Material assembling system and method

By designing a material assembly system for installation of grilles for air conditioning external units, the transportation line, locking device and screwing device are used to realize automatic snapping of the grille and automatic tightening of screws, solving the problems of low manual assembly efficiency and missing screwing, and improving production efficiency and product quality.

CN119772567APending Publication Date: 2025-04-08GREE ELECTRIC APPLIANCES (ZHUHAI JINWAN) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510091193.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-21
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

During the installation of the grille of the air conditioner, it is difficult to manually snap the grille into the panel of the outer unit by manually, and the fastening screws are prone to missing, resulting in abnormal noise and vibration, affecting the user experience and the normal operation of the equipment.

Method used

Design a material assembly system, including transportation lines, locking devices and screwing devices. The transportation line drives the first material to move to the assembly station, the locking device locks the second material on the first material by rotating means, and the screw-driving device automatically screws the screw into the screw hole between the two.

Benefits of technology

The grille is automatically snapped into the air conditioner external panel and automatically punched screws, solving the problems of low manual assembly efficiency and missed screws, and improving production efficiency and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119772567A_ABST
    Figure CN119772567A_ABST
Patent Text Reader

Abstract

The invention provides a material assembly system and method. The system comprises a conveying line, a first assembly station and a second assembly station are adjacently arranged on the conveying line, a locking device is arranged close to the first assembly station, and a screw hitting device is arranged close to the second assembly station; a first material is placed on the conveying line, and when the conveying line drives the first material to move to the first assembly station, the locking device locks a second material on the first material in a rotating mode; and when the first material moves to the second assembly station, the screw hitting device is used for screwing the screws into the first material and the second material. The second material is automatically clamped into the first material through the locking device, the problems of high labor intensity and low efficiency during manual assembly are solved, and the production efficiency is greatly improved. By means of the screw hitting device, automatic screw hitting of the second material and the first material is achieved, the torque of screw hitting is stable, and the production quality is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air conditioner assembly, and in particular to a material assembly system and method. Background Art

[0002] At present, the installation of the grille of the air conditioner outdoor unit is generally done manually. The investigation of the work site found that during the installation of the grille, due to the special shape and structure of the grille and the assembly position, it is difficult for the manual force to clamp the grille into the outdoor unit panel. In large-scale production, manual assembly is not only labor-intensive, but also very inefficient in production and assembly, which is difficult to meet production needs.

[0003] In addition, the screws fastening the grille of the air conditioner's outdoor unit are often missed, causing abnormal noises when the air conditioner is working, leading to user complaints. When the screws are not tightened properly, the air conditioner's outdoor unit will vibrate during operation, causing friction between the grille and the panel, causing abnormal noises. This situation not only affects the user experience, but also may pose a potential risk to the normal operation of the air conditioner.

[0004] Therefore, a material assembly system is needed that can automatically clip the grille into the air conditioner outdoor unit panel and automatically drive screws to fix the grille and the air conditioner outdoor unit panel. Summary of the invention

[0005] In order to overcome the problems existing in the related art, the purpose of the present invention is to provide a material assembly system and method, wherein the system can automatically clip the grille into the air-conditioning outdoor unit panel, and can automatically screw in to fix the grille and the air-conditioning outdoor unit panel.

[0006] A material assembly system includes a transport line, wherein a first assembly station and a second assembly station are adjacently arranged on the transport line, a locking device is arranged near the first assembly station, and a screw driving device is arranged near the second assembly station; a first material is placed on the transport line, and when the transport line drives the first material to move to the first assembly station, the locking device uses a rotational manner to lock the second material on the first material; when the first material moves to the second assembly station, the screw driving device is used to screw screws into the first material and the second material.

[0007] In a preferred technical solution of the present invention, the locking device includes a rotating mechanism, the rotating mechanism is connected to a rotating motor, and the rotating mechanism is used to drive the second material to rotate so as to clamp the second material into the first material.

[0008] In a preferred technical solution of the present invention, the rotating mechanism is a disc-shaped structure, and an electromagnetic coil is arranged inside the rotating mechanism.

[0009] In a preferred technical solution of the present invention, the locking device further comprises a first shell, the first shell is located on a side of the rotating motor away from the rotating mechanism, and the rotating motor is arranged in the first shell.

[0010] In a preferred technical solution of the present invention, the screw driving device includes a clamping mechanism, and the clamping mechanism includes clamping jaws arranged opposite to each other, and the clamping jaws are used to clamp the screw.

[0011] In a preferred technical solution of the present invention, the screw driving device further comprises a second shell, a first through hole is provided in the second shell, the first through hole is located between the two clamping jaws, and the screw rod of the screw passes through the first through hole.

