Control system and method of elevator shaft climbing formwork

By designing the control system for the elevator shaft climbing mold frame and using automation and intelligent technology, the problems of low safety and high labor intensity caused by the reliance on manual climbing operation of the mold frame in the existing technology are solved, and higher construction safety and efficiency are achieved.

CN119644878APending Publication Date: 2025-03-18上海市建设机械检测中心有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411829657.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-12
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

In the prior art, the climbing operation of the mold frame relies on manual operation of the tower crane, resulting in low construction safety and high labor intensity. In the construction of high-rise buildings, insufficient manpower increases the risk of accidents.

Method used

A control system for elevator shaft climbing mold frame is designed, including the main control cabinet, force sensor, electric hoist, remote control cabinet, leveling ruler and displacement sensor. Through the main control cabinet, the electric hoist automatically lifts the mold frame during the climbing process, the force sensor detects the stress data, and the remote control cabinet realizes multi-level coordinated control. The horizontal scale and displacement sensor monitor the horizontality and structural strain of the mold frame.

Benefits of technology

The automation and intelligence of mold frame climbing has been realized, which significantly improves the safety and efficiency of construction, reduces the influence of human factors, and reduces the risk of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119644878A_ABST
    Figure CN119644878A_ABST
Patent Text Reader

Abstract

The invention provides a control system and method for an elevator shaft climbing formwork, and relates to the technical field of building equipment, the system comprises a master control cabinet, an electric hoist, a force sensor, a remote control cabinet, a leveling instrument and a displacement sensor, the master control cabinet is used for containing a control module of the control system of the climbing formwork; the electric hoist is used for receiving a first control signal of the master control cabinet and hoisting the climbing formwork in the climbing process of the climbing formwork; the force sensor is used for detecting stress data of the electric hoist and transmitting the stress data to the master control cabinet; the remote control cabinet is used for receiving a second control signal of the master control cabinet; the leveling instrument is used for monitoring levelness data of the lower-layer formwork, and the displacement sensor is used for detecting structural strain data of the lower-layer formwork; and the master control cabinet is used for controlling the climbing formwork based on the stress data, the levelness data and the structural strain data. By implementing the technical scheme provided by the invention, the construction safety and efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction equipment, and in particular to a control system and method for an elevator shaft climbing formwork. Background Art

[0002] In the current construction field, the number of high-rise and super-high-rise buildings is increasing, and construction safety issues are becoming increasingly prominent. Among various safety accidents, safety accidents involving formwork are particularly serious, which may cause casualties and huge property losses. In addition, the labor intensity of formwork climbing operations is high and the working environment is harsh, which can easily have a negative impact on the operator's body and mind. Especially for formwork projects constructed in shafts and elevator shafts, due to the limited structural space and complex force conditions in the shaft, the working space is narrow and the working blind area is large. In addition, there is a general problem of insufficient manpower on the construction site, which further increases the risk of accidents.

[0003] In the related art, the main method of formwork climbing is to manually operate the tower crane to hoist and lift. In recent years, although the structure of the formwork has undergone a major update, the automation level of the formwork control system is still low, and the climbing process of the formwork is still completed by manual hoisting. Safety management also depends on on-site management personnel. Manual climbing formwork has a large randomness due to the different abilities of workers, and it is difficult to ensure the construction quality; manual supervision is also limited by the safety officer's field of vision, making it difficult to ensure construction safety. It can be seen that the climbing formwork in the related art has the technical problem of low safety. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides a control system and method for an elevator shaft climbing formwork.

[0005] In the first aspect, the present application provides a control system for an elevator shaft climbing formwork, comprising: a main control cabinet, a force sensor, an electric hoist, a remote control cabinet, a level and a displacement sensor, wherein the main control cabinet is installed in the upper formwork, the main control cabinet is used to accommodate a control module of the control system of the climbing formwork, and the climbing formwork includes an upper formwork; an electric hoist is installed in the upper formwork, the electric hoist is electrically connected to the main control cabinet, the electric hoist is used to receive a first control signal from the main control cabinet, and hoist the climbing formwork during the climbing process of the climbing formwork; the force sensor is connected to the electric hoist, the force sensor is used to detect the force data of the electric hoist, and transmit the force data to the main control cabinet; the remote control cabinet is installed in the lower formwork, and the remote control The cabinet is electrically connected to the main control cabinet, and the remote control cabinet is used to receive the second control signal of the main control cabinet. The climbing formwork also includes a lower formwork; a level ruler is installed in the lower formwork, and the level ruler is used to monitor the level data of the lower formwork, and a displacement sensor is installed in the lower formwork, and the displacement sensor is used to detect the structural strain data of the lower formwork; the level ruler and the displacement sensor are electrically connected to the remote control cabinet respectively, and the remote control cabinet is used to control the level ruler to detect the level data and control the displacement sensor to detect the structural strain data based on the second control signal. The remote control cabinet is also used to transmit the level data and the structural strain data to the main control cabinet; the main control cabinet is used to control the climbing formwork based on the force data, the level data and the structural strain data.

[0006] By adopting the above technical solution, the main control cabinet is installed on the upper mold frame to centrally manage the various modules of the entire control system to ensure the coordinated operation of the system; the electric hoist is electrically connected to the main control cabinet to automatically hoist the mold frame during the climbing process, reducing manual intervention, labor intensity and risks; the force sensor detects the force of the electric hoist and feeds back to the main control cabinet in real time, which helps to adjust the operating parameters in time to prevent overload and damage; the remote control cabinet is installed on the lower mold frame to receive the control signal from the main control cabinet to achieve multi-level collaborative control and improve the response speed and flexibility of the system; the level ruler and displacement sensor respectively monitor the horizontality and structural strain of the lower mold frame to ensure the stability and safety of the mold frame during the climbing process; the main control cabinet comprehensively controls the climbing mold frame based on the comprehensive analysis of data from multiple sensors, effectively preventing potential safety hazards and improving construction quality. That is, the control system of the elevator shaft climbing mold frame integrates multiple sensors, and realizes the automation and intelligence of the mold frame climbing through the main control cabinet, which significantly improves the safety and efficiency of construction, reduces the influence of human factors, and reduces the risk of accidents. This technical solution can realize intelligent control of the elevator shaft climbing formwork, significantly improving construction safety and efficiency.

[0007] Optionally, the main control cabinet includes: a mobile power supply, an intelligent control module, a bus and a wireless communication module, wherein the mobile power supply, the intelligent control module, the bus and the wireless communication module are all installed in the main control cabinet; the mobile power supply is used to provide power to the control system of the climbing formwork; the intelligent control module is used to collect and store a first set of data generated by the control system of the climbing formwork during operation, wherein the first set of data includes force data, horizontality data and structural strain data; the wireless communication module is electrically connected to the intelligent control module through the bus, and the wireless communication module is used to send the first set of data to an external monitoring device and receive external instructions sent by the external monitoring device, and send the external instructions to the intelligent control module, so that the intelligent control module controls the control system of the climbing formwork based on the external instructions.

[0008] By adopting the above technical solution, the mobile power supply provides a stable power supply for the control system of the entire climbing formwork, and the intelligent control module can collect and store a variety of key data (such as force data, level data and structural strain data) of the climbing formwork in real time during operation. These data provide a basis for subsequent analysis and control, and help to timely discover potential problems and take corresponding measures. The wireless communication module is connected to the intelligent control module through the bus to realize data communication with the external monitoring device, which not only enables on-site operators to monitor the status of the formwork in real time away from the dangerous area, but also receives external instructions and transmits them to the intelligent control module, thereby realizing remote control and improving the safety and convenience of operation. The intelligent control module controls the control system of the climbing formwork based on external instructions, making the climbing process of the formwork more intelligent and automated, reducing the influence of human factors, and improving the construction quality and efficiency. At the same time, through real-time data feedback, the system can adjust and optimize the climbing parameters in time to further improve the stability and safety of the system.

