedly connected to one side of the inner wall panel (23) close to the outer wall panel (24), and the sponge (25) is located in the cavity.
9. The green and sustainable fully modular prefabricated building according to claim 2, characterized in that: The connecting member between the base (1) and the planar connecting plate (12) comprises two groups of connecting columns (6) vertically fixedly connected to the top surface of the base (1), and the two ends of the two groups of load-bearing columns (20) are respectively provided with plug holes (22), and the plug holes (22) penetrate the top surface and the bottom surface of the planar connecting plate (12). The two groups of connecting columns (6) on the base (1) are respectively inserted into the two plug holes (22) at the bottom of the planar connecting plate (12), and the connecting columns (6) and the plug holes (22) are fixedly connected by bolts.