[0012] In a preferred technical solution of the present invention, a second through hole is opened in the second shell, the second through hole is located above the first through hole, and the second through hole is aligned with the first through hole; a screwdriver is arranged near the second through hole.

[0013] In a preferred technical solution of the present invention, the screw driving device further includes a feeding pipe, the feeding pipe is communicated with the second through hole, and the screw enters the second through hole through the feeding pipe.

[0014] In a preferred technical solution of the present invention, a first blocking mechanism is provided on one side of the first assembly station, and the first blocking mechanism is used to block the first material when the first material moves to the first assembly station; a second blocking mechanism is provided on one side of the second assembly station, and the second blocking mechanism is used to block the first material when the first material moves to the second assembly station.

[0015] In a preferred technical solution of the present invention, the first material is an air conditioner outdoor unit panel, and the second material is a grille.

[0016] The present invention further provides a material automatic assembly method, based on any of the above material assembly systems, the method comprising:

[0017] Starting the transport line, and if the first material arrives at the first assembly station, pausing the transport line;

[0018] Controlling the locking device to adsorb the second material;

[0019] Controlling the locking device to align the second material with the first material;

[0020] Controlling the rotating mechanism to drive the second material to rotate until the second material is stuck into the slot of the first material;

[0021] Starting the transport line, and if the first material arrives at the second assembly station, pausing the transport line;

[0022] The screw driving device is controlled to screw screws into the screw holes of the first material and the second material.

[0023] In a preferred technical solution of the present invention, controlling the locking device to adsorb the second material includes:

[0024] Controlling the rotating mechanism to move above the loading area;

[0025] supplying power to the rotating mechanism so that the electromagnetic coil in the rotating mechanism generates magnetic force;

[0026] The first material is adsorbed onto the rotating mechanism.

[0027] In a preferred technical solution of the present invention, the step of controlling the screw driving device to screw the screws into the screw holes of the first material and the second material comprises:

[0028] Feed the screw in the feeding tube into the second through hole;

[0029] Controlling the screwdriver to move downward until the screwdriver abuts against the screw;

[0030] Aligning the screw with the screw holes on the first material and the second material;

[0031] Opening the clamping jaws to allow the screw to fall into the screw holes of the first material and the second material;

[0032] The screwdriver is controlled to screw the screws into the screw holes of the first material and the second material.

[0033] The beneficial effects of the present invention are:

[0034] The present invention provides a material assembly system, including a transport line, on which a first assembly station and a second assembly station are adjacently arranged, a locking device is arranged near the first assembly station, and a screwing device is arranged near the second assembly station; a first material is placed on the transport line, and when the transport line drives the first material to move to the first assembly station, the locking device uses a rotational method to lock the second material on the first material; when the first material moves to the second assembly station, the screwing device is used to screw screws into the first material and the second material. When the first material is driven to move to the first assembly station by the transport line, the transport line stops running, the locking device moves to the loading area to absorb the second material, and drives the absorbed second material to move to the first assembly station, and inserts the buckle of the second material into the slot of the first material, so that the second material is locked after being engaged with the first material. After the second material is locked on the first material, the transport line resumes operation, and the transport line drives the first material to move toward the second assembly station. When the first material moves to the second assembly station, the screw driving device aligns the screw with the second screw hole of the second material, and screws the screw into the second screw hole of the second material and the first screw hole of the first material at the same time to fix the second material on the first material. In the above process, the second material is automatically inserted into the first material through the locking device, which solves the problems of high labor intensity and low efficiency during manual assembly, greatly improves production efficiency, reduces labor costs, and achieves the purpose of reducing staff and increasing efficiency. At the same time, the screw driving device is used to realize automatic screw driving of the second material and the first material, which solves the problem of missing screws and not tightening the screws during manual assembly. The use of the screw driving device makes the assembly accuracy of the second material on the first material higher, and the torque of screw driving is also relatively stable, which greatly improves the production quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural schematic diagram of the material assembly system of the present invention;

[0036] Figure 2 is a schematic diagram of screwing a screw into a first material and a second material according to the present invention;

[0037] Figure 3 is a front view of the rotating mechanism and the rotating motor of the present invention;

[0038] Figure 4 It is a schematic diagram of an electromagnetic coil provided in the rotating mechanism of the present invention;

[0039] Figure 5 is a schematic diagram of the screw driving device and the second blocking mechanism of the present invention;

[0040] Figure 6is a schematic diagram of the locking device and the first blocking mechanism of the present invention;

[0041] Figure 7 is a cross-sectional view of the screw driving device of the present invention;

[0042] Figure 8 is a schematic diagram of a screw driving device of the present invention;

[0043] Fig. 9 It is a schematic diagram of the buckle and the slot of the present invention.