[0009] Optionally, the intelligent control module includes: a data interaction unit, a data storage unit and a data calculation unit, wherein the data interaction unit is used to obtain a first set of data in real time and store the first set of data in the data storage unit; the data calculation unit is used to compare each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the intelligent control module is used to control the climbing formwork based on the comparison result.

[0010] By adopting the above technical scheme, the data interaction unit ensures the timely acquisition and storage of the first set of data, and improves the real-time and accuracy of data processing; the data calculation unit can quickly identify abnormal situations, such as excessive force, horizontality deviating from the normal range, or structural strain exceeding the safety threshold, by comparing the first set of data with a set of preset values, so that the intelligent control module can take timely measures; the control strategy based on the comparison results not only improves the operating accuracy of the climbing formwork, but also greatly reduces the uncertainty and risk of human operation, and significantly improves the safety and reliability of construction.

[0011] Optionally, the data calculation unit is also used to calculate the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module is also used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes a first instruction, and the first instruction is used to instruct the climbing formwork to lift a preset height. The first set of data also includes acceleration data, and the control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is detected by the acceleration sensor.

[0012] By adopting the above technical solution, the acceleration sensor detects the acceleration data of the climbing formwork in real time, and these data are transmitted to the data calculation unit of the intelligent control module. The data calculation unit calculates the actual lifting distance of the climbing formwork based on the acceleration data, thereby ensuring the precise control of the lifting process; the intelligent control module compares the calculated lifting distance with the first instruction in the external instruction to determine whether the climbing formwork has reached the preset height. If the actual lifting distance is consistent with the preset height, the intelligent control module will stop sending the lifting signal to the electric hoist to avoid the safety risks caused by over-lifting; by accurately controlling the lifting distance of the climbing formwork, manual intervention can be effectively reduced, the construction difficulty and labor intensity can be reduced, and the construction efficiency can be improved. At the same time, this automated control method reduces the influence of human factors and improves the safety and reliability of construction.

[0013] Optionally, the intelligent control module is also used to perform one of the following operations: when it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module controls the electric hoist brake to stop lifting the climbing formwork and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to the first preset value; the horizontality data is greater than or equal to the second preset value; the structural strain data is greater than or equal to the third preset value; a group of preset values ​​includes a first preset value, a second preset value and a third preset value; when it is determined that the climbing formwork has been lifted into place, the intelligent control module stops sending a lifting signal to the electric hoist.

[0014] By adopting the above technical solution, the intelligent control module can monitor the force data, levelness data and structural strain data of the climbing formwork in real time, and compare them with the corresponding preset values ​​in a set of preset values. When it is detected that any data exceeds the preset value, the intelligent control module will immediately control the electric hoist brake, stop lifting the climbing formwork, and issue the first alarm information, thereby effectively preventing accidents caused by overload, tilt or deformation, and improving construction safety. At the same time, when it is determined that the climbing formwork has been lifted into place, the intelligent control module will automatically stop sending lifting signals to the electric hoist to ensure accurate control of the climbing process and avoid the risks caused by excessive lifting.

[0015] Optionally, the upper end of the force sensor is connected to the elevator shaft building structure, the lower end of the force sensor is connected to the first hanging point of the electric hoist, and the second hanging point of the electric hoist is connected to the climbing formwork.

[0016] By adopting the above technical solution, the upper end of the force sensor is connected to the elevator shaft building structure, and the lower end is connected to the first suspension point of the electric hoist, which can accurately detect the force of the electric hoist during the hoisting process; at the same time, the second suspension point of the electric hoist is connected to the climbing formwork, so that the electric hoist can effectively hoist the climbing formwork, improving the climbing efficiency and reliability. This connection method not only simplifies the installation process, but also effectively prevents safety hazards such as unhooking during the hoisting process, thereby significantly improving the safety performance of the entire climbing formwork system.

[0017] On the second aspect, the present application also provides a control method for an elevator shaft climbing formwork, which is applied to the control system of the aforementioned elevator shaft climbing formwork, including: the main control cabinet sends a lifting signal to the electric hoist to start the electric hoist to lift the climbing formwork; the main control cabinet obtains a first set of data, wherein the first set of data includes data generated by the control system of the climbing formwork during operation, and the first set of data includes force data, horizontality data and structural strain data; the main control cabinet controls the climbing formwork based on the first set of data.

[0018] By adopting the above technical solution, the main control cabinet sends a lifting signal to the electric hoist, and starts the electric hoist to lift the climbing formwork; the main control cabinet obtains the first set of data in real time, including force data, level data and structural strain data, which can fully reflect the force, level and structural deformation of the climbing formwork during the climbing process, and provide accurate data support for subsequent control decisions; based on the first set of data, the climbing formwork is controlled, and the climbing parameters can be adjusted in time to avoid problems such as overload, tilt and structural damage, thereby improving the safety and reliability of construction. The main control cabinet comprehensively controls the climbing formwork based on the comprehensive analysis of data from multiple sensors, effectively preventing potential safety hazards and improving construction quality. The automation and intelligence of formwork climbing are realized, which significantly improves the safety and efficiency of construction, reduces the impact of human factors, and reduces the risk of accidents.

[0019] Optionally, the main control cabinet controls the climbing formwork based on the first set of data, including: the data calculation unit compares each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the main control cabinet includes an intelligent control module, the intelligent control module includes a data interaction unit, a data storage unit and a data calculation unit, the data interaction unit is used to obtain the first set of data in real time, and store the first set of data in the data storage unit; when it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module controls the electric hoist brake to stop lifting the climbing formwork and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to the first preset value; the horizontality data is greater than or equal to the second preset value; the structural strain data is greater than or equal to the third preset value; a set of preset values ​​includes a first preset value, a second preset value and a third preset value.

[0020] By adopting the above technical solution, the force data, horizontality data and structural strain data are monitored and compared in real time through the intelligent control module. When these data exceed the corresponding preset values, the system will automatically control the electric hoist brake to stop lifting the climbing formwork and issue the first alarm message, thereby effectively preventing accidents caused by overload, tilt or structural deformation, and significantly improving the safety of the construction process; the intelligent control module ensures that the climbing formwork is always in a safe state during the lifting process through real-time monitoring and processing of various data, avoiding the uncertainty of traditional manual operation and improving construction quality and efficiency; the automated control system reduces dependence on on-site management personnel and operators, reduces labor intensity, improves the working environment, and reduces errors and safety hazards caused by human factors; the monitoring data is transmitted to the external monitoring device in real time through the wireless communication module, realizing remote monitoring and management, which helps to timely discover and deal with potential problems and ensure construction progress and quality.

[0021] Optionally, the main control cabinet also includes a wireless communication module, a bus and a mobile power supply. The wireless communication module is electrically connected to the intelligent control module through the bus. The mobile power supply is used to provide power to the control system of the climbing formwork. The wireless communication module is used to send a first set of data to an external monitoring device and receive external instructions sent by the external monitoring device, and send the external instructions to the intelligent control module; the above method also includes: the data calculation unit calculates the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module is also used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes a first instruction, and the first instruction is used to instruct the climbing formwork to lift a preset height. The first set of data also includes acceleration data. The control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is detected by the acceleration sensor; when it is determined that the climbing formwork has been lifted into place, the intelligent control module stops sending a lifting signal to the electric hoist.

