Artificial false bottom structure and mining method

By introducing artificial fake bottom structures of walking mechanisms, telescopic mechanisms and top support mechanisms in the filling method layered artificial fake bottom mining technology, the problem of the need to reserve tunnels during filling affects production efficiency, and efficient mining operations and resource utilization are achieved.

CN119686740APending Publication Date: 2025-03-25HAMI HEXIN MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510144082.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-10
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

The existing filling method layered artificial fake bottom mining technology needs to reserve tunnels when filling the mines, resulting in the impact of production efficiency.

Method used

An artificial fake bottom structure is proposed, including a walking mechanism, a telescopic mechanism and a top support mechanism, which can walk and fill along the formed tunnel, avoiding the need to reserve the tunnel.

Benefits of technology

Through this artificial fake bottom structure and mining method, the mining operation in the mine can be achieved without affecting the stability of the tunnel, improving production efficiency and reducing resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686740A_ABST
    Figure CN119686740A_ABST
Patent Text Reader

Abstract

The invention discloses an artificial false bottom structure and a mining method, and relates to the technical field of mining, by arranging a walking mechanism, a telescopic mechanism and a top supporting mechanism, the arranged walking mechanism can walk along a formed roadway, the walking mechanism can make contact with the bottom of the formed roadway, the telescopic mechanism is installed on the top of the walking mechanism, and the top supporting mechanism is installed on the top of the telescopic mechanism. The top supporting mechanism is installed on the top of the telescopic mechanism, the telescopic mechanism can drive the top supporting mechanism to ascend and descend, and the top supporting mechanism can support the top of the formed roadway so that operators can be protected when stoping operation is conducted on the to-be-stoped ore columns in the formed roadway in sequence, and during walking, the telescopic mechanism can be driven by the telescopic mechanism to ascend and descend. And the filling material is used for filling the area where the stoping operation is completed, so that when the mining area is subjected to the stoping operation, the stoping operation does not need to be carried out after the formed roadway is filled with the filling material. The safety of the device is improved, and meanwhile the production efficiency is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining, and in particular to an artificial false bottom structure and a mining method. Background Art

[0003] With the development of underground mining technology in metal mines, the filling method layered artificial false bottom mining technology came into being, aiming to solve the problem of high ore loss rate in traditional open-pit mining. Under this technical path, the ground pressure is controlled by leaving top and bottom pillars to ensure the safety of mining operations. Especially in mines with open-pit mining, due to the need to leave a large number of pillars, the ore loss rate is large, and high-grade pillars have not been effectively developed, resulting in a waste of mineral resources. The development of this technology aims to improve resource utilization and reduce ore loss to meet the requirements of sustainable development.

[0004] At present, the filling method of layered artificial false bottom mining technology has become an important method in underground mining of metal mines. This technology reduces the loss of ore by reserving an artificial false bottom in the cutting space to replace the traditional pillar support. However, in the existing technology, if an artificial false bottom needs to be reserved, it is usually necessary to prefabricate reinforced concrete structures in the cutting space. This process not only consumes a large amount of steel, cement and labor, but also requires long-term maintenance after prefabrication to ensure that the strength of the reinforced concrete meets the standards. This traditional method of making artificial false bottoms has a huge waste of resources and labor, and also affects the efficiency of mining.

[0005] In the prior art, when using the filling method to carry out mining operations with a layered artificial false bottom mining technology, the traditional reinforced concrete artificial false bottom is filled in the mining channel of the stope, and it is completely filled in the tunnel where the ore excavation has been completed. In this way, although the purpose of mining can be achieved by filling the tunnel, in the actual operation process, if the tunnel is completely filled, the mining cannot be fully realized. If the excavated tunnel is reserved during the filling process, the stability of the tunnel will be affected. It can be seen that the filling method in the prior art affects the production efficiency of the mine because of the need to reserve the tunnel when filling the tunnel in the mine. Summary of the invention

[0007] The main purpose of the present invention is to propose an artificial false bottom structure and a mining method, aiming to solve the technical problem that when the filling method in the prior art is used to fill the tunnels in the mine, the production efficiency of the mine is affected due to the need to reserve tunnels.