[0044] Figure numerals: 1. transport line; 2. first assembly station; 3. second assembly station; 4. locking device; 5. screw driving device; 6. first material; 7. second material; 8. screw; 9. rotating mechanism; 10. rotating motor; 11. electromagnetic coil; 12. first shell; 13. clamping mechanism; 14. clamping claw; 15. second shell; 16. first through hole; 17. screw; 18. second through hole; 19. screwdriver; 20. feeding tube; 21. first blocking mechanism; 22. second blocking mechanism; 23. buckle; 24. slot. DETAILED DESCRIPTION

[0045] The preferred embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the preferred embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0046] Example 1

[0047] like Figure 1-Figure 9 As shown, this embodiment provides a material assembly system, including a transportation line 1, on which a first assembly station 2 and a second assembly station 3 are adjacently arranged, a locking device 4 is arranged near the first assembly station 2, and a screwing device 5 is arranged near the second assembly station 3; a first material 6 is placed on the transportation line 1, and when the transportation line 1 drives the first material 6 to move to the first assembly station 2, the locking device 4 locks the second material 7 on the first material 6 in a rotating manner; when the first material 6 moves to the second assembly station 3, the screwing device 5 is used to screw the screw 8 into the first material 6 and the second material 7.

[0048] A grille loading area is provided on one side close to the transport line 1, and the second material 7 is placed in the grille loading area. When the transport line 1 drives the first material 6 to move to the first assembly station 2, the transport line 1 stops running, and the locking device 4 moves to the grille loading area and adsorbs the second material 7. Then, the locking device 4 moves the adsorbed second material 7 to the first assembly station 2, and then the locking device 4 drives the second material 7 to rotate, so as to lock the second material 7 on the first material 6. This embodiment takes the first material as the air conditioner outdoor unit panel and the second material as the grille as an example.

[0049] The first material 6 is provided with a slot 24, and the second material 7 is provided with a buckle 23, and the buckle 23 and the slot 24 are adapted. Preferably, there are multiple buckles 23 and slots 24, respectively, and the multiple buckles 23 correspond to the multiple slots 24 one by one. The rotating mechanism 8 inserts the buckle 23 of the second material 7 into the slot 24 of the first material 6, and the rotating mechanism 8 drives the second material 7 to rotate, and locks the second material 7 on the first material 6.

[0050] A first screw hole is further provided on the outer side of the first material 6 near the second material 7, and a second screw hole is provided on the outer side near the second material 7. The first screw hole and the second screw hole are adapted to each other, and after the screw 8 is inserted into the first screw hole and the second screw hole, the second material 7 is fixed on the first material 6. Preferably, a plurality of first screw holes and a plurality of second screw holes are respectively provided, and a plurality of screws 8 are respectively inserted into the plurality of first screw holes and the plurality of second screw holes, so that the connection between the second material 7 and the first material 6 is more stable.

[0051] After the second material 7 is locked on the first material 6, the conveyor line 1 resumes operation and drives the first material 6 to continue to move to the second assembly station 3. When the first material 6 moves to the second assembly station 3, the conveyor line 1 stops operating, and the screwing device 5 aligns the screw 8 with the first screw hole and the second screw hole, and screws the screw 8 into the first screw hole and the second screw hole to fix the second material 7 on the first material 6.

[0052] This embodiment provides a material assembly system, including a transport line 1, on which a first assembly station 2 and a second assembly station 3 are adjacently arranged, a locking device 4 is arranged near the first assembly station 2, and a screwing device 5 is arranged near the second assembly station 3; a first material 6 is placed on the transport line 1, and when the transport line 1 drives the first material 6 to move to the first assembly station 2, the locking device 4 uses a rotational method to lock the second material 7 on the first material 6; when the first material 6 moves to the second assembly station 3, the screwing device 5 is used to screw the screw 8 into the first material 6 and the second material 7. When the first material 6 is driven to move to the first assembly station 2 by the transport line 1, the transport line 1 stops running, the locking device 4 moves to the loading area to absorb the second material 7, and drives the absorbed second material 7 to move to the first assembly station 2, and the buckle 23 of the second material 7 is inserted into the slot 24 of the first material 6, so that the second material 7 is locked with the first material 6. After the second material 7 is locked on the first material 6, the transport line 1 resumes operation, and the transport line 1 drives the first material 6 to move toward the second assembly station 3. When the first material 6 moves to the second assembly station 3, the screwing device 5 aligns the screw 8 with the second screw hole of the second material 7, and screws the screw 8 into the second screw hole of the second material 7 and the first screw hole of the first material 6 at the same time, so as to fix the second material 7 on the first material 6. In the above process, the second material 7 is automatically inserted into the first material 6 by the locking device 4, which solves the problems of high labor intensity and low efficiency during manual assembly, greatly improves production efficiency, reduces labor costs, and achieves the purpose of reducing staff and increasing efficiency. At the same time, the screwing device 5 is used to realize automatic screwing 8 of the second material 7 and the first material 6, which solves the problem of missing screws 8 and not tightening screws 8 during manual assembly. The use of the screwing device 5 makes the assembly accuracy of the second material 7 on the first material 6 higher, and the torque of screwing 8 is also relatively stable, which greatly improves the production quality.

