Intrinsically safe operation navigation method and system for new energy and petroleum and petrochemical industries
The implementation of a standardized operation procedure system in the petroleum and chemical industries addresses the reliance on experience by converting procedures into software-executable languages and integrating them into distributed control systems, enhancing operator safety and reducing accidents.
Patent Information
- Application Number
- CN202311254087.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-26
- Publication Date
- 2025-03-28
AI Technical Summary
In the petroleum and chemical industries, the lack of information-based management systems leads to operators relying on experience rather than standardized procedures, resulting in errors and safety accidents, especially for new employees who struggle to remember all standard steps.
A method and system for developing and implementing standardized operation procedures through structured, standardized, and quantified processes, converted into software-executable languages, and integrated into distributed control systems for training and use.
This approach ensures that operation procedures are consistently followed, reducing errors and enhancing operator safety, thereby preventing accidents by providing a structured and monitored operation environment.
Smart Images

Figure CN119718489A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of management operation technology, and in particular relates to an intrinsically safe operation navigation method and system for new energy and petroleum and petrochemical industries. Background Art
[0002] Operating procedures are the procedures or steps that must be followed when operating equipment or handling business, which are formulated in the production process of an enterprise to ensure the safe, stable and effective operation of the device or equipment. Operating procedures are the most basic, important and critical elements in the production of petrochemical enterprises. They are the standards and basis for the "prescribed actions" in the operation process of all devices, and are the basic supporting materials to ensure the safe production of petrochemical devices.
[0003] At present, most petrochemical enterprises are managed in accordance with the paper operation card management mode, and lack of information management means. Although many enterprises have standard production operation procedures, namely operation cards, in the production operation process, skilled operators are more likely to operate according to their own operating experience and rarely follow the guidance of standard production operation procedures, resulting in many misoperations, omissions and other behaviors. In addition, new operators sometimes cannot remember all the standard operating steps, which will result in omissions, which may eventually lead to safety accidents. Summary of the invention
[0004] In view of the above problems, the present invention provides an intrinsically safe operation navigation method for the new energy and petroleum and petrochemical industries, the method comprising:
[0005] Collect operating procedures according to the scope of implementation of safe operations;
[0006] Develop standardized operating procedures based on operating procedures;
[0007] Perform functional configuration on standardized processes and generate configuration programs;
[0008] Install the configuration program into the distributed control system and put it into training and use.
[0009] Preferably, the formulation requirements of the standardized operating procedures include: structural requirements, standardized requirements and quantitative requirements.
[0010] Preferably, functional configuration of the standardized process includes:
[0011] Convert standardized operating procedures into the execution language of the software system.
[0012] Preferably, after the configuration program is generated, it is also necessary to perform internal testing on the configuration program.
[0013] Preferably, the installation basis for installing the configuration program into the distributed control system includes: a network structure diagram or a system structure, a site environment construction situation, a communication test situation, and configuration downloading.
[0014] The present invention also proposes an intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries, the system comprising a collection module, a designation module, a generation module and an application module;
[0015] The collection module is used to collect operating procedures according to the implementation scope of the safety operation;
[0016] The designated module is used to formulate a standardized operating procedure according to the operating procedures;
[0017] The generation module is used to perform functional configuration on the standardized process and generate a configuration program;
[0018] The application module is used to install the configuration program into the distributed control system and put it into training and use.
[0019] Preferably, the generating module is used to perform functional configuration on the standardized process, including:
[0020] The generation module is used to convert the standardized operating procedures into the execution language of the software system.
[0021] Preferably, the system further comprises a testing module;
[0022] The test module is used to perform internal testing on the configuration program.
[0023] Preferably, the application module is used to install the configuration program into the distributed control system based on the installation basis including: the application module is used to install the configuration program into the network structure diagram or system structure, the on-site environment construction situation, the communication test situation and the configuration.
[0024] The present invention also provides an electronic device, comprising:
[0025] Processor and memory;
[0026] The processor calls the computer program stored in the memory to execute any one of the above-mentioned intrinsically safe operation navigation methods for the new energy and petroleum and petrochemical industries.
[0027] The present invention also provides a computer-readable storage medium.
[0028] The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor is enabled to execute any of the above-mentioned intrinsically safe operation navigation methods for the new energy and petroleum and petrochemical industries.