[0008] To achieve the above objectives, in a first aspect, the present invention provides an artificial false bottom structure, comprising: A walking mechanism, the bottom of which can walk along the formed lane, and the walking mechanism can collide with the bottom of the formed lane; a telescopic mechanism, the telescopic mechanism being mounted on the top of the walking mechanism; and, A top support mechanism, the top support mechanism is installed on the top of the telescopic mechanism, the telescopic mechanism can drive the top support mechanism to rise and fall, and the top support mechanism can be supported on the top of the formed tunnel to protect the workers when the mining column to be mined on one side of the formed tunnel is mined; The walking mechanism can drive the telescopic mechanism and the top supporting mechanism to walk along the formed tunnel when the workers dig out the mining pillars to be mined on both sides of the artificial false bottom structure, and fill the area where the mining operation is completed with filling materials while walking.

[0009] In one embodiment, the walking mechanism comprises: A base, the telescopic mechanism is installed on the top of the base; A walking assembly, wherein the walking assembly is installed at the bottom of the base, and the walking assembly can drive the base to walk along the formed tunnel to a side of the mining column to be mined; and The adsorption component is installed on the side wall of the base, and the adsorption component can be adsorbed on the side wall of the mining column to be recovered.

[0010] In one embodiment, the base is arranged along the extension direction of the formed lane, and the walking assembly includes: A guide rail, the guide rail being arranged at the bottom of the base along the extension direction of the formed lane; A sliding drive member, wherein the sliding drive member is in sliding cooperation with the guide rail, and the sliding drive member can slide on the guide rail along the extension direction of the lane; A walking member is installed on a side of the sliding drive member away from the base, and the walking member can approach or move away from the bottom plate of the formed lane to cooperate with the sliding drive member and drive the base to move.

[0011] In one embodiment, the walking member comprises: A connecting rod, wherein two ends of the connecting rod are respectively a free end and a hinged end, the hinged end is rotationally matched with the bottom of the sliding drive member, and the free end extends out of the sliding drive member along the extension direction of the formed lane; a first telescopic drive member, the first telescopic drive member is mounted on the bottom of the sliding drive member, and the telescopic end of the first telescopic drive member is connected to the position of the connecting rod near the free end, and the first telescopic drive member can drive the connecting rod around the hinged end to make the free end close to or away from the bottom plate of the formed tunnel; and A walking block is installed at the free end, and the walking block can walk along the extension direction of the lane when the free end is close to the bottom plate of the formed lane.

[0012] In one embodiment, there are multiple walking members, and the multiple walking members are arranged in pairs to form a walking module. Two of the walking members in the walking module are symmetrically arranged along the extension direction of the formed lane, and the multiple walking modules are spaced apart along the width direction of the formed lane.

[0013] In one embodiment, there are multiple adsorption components, and the multiple adsorption components are distributed at intervals along the circumferential direction on the outer periphery of the base, and each of the adsorption components can be adsorbed on the mining column to be recovered on the corresponding side.

[0014] In one embodiment, the adsorption component comprises: a second telescopic driving member, the second telescopic driving member being mounted on a side wall of the base, and a telescopic end of the second telescopic driving member extending in a direction away from the base; and; An adsorption member, the adsorption member being mounted on the telescopic end of the second telescopic driving member; The second telescopic driving member can drive the adsorption member to approach and adsorb the adsorption member to the mining column to be recovered on the corresponding side.