[0022] By adopting the above technical solution, the wireless communication module is electrically connected to the intelligent control module through the bus, which can realize data exchange with the external monitoring device, ensure that the system can operate normally without human intervention, and improve the reliability and maintainability of the system; the mobile power supply provides a stable power supply for the entire control system, avoiding system failures caused by power outages, and enhancing the stability and continuous operation capability of the system; the acceleration data detected by the acceleration sensor is used by the data calculation unit to calculate the lifting distance of the climbing formwork, and the intelligent control module compares the lifting distance with the first instruction to determine whether the climbing formwork is lifted in place. This function ensures accurate control of the climbing process, reduces human errors, and improves construction quality and safety. When the climbing formwork is lifted in place, the intelligent control module will stop sending lifting signals to the electric hoist, thereby avoiding the risks of over-lifting and protecting the safety of equipment and personnel.

[0023] Optionally, the method further includes: upon receiving a second instruction, the intelligent control module sends a forced braking signal to the electric hoist to put the climbing formwork in a stationary state, wherein the external instruction includes the second instruction; the data interaction unit acquires a second set of data in real time, wherein the second set of data includes force data of the electric hoist in a stationary state, horizontality data of the lower formwork in a stationary state, and structural strain data of the lower formwork in a stationary state; the data calculation unit calculates the change rate of each data in the second set of data to obtain a set of change rates; when a set of change rates meets a second preset condition, the intelligent control module issues a second alarm message, wherein The second alarm information is used to indicate that the climbing formwork is in an abnormal static state, and the second preset condition includes at least one of the following: a first change rate is greater than a first preset threshold value, wherein the first change rate is used to indicate the change rate of the force data of the electric hoist in a static state, and a group of change rates includes the first change rate; a second change rate is greater than a second preset threshold value, wherein the second change rate is used to indicate the change rate of the horizontality data of the lower formwork in a static state, and a group of change rates includes the second change rate; a third change rate is greater than the second preset threshold value, wherein the third change rate is used to indicate the change rate of the structural strain data of the lower formwork in a static state, and a group of change rates includes the third change rate.

[0024] By adopting the above technical solution, when receiving the second instruction, the intelligent control module sends a forced brake signal to the electric hoist, so that the climbing formwork enters a static state, ensuring the safety and stability of the formwork during non-working hours; the data interaction unit obtains the force data of the electric hoist in the static state, the horizontality data of the lower formwork and the structural strain data of the lower formwork in real time. The real-time monitoring of these data can timely discover the potential risks of the formwork in the static state; the data calculation unit calculates the change rate of the above data, and by comparing it with the corresponding preset threshold, it can identify whether the formwork has an abnormality at the first time; when the change rate exceeds the corresponding preset threshold, the intelligent control module will issue a second alarm message to remind relevant personnel to pay attention to the abnormal static state of the formwork, so as to take timely measures to avoid accidents, thereby improving the safety and reliability of the entire construction process. This technical solution can achieve the purpose of all-round monitoring of the climbing formwork in a static state.

[0025] In a third aspect of the present application, an electronic device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the program, any of the above method steps is implemented.

[0026] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores instructions, and when the instructions are executed, any of the above method steps is performed.

[0027] In summary, one or more technical solutions provided in this application have at least the following technical effects or advantages: 1. The control system integrates a variety of sensors, and realizes the automation and intelligence of formwork climbing through the main control cabinet, which significantly improves the safety and efficiency of construction; 2. The intelligent control module controls the control system of the climbing formwork based on external instructions, making the climbing process of the formwork more intelligent and automated, reducing the influence of human factors and improving construction quality and efficiency; 3. By comparing the first set of data with a set of preset values, abnormal situations can be quickly identified, and the intelligent control module can take timely measures, greatly reducing the uncertainty and risk of human operation; 4. When any data is detected to exceed the preset value, the intelligent control module will immediately control the electric hoist brake, stop lifting the climbing formwork, and issue the first alarm message, thereby effectively preventing accidents caused by overload, tilt or deformation and improving construction safety; 5. It can realize the purpose of all-round monitoring of the climbing formwork in a static state. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a framework diagram of a control system of an elevator shaft climbing formwork provided in an embodiment of the present application; Figure 2 It is a schematic diagram of the control system layout of an elevator shaft climbing formwork provided in an embodiment of the present application; Figure 3 The embodiment of this application provides Figure 2 A partial enlarged view of the area A in the middle circle; Figure 4 The embodiment of this application provides Figure 2 Schematic diagram of the structure of the middle BB section; Figure 5 It is a schematic diagram of the control system structure of an elevator shaft climbing formwork provided in an embodiment of the present application; Figure 6 This is a schematic diagram of the system structure in a master control cabinet provided in an embodiment of the present application; Figure 7 is a structural diagram of an intelligent control module provided in an embodiment of the present application; Figure 8 It is a flow chart of a control method of an elevator shaft climbing formwork provided in an embodiment of the present application; Fig. 9 It is a flow chart of a control method for lifting an elevator shaft climbing formwork in an elevator shaft provided in an embodiment of the present application; Fig.10It is a schematic diagram of a control method for keeping an elevator shaft climbing formwork stationary in an elevator shaft provided in an embodiment of the present application.

[0029] Reference numerals: 1- main control cabinet; 11- mobile power supply; 12- intelligent control module; 121- data storage unit; 122- data interaction unit; 123- data calculation unit; 13- bus; 14- wireless communication module; 2- electric hoist with force sensor; 21- force sensor; 22- electric hoist; 3- remote control cabinet; 4- level ruler; 5- displacement sensor. DETAILED DESCRIPTION

[0030] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0031] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0032] In the description of the embodiments of the present application, the term "plurality" means two or more. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0033] The present application provides a control system for an elevator shaft climbing formwork, such as Figure 1 As shown, Figure 1 It is a framework diagram of a control system of an elevator shaft climbing formwork provided in an embodiment of the present application, including: a main control cabinet 1, a force sensor 21, an electric hoist 22, a remote control cabinet 3, a level 4 and a displacement sensor 5, wherein: The main control cabinet 1 is installed on the upper mold frame, and the main control cabinet 1 is used to accommodate the control module of the control system of the climbing mold frame, and the climbing mold frame includes the upper mold frame; The electric hoist 22 is installed on the upper mold frame, and the electric hoist 22 is electrically connected to the main control cabinet 1. The electric hoist 22 is used to receive the first control signal of the main control cabinet 1 and hoist the climbing mold frame during the climbing process of the climbing mold frame; The force sensor 21 is connected to the electric hoist 22, and the force sensor 21 is used to detect the force data of the electric hoist 22 and transmit the force data to the main control cabinet 1; The remote control cabinet 3 is installed in the lower mold frame, the remote control cabinet 3 is electrically connected to the main control cabinet 1, and the remote control cabinet 3 is used to receive the second control signal of the main control cabinet 1. The climbing mold frame also includes the lower mold frame; A level ruler 4 is installed in the lower mold frame, and the level ruler 4 is used to monitor the levelness data of the lower mold frame. A displacement sensor 5 is installed in the lower mold frame, and the displacement sensor 5 is used to detect the structural strain data of the lower mold frame. The level ruler 4 and the displacement sensor 5 are electrically connected to the remote control cabinet 3 respectively. The remote control cabinet 3 is used to control the level ruler 4 to detect the levelness data and the displacement sensor 5 to detect the structural strain data based on the second control signal. The remote control cabinet 3 is also used to transmit the levelness data and the structural strain data to the main control cabinet 1; The main control cabinet 1 is used to control the climbing formwork based on force data, levelness data and structural strain data.