[0029] The present invention has the following beneficial effects:
[0030] (1) The present invention structures, standardizes and quantifies the operating procedures based on paper or electronic operating procedures, and sets process indicators that need to be monitored;
[0031] (2) The present invention guides the operation process and monitors the process indicators through standardization and proceduralization of the operation procedures, thereby improving the safety operation ability of employees and ensuring that safety accidents caused by operation errors are eliminated.
[0032] Other features and advantages of the present invention will be described in the following description, and partly become obvious from the description, or be understood by implementing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0034] Figure 1 A diagram showing an intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries in an embodiment of the present invention;
[0035] Figure 2 A detailed flow chart of an intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries in an embodiment of the present invention is shown;
[0036] Figure 3 The configuration exploded diagram of the adsorption unit supplementing analytical agent operation card in the embodiment of the present invention is shown;
[0037] Figure 4 A typical architecture diagram of an intrinsically safe operation navigation system in an embodiment of the present invention is shown;
[0038] Figure 5 A diagram showing an intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries in an embodiment of the present invention is shown;
[0039] Figure 6 A diagram of an electronic device in an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as being limited to the examples set forth herein; on the contrary, these embodiments are provided so that the present disclosure will be more comprehensive and complete, and the concepts of the example embodiments are fully conveyed to those skilled in the art. The described features, structures, or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced while omitting one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known technical solutions are not shown or described in detail to avoid obscuring various aspects of the present disclosure.
[0041] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware units or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.
[0042] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the steps. For example, some steps may be decomposed, while some steps may be combined or partially combined, so the actual execution order may change according to the actual situation.
[0043] The terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example.
[0044] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or apparatus comprising a series of steps or sub-modules is not necessarily limited to those steps or sub-modules explicitly listed, but may include other steps or sub-modules not explicitly listed or inherent to these processes, methods, products, or apparatuses.
[0045] like Figure 1 As shown, the present invention proposes an intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries, the method comprising the following steps:
[0046] S1 Collect operating procedures according to the implementation scope of safe operations;
[0047] S2 formulates standardized operating procedures according to operating procedures;
[0048] The requirements for formulating the standardized operating procedures include: structured requirements, standardized requirements and quantitative requirements.
[0049] S3 performs functional configuration on the standardized process and generates a configuration program;
[0050] Functional configuration of standardized processes includes converting standardized operating processes into the execution language of the software system.
[0051] After generating the configuration program, you also need to perform internal testing on the configuration program.
[0052] S4 installed the configuration program into the Distributed Control System (DCS) and put it into training and use.
[0053] The installation basis for installing the configuration program into the DCS includes: network structure diagram or system structure, on-site environment construction, communication test conditions and configuration download.
[0054] The specific process steps are as follows Figure 2 As shown, combined Figure 2 Further explanation of the implementation case:
[0055] Step 1: Establish a safety operation navigation team. Through meeting discussions, establish a safety operation navigation team, which mainly includes the host, software engineers, operation engineers, process engineers, HSE engineers, etc.
[0056] Step 2: Determine the scope of operation cards that require safe operation navigation by screening the operation cards.
[0057] Step 3: Select an operation card. Through group discussion, discuss and determine the standard operating procedures based on the characteristics of the operating procedures, and convert them into the execution language of the safe operation navigation.
[0058] According to the actual operation needs of the operating procedures, the operation details are clarified in detail and specifically, and the operation is quantified. For example: (1) The original operation card "Confirm that the P003 inlet valve is fully open". According to the group discussion, the standard operation process is: the confirmation information of the external operation: "The external operation confirms that the P-003 inlet valve XV00306 / XV00309 is fully open, confirms that XV00303 is fully open, and confirms that the T-004 outlet first manual valve is fully open"; the confirmation information of the internal operation is: "T-004 outlet valve XV00303: 422XV00303.PV = 2 (fully open) and (P-003A inlet valve XV00306: 422XV00306.PV = 2 (fully open) or P-003A inlet valve XV00309: 422XV00309.PV = 2 (fully open))". The purpose is to form a standard operating procedure and a language that can be executed in the navigation software. Standard process for other operation cards.