[0015] In one embodiment, there are multiple telescopic mechanisms, and the multiple telescopic mechanisms are distributed at intervals on the top of the base, and each of the telescopic mechanisms is arranged close to the edge of the base; The telescopic mechanism comprises: a third telescopic driving member, the third telescopic driving member being mounted on the base and telescopic along an extension direction of the formed lane; A guide sliding member, the guide sliding member is installed on the top of the base, and a sliding groove is formed on the guide sliding member and is arranged along the extension direction of the formed lane; and A scissors telescopic member, wherein the bottom and the top of the scissors telescopic member each have two hinge positions spaced apart from each other, one of the two hinge positions at the bottom of the scissors telescopic member is in sliding cooperation with the hinge position of the base, and the other one is in sliding cooperation with the sliding groove; One of the two hinged positions on the top of the scissor telescopic member is hinged to the top support mechanism, and the other is slidably matched with the bottom of the top support mechanism.

[0016] In one embodiment, the top support mechanism comprises: A top plate, the top plate being mounted and rotatably connected to the scissor telescopic member; and A plurality of support blocks are distributed at intervals along the circumferential direction at the bottom of the top plate.

[0017] Based on the same technical concept, in a second aspect, the present invention also proposes a mining method, using the artificial false bottom structure described in the first aspect; The mining method comprises the following steps: According to the mining conditions of the mine area to be mined, the distribution data information of the formed tunnels in the mine area to be mined is obtained; wherein the distribution data information includes the quantity information, direction information and distribution size information of the formed tunnels, and a plurality of interval-distributed mining pillars to be mined are formed on both sides of each of the formed tunnels; Determine the mining order of the mining columns to be mined according to the distribution data information; Determine a current mining area from the formed roadway; wherein the current mining area includes the formed roadway and at least one mining pillar to be mined; Controlling the artificial false bottom structure described in the first aspect to move to the current mining area and perform mining operations to obtain a current backfill area; Taking a position adjacent to the current mining area as the current mining area, and controlling the artificial false bottom structure to move to the current mining area; Performing backfilling operation on the current backfilling area; According to the mining area, the steps of determining a current mining area from the formed tunnels to controlling the movement of the artificial false bottom structure described in the first aspect to backfill the current backfill area are repeatedly executed until all the formed tunnels are traversed and mining is completed.

[0018] The technical solution of the present invention is to set a walking mechanism, a telescopic mechanism and a top support mechanism. When in use, the walking mechanism can walk along the formed tunnel and the walking mechanism can contact the bottom of the formed tunnel. The telescopic mechanism is installed on the top of the walking mechanism, and the top support mechanism is installed on the top of the telescopic mechanism. The telescopic mechanism can drive the top support mechanism to rise and fall, and the top support mechanism can be supported on the top of the formed tunnel to protect the workers when the formed tunnel is mined in sequence. When the workers dig out the mined pillars on both sides of the artificial false bottom structure, the present invention can use the walking mechanism to drive the telescopic mechanism and the top support mechanism to walk along the formed tunnel. When walking, the area where the mining operation is completed is filled with filling materials. When the present invention performs mining operations on the mining area, there is no need to fill the formed tunnel with filling materials before performing mining operations. At the same time, since the cooperation of the traveling mechanism, telescopic mechanism and top supporting mechanism can realize the protection of the operating personnel, the present invention can utilize the transportation filling body between the top supporting mechanism and the traveling mechanism during specific use, thereby improving the safety of the present invention and ensuring production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0021] Figure 1 A schematic diagram of the structure of the artificial false bottom structure provided by the present invention; Figure 2 for Figure 1 A schematic diagram of the structure of the enlarged portion A of the example; Figure 3 for Figure 1 A schematic diagram of the structure of the walking component of the example; Figure 4 A schematic diagram of the structure of the mining sequence of the present invention; Figure 5 A flow chart of an exemplary mining method of the present invention.

[0022] Description of Figure Numbers: 100, walking mechanism; 200, telescopic mechanism; 300, top supporting mechanism; 110, base; 120, walking assembly; 130, adsorption assembly; 121, guide rail; 122, sliding drive member; 123, walking member; 124, connecting rod; 125, first telescopic drive member; 126, walking block; 131, second telescopic drive member; 132, adsorption member; 210, third telescopic drive member; 220, guide sliding member; 230, scissors telescopic member; 310, top plate; 320, support block; 127, connecting plate; 400, formed tunnel.