[0034] In the above embodiment, the main control cabinet 1 is installed on the upper mold frame to centrally manage the various modules of the entire control system to ensure the coordinated operation of the system; the electric hoist 22 is electrically connected to the main control cabinet 1 to automatically hoist the mold frame during the climbing process, reducing manual intervention, labor intensity and risk; the force sensor 21 detects the force of the electric hoist 22 and feeds back to the main control cabinet 1 in real time, which helps to adjust the operating parameters in time to prevent overload and damage; the remote control cabinet 3 is installed on the lower mold frame to receive the control signal from the main control cabinet 1 to achieve multi-level collaborative control and improve the response speed and flexibility of the system; the level 4 and the displacement sensor 5 respectively monitor the horizontality and structural strain of the lower mold frame to ensure the stability and safety of the mold frame during the climbing process; the main control cabinet 1 comprehensively controls the climbing mold frame based on the comprehensive analysis of the data of multiple sensors, effectively prevents potential safety hazards, and improves the construction quality. That is, the control system of the elevator shaft climbing mold frame integrates multiple sensors, and realizes the automation and intelligence of the mold frame climbing through the main control cabinet 1, which significantly improves the safety and efficiency of construction, reduces the influence of human factors, and reduces the risk of accidents. This embodiment can realize intelligent control of the elevator shaft climbing formwork, significantly improving construction safety and efficiency.

[0035] In the related art, the climbing of the formwork mainly relies on manual operation of the tower crane for lifting and hoisting. The automation level of the formwork control system is low. The climbing operation and safety management mainly rely on manual labor, which makes it difficult to ensure the quality and safety of construction. There are large randomness and safety hazards, which are easy to cause safety accidents. In this embodiment, the electric hoist 22 and the force sensor 21 are used together to automatically hoist the formwork, reduce manual operation, and reduce the risk of safety accidents caused by operational errors. The force sensor 21 detects the force data of the electric hoist 22, and the level ruler 4 and the displacement sensor 5 monitor the horizontality and structural strain data of the lower layer of the formwork respectively. These data are transmitted to the main control cabinet 1 for real-time adjustment and control of the climbing of the formwork, thereby improving the safety, efficiency and intelligence level of construction. The automated control system reduces the dependence on manpower, improves the working efficiency, and reduces the workload of the operators.

[0036] Figure 2 1 is a schematic diagram of the control system layout of an elevator shaft climbing formwork provided in an embodiment of the present application. Figure 2 It includes a main control cabinet 1, an electric hoist 2 with a force sensor (actually including a force sensor 21 and an electric hoist 22) and a remote control cabinet 3. Figure 2 The middle circle A area represents an electric hoist 2 with a force sensor, that is, the figure shows an electric hoist 2 with a force sensor on each side. The climbing formwork (also referred to as formwork, or climbing frame) in this application is a whole, including an upper formwork and a lower formwork, and the number of layers between the upper formwork and the lower formwork is not limited. Figure 3 yes Figure 2 The partial enlarged view of the area in the middle circle A, that is, the electric hoist 2 with force sensor includes a force sensor 21 and an electric hoist 22. Figure 4 yes Figure 2 The structural diagram of the BB section is a horizontal section of the lower mold frame where the remote control cabinet 3, the level 4 and the displacement sensor 5 are located. Figure 4 As can be seen in the figure, the level ruler 4 and the displacement sensor 5 can be arranged at the corners of the lower mold frame.

[0037] Figure 5 is a schematic diagram of the control system structure of an elevator shaft climbing formwork provided in an embodiment of the present application, Figure 5 The apparatus includes two force sensors 21 and two electric hoists 22 .

[0038] In an optional embodiment, if Figure 6As shown, the main control cabinet 1 includes: a mobile power supply 11, an intelligent control module 12, a bus 13 and a wireless communication module 14, wherein the mobile power supply 11, the intelligent control module 12, the bus 13 and the wireless communication module 14 are all installed in the main control cabinet 1; the mobile power supply 11 is used to provide power to the control system of the climbing formwork; the intelligent control module 12 is used to collect and store a first set of data generated by the control system of the climbing formwork during operation, wherein the first set of data includes force data, horizontality data and structural strain data; the wireless communication module 14 is electrically connected to the intelligent control module 12 through the bus 13, and the wireless communication module 14 is used to send the first set of data to an external monitoring device and receive external instructions sent by the external monitoring device, and send the external instructions to the intelligent control module 12, so that the intelligent control module 12 controls the control system of the climbing formwork based on the external instructions.

[0039] In the above embodiment, the mobile power supply 11 provides a stable power supply for the control system of the entire climbing formwork, and the intelligent control module 12 can collect and store various key data (such as force data, level data and structural strain data) of the climbing formwork in real time during operation. These data provide a basis for subsequent analysis and control, which helps to timely discover potential problems and take corresponding measures. The wireless communication module 14 is connected to the intelligent control module 12 through the bus 13, realizing data communication with the external monitoring device, which not only enables the on-site operator to monitor the state of the formwork in real time away from the dangerous area, but also receives external instructions and transmits them to the intelligent control module 12, thereby realizing remote control and improving the safety and convenience of operation. The intelligent control module 12 controls the control system of the climbing formwork based on external instructions, making the climbing process of the formwork more intelligent and automated, reducing the influence of human factors, and improving the construction quality and efficiency. At the same time, through real-time data feedback, the system can adjust and optimize the climbing parameters in time to further improve the stability and safety of the system.

[0040] In this embodiment, the intelligent control module 12 collects and stores the first set of data, including force data, levelness data and structural strain data, thereby improving the efficiency and accuracy of data management. The wireless communication module 14 is electrically connected to the intelligent control module 12 through the bus, and can send the first set of data to the external monitoring device, and receive the external instructions sent by the external monitoring device at the same time, thereby enhancing the remote monitoring and data sharing capabilities; the wireless communication module 14 enables the system to communicate with the external monitoring device in a two-way manner, allowing remote workers to obtain the latest construction status information at any time, and send instructions to the intelligent control module 12 to perform corresponding actions as needed, thereby achieving more flexible and efficient remote management and intervention; the intelligent control module 12 can control the control system of the climbing formwork based on external instructions, thereby improving the efficiency and response speed of instruction execution; through the wireless communication module 14, the system can flexibly receive and execute external instructions from different sources, thereby improving the flexibility of the system and its ability to respond to emergencies; through real-time monitoring and remote control, potential safety issues can be discovered and handled in a timely manner, thereby improving the safety and reliability of construction.

[0041] In an optional embodiment, if Figure 7 As shown, the intelligent control module 12 includes: a data interaction unit 122, a data storage unit 121 and a data calculation unit 123, wherein the data interaction unit 122 is used to obtain a first set of data in real time and store the first set of data in the data storage unit 121; the data calculation unit 123 is used to compare each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the intelligent control module 12 is used to control the climbing formwork based on the comparison result.

[0042] In the above embodiment, the data interaction unit 122 ensures the timely acquisition and storage of the first set of data, and improves the real-time and accuracy of data processing; the data calculation unit 123 can quickly identify abnormal situations, such as excessive force, horizontality deviating from the normal range, or structural strain exceeding the safety threshold, by comparing the first set of data with a set of preset values, so that the intelligent control module 12 can take timely measures, such as controlling the electric hoist 22 to shut down and issue an alarm message, effectively preventing the occurrence of safety accidents; the control strategy based on the comparison results not only improves the operating accuracy of the climbing formwork, but also greatly reduces the uncertainty and risk of human operation, and significantly improves the safety and reliability of construction.

[0043] In this embodiment, the data interaction unit 122 acquires and stores the first set of data in real time, and the data calculation unit 123 compares the first set of data with a set of preset values ​​to obtain the comparison results, so that any deviation from the normal range, such as overload, tilt or deformation, can be quickly identified, so that measures can be taken immediately to avoid accidents. The intelligent control module 12 automatically adjusts the control strategy based on these results, enhancing the intelligent decision-making ability of the system. The intelligent control module 12 can automatically control the climbing formwork based on the comparison results, reducing manual intervention and improving the automation level of construction; based on the comparison results, the intelligent control module 12 can automatically generate corresponding instructions to adjust the operation of the electric hoist 22 to ensure that the formwork climbing process is smooth and safe. This instant feedback mechanism greatly improves the response speed and flexibility of the system. Through real-time monitoring and intelligent comparison, the system can promptly discover potential safety issues and take measures to improve the safety of construction.