[0053] Example 2

[0054] like Figure 1-Figure 9 As shown, this embodiment provides a material assembly system, including a transportation line 1, on which a first assembly station 2 and a second assembly station 3 are adjacently arranged, a locking device 4 is arranged near the first assembly station 2, and a screw driving device 5 is arranged near the second assembly station 3; a first material 6 is placed on the transportation line 1, and when the transportation line 1 drives the first material 6 to move to the first assembly station 2, the locking device 4 locks the second material 7 on the first material 6 in a rotating manner; when the first material 6 moves to the second assembly station 3, the screw driving device 5 is used to screw the screw 8 into the first material 6 and the second material 7.

[0055] The locking device 4 includes a rotating mechanism 9 , and the rotating mechanism 9 is connected to a motor. The rotating mechanism 9 is used to drive the second material 7 to rotate so as to clamp the second material 7 into the first material 6 .

[0056] The rotating mechanism 9 is a disc-shaped structure, and an electromagnetic coil 11 is disposed inside the rotating mechanism 9 .

[0057] The locking device 4 further includes a first shell 12 . The first shell 12 is located at a side of the motor away from the rotating mechanism 9 , and the first shell 12 is connected to the motor.

[0058] The first material 6 of this embodiment is an air conditioner exterior panel, and the second material 7 is a grille. The rotating mechanism 9 is connected to the output shaft of the rotating motor 10, and the motor is placed in the housing. The rotating mechanism 9 is a disc-shaped structure, and a circular ring-shaped electromagnetic coil 11 is arranged in the rotating mechanism 9. The rotating mechanism 9 is electrically connected to the power supply. When the power supply supplies power to the electromagnetic coil 11 in the rotating mechanism 9, the electromagnetic coil 11 generates magnetic force; when the power supply does not supply power to the electromagnetic coil 11 in the rotating mechanism 9, the electromagnetic coil 11 has no magnetic force.

[0059] A photoelectric sensor is respectively arranged near the first assembly station 2 and the second assembly station 3, and the photoelectric sensor is used to detect whether the air conditioner outdoor unit panel has reached the first assembly station 2 or the second assembly station 3. When the air conditioner outdoor unit panel reaches the first assembly station 2, the photoelectric sensor feeds back the signal to the PLC (Programmable Logic Controller). After receiving the signal, the PLC controls the first blocking mechanism 21 to pop up, locate the air conditioner outdoor unit panel, and the transport line 1 stops running. The rotating mechanism 9 is controlled to move to the grille loading area, and power is supplied to the rotating mechanism 9, so that the electromagnetic coil 11 in the rotating mechanism 9 generates magnetic force, and the rotating mechanism 9 adsorbs the grille.

[0060] The visual recognition device is used to accurately locate the installation area, and the rotating mechanism 9 transfers the grille to the installation area and then puts it down. The installation area is an area above the first assembly station 2. The rotating mechanism 9 is also connected to a driving cylinder, and a buckle 23 is provided on the grille. After the grille is in place, the driving cylinder drives the rotating mechanism 9 to press down until the rotating mechanism 9 aligns the buckle 23 on the grille with the slot 24 placed in the air conditioner outdoor panel, controls the rotating mechanism 9 to rotate, and uses the friction force on the surface of the rotating mechanism 9 when rotating to snap the grille into the slot 24, so that the grille is assembled on the air conditioner outdoor panel.

[0061] The surface of the rotating mechanism 9 is made of rubber material to prevent excessive downward pressure on the rotating mechanism 9 during the bonding process, which may cause deformation of the air conditioner outdoor unit panel.

[0062] When the locking process of the outdoor unit grille is completed, the first blocking mechanism 21 is reset, and the outdoor unit panel of the air conditioner flows into the automatic screw driving area 8.

