Multi-layer steel structure large-span corridor lifting device and mounting method

By using the gear transmission cooperation of rail components and lifting components in the installation of steel corridors, combined with the precise control of intelligent control modules, the problem of steel corridors being susceptible to environmental factors during the installation process is solved, and an efficient and accurate installation process is achieved, and construction efficiency and safety are improved.

CN119774434AInactive Publication Date: 2025-04-08CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202510206925.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-25
Publication Date
2025-04-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When installing large-span steel corridors, the existing technology is susceptible to environmental factors to cause the steel corridor to shake, which increases the difficulty of docking with wall embedded parts. Especially in the installation of multi-layer corridors, repeated docking processes lead to an extended construction cycle and reduced efficiency.

Method used

By setting track components on both sides of the floor and lifting components on both sides of the steel corridor body, the steel corridor body is stably raised by gear transmission. At the same time, an intelligent control module is introduced, including infrared sensors, displacement sensors and drive motors, to control the lifting, calibration and fixing process of the steel corridor body to ensure accurate positioning and attitude adjustment.

Benefits of technology

The stability and accuracy of the steel corridor body in the improvement process is achieved, the docking process is reduced, the construction efficiency is improved, the construction cycle is shortened, and the safety of the corridor structure is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119774434A_ABST
    Figure CN119774434A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-layer steel structure large-span corridor lifting device and an installation method, and relates to the technical field of steel corridor installation, the multi-layer steel structure large-span corridor lifting device comprises a steel corridor body, two lifting assemblies are arranged at the two ends of the steel corridor body, and each lifting assembly comprises two corridor clamps which are arranged on the two sides of the middle of a lifting frame correspondingly; the driving motor is fixedly arranged at the position, located above the corridor clamp, of the lifting frame, the rail assembly comprises a fixing frame and a rack, the fixing frame is fixed to floor walls on the two sides through opposite-pull screws, the rack is arranged on the side, close to the middle, of the fixing frame in the vertical direction, the lifting assembly is arranged on the fixing frame in a sliding mode, and the calibration assembly comprises a control module. The control module is used for controlling operation of the lifting assembly and controlling the posture of the steel corridor body in the lifting process, and the problems that in the prior art, when the steel corridor is hung, shaking is prone to being affected by environmental factors, so that butt joint is difficult, especially when a multi-layer corridor is installed, the butt joint process is repeated, time and labor are wasted, and the construction efficiency is reduced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel corridor installation, and in particular to a multi-layer steel structure large-span corridor lifting device and an installation method. Background Art

[0002] Steel structure corridors, with their light weight, high strength and fast construction, have been widely used in commercial buildings, industrial plants and civil buildings. Especially in super high-rise buildings and large industrial parks, it is not only an elegant transition between indoor and outdoor spaces, but also plays a key connection and support function. For the installation of large-span steel corridors, the conventional practice is to complete the assembly on the ground first, and then use the hydraulic lifting device and cable system to lift it to the preset position for assembly and docking. Although this practice improves construction efficiency, it faces many challenges in actual operation, especially in the docking link. Due to the interference of environmental factors such as wind and temperature, the steel corridor is prone to shaking during hoisting, which increases the difficulty of accurate docking with the embedded parts of the wall. Especially in the installation scenario of multi-layer corridors, each layer needs to go through this complex and time-consuming docking adjustment process, which not only greatly extends the construction period, but also significantly reduces the overall construction efficiency. Summary of the invention

[0003] The embodiment of the present invention provides a multi-story steel structure large-span corridor lifting device and installation method. Track components are arranged on both sides of the floor, and lifting components are arranged on both sides of the assembled steel corridor body. The gear transmission of the two cooperates to make the steel corridor body rise stably without being affected by environmental factors. At the same time, the control console in the control module coordinates the basic lifting control module and the angle adjustment module to ensure that the steel corridor body accurately stops on the corresponding wall embedded connection parts, reducing the docking process, and solving the problem that the existing technology is easily affected by environmental factors when the steel corridor is suspended and shakes, resulting in difficulty in docking with the wall embedded parts. Especially when installing multi-story corridors, this docking process is repeated, which is time-consuming and labor-intensive and reduces the construction efficiency.

[0004] A multi-story steel structure large-span corridor lifting device, comprising a steel corridor body, wherein the two ends of the steel corridor body are provided with docking parts, comprising a lifting assembly, a track assembly and a calibration assembly, wherein there are two lifting assemblies, which are arranged at the two ends of the steel corridor body, the lifting assembly comprises a lifting frame, a driving motor and a corridor clamp, and the corridor clamp has two, which are respectively arranged on both sides of the middle part of the lifting frame, and the corridor clamp is used to clamp and fix the steel corridor body, the driving motor is fixedly arranged on the lifting frame at a position above the corridor clamp, the track assembly comprises a fixed frame and a rack, the fixed frame is fixed to the floor walls on both sides by tension screws, a rack is arranged on one side of the fixed frame near the middle in the vertical direction, the lifting assembly is slidably arranged on the fixed frame, and a transmission gear is arranged at the output end of the driving motor, the transmission gear passes through the lifting frame and meshes with the rack, and the calibration assembly comprises a control module, and the control module is used to control the operation of the lifting assembly and control the posture of the steel corridor body during the lifting process.

[0005] Furthermore, a main fixing plate is provided in the middle of one side of the lifting frame, and a motor fixing plate is provided on the other side near the top. Sliders are provided at the four corners of the lifting frame on this side. The driving motor is fixed to the motor fixing plate from the direction of the main fixing plate, and its output shaft passes through the motor fixing plate.

[0006] Furthermore, the corridor clamp includes a connecting plate arranged on the main fixing plate, an embedded plate is arranged on the connecting plate, and a clamping screw is threadedly connected to one side of the embedded plate. After the steel corridor body is placed on the embedded plate and the clamping screw is tightened, the steel corridor body is fixed to the embedded plate.

[0007] Furthermore, the fixed frame includes two first vertical channel steels and two horizontal channel steels, a guide rail is arranged on one side of the first vertical channel steel, a second vertical channel steel is arranged between the two horizontal channel steels, a tension screw is arranged between the second vertical channel steel and the floor wall, the rack is fixedly arranged on one side of the second vertical channel steel, the slider on the lifting assembly is slidably arranged on the guide rail, and the transmission gear on the output end of the driving motor is meshed with the rack.

[0008] Further, the control module includes a basic lifting control module, a calibration module, an angle adjustment module and a control console;

[0009] The basic lifting control module is used to control the operation of the lifting component on the track component.

[0010] The calibration module is used to calibrate that any of the docking parts on the steel corridor body are in the same vertical position relationship with the pre-buried connectors on the floor in the vertical direction;

[0011] The angle adjustment module is used to obtain the angle state of the steel corridor body during the lifting process, so as to fine-tune the lifting posture of the steel corridor body;

[0012] The control console is used to realize the control synchronization of the above modules.

[0013] Furthermore, the foundation lifting control module includes two pressure sensors and several displacement sensors. Two right-angle steel plates are respectively arranged at both ends of the second vertical channel