[0044] In an optional embodiment, the data calculation unit 123 is also used to calculate the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module 12 is also used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes a first instruction, and the first instruction is used to instruct the climbing formwork to lift a preset height. The first set of data also includes acceleration data, and the control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is obtained by detection by the acceleration sensor.

[0045] In the above embodiment, the acceleration sensor detects the acceleration data of the climbing formwork in real time, and these data are transmitted to the data calculation unit of the intelligent control module 12. The data calculation unit 123 calculates the actual lifting distance of the climbing formwork based on the acceleration data, thereby ensuring the precise control of the lifting process; the intelligent control module 12 compares the calculated lifting distance with the first instruction in the external instruction to determine whether the climbing formwork has reached the preset height. If the actual lifting distance is consistent with the preset height, the intelligent control module 12 will stop sending the lifting signal to the electric hoist 22 to avoid the safety risk caused by over-lifting; by accurately controlling the lifting distance of the climbing formwork, manual intervention can be effectively reduced, the construction difficulty and labor intensity can be reduced, and the construction efficiency can be improved. At the same time, this automated control method reduces the influence of human factors and improves the safety and reliability of construction.

[0046] In this embodiment, the acceleration data detected by the acceleration sensor is used, and the data calculation unit 123 can calculate the lifting distance of the climbing formwork, and compare it with the first instruction to automatically determine whether the formwork is lifted in place. The first instruction is used to lift the climbing formwork to a preset height, for example, the preset height is a layer height, such as 3m (or 4m, or other heights); by using the acceleration sensor to obtain acceleration information and calculate the actual lifting distance, the position of the formwork can be accurately controlled to ensure that it moves to the position accurately according to the predetermined height; the automatic in-place judgment reduces the dependence on manual inspection, reduces labor intensity, and improves construction efficiency; by accurately controlling the lifting of the formwork, the safety risks caused by insufficient lifting or excessive lifting are reduced. In practical applications, the above-mentioned acceleration sensors can also be installed at the four corners of the lower formwork.

[0047] In an optional embodiment, the intelligent control module 12 is also used to perform one of the following operations: when it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module 12 controls the electric hoist 22 to engage the brake to stop lifting the climbing formwork, and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to the first preset value; the horizontality data is greater than or equal to the second preset value; the structural strain data is greater than or equal to the third preset value; a group of preset values ​​includes a first preset value, a second preset value and a third preset value; when it is determined that the climbing formwork has been lifted into place, the intelligent control module 12 stops sending a lifting signal to the electric hoist 22.

[0048] In the above embodiment, the intelligent control module 12 can monitor the force data, levelness data and structural strain data of the climbing formwork in real time, and compare them with the corresponding preset values ​​in a set of preset values. When any data is detected to exceed the preset value, the intelligent control module 12 will immediately control the electric hoist 22 to brake, stop lifting the climbing formwork, and issue a first alarm message, thereby effectively preventing accidents caused by overload, tilt or deformation, and improving construction safety. At the same time, when it is determined that the climbing formwork has been lifted into place, the intelligent control module 12 will automatically stop sending the lifting signal to the electric hoist 22 to ensure accurate control of the climbing process and avoid the risks caused by excessive lifting.

[0049] In this embodiment, the intelligent control module 12 can immediately control the electric hoist 22 to stop lifting and issue a first alarm message when it detects that the force, levelness or structural strain data exceeds the corresponding preset value, thereby improving the response speed and safety to abnormal conditions; for example, the first preset value is 1.1 times (or other multiples) the weight of the climbing formwork, the second preset value is 5‰ (or other values), and the third preset value is 50mm (or other values). And the intelligent control module 12 determines whether the formwork is lifted in place and stops sending the lifting signal, thereby improving the accuracy of the formwork lifting operation and avoiding the problem of over-lifting or under-lifting; the automated abnormal detection and response reduces the need for manual continuous monitoring, reduces labor intensity, and improves construction efficiency; the automated abnormal detection and response reduces the need for manual continuous monitoring, reduces labor intensity, and improves construction efficiency. The lifting signal in this embodiment can be understood as an enable signal for the electric hoist 22. In actual applications, the intelligent control module 12 can send a lifting signal to the electric hoist 22 through the data interaction unit 122, or stop sending a lifting signal to the electric hoist 22.

[0050] In an optional embodiment, the upper end of the force sensor 21 is connected to the elevator shaft building structure, the lower end of the force sensor 21 is connected to the first suspension point of the electric hoist 22, and the second suspension point of the electric hoist 22 is connected to the climbing formwork.

[0051] In the above embodiment, the upper end of the force sensor 21 is connected to the elevator shaft building structure, and the lower end is connected to the first suspension point of the electric hoist 22, which can accurately detect the force of the electric hoist 22 during the hoisting process; at the same time, the second suspension point of the electric hoist 22 is connected to the climbing formwork, so that the electric hoist 22 can effectively hoist the climbing formwork, improving the climbing efficiency and reliability. This connection method not only simplifies the installation process, but also effectively prevents safety hazards such as unhooking during the hoisting process, thereby significantly improving the safety performance of the entire climbing formwork system.

[0052] This embodiment connects the upper end of the force sensor 21 to the elevator shaft building structure, the lower end to the first suspension point of the electric hoist 22, and the second suspension point of the electric hoist 22 to the climbing formwork, so that the stress condition of the formwork during the climbing process can be more accurately monitored, thereby improving the accuracy of force monitoring; accurate force data can be transmitted to the main control cabinet 1, so that the control system can adjust the working state of the electric hoist 22 in time according to the real-time force data, thereby enhancing the response capability of the control system; through accurate force monitoring and timely control response, safety accidents caused by abnormal force can be effectively prevented, thereby improving the safety of construction. Through precise control of the stress condition, the stability and accuracy of the formwork during climbing can be ensured, thereby improving the quality of the entire construction project.

[0053] The present application provides a control method for an elevator shaft climbing formwork, which is applied to a control system of an elevator shaft climbing formwork in any of the aforementioned embodiments, such as Figure 8 As shown, Figure 8 This is a flow chart of a control method for an elevator shaft climbing formwork provided in an embodiment of the present application, and the process includes: Step S801, the main control cabinet 1 sends a lifting signal to the electric hoist 22 to start the electric hoist 22 to lift the climbing formwork; Step S802, the main control cabinet 1 obtains a first set of data, wherein the first set of data includes data generated by the control system of the climbing formwork during operation, and the first set of data includes force data, levelness data and structural strain data; Step S803: the main control cabinet 1 controls the climbing formwork based on the first set of data.

[0054] Through the above steps, the main control cabinet 1 sends a lifting signal to the electric hoist 22, and starts the electric hoist 22 to lift the climbing formwork; the main control cabinet 1 obtains the first set of data in real time, including force data, level data and structural strain data, which can fully reflect the force, level and structural deformation of the climbing formwork during the climbing process, and provide accurate data support for subsequent control decisions; based on the first set of data, the climbing formwork is controlled, and the climbing parameters can be adjusted in time to avoid problems such as overload, tilt and structural damage, thereby improving the safety and reliability of construction. The main control cabinet 1 comprehensively controls the climbing formwork based on the comprehensive analysis of data from multiple sensors, effectively preventing potential safety hazards and improving construction quality. The automation and intelligence of formwork climbing are realized, which significantly improves the safety and efficiency of construction, reduces the impact of human factors, and reduces the risk of accidents.