[0063] The locking device 4 of this embodiment includes a rotating mechanism 9, which is connected to a rotating motor 10, and is used to drive the second material 7 to rotate so as to insert the second material 7 into the first material 6. The rotating mechanism 9 is a disc-shaped structure, and an electromagnetic coil 11 is arranged in the rotating mechanism 9. When the air conditioner outdoor unit panel arrives at the first assembly station 2, the first blocking mechanism 21 is controlled to pop out, the air conditioner outdoor unit panel is positioned, and the transportation line 1 stops running. The rotating mechanism 9 is controlled to move to the grille loading area, and power is supplied to the rotating mechanism 9, so that the electromagnetic coil 11 in the rotating mechanism 9 generates magnetic force, and the rotating mechanism 9 adsorbs the grille. After the grille is in place, the driving cylinder drives the rotating mechanism 9 to press down until the rotating mechanism 9 aligns the buckle 23 on the grille with the slot 24 into which the air conditioner outdoor unit panel is placed, and controls the rotating mechanism 9 to rotate, and uses the friction force on the surface of the rotating mechanism 9 when rotating to insert the grille into the slot 24, so that the grille is assembled on the air conditioner outdoor unit panel. The above-mentioned automated assembly method can improve the assembly efficiency of the grille and the air conditioner outdoor unit panel.

[0064] Example 3

[0065] like Figure 1-Figure 9 As shown, this embodiment provides a material assembly system, including a transportation line 1, on which a first assembly station 2 and a second assembly station 3 are adjacently arranged, a locking device 4 is arranged near the first assembly station 2, and a screwing device 5 is arranged near the second assembly station 3; a first material 6 is placed on the transportation line 1, and when the transportation line 1 drives the first material 6 to move to the first assembly station 2, the locking device 4 locks the second material 7 on the first material 6 in a rotating manner; when the first material 6 moves to the second assembly station 3, the screwing device 5 is used to screw the screw 8 into the first material 6 and the second material 7.

[0066] The screw driving device 5 includes a clamping mechanism 13 , and the clamping mechanism 13 includes clamping jaws 14 arranged opposite to each other, and the clamping jaws 14 are used to clamp the screw 8 .

[0067] The screw driving device 5 further includes a second housing 15 . A first through hole 16 is disposed in the second housing 15 . The first through hole 16 is located between the two clamping jaws 14 . The screw rod 17 of the screw 8 passes through the first through hole 16 .

[0068] A second through hole 18 is defined in the second housing 15 . The second through hole 18 is located above the first through hole 16 , and the second through hole 18 is aligned with the first through hole 16 . A screwdriver 19 is disposed near the second through hole 18 .

[0069] The screw driving device 5 further includes a feeding pipe 20 , which is in communication with the second through hole 18 , and the screw 8 enters the second through hole 18 through the feeding pipe 20 .

[0070] The feed pipe 20 is bent and arranged on the side wall of the housing. The feed pipe 20 is connected to the second through hole 18, and the second through hole 18 is connected to the first through hole 16. The screw 8 enters the second through hole 18 from the feed pipe 20, and then enters the first through hole 16 and is clamped by the first through hole 16. When the screw 8 is clamped in the first through hole 16, the screw rod 17 of the screw 8 passes through the first through hole 16, and the nut of the screw 8 is clamped above the first through hole 16. When the two clamping jaws 14 abut against each other, the first through hole 16 is formed between the two clamping jaws 14, and the screw 8 is clamped after the screw 8 passes through the first through hole 16.

[0071] When the transport line 1 drives the first material 6 to move to the second assembly station 3, the screw 8 is transported from the feed pipe 20 to the second through hole 18, and then to the first through hole 16, and the two clamps 14 clamp the screw 8. The end of the screwdriver 19 away from the second through hole 18 is connected to a screw tightening motor. The motor shaft of the screw tightening motor is connected to the screwdriver 19, and the motor shaft of the screw tightening motor drives the screwdriver 19 to press down and pass through the second through hole 18 until the screwdriver 19 abuts against the nut of the screw 8. The clamping mechanism 13 drives the screw 8 to move above the second screw hole of the second material 7, and aligns the screw 8 with the second screw hole and the first screw hole. At this time, the two clamps 14 of the clamping mechanism 13 are opened, and the screw 8 is no longer clamped. The screw 8 falls directly into the second screw hole of the second material 7 and the first screw hole of the first material 6. The screw tightening motor is started, and the screw tightening motor drives the screwdriver 19 to rotate, and the screwdriver 19 drives the screw 8 to rotate, so as to tighten the screw 8 in the second screw hole of the second material 7 and the first screw hole of the first material 6, so that the second material 7 is fixed on the first material 6.