[0023] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0027] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0028] The invention provides an artificial false bottom structure and a mining method.

[0029] See also Figures 1 to 5For ease of understanding, the artificial false bottom structure includes a walking mechanism 100, a telescopic mechanism 200 and a top support mechanism 300. The bottom of the walking mechanism 100 can walk along the formed tunnel 400, and the walking mechanism 100 can contact the bottom of the formed tunnel 400. The telescopic mechanism 200 is installed on the top of the walking mechanism 100, and the top support mechanism 300 is installed on the top of the telescopic mechanism 200. The telescopic mechanism 200 can drive the top support mechanism 300 to rise and fall, and the top support mechanism 300 can be supported on the top of the formed tunnel 400 to protect the workers when the mining column to be mined on one side of the formed tunnel 400 is mined; the walking mechanism 100 can drive the telescopic mechanism 200 and the top support mechanism 300 to walk along the formed tunnel 400 when the workers dig out the mining columns to be mined on both sides of the artificial false bottom structure, and when walking, the area where the mining operation is completed is filled with filling materials.

[0030] In this embodiment, by providing a walking mechanism 100, a telescopic mechanism 200 and a top support mechanism 300, when in use, the walking mechanism 100 can walk along the formed tunnel 400, and the walking mechanism 100 can contact the bottom of the formed tunnel 400, the telescopic mechanism 200 is installed on the top of the walking mechanism 100, and the top support mechanism 300 is installed on the top of the telescopic mechanism 200, the telescopic mechanism 200 can drive the top support mechanism 300 to rise and fall, and the top support mechanism 300 can support the bottom of the formed tunnel 400. The top of the formed tunnel 400 is used to protect the workers when the mining columns to be mined are sequentially mined. When the workers dig out the mining columns to be mined on both sides of the artificial false bottom structure, the present invention can use the travel mechanism 100 to drive the telescopic mechanism 200 and the top support mechanism 300 to walk along the formed tunnel 400, and when walking, the filling material is used to fill the area where the mining operation is completed. When the mining operation is carried out in the mining area, the present invention does not need to fill the filling material in the formed tunnel 400 before the mining operation. At the same time, since the cooperation of the travel mechanism 100, the telescopic mechanism 200 and the top support mechanism 300 can realize the protection of the workers, the present invention can use the top support mechanism 300 and the travel mechanism 100 to transport the filling body when it is used, which improves the safety of the present invention and ensures the production efficiency.

[0031] In some specific embodiments, the walking mechanism 100 includes a base 110, a walking component 120 and an adsorption component 130. The telescopic mechanism 200 is installed on the top of the base 110, and the walking component 120 is installed on the bottom of the base 110. The walking component 120 can drive the base 110 to walk along the formed tunnel 400 to the side of the mining column to be recovered, and is installed on the side wall of the base 110, and the adsorption component 130 can be adsorbed on the side wall of the mining column to be recovered.

[0032] In this embodiment, by setting up a base 110, a walking component 120 and an adsorption component 130, when in use, by utilizing the cooperation of the walking component 120 and the adsorption component 130, the present invention can utilize the provided shape component to drive the base 110 to move along the formed tunnel 400, thereby realizing the function of protecting the operating personnel. At the same time, since the walking component 120 can drive the base 110 to move, the present invention can also realize the function of moving the artificial false bottom structure when in use.

[0033] It should be particularly and clearly stated that, in the present embodiment, the exemplary base 110 is arranged along the extension direction of the formed alley 400, and the walking component 120 includes a guide rail 121, a sliding drive member 122 and a walking member 123. The guide rail 121 is arranged at the bottom of the base 110 along the extension direction of the formed alley 400, the sliding drive member 122 is slidably matched with the guide rail 121, and the sliding drive member 122 can slide on the guide rail 121 along the extension direction of the alley, the walking member 123 is installed on the side of the sliding drive member 122 away from the base 110, and the walking member 123 can approach or move away from the bottom plate of the formed alley 400, so as to cooperate with the sliding drive member 122 and drive the base 110 to walk.