[0055] By sending a lifting signal to the electric hoist 22 through the main control cabinet 1, and obtaining the first set of data including force data, level data and structural strain data in real time, the formwork can be precisely controlled. This helps to ensure that the formwork maintains the correct position and posture during climbing or working, and improves the construction quality and safety. In this embodiment, the electric hoist 22 and the force sensor 21 are used in conjunction to automatically hoist the formwork, reduce manual operation, and reduce the risk of safety accidents caused by operational errors. The force sensor 21 detects the force data of the electric hoist 22, and the level ruler 4 and the displacement sensor 5 monitor the level and structural strain data of the lower layer of the formwork respectively. These data are transmitted to the main control cabinet 1 for real-time adjustment and control of the climbing of the formwork, thereby improving construction safety, efficiency and intelligence. The automated control system reduces dependence on manpower, improves work efficiency, and reduces the workload of operators.

[0056] In an optional embodiment, the main control cabinet 1 controls the climbing formwork based on the first set of data, including: the data calculation unit 123 compares each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the main control cabinet 1 includes an intelligent control module 12, the intelligent control module 12 includes a data interaction unit 122, a data storage unit 121 and a data calculation unit 123, the data interaction unit 122 is used to obtain the first set of data in real time, and store the first set of data in the data storage unit 121; when it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module 12 controls the electric hoist 22 to brake to stop lifting the climbing formwork, and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to the first preset value; the horizontality data is greater than or equal to the second preset value; the structural strain data is greater than or equal to the third preset value; a set of preset values ​​includes a first preset value, a second preset value and a third preset value.

[0057] In the above embodiment, the force data, horizontality data and structural strain data are monitored and compared in real time through the intelligent control module 12. When these data exceed the corresponding preset values, the system will automatically control the electric hoist 22 to engage the brake, stop lifting the climbing formwork, and issue a first alarm message, thereby effectively preventing accidents caused by overload, tilt or structural deformation, and significantly improving the safety of the construction process; the intelligent control module 12 ensures that the climbing formwork is always in a safe state during the lifting process through real-time monitoring and processing of various data, avoiding the uncertainty of traditional manual operation and improving construction quality and efficiency; the automated control system reduces dependence on on-site management personnel and operating workers, reduces labor intensity, improves the working environment, and reduces errors and safety hazards caused by human factors; the monitoring data is transmitted to an external monitoring device in real time through the wireless communication module 14, realizing remote monitoring and management, which helps to timely discover and deal with potential problems and ensure construction progress and quality.

[0058] In this embodiment, the data calculation unit 123 compares the real-time collected data with the preset safety threshold (i.e., the corresponding preset value), and the system can automatically identify any abnormal situation beyond the safety range, thereby improving the timeliness and accuracy of abnormality detection; once an abnormality is detected, the intelligent control module 12 can immediately control the electric hoist 22 to stop lifting the mold frame, and issue an alarm message to notify relevant personnel, greatly shortening the time interval from discovering the problem to taking measures; the automated abnormality detection and rapid response mechanism reduce the impact of human factors, improve the reliability and stability of the system, and help prevent and reduce the occurrence of construction accidents.

[0059] In an optional embodiment, the main control cabinet 1 also includes a wireless communication module 14, a bus 13 and a mobile power supply 11. The wireless communication module 14 is electrically connected to the intelligent control module 12 through the bus 13. The mobile power supply 11 is used to provide power to the control system of the climbing formwork. The wireless communication module 14 is used to send a first set of data to an external monitoring device and receive an external instruction sent by the external monitoring device, and send the external instruction to the intelligent control module 12; the above method also includes: the data calculation unit 123 calculates the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module 12 is also used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes a first instruction, and the first instruction is used to instruct the climbing formwork to lift a preset height. The first set of data also includes acceleration data. The control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is detected by the acceleration sensor; when it is determined that the climbing formwork has been lifted into place, the intelligent control module 12 stops sending a lifting signal to the electric hoist 22.

[0060] In the above embodiment, the wireless communication module 14 is electrically connected to the intelligent control module 12 through the bus 13, and can realize data exchange with the external monitoring device, ensuring that the system can operate normally without human intervention, thereby improving the reliability and maintainability of the system; the mobile power supply 11 provides a stable power supply for the entire control system, avoiding system failures caused by power outages, and enhancing the stability and continuous operation capability of the system; the acceleration data detected by the acceleration sensor is used by the data calculation unit 123 to calculate the lifting distance of the climbing formwork, and the intelligent control module 12 compares the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place. This function ensures accurate control of the climbing process, reduces human errors, and improves construction quality and safety. When the climbing formwork is lifted into place, the intelligent control module 12 will stop sending a lifting signal to the electric hoist 22, thereby avoiding the risks caused by excessive lifting and protecting the safety of equipment and personnel.

[0061] This embodiment can realize data exchange between the formwork control system and the external monitoring device through the application of the wireless communication module 14 and the bus 13, thereby improving the remote monitoring and control capabilities; through the acceleration data obtained by the acceleration sensor, the data calculation unit 123 can calculate the lifting distance of the climbing formwork and compare it with the first instruction. The first instruction is used to instruct the climbing formwork to be lifted to a preset height. For example, the preset height is a layer height, such as 3m (or 4m, or other heights), and automatically judge whether the formwork is lifted into place, thereby improving the automation and accuracy of the lifting operation; when it is judged that the climbing formwork has been lifted into place, the intelligent control module 12 stops sending the lifting signal to the electric hoist 22, thereby reducing the dependence on manual intervention, improving the automation level and work efficiency of the system, effectively avoiding the safety risks caused by excessive lifting, and enhancing the safety of construction.

[0062] In an optional embodiment, the method further includes: upon receiving the second instruction, the intelligent control module 12 sends a forced brake signal to the electric hoist 22 to place the climbing formwork in a stationary state, wherein the external instruction includes the second instruction; the data interaction unit 122 acquires a second set of data in real time, wherein the second set of data includes force data of the electric hoist 22 in a stationary state, horizontality data of the lower formwork in a stationary state, and structural strain data of the lower formwork in a stationary state; the data calculation unit 123 calculates the change rate of each data in the second set of data to obtain a set of change rates; when a set of change rates meets the second preset condition, the intelligent control module 12 A second alarm message is issued, wherein the second alarm message is used to indicate that the static state of the climbing formwork is abnormal, and the second preset condition includes at least one of the following: a first change rate is greater than a first preset threshold value, wherein the first change rate is used to indicate the change rate of the force data of the electric hoist in a static state, and a group of change rates includes the first change rate; a second change rate is greater than a second preset threshold value, wherein the second change rate is used to indicate the change rate of the horizontality data of the lower formwork in a static state, and a group of change rates includes the second change rate; a third change rate is greater than the second preset threshold value, wherein the third change rate is used to indicate the change rate of the structural strain data of the lower formwork in a static state, and a group of change rates includes the third change rate.

[0063] In the above embodiment, upon receiving the second instruction, the intelligent control module 12 sends a forced brake signal to the electric hoist 22, so that the climbing formwork enters a static state, ensuring the safety and stability of the formwork during non-working hours; the data interaction unit 122 obtains the force data of the electric hoist 22 in a static state, the horizontality data of the lower formwork, and the structural strain data of the lower formwork in real time. The real-time monitoring of these data can timely discover the potential risks of the formwork in a static state; the data calculation unit 123 calculates the change rate of the above data, and by comparing it with the corresponding preset threshold, it can identify whether the formwork has an abnormality at the first time; when the change rate exceeds the corresponding preset threshold, the intelligent control module 12 will issue a second alarm message to remind relevant personnel to pay attention to the abnormal static state of the formwork, so as to take timely measures to avoid accidents, thereby improving the safety and reliability of the entire construction process. This embodiment can achieve the purpose of all-round monitoring of the climbing formwork in a static state.