[0059] Take the adsorption unit refilling analytical agent operation card as an example, where P stands for external operation; I stands for internal operation; () requires execution of steps to confirm information; [] requires execution of steps for related operations; [] is the detailed part of the operating procedures and the executable language for navigation.
[0060] (P) – Confirm that the P003 inlet valve is fully open (month, day, hour, minute)
【
[0062] Exapilot operation confirmation information:
[0063] "External operator confirms that the P-003 inlet valve XV00306 / XV00309 is fully open, confirms that XV00303 is fully open, and confirms that the T-004 outlet first manual valve is fully open."
[0064] Exapilot checks:
[0065] T-004 outlet valve XV00303: 422XV00303.PV = 2 (fully open) and (P-003A inlet valve XV00306: 422XV00306.PV = 2 (fully open) or P-003A inlet valve XV00309: 422XV00309.PV = 2 (fully open)) 】
[0066] (P) – Confirm that P003 is in normal standby mode (month, day, hour, minute)
【
[0068] Exapilot operation confirmation information:
[0069] "External control confirms that P-003 is in normal standby." 】
[0071] (I) – Confirm that the fresh solvent tank T004 is operating normally, and the nitrogen sealing system and oil and gas recovery system are operating normally
[0072] (Month, Day, Hour, Minute)
【
[0074] Exapilot operation confirmation information:
[0075] "Confirm that the fresh solvent tank T-004 is operating normally, and the nitrogen sealing system and oil and gas recovery system are operating normally."
[0076] Details:
[0077] "Fresh Analyzer Tank T-004:
[0078] The internal operator confirms that the oil and gas recovery valve PV00301 from T-6001 is in the open state;
[0079] Internal operation confirms that the pressure value from T-6001 to the oil and gas recovery valve pressure PIS00301 is within the range of [0.3, 0.9] KPa;
[0080] Nitrogen blanketing system:
[0081] The external operator confirmed that the nitrogen sealing system to T-6001 valve PCV62601 was in normal use;
[0082] Internal operation confirms that the pressure value of the new desorbent tank PIS00301 is within the range of [0.3, 0.9] KPa;
[0083] Oil and gas recovery system:
[0084] The internal operator confirmed that the oil and gas recovery system was operating normally;"
[0085] Exapilot checks:
[0086] T-6001 to oil and gas recovery valve 422PV00301.PV=2(open)&T-6001 to oil and gas recovery valve pressure 0.3KPa<=422PIS00301.PV<=0.9KPa;
[0087] Note: Feedback of PV00301 valve: 422PZLO00301 / 422PZLC00301.PV=1 / 0 】
[0089] (I) – Confirm that the liquid level in the fresh solvent tank T004 is normal (month, day, hour, minute)
【
[0091] Exapilot operation confirmation information:
[0092] "The internal operator confirmed that the liquid level LIA62601A in the fresh analytical agent tank T-004 is at [2200,12500] mm."
[0093] Exapilot checks:
[0094] The liquid level in the fresh analytical agent tank T-004 is 2200mm<=422LIA62601A.PV<=12500mm; 】
[0096] (P) – Confirm that the fresh analytical agent tank T004 to the dirty oil line and the drain valve are closed (month, day, hour, minute)
【
[0097] Exapilot operation confirmation information:
[0098] "Outside operator confirms that the fresh analytical agent tank T-004 to dirty oil line and drain valve are closed." 】
[0100] [P] – Process of conducting fresh analytical agent tank T004 to P003 (month, day, hour, minute)
【
[0102] Exapilot operation confirmation information:
[0103] "The external operator conducts the flow from fresh analytical agent tank T-004 to P-003." 】
[0105] [P] – Close the vent valve and drain valve on the pipeline from P003 outlet to C6001 (month, day, hour, minute)
【
[0106] Exapilot operation confirmation information:
[0107] "Outside control confirmed that the vent valve and drain valve on the pipeline from P-003 outlet to C-6001 were closed." 】
[0109] [P] – Open the P003 outlet to C6001 to replenish the fresh analytical agent line boundary area double valve (month day hour minute)
【
[0111] Exapilot operation confirmation information:
[0112] "Outside control confirmed that the double valves at the boundary area of the P-003 outlet to C-6001 replenishment fresh analytical agent line are open." 】
[0114] [P]–Commissioning of regulating valve FV61105 (month, day, hour, minute)
【
[0116] Exapilot operation confirmation information:
[0117] "External control valve FV61105." 】
[0119] [P] – Open the P003 return line to the T004 valve (month, day, hour, minute)
【
[0121] Exapilot operation confirmation information:
[0122] "Outside operator opens the P-003 return line to the T-004 valve." 】
[0124] [P] – Start the supplementary analytical agent pump P003 to establish self-circulation according to the operating procedures (month, day, hour, minute)
【
[0125] Exapilot operation confirmation information:
[0126] "Outside operation starts according to the operating procedures -003."