[0034] In this embodiment, by providing a guide rail 121, a sliding drive member 122 and a walking member 123, the present invention can utilize the provided sliding drive member 122 to drive the walking member 123 to slide along the guide rail 121 when in use, thereby realizing the function of driving the base 110 to drive the telescopic mechanism 200 and the top support mechanism 300 to move.

[0035] It can be further clarified that the walking member 123 illustrated in the present embodiment includes a connecting rod 124, a first telescopic driving member 125 and a walking block 126, the two ends of the connecting rod 124 are a free end and a hinged end respectively, the hinged end is rotatably matched with the bottom of the sliding driving member 122, the free end extends out of the sliding driving member 122 along the extension direction of the formed tunnel 400, the first telescopic driving member 125 is installed at the bottom of the sliding driving member 122, and the telescopic end of the first telescopic driving member 125 is connected to the position of the connecting rod 124 close to the free end, the first telescopic driving member 125 can drive the connecting rod 124 around the hinged end to make the free end close to or away from the bottom plate of the formed tunnel 400, the walking block 126 is installed at the free end, and the walking block 126 can walk along the extension direction of the tunnel when the free end is close to the bottom plate of the formed tunnel 400.

[0036] In this embodiment, by providing a connecting rod 124, a first telescopic driving member 125 and a walking block 126, the present invention can enable the first telescopic driving member 125 to drive the connecting rod 124 to rotate around the hinge end when in use, so that the walking block 126 is close to or away from the bottom plate of the formed tunnel 400, thereby realizing the function of movement.

[0037] It can be further clarified that, in this embodiment, the walking block 126 is an automatic suction cup or a walking wheel, so that the present invention can realize the function of automatic walking when in use. The first telescopic driving member 125 is preferably a hydraulic cylinder.

[0038] It can be further clarified that there are multiple walking parts 123, and the multiple walking parts 123 are arranged in pairs to form a walking module. The two walking parts 123 in the walking module are symmetrically arranged along the extension direction of the formed tunnel 400, and the multiple walking modules are distributed at intervals along the width direction of the formed tunnel 400.

[0039] In this embodiment, the present invention can realize the fast walking function by providing a plurality of walking members 123, and also improve the stability of the entire artificial false bottom structure.

[0040] It can be further clarified that, in the present embodiment, connecting plates 127 are sequentially arranged between the multiple walking parts 123 on the same side of the multiple walking modules, and the telescopic end of the first telescopic driving member 125 is hinged to the connecting plate 127, thereby driving the walking parts 123 on the same side to rise and fall synchronously.

[0041] In some optional embodiments, there are multiple adsorption assemblies 130 , which are circumferentially spaced and distributed on the periphery of the base 110 , and each adsorption assembly 130 can be adsorbed on the mining column to be recovered on the corresponding side.

[0042] In this embodiment, a plurality of adsorption components 130 are provided, and the plurality of adsorption components 130 are distributed circumferentially at intervals on the periphery of the base 110, so that when in use, the present invention can utilize the plurality of adsorption components 130 to enhance the contact stability between the artificial false bottom structure of the present invention example and the formed tunnel 400 and the mining pillars to be mined.

[0043] It should be particularly and clearly stated that, in the present embodiment, the exemplary adsorption assembly 130 includes a second telescopic driving member 131 and an adsorption member 132. The second telescopic driving member 131 is installed on the side wall of the base 110, and the telescopic end of the second telescopic driving member 131 extends in a direction away from the base 110, and the adsorption member 132 is installed on the telescopic end of the second telescopic driving member 131; the second telescopic driving member 131 can drive the adsorption member 132 to approach and make the adsorption member 132 adsorbed on the corresponding side of the mining column to be recovered.