[0072] The screw driving device 5 of this embodiment includes a clamping mechanism 13, and the clamping mechanism 13 includes clamping jaws 14 arranged opposite to each other, and the clamping jaws 14 are used to clamp the screw 8. The screw driving device 5 also includes a second housing 15, and a first through hole 16 is provided in the second housing 15, and the first through hole 16 is located between the two clamping jaws 14, and the screw rod 17 of the screw 8 passes through the first through hole 16. A second through hole 18 is provided in the second housing 15, and the second through hole 18 is located above the first through hole 16, and the second through hole 18 is aligned with the first through hole 16; a screwdriver 19 is provided near the second through hole 18. The screw driving device 5 also includes a feeding pipe 20, and the feeding pipe 20 is connected with the second through hole 18, and the screw 8 enters the second through hole 18 through the feeding pipe 20. When the transport line 1 drives the first material 6 to move to the second assembly station 3, the screw 8 is transported from the feed pipe 20 to the second through hole 18, and then to the first through hole 16. The two clamping claws 14 of the clamping mechanism 13 clamp the screw 8, and the screwdriver 19 passes through the second through hole 18 and is pressed down to the top of the first through hole 16, and abuts against the nut of the screw 8. The clamping mechanism 13 drives the screw 8 to move to the second assembly station 3, so that the screw 8 is aligned with the second screw hole of the second material 7 and the first screw hole of the first material 6. The motor shaft of the screw-tightening motor drives the screwdriver 19 to rotate, and the screw 8 is screwed into the second screw hole of the second material 7 and the first screw hole of the first material 6, so as to fix the second material 7 on the first material 6. In the above process, the screw 8 is screwed into the second material 7 and the first material 6 by the screw-tightening device 5, so that the automatic screwing 8 of the second material 7 and the first material 6 is realized, which greatly improves the production efficiency.

[0073] Example 4

[0074] like Figure 1-Figure 9 As shown, this embodiment provides a material assembly system, including a transportation line 1, on which a first assembly station 2 and a second assembly station 3 are adjacently arranged, a locking device 4 is arranged near the first assembly station 2, and a screw driving device 5 is arranged near the second assembly station 3; a first material 6 is placed on the transportation line 1, and when the transportation line 1 drives the first material 6 to move to the first assembly station 2, the locking device 4 locks the second material 7 on the first material 6 in a rotating manner; when the first material 6 moves to the second assembly station 3, the screw driving device 5 is used to screw the screw 8 into the first material 6 and the second material 7.

[0075] A first blocking mechanism 21 is provided on one side of the first assembly station 2, and the first blocking mechanism 21 is used to block the first material 6 when the first material 6 moves to the first assembly station 2; a second blocking mechanism 22 is provided on one side of the second assembly station 3, and the second blocking mechanism 22 is used to block the first material 6 when the first material 6 moves to the second assembly station 3.

[0076] The first material 6 is an air conditioner outdoor unit panel, and the second material 7 is a grille.

[0077] This embodiment further provides a material automatic assembly method, based on the material assembly system described in any one of Embodiments 1 to 3, the method comprising:

[0078] S1: Start the transport line. If the first material arrives at the first assembly station, pause the transport line.

[0079] S2: Control the locking device to adsorb the second material.

[0080] S3: Control the locking device to align the second material with the first material.

[0081] S4: Control the rotating mechanism to drive the second material to rotate until the second material is stuck into the slot of the first material.

[0082] S5: Start the transport line, and if the first material arrives at the second assembly station, pause the transport line.

[0083] S6: Control the screw driving device to screw screws into the screw holes of the first material and the second material.

[0084] The controlling the locking device to adsorb the second material comprises:

[0085] S21: Control the rotating mechanism to move above the loading area.

[0086] S22: Power is supplied to the rotating mechanism so that the electromagnetic coil in the rotating mechanism generates magnetic force.

[0087] S23: adsorbing the first material onto the rotating mechanism.

[0088] The method of controlling the screw driving device to screw the screws into the screw holes of the first material and the second material includes:

[0089] S61: Feed the screw in the feeding tube into the second through hole.

[0090] S62: Control the screwdriver to move downward until the screwdriver abuts against the screw.

[0091] S63: Align the screw with the screw holes on the first material and the second material.

[0092] S64: Open the clamping jaws to allow the screw to fall into the screw holes of the first material and the second material.

[0093] S65: Control the screwdriver to screw the screws into the screw holes of the first material and the second material.