[0127] If 422P003A.PV=2(Running)
[0128] Exapilot check 422XV00308.MV=2 (open command)
[0129] If not satisfied, Exapilot operation confirmation message: "Internal operation confirms that P-003A outlet valve XV00308 is in the open command state."; If satisfied, continue;
[0130] Exapilot operation confirmation message:
[0131] "Exapilot will gradually increase the opening of the P-003A outlet valve HC00308. Please enter the adjustment target value" [8.0-15.0]"
[0132] Exapilot gradually improves 422HC00308.MV, executing at 2.0% every 5 seconds;
[0133] If 422P003B.PV=2(Running)
[0134] Exapilot check 422XV00311.MV=2 (open command)
[0135] If not satisfied, Exapilot operation confirmation message: "Internal operation confirms that P-003B outlet valve XV00311 is in the open command state.";
[0136] If satisfied, continue;
[0137] Exapilot operation confirmation message:
[0138] "Exapilot will gradually increase the opening of the P-003B outlet valve HC00311. Please enter the adjustment target value" [8.0-15.0]"
[0139] Exapilot gradually improves 422HC00311.MV, executing at 2.0% every 5 seconds 】
[0141] (P)-Confirm that the supplementary analytical agent pump P003 is operating normally (month, day, hour, minute)
【
[0143] Exapilot operation confirmation information:
[0144] "External operator confirms that the supplementary analytical agent pump P-003 is operating normally." 】
[0146] [I]–Adjust the opening of FV61105 to control the flow rate of fresh analytical agent to 8-10t / h (month, day, hour, minute)
【
[0148] Exapilot operation confirmation information:
[0149] "Internal operation input desorbent delivery pump outlet flow control valve FIC61105 adjusts the target value."
[0150] Range [5.0, 15.0]
[0151] More Information
[0152] "Exapilot will slowly adjust the desorbent delivery pump outlet flow control valve FIC61105 to the target value at a rate of 1.0% opening every 5 seconds."
[0153] Exapilot check 160FIC61105.MODE=MAN
[0154] Then Exapilot executes 160FIC61105.MV=15.0% / 1.0% / 5 seconds
[0155] Exapilot monitoring (only for this step)
[0156] P-003A pump current: 422IIP003A.PV>85.0A, suspend execution of FV61105.MV
[0157] Current of P-003B pump: 422IIP003B.PV>85.0A, suspend execution of FV61105.MV
[0158] P-003A pump outlet pressure: 422PI00303.PV<0.65MPa, suspend execution of FV61105.MV
[0159] P-003B pump outlet pressure: 422PI00304.PV<0.65MPa, suspend execution of FV61105.MV 】
[0161] [I]–Confirm that the operating current of P003 is normal (month, day, hour, minute)
【
[0163] Exapilot operation confirmation information:
[0164] "Internal control confirmed that there was no abnormality in the operating current of P003." 】
[0166] [P] – Check the pipeline of C6001 for fresh analytical reagent and find no leakage (month, day, hour, minute)
【
[0168] Exapilot operation confirmation information:
[0169] "The external operation confirmed that the process was normal and there was no leakage." 】
[0171] (I) – Confirm that the liquid level of C6001 is replenished to 60%, the liquid level of C6002 is replenished to 60%, and stop replenishing the desorbent
[0172] (Month, Day, Hour, Minute)
【
[0174] Exapilot checks C-6001 liquid level 160LI61201.PV>=60.0%;
[0175] Exapilot operation confirmation information:
[0176] "Internal control confirmed that the liquid level of C-6001 has been replenished to 60.0%, and the liquid level of C6002 has been replenished to 60%. Stop replenishing the desorbent."