[0044] In this embodiment, by setting up a second telescopic driving member 131 and an adsorption member 132, the present invention can utilize the second telescopic driving member 131 to drive the adsorption member 132 to move closer to or away from the mining column to be mined on the corresponding side when in use, thereby ensuring the installation stability of the artificial false bottom structure of the present invention example in the formed tunnel 400.

[0045] In some preferred embodiments, there are multiple telescopic mechanisms 200, and the multiple telescopic mechanisms 200 are distributed at intervals on the top of the base 110, and each telescopic mechanism 200 is arranged close to the edge of the base 110; The telescopic mechanism 200 includes a third telescopic drive member 210, a guide sliding member 220 and a scissors telescopic member 230. The third telescopic drive member 210 is installed on the base 110, and the third telescopic drive member 210 is telescopic along the extension direction of the formed lane 400. The guide sliding member 220 is installed on the top of the base 110, and a sliding groove is formed on the guide sliding member 220 along the extension direction of the formed lane 400. The bottom and top of the scissors telescopic member 230 each have two spaced-apart hinge positions, one of the two hinge positions at the bottom of the scissors telescopic member 230 is hinged to the hinge position of the base 110, and the other is slidably matched with the sliding groove; and one of the two hinge positions at the top of the scissors telescopic member 230 is hinged to the top support mechanism 300, and the other is slidably matched with the bottom of the top support mechanism 300.

[0046] In this embodiment, by providing the third telescopic driving member 210, the guide sliding member 220 and the scissor telescopic member 230, the present invention can achieve the function of stably lifting and lowering the top supporting mechanism 300 when in use.

[0047] It should be particularly and clearly stated that, in this embodiment, the third telescopic driving member 210 is preferably a hydraulic cylinder.

[0048] In one embodiment, the top support mechanism 300 includes a top plate 310 and a plurality of support blocks 320 . The top plate 310 is rotatably mounted on the scissor telescopic member 230 , and the plurality of support blocks 320 are circumferentially spaced and distributed at the bottom of the top plate 310 .

[0049] In this embodiment, by providing a top plate 310 and a plurality of support blocks 320, the present invention can support the top plate 310 and the plurality of support blocks 320 when in use. At the same time, by providing a plurality of support blocks 320, the present invention can improve the strength of the top support mechanism 300 and avoid damage to the artificial false bottom structure.

[0050] It can be further clarified that, in this embodiment, during specific use, the support block 320 provided can enable the technician to avoid damage to the entire artificial bottom structure due to the pressure borne by the top plate 310 when moving on the top of the top plate 310, thereby improving the strength of the artificial bottom structure.

[0051] Based on the same technical concept, in a second aspect, the present invention also proposes a mining method, using the artificial false bottom structure described in the first aspect; The mining method comprises the following steps: S100, according to the mining conditions of the mine area to be mined, obtaining the distribution data information of the formed tunnels in the mine area to be mined; wherein the distribution data information includes the quantity information, direction information and distribution size information of the formed tunnels, and a plurality of interval-distributed mining pillars to be mined are formed on both sides of each of the formed tunnels; In this embodiment, when acquiring the distribution data information, the distribution data information can be determined based on the distribution of ore layers in the mining area, and the distribution of formed tunnels and mining pillars to be mined when stratified mining is adopted in the mining area.

[0052] S200, determining the mining order of the mining pillars to be mined according to the distribution data information; In this embodiment, when determining the mining order of the mining pillars to be mined, according to the distribution of the mining area, the inner side of the formed tunnels close to the bottom layer of the mining area and far away from the transportation tunnels can be used as priority mining areas, and the top layer of the formed tunnels and the areas close to the transportation tunnels can be used as post-mining areas.

[0053] It can be further clarified that, in this embodiment, the preferred mining order is: first, the area of ​​the bottom-level formed tunnel away from the transport tunnel is used as the current mining area, and along the corresponding formed tunnel toward the position close to the transport tunnel is used as the next current mining area, and then the mining order is set upward in order from bottom to top until the top-level formed tunnel is reached to form a mining order.