[0064] When receiving the second instruction, the intelligent control module 12 sends a forced brake signal to the electric hoist 22, so that the climbing formwork is quickly in a static state, which enhances the response capability in an emergency; the data interaction unit 122 can obtain the second set of data in the static state in real time, including force data, horizontality data and structural strain data, which improves the data monitoring capability in the static state; the data calculation unit 123 calculates the change rate of the second set of data, and issues a second alarm message when the change rate meets the second preset condition, thereby realizing an early warning of abnormal static state of the formwork. This embodiment can prevent and reduce safety accidents caused by abnormal changes in the static state and improve construction safety by monitoring the data change rate in the static state and issuing an alarm in time; by monitoring and alarming the data in the static state, problems that require maintenance or overhaul can be identified more quickly, and the maintenance and overhaul process can be optimized.

[0065] It should be noted that the above-described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The present application will be described in detail below in conjunction with specific embodiments.

[0066] The present application embodiment provides a control system and method for an elevator shaft climbing formwork. Figure 2-Figure 7 as well as Figure 9-10 The embodiments of the present application are described in detail.

[0067] A control system for an elevator shaft climbing formwork, installed on Figure 2 The formwork shown in the figure is climbing in the elevator shaft, which is characterized by comprising a main control cabinet 1, an electric hoist 2 with a force sensor, a remote control cabinet 3, a level 4 and a displacement sensor 5; wherein the electric hoist 2 with a force sensor, the remote control cabinet 3, the level 4 and the displacement sensor 5 are positioned in the formwork as shown in FIG. Figure 3-Figure 4 As shown. Combined Figure 5 It can be seen that the connection relationship between the various parts in the control system of the climbing formwork is clear.

[0068] The main control cabinet 1 is installed on the upper layer of the formwork and is used to accommodate the core control module of the control system of the elevator shaft climbing formwork. The main control cabinet 1 specifically includes: Mobile power supply 11, intelligent control module 12, bus 13 and wireless communication module 14; Figure 6 As shown; Specifically, the mobile power supply 11 is installed in the main control cabinet 1 to provide power for the entire system; Specifically, the intelligent control module 12 is installed in the main control cabinet 1 and is used to collect, store and calculate the data generated during the operation of the system. The intelligent control module 12 specifically includes: The data interaction unit 122, the data storage unit 121 and the data calculation unit 123; Figure 7 As shown; Specifically, the bus 13 is installed in the main control cabinet 1 and is used to connect the intelligent control module 12 and the wireless communication module 14 to achieve real-time communication between the two; Specifically, the wireless communication module 14 is installed in the main control cabinet 1 and is used to send and receive operating instructions and data inside and outside the system.

[0069] In an optional embodiment, the wireless communication module 14 has the function of receiving satellite timing positioning, and can accurately record the time and the position of each measuring point; The electric hoist 2 with force sensor is installed on the upper layer of the mold frame, specifically including: Force sensor 21 and electric hoist 22; Figure 2-Figure 3 shown.

[0070] Specifically, the upper end of the force sensor 21 is connected to the elevator shaft building structure, and the lower end is connected to the hanging point of the electric hoist 22, which is used to detect the force of the electric hoist 22 and output an electrical signal describing the magnitude of the force to the main control cabinet 1; Specifically, the upper end of the electric hoist 22 is connected to the force sensor 21, and the lower end is connected to the lower mold frame lifting point. By receiving the control signal of the main control cabinet 1, the mold frame is hoisted during the climbing process of the mold frame.

[0071] The remote control cabinet 3 is installed at the lower layer of the mold frame, and is used to receive the electric energy and control signal of the main control cabinet 1, transmit it to the level ruler 4 and displacement sensor 5 which are also installed at the lower layer of the mold frame, and feed back the electric signals of these devices to the main control cabinet 1; Level ruler 4, used to measure the change of the inclination of the lower mold frame; The displacement sensor 5 is used to measure the structural strain of the lower mold frame, especially the position near the lifting point of the electric hoist 22.

[0072] In an optional embodiment, four levels 4 and four displacement sensors 5 may be provided and installed at four corners of the lower mold frame, respectively, to ensure the effectiveness of the measurement.

[0073] Specifically, for ease of installation, each level ruler 4 is provided with a mounting mechanism capable of correcting the horizontality; Specifically, the measurement accuracy of the level ruler 4 should be no less than 1‰; Specifically, the measurement accuracy of the displacement sensor 5 should be no less than 0.1 mm.

[0074] The technical solution of the present invention also includes: A control method for lifting an elevator shaft climbing formwork frame in a shaft is applied to a control system of an elevator shaft climbing formwork frame.

[0075] Fig. 9 This is a flow chart of a control method for lifting a climbing formwork frame of an elevator shaft in an elevator shaft provided by an embodiment of the present application. The control method for lifting a climbing formwork frame (also referred to as a formwork frame or a climbing frame) in an elevator shaft specifically includes: Step S1: the main control cabinet 1 sends a lifting signal to the electric hoist 22, and starts the electric hoist 22 to lift the climbing frame; Step S2: the data exchange unit 122 reads the detection data of the force sensor 21, the level 4 and the displacement sensor 5 in real time, and stores the data in the data storage unit 121; Step S3: the data calculation unit 123 compares the detection data to determine whether the data of the level ruler 4 exceeds 5‰, whether the data of the displacement sensor 5 exceeds 50mm, and whether the data of the force sensor 21 exceeds 1.1 times the weight of the mold frame; If yes, execute step S4; If not, execute step S5; Step S4: the main control cabinet 1 controls the electric hoist 22 to brake, and issues an alarm for abnormal mold frame climbing state (corresponding to the aforementioned first alarm information); Step S5: the data calculation unit 123 compares the external instruction and whether the integral value of the mold frame acceleration and time exceeds one layer height (corresponding to the aforementioned preset height), and determines whether the climbing frame is lifted into place; If not, continue to step S1; If so, the main control cabinet 1 stops sending the lifting signal to the electric hoist 22 and ends the program.

[0076] In an optional embodiment, the control method for lifting the formwork in the elevator shaft also includes a control method for keeping the formwork stationary in the elevator shaft. Fig.10 Schematic diagram of a control method for keeping a climbing formwork frame of an elevator shaft stationary in an elevator shaft provided in an embodiment of the present application, specifically comprising: Step SS1: the main control cabinet 1 controls the electric hoist 22 to force the brake to keep the climbing frame stationary; Step SS2: the data exchange unit 122 reads the detection data of the force sensor 21, the level 4 and the displacement sensor 5 in real time, and stores the data in the data storage unit 121; Step SS3: the data calculation unit 123 calculates the derivative of the detection data of the force sensor 21, the level 4 and the displacement sensor 5 with respect to time, obtains the change rate of the sensor data (corresponding to the aforementioned set of change rates), and determines whether the change rate exceeds the safety threshold; If yes, go to step SS4; If not, go to step SS5; Step SS4: the main control cabinet 1 issues an abnormal alarm of the mold frame static state (corresponding to the aforementioned second alarm information); Step SS5: the data calculation unit 123 identifies the external instruction and determines whether the mold frame continues to remain stationary; If yes, go to step SS1; If not, the main control cabinet 1 cancels the forced brake control on the electric hoist 22 and ends the program.

[0077] The above description is only a preferred embodiment of the present invention, and does not limit the implementation mode and protection scope of the present invention. Those skilled in the art should be able to realize that all solutions obtained by equivalent substitution and obvious changes made by using the description and illustrations of the present invention should be included in the protection scope of the present invention.

[0078] The embodiments of the present application have at least the following technical effects: a mobile power supply is used for power supply, and there is no need to connect a power cord, thereby avoiding the problem that the power cord easily interferes with the building structure during the climbing of the formwork in the elevator shaft; a force sensor is used to perform digital control of the electric hoist, thereby improving the accuracy of the lifting operation; a level and a displacement sensor are used to monitor the lower layer of the formwork, thereby avoiding monitoring blind spots for operators on the upper layer of the formwork, ensuring construction safety, and at the same time providing a comparison basis for the detection data of the force sensor to ensure the accuracy of the detection data.