[0177] Details "After confirming this message, the Exapilot program will slowly shut down FIC61105"
[0178] After confirming the internal operation, go directly to the next step "Slowly close FV61105";
[0179] When the liquid level of C-6001 160LI61201.PV>=45.0%,
[0180] Exapilot operation confirmation message:
[0181] "The current liquid level of C-6001 is xx%, and the internal operator inputs the C-6002 liquid level LIC61901 to adjust the target value and adjustment frequency."
[0182] Exapilot executes C-6002 level 160LIC61901.MODE=AUT and SV=1.0% / adjustment time
[0183] Deviation = abs(160LIC61901.PV-160LIC61901.SV)>=2, pause adjusting C6002 liquid level; until the deviation value <=1.0%, continue to adjust C-6002 liquid level until the target value. 】
[0185] [I] – Slowly close FV61105 (month, day, hour, minute)
【
[0187] Exapilot operation confirmation message:
[0188] "Exapilot will slowly close the desorbent delivery pump outlet flow control valve FIC61105. Confirm whether the desorbent delivery pump outlet flow control valve FIC61105 is slowly closing."
[0189] Details:
[0190] "Exapilot will gradually close the desorbent delivery pump outlet flow control valve FIC61105 at 2% every 5 seconds." Then Exapilot executes FIC61105.MODE=MAN and MV=0% / 2% / 5 seconds 】
[0192] [I] – Close HIC00308 / HIC00311 (month, day, hour, minute)
【
[0194] Exapilot operation confirmation information:
[0195] "Confirmed that the external operation has arrived at the P-003A / B site."
[0196] Exapilot operation confirmation information:
[0197] "The Exapilot program will slowly close the P-003A / B outlet valves HC00308 / HC00311."
[0198] Details:
[0199] "Exapilot will slowly close the pump P-003A / B outlet valve HC00308 / HC00311 at 2% every 5 seconds until it is fully closed"
[0200] Exapilot executes 422HC00308.MV = 0% / 2% / 5 seconds
[0201] Exapilot executes 422HC00311.MV = 0% / 2% / 5 seconds 】
[0203] [P] – Stop and replenish the analytical agent pump P003 according to the operating procedures (month, day, hour, minute)
【
[0205] Exapilot operation confirmation information:
[0206] "Outside operator stops the analytical agent pump P-003 according to the operating procedures."
[0207] Exapilot check 422P003A&B.PV=0 (stop) 】
[0209] [P] – Close the P003 return line to the T004 valve (month, day, hour, minute)
【
[0211] Exapilot operation confirmation information:
[0212] "Outside operator confirms closing of P-003 return line to T-004 valve." 】
[0214] [I] – Calculate the amount of additional desorbent in tons (month, day, hour, minute)
【
[0216] Exapilot calculates the amount of additional desorbent = 422T004-WIA.PV2-422T004-WIA.PV1 (the amount of fresh desorbent tank T-004)
[0217] 422T004-WIA.PV1: 422T004-WIA.PV value before starting pump P-003;
[0218] 422T004-WIA.PV2: 422T004-WIA.PV value after stopping pump P-003
[0219] Exapilot operation confirmation information:
[0220] "The amount of additional desorption this time is xxx tons." 】
[0222] Step 4: The project leader and software engineer use the operation navigation software to configure the standard operation process formed in step 3, such as Figure 3 shown.
[0223] Step 5: The project team discusses the standard operating procedures and functional configuration diagrams formed in steps 3 and 4, and signs to confirm the final plan and configuration diagram.
[0224] Step 6: The software engineers of the project team conduct internal testing of the program and modify and improve any problems.
[0225] Step 7: The project team will build the software and hardware environment for safe operation navigation in the central control and cabinet room, and install the software configuration. Figure 4 As shown, the OPC server is responsible for data transmission between DCS data and communication server, the safety operation navigation client is installed on the DCS console and is responsible for running standardized operating procedures, the safety operation server is responsible for running standardized operating procedures, the communication server is responsible for data and information storage, the wireless transmitter is responsible for data transmission between PDA and server, and PDA (intelligent portable terminal) is responsible for external operators to view the running status of standardized operating procedures.
[0226] Step 8: Provide training on the installation and operation of navigation software, hardware and their operators and put them into formal use.