[0054] S300, determining a current mining area from the formed roadway; wherein the current mining area includes the formed roadway and at least one mining pillar to be mined; In this embodiment, when determining the current mining area, the area of ​​the lowest layer of formed tunnels far away from the transport tunnels can be used as the first current mining area.

[0055] S400, controlling the artificial false bottom structure described in the first aspect to move to the current mining area and perform mining operations to obtain a current backfill area; In this embodiment, when the mining operation is carried out, the mining operation is carried out in sequence from top to bottom for each mining column to be recovered.

[0056] S500, taking a position adjacent to the current mining area as the current mining area, and controlling the artificial false bottom structure to move to the current mining area; In this embodiment, when the movement of the artificial false bottom structure is controlled, the artificial false bottom structure can be moved while backfilling with filling materials is performed.

[0057] It should be particularly and clearly stated that the filling material exemplified in this embodiment is preferably slag or tailings material.

[0058] S600, performing backfilling operation on the current backfilling area; In this embodiment, when performing backfilling operations, slag or tailings materials may be used for the backfilling operations, or concrete may be used for the backfilling operations.

[0059] S700. According to the mining area, repeatedly execute the steps of determining a current mining area from the formed tunnels to controlling the movement of the artificial false bottom structure described in the first aspect to perform backfilling operations on the current backfilling area, until all the formed tunnels are traversed and mining is completed.

[0060] The mining method provided by the present application adopts the artificial false bottom structure in the above embodiment, which can solve the technical problem that when the filling method is used to fill the tunnels in the mine, the production efficiency of the mine is affected due to the need to reserve tunnels. Compared with the prior art, the beneficial effects of the mining method provided by the present application are the same as the beneficial effects of the artificial false bottom structure provided by the above embodiment, and the other technical features of the mining method are the same as those disclosed in the previous embodiment, which will not be repeated here.

[0061] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. An artificial false bottom structure, characterized in that: include: A walking mechanism, the bottom of which can walk along the formed lane, and the walking mechanism can collide with the bottom of the formed lane; A telescopic mechanism, wherein the telescopic mechanism is installed on the top of the walking mechanism; as well as, A top support mechanism, the top support mechanism is installed on the top of the telescopic mechanism, the telescopic mechanism can drive the top support mechanism to rise and fall, and the top support mechanism can be supported on the top of the formed tunnel to protect the workers when the mining column to be mined on one side of the formed tunnel is mined; The walking mechanism can drive the telescopic mechanism and the top supporting mechanism to walk along the formed tunnel when the workers dig out the mining pillars to be mined on both sides of the artificial false bottom structure, and fill the area where the mining operation is completed with filling materials while walking.

2. The artificial false bottom structure according to claim 1, characterized in that: The walking mechanism comprises: A base, the telescopic mechanism is installed on the top of the base; A walking assembly, wherein the walking assembly is installed at the bottom of the base, and the walking assembly can drive the base to walk along the formed tunnel to a side of the mining column to be mined; and The adsorption component is installed on the side wall of the base, and the adsorption component can be adsorbed on the side wall of the mining column to be recovered.

3. The artificial false bottom structure according to claim 2, characterized in that: The base is arranged along the extension direction of the formed lane, and the walking assembly includes: A guide rail, the guide rail being arranged at the bottom of the base along the extension direction of the formed lane; A sliding drive member, wherein the sliding drive member is in sliding cooperation with the guide rail, and the sliding drive member can slide on the guide rail along the extension direction of the lane; A walking member is installed on a side of the sliding drive member away from the base, and the walking member can approach or move away from the bottom plate of the formed lane to cooperate with the sliding drive member and drive the base to move.