[0079] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0080] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0081] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification, those skilled in the art will easily think of other embodiments of the present disclosure.

[0082] This application is intended to cover any modifications, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary technical means in the technical field not recorded in the present disclosure.

Claims

1. A control system for an elevator shaft climbing formwork, characterized in that: include: Main control cabinet, force sensor, electric hoist, remote control cabinet, level and displacement sensor, among which, The main control cabinet is installed on the upper formwork, and the main control cabinet is used to accommodate the control module of the control system of the climbing formwork, and the climbing formwork includes the upper formwork; The electric hoist is installed on the upper formwork, the electric hoist is electrically connected to the main control cabinet, and the electric hoist is used to receive the first control signal of the main control cabinet and hoist the climbing formwork during the climbing process of the climbing formwork; The force sensor is connected to the electric hoist, and is used to detect the force data of the electric hoist and transmit the force data to the main control cabinet; The remote control cabinet is installed in the lower mold frame, the remote control cabinet is electrically connected to the main control cabinet, the remote control cabinet is used to receive the second control signal of the main control cabinet, and the climbing mold frame also includes the lower mold frame; The level ruler is installed in the lower mold frame, and the level ruler is used to monitor the levelness data of the lower mold frame. The displacement sensor is installed in the lower mold frame, and the displacement sensor is used to detect the structural strain data of the lower mold frame. The level ruler and the displacement sensor are electrically connected to the remote control cabinet respectively, and the remote control cabinet is used to control the level ruler to detect the level data and control the displacement sensor to detect the structural strain data based on the second control signal, and the remote control cabinet is also used to transmit the level data and the structural strain data to the main control cabinet; The main control cabinet is used to control the climbing formwork based on the force data, the horizontality data and the structural strain data.

2. The control system of the elevator shaft climbing formwork according to claim 1 is characterized in that: The main control cabinet includes: a mobile power supply, an intelligent control module, a bus and a wireless communication module, wherein: The mobile power supply, the intelligent control module, the bus and the wireless communication module are all installed in the main control cabinet; The mobile power supply is used to provide power to the control system of the climbing formwork; The intelligent control module is used to collect and store a first set of data generated by the control system of the climbing formwork during operation, wherein the first set of data includes the force data, the levelness data and the structural strain data; The wireless communication module is electrically connected to the intelligent control module through the bus. The wireless communication module is used to send the first set of data to an external monitoring device and receive external instructions sent by the external monitoring device, and send the external instructions to the intelligent control module, so that the intelligent control module controls the control system of the climbing formwork based on the external instructions.

3. The control system of the elevator shaft climbing formwork according to claim 2 is characterized in that: The intelligent control module includes: a data interaction unit, a data storage unit and a data calculation unit, wherein: The data interaction unit is used to obtain the first set of data in real time and store the first set of data in the data storage unit; The data calculation unit is used to compare each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the intelligent control module is used to control the climbing formwork based on the comparison result.

4. The control system of the elevator shaft climbing formwork according to claim 3 is characterized in that: The data calculation unit is also used to calculate the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module is also used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes the first instruction, and the first instruction is used to instruct to lift the climbing formwork to a preset height. The first set of data also includes the acceleration data, and the control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is detected by the acceleration sensor.

5. The control system of the elevator shaft climbing formwork according to claim 4 is characterized in that: The intelligent control module is also used to perform one of the following operations: In the case where it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module controls the electric hoist brake to stop lifting the climbing formwork and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to a first preset value; the levelness data is greater than or equal to a second preset value; the structural strain data is greater than or equal to a third preset value; the set of preset values ​​includes the first preset value, the second preset value and the third preset value; When it is determined that the climbing formwork has been lifted into place, the intelligent control module stops sending a lifting signal to the electric hoist.

6. The control system of the elevator shaft climbing formwork according to claim 1 is characterized in that: The upper end of the force sensor is connected to the elevator shaft building structure, the lower end of the force sensor is connected to the first hanging point of the electric hoist, and the second hanging point of the electric hoist is connected to the climbing formwork.

7. A control method for an elevator shaft climbing formwork, characterized in that: The control system for the elevator shaft climbing formwork used in any one of claims 1 to 6 comprises: The main control cabinet sends a lifting signal to the electric hoist to start the electric hoist to lift the climbing formwork; The main control cabinet acquires a first set of data, wherein the first set of data includes data generated by the control system of the climbing formwork during operation, and the first set of data includes the force data, the levelness data and the structural strain data; The main control cabinet controls the climbing formwork based on the first set of data.

8. The control method of the elevator shaft climbing formwork according to claim 7 is characterized in that: The main control cabinet controls the climbing formwork based on the first set of data, including: The data calculation unit compares each data in the first set of data with each corresponding preset value in a set of preset values ​​to obtain a comparison result, wherein the main control cabinet includes an intelligent control module, the intelligent control module includes a data interaction unit, a data storage unit and the data calculation unit, the data interaction unit is used to obtain the first set of data in real time, and store the first set of data in the data storage unit; When it is determined based on the comparison result that the first set of data meets the first preset condition, the intelligent control module controls the electric hoist brake to stop lifting the climbing formwork and issues a first alarm message, wherein the first alarm message is used to indicate that the climbing state of the climbing formwork is abnormal, and the first preset condition includes at least one of the following: the force data is greater than or equal to the first preset value; the horizontality data is greater than or equal to the second preset value; the structural strain data is greater than or equal to the third preset value; the group of preset values ​​includes the first preset value, the second preset value and the third preset value.

9. The control method of the elevator shaft climbing formwork according to claim 8 is characterized in that: The main control cabinet further includes a wireless communication module, a bus and a mobile power supply. The wireless communication module is electrically connected to the intelligent control module via the bus. The mobile power supply is used to provide power to the control system of the climbing formwork. The wireless communication module is used to send the first set of data to an external monitoring device and receive external instructions sent by the external monitoring device, and send the external instructions to the intelligent control module. The method further comprises: The data calculation unit calculates the lifting distance of the climbing formwork based on the acceleration data, and the intelligent control module is further used to compare the lifting distance with the first instruction to determine whether the climbing formwork is lifted into place, wherein the external instruction includes the first instruction, and the first instruction is used to instruct to lift the climbing formwork to a preset height, and the first set of data also includes the acceleration data, and the control system of the elevator shaft climbing formwork also includes an acceleration sensor, and the acceleration data is detected by the acceleration sensor; When it is determined that the climbing formwork has been lifted into place, the intelligent control module stops sending the lifting signal to the electric hoist.

10. The control method of the elevator shaft climbing formwork according to claim 9, characterized in that: The method further comprises: When receiving a second instruction, the intelligent control module sends a forced brake signal to the electric hoist to put the climbing formwork in a stationary state, wherein the external instruction includes the second instruction; The data interaction unit acquires a second set of data in real time, wherein the second set of data includes force data of the electric hoist in a stationary state, horizontality data of the lower mold frame in a stationary state, and structural strain data of the lower mold frame in a stationary state; The data calculation unit calculates the change rate of each data in the second group of data to obtain a group of change rates; When the set of change rates meets the second preset condition, the intelligent control module issues a second alarm message, wherein the second alarm message is used to indicate that the static state of the climbing formwork is abnormal, and the second preset condition includes at least one of the following: A first change rate is greater than a first preset threshold, wherein the first change rate is used to represent a change rate of the force data of the electric hoist in a stationary state, and the set of change rates includes the first change rate; The second change rate is greater than a second preset threshold, wherein the second change rate is used to represent the change rate of the horizontality data of the lower mold frame in a static state, and the set of change rates includes the second change rate; The third change rate is greater than the second preset threshold, wherein the third change rate is used to represent the change rate of the structural strain data of the lower mold frame in a static state, and the set of change rates includes the third change rate.