[0227] Step 9: Select the next operating procedure and follow the process from step 3 to step 8 (step 7 only requires software configuration download) to perform safety operation navigation until all safety operation cards are completed.
[0228] like Figure 5As shown, the present invention also proposes an intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries, the system comprising a collection module 10, a designation module 20, a generation module 30 and an application module 40;
[0229] The collection module 10 is used to collect operating procedures according to the implementation scope of the safety operation;
[0230] The designation module 20 is used to formulate a standardized operating procedure according to the operating procedures;
[0231] The generating module 30 is used to perform functional configuration on the standardized process and generate a configuration program;
[0232] The application module 40 is used to install the configuration program into the DCS and put it into training and use.
[0233] like Figure 6 As shown, corresponding to the intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries provided above, the present invention also provides an electronic device. Since the embodiment of the device is similar to the above method embodiment, the description is relatively simple. For relevant parts, please refer to the description of the above method embodiment part. The device described below is only schematic. The device may include: a processor (processor) 1, a memory (memory) 2 and a communication bus (i.e., the above device bus) and a search engine, wherein the processor 1 and the memory 2 communicate with each other through the communication bus and communicate with the outside through the communication interface. The processor 1 can call the logic instructions in the memory 2 to execute the intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries.
[0234] In addition, the logic instructions in the above-mentioned memory 2 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: a storage chip, a U disk, a mobile hard disk, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), a disk or an optical disk, and other media that can store program codes.
[0235] On the other hand, an embodiment of the present invention further provides a processor-readable storage medium, on which a computer program 3 is stored. When the computer program 3 is executed by the processor 1, it is implemented to execute the intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries provided in the above-mentioned embodiments.
[0236] The processor-readable storage medium can be any available medium or data storage device that can be accessed by the processor 1, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.
[0237] Those skilled in the art should understand that although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible to modify the technical solutions described in the aforementioned embodiments, or to make equivalent replacements for some of the technical features therein; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. The intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries is characterized by: The method comprises: Collect operating procedures according to the scope of implementation of safe operations; Develop standardized operating procedures based on operating procedures; Perform functional configuration on standardized processes and generate configuration programs; Install the configuration program into the distributed control system and put it into training and use.
2. The intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries according to claim 1 is characterized in that: The requirements for formulating the standardized operating procedures include: structured requirements, standardized requirements and quantitative requirements.
3. The intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries according to claim 1 is characterized in that: Functional configuration for standardized processes includes: Convert standardized operating procedures into the execution language of the software system.
4. The intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries according to claim 1 is characterized in that: After generating the configuration program, you also need to perform internal testing on the configuration program.
5. The intrinsically safe operation navigation method for new energy and petroleum and petrochemical industries according to claim 1 is characterized in that: The installation basis for installing the configuration program into the distributed control system includes: network structure diagram or system structure, on-site environment construction, communication test conditions and configuration download.
6. Used in the intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries, characterized by: The system includes a collection module, a designation module, a generation module and an application module; The collection module is used to collect operating procedures according to the implementation scope of the safety operation; The designated module is used to formulate a standardized operating procedure according to the operating procedures; The generation module is used to perform functional configuration on the standardized process and generate a configuration program; The application module is used to install the configuration program into the distributed control system and put it into training and use.
7. The intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries according to claim 6 is characterized in that: The generation module is used to perform functional configuration on the standardized process, including: The generation module is used to convert the standardized operating procedures into the execution language of the software system.
8. The intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries according to claim 6 is characterized in that: The system also includes a testing module; The test module is used to perform internal testing on the configuration program.
9. The intrinsically safe operation navigation system for new energy and petroleum and petrochemical industries according to claim 6 is characterized in that: The application module is used to install the configuration program into the distributed control system. The installation basis includes: the application module is used to install the configuration program into the network structure diagram or system structure, the on-site environment construction situation, the communication test situation and the configuration.
10. An electronic device, characterized in that: include: Processor and memory; The processor calls the computer program stored in the memory to execute the intrinsically safe operation navigation method for the new energy and petroleum and petrochemical industries according to any one of claims 1 to 5.
11. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor is enabled to execute the intrinsically safe operation navigation method for the new energy and petroleum and petrochemical industries as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Nuclear power station regulation digital conversion method and system based on DCS system
CN112559446A