[0094] Start the transport line 1, which drives the first material 6 to move to the first assembly station 2. The RFID (Radio Frequency Identification) module automatically obtains the model information corresponding to the second material 7, generates a corresponding serial number, and uploads it to the associated server for storage, so that the production information can be retrieved later to trace the manufacturing process and strengthen the equipment supervision process control capability. When the photoelectric sensor senses that the first material 6 is located at the first assembly station 2, the output signal is fed back to the PLC. After receiving the signal, the PLC controls the first blocking mechanism 21 to extend to prevent the first material 6 from continuing to move, and at the same time controls the transport line 1 to stop operating.

[0095] Then, the locking device 4 is controlled to move to the top of the loading area, and power is supplied to the rotating mechanism 9, so that the electromagnetic coil 11 in the rotating mechanism 9 generates magnetic force. The rotating mechanism 9 automatically absorbs the second material 7 through magnetic force, and accurately locates it to the first assembly station 2 through the visual recognition device. After the rotating mechanism 9 absorbs the second material 7, it moves to the first assembly station 2, and aligns the second material 7 with the first material 6 before putting the second material 7 down. When the second material 7 is located at the first assembly station 2, the cylinder is started, and the cylinder drives the rotating mechanism 9 to press down, and the rotating mechanism 9 is driven to rotate by the motor, and the rotating mechanism 9 then drives the second material 7 to rotate, so that the second material 7 is stuck in the slot 24 of the first material 6.

[0096] After the locking device 4 completes the locking process of the second material 7 and the first material 6, the first blocking mechanism 21 is controlled to retract, and the transport line 1 is started. The transport line 1 drives the first material 6 to continue to move to the second assembly station 3. When the photoelectric sensor senses that the first material 6 is located at the second assembly station 3, the output signal is fed back to the PLC. After the PLC receives the signal, the second blocking mechanism 22 extends to prevent the first material 6 from continuing to move, and at the same time controls the transport line 1 to stop operating.

[0097] Then, an industrial camera is used to take a picture, and the second screw hole of the second material 7 is identified. The captured information is sent to the screw driving device 5, and the screw driving device 5 moves to the top of the second screw hole according to the generated path. The screw driving device 5 feeds the screw 8 in the feeding tube 20 into the second through hole 18, and the screw 8 falls into the first through hole 16 through the second through hole 18. At this time, the two clamping jaws 14 of the clamping mechanism 13 clamp the screw 8, and the screwdriver 19 passes through the second through hole 18 and moves downward until the screwdriver 19 abuts against the screw 8. The screw driving device 5 drives the screw 8 to press down until the screw 8 is aligned with the screw holes of the first material 6 and the second material 7, and controls the two clamping jaws 14 of the clamping mechanism 13 to open, so that the screw 8 falls directly into the screw holes of the first material 6 and the second material 7. The motor shaft of the screw tightening motor drives the screwdriver 19 to rotate, and the screwdriver 19 rotates to screw the screw 8 into the screw holes of the first material 6 and the second material 7.

[0098] After the screw driving device 5 screws the screw 8 into the first screw hole of the first material 6 and the second screw hole of the second material 7, the second blocking mechanism 22 is controlled to retract, and the conveyor line 1 is restarted. The conveyor line 1 drives the first material 6 to continue to move to the inspection station, and the industrial camera is used to take pictures to obtain the assembled images of the first material 6 and the second material 7, and the height difference is compared with the correctly assembled image in the system to identify whether it meets the requirements. If the system determines that the assembly is successful, the second material 7 flows into the next station; if the system determines that the installation fails, an alarm signal is issued to remind the manual offline.

[0099] When the transport line 1 of this embodiment drives the first material 6 to move to the second assembly station 3, the screw driving device 5 moves to the top of the screw hole 8 of the first material 6 and the second material 7, and the screw 8 in the feeding tube 20 is fed into the second through hole 18, and then fed into the first through hole 16 through the second through hole 18. The screw 8 is clamped by the two clamping claws 14 of the clamping mechanism 13, and the screw driver 19 is controlled to move downward until it contacts the screw 8. Then the screw driving device 5 is controlled to drive the screw 8 to press down, and the screw 8 is directly aligned with the screw hole 8 on the first material 6 and the second material 7. The two clamping claws 14 are opened to make the screw 8 fall into the screw hole 8, and then the motor shaft of the screw driving motor is controlled to drive the screw driver 19 to rotate, so as to screw the screw 8 into the screw hole 8 of the first material 6 and the second material 7. In the above process, the second material 7 is automatically clamped into the first material 6 by using the locking device 4, which solves the problem of high labor intensity and low efficiency in manual assembly, greatly improves production efficiency, reduces labor costs, and achieves the purpose of reducing staff and increasing efficiency. By utilizing the screw driving device 5, automatic screw driving 8 is realized on the second material 7 and the first material 6, thereby solving the problem of missing screws 8 or not tightening the screws 8 during manual assembly. This allows the second material 7 to be assembled on the first material 6 with higher assembly accuracy, and the torque for driving the screws 8 is also relatively stable, thereby greatly improving the production quality.