4. The artificial false bottom structure according to claim 2, characterized in that: The walking member comprises: A connecting rod, wherein two ends of the connecting rod are respectively a free end and a hinged end, the hinged end is rotationally matched with the bottom of the sliding drive member, and the free end extends out of the sliding drive member along the extension direction of the formed lane; a first telescopic drive member, the first telescopic drive member is mounted on the bottom of the sliding drive member, and the telescopic end of the first telescopic drive member is connected to the position of the connecting rod near the free end, and the first telescopic drive member can drive the connecting rod around the hinged end to make the free end close to or away from the bottom plate of the formed tunnel; and A walking block is installed at the free end, and the walking block can walk along the extension direction of the lane when the free end is close to the bottom plate of the formed lane.

5. The artificial false bottom structure according to claim 4, characterized in that: There are multiple walking parts, and the multiple walking parts are arranged in pairs to form a walking module. Two of the walking parts in the walking module are symmetrically arranged along the extension direction of the formed lane, and the multiple walking modules are distributed at intervals along the width direction of the formed lane.

6. The artificial false bottom structure according to claim 3, characterized in that: There are multiple adsorption components, which are distributed at intervals along the circumferential direction on the outer periphery of the base, and each of the adsorption components can be adsorbed on the mining column to be recovered on the corresponding side.

7. The artificial false bottom structure according to claim 6, characterized in that: The adsorption assembly comprises: a second telescopic driving member, the second telescopic driving member being mounted on a side wall of the base, and a telescopic end of the second telescopic driving member extending in a direction away from the base; and; An adsorption member, the adsorption member being mounted on the telescopic end of the second telescopic driving member; The second telescopic driving member can drive the adsorption member to approach and adsorb the adsorption member to the mining column to be recovered on the corresponding side.

8. The artificial false bottom structure according to any one of claims 1 to 7, characterized in that: There are multiple telescopic mechanisms, and the multiple telescopic mechanisms are distributed at intervals on the top of the base, and each of the telescopic mechanisms is arranged close to the edge of the base; The telescopic mechanism comprises: a third telescopic driving member, the third telescopic driving member being mounted on the base and telescopic along an extension direction of the formed lane; A guide sliding member, the guide sliding member is installed on the top of the base, and a sliding groove is formed on the guide sliding member and is arranged along the extension direction of the formed lane; and A scissors telescopic member, wherein the bottom and the top of the scissors telescopic member each have two hinge positions spaced apart from each other, one of the two hinge positions at the bottom of the scissors telescopic member is in sliding cooperation with the hinge position of the base, and the other one is in sliding cooperation with the sliding groove; One of the two hinged positions on the top of the scissor telescopic member is hinged to the top support mechanism, and the other is slidably matched with the bottom of the top support mechanism.

9. The artificial false bottom structure according to claim 8, characterized in that: The top support mechanism comprises: A top plate, the top plate being mounted and rotatably connected to the scissor telescopic member; and A plurality of support blocks are distributed at intervals along the circumferential direction at the bottom of the top plate.

10. A mining method, characterized in that: Using the artificial false bottom structure as described in any one of claims 1 to 9; The mining method comprises the following steps: According to the mining conditions of the mine area to be mined, the distribution data information of the formed tunnels in the mine area to be mined is obtained; wherein the distribution data information includes the quantity information, direction information and distribution size information of the formed tunnels, and a plurality of interval-distributed mining pillars to be mined are formed on both sides of each of the formed tunnels; Determine the mining order of the mining columns to be mined according to the distribution data information; Determine a current mining area from the formed roadway; wherein the current mining area includes the formed roadway and at least one mining pillar to be mined; Controlling the artificial false bottom structure according to any one of claims 1 to 9 to move to the current mining area and perform mining operations to obtain a current backfill area; Taking a position adjacent to the current mining area as the current mining area, and controlling the artificial false bottom structure to move to the current mining area; Performing backfilling operation on the current backfilling area; According to the mining area, the steps of determining a current mining area from the formed tunnels to controlling the movement of the artificial false bottom structure as described in any one of claims 1 to 9 to perform backfill operations on the current backfill area are repeatedly executed until all the formed tunnels are traversed and mining is completed.