[0100] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values ​​of the parts and steps set forth in these embodiments do not limit the scope of the application. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a restriction. Therefore, other examples of exemplary embodiments can have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, and therefore, once a certain item is defined in an accompanying drawing, it does not need to be further discussed in the subsequent accompanying drawings.

[0101] It should be understood that spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is inverted, a device described as "above" or "above" other devices or structures would then be positioned "below" or "below" the other devices or structures. Thus, the exemplary term "above" can include both the orientations of "above" and "below." The device may also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used herein should be interpreted accordingly.

[0102] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. Unless otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of this application.

[0103] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A material assembly system, characterized in that: The invention comprises a transport line, on which a first assembly station and a second assembly station are adjacently arranged, a locking device is arranged near the first assembly station, and a screw driving device is arranged near the second assembly station; a first material is placed on the transport line, and when the transport line drives the first material to move to the first assembly station, the locking device locks the second material on the first material in a rotating manner; when the first material moves to the second assembly station, the screw driving device is used to screw screws into the first material and the second material.

2. The material assembly system according to claim 1, characterized in that: The locking device includes a rotating mechanism, the rotating mechanism is connected to a rotating motor, and the rotating mechanism is used to drive the second material to rotate so as to clamp the second material into the first material.

3. The material assembly system according to claim 2, characterized in that: The rotating mechanism is a disc-shaped structure, and an electromagnetic coil is arranged inside the rotating mechanism.

4. The material assembly system according to claim 2, characterized in that: The locking device further comprises a first shell, the first shell is located at a side of the rotating motor away from the rotating mechanism, and the rotating motor is arranged in the first shell.

5. The material assembly system according to claim 1, characterized in that: The screw driving device comprises a clamping mechanism, wherein the clamping mechanism comprises clamping jaws arranged opposite to each other, and the clamping jaws are used to clamp the screw.

6. The material assembly system according to claim 5, characterized in that: The screw driving device further comprises a second shell, a first through hole is arranged in the second shell, the first through hole is located between the two clamping jaws, and the screw rod of the screw passes through the first through hole.

7. The material assembly system according to claim 6, characterized in that: A second through hole is provided in the second shell body, the second through hole is located above the first through hole, and the second through hole is aligned with the first through hole; a screwdriver is provided near the second through hole.

8. The material assembly system according to claim 7, characterized in that: The screw driving device further comprises a feeding pipe, the feeding pipe is communicated with the second through hole, and the screw enters the second through hole through the feeding pipe.

9. The material assembly system according to claim 1, characterized in that: A first blocking mechanism is provided on one side of the first assembly station, and the first blocking mechanism is used to block the first material when the first material moves to the first assembly station; a second blocking mechanism is provided on one side of the second assembly station, and the second blocking mechanism is used to block the first material when the first material moves to the second assembly station.

10. The material assembly system according to any one of claims 1 to 9, characterized in that: The first material is an air conditioner outdoor unit panel, and the second material is a grille.

11. A material automatic assembly method, characterized in that: Based on the material assembly system according to any one of claims 1 to 10, the method comprises: Starting the transport line, and if the first material arrives at the first assembly station, pausing the transport line; Controlling the locking device to adsorb the second material; Controlling the locking device to align the second material with the first material; Controlling the rotating mechanism to drive the second material to rotate until the second material is stuck into the slot of the first material; Starting the transport line, and if the first material arrives at the second assembly station, pausing the transport line; The screw driving device is controlled to screw screws into the screw holes of the first material and the second material.

12. The material automatic assembly method according to claim 11, characterized in that: The controlling the locking device to adsorb the second material comprises: Controlling the rotating mechanism to move above the loading area; supplying power to the rotating mechanism so that the electromagnetic coil in the rotating mechanism generates magnetic force; The first material is adsorbed onto the rotating mechanism.

13. The material automatic assembly method according to claim 11, characterized in that: The method of controlling the screw driving device to screw the screws into the screw holes of the first material and the second material includes: Feed the screw in the feeding tube into the second through hole; Controlling the screwdriver to move downward until the screwdriver abuts against the screw; Aligning the screw with the screw holes on the first material and the second material; Opening the clamping jaws to allow the screw to fall into the screw holes of the first material and the second material; The screwdriver is controlled to screw the screws into the screw holes of the first material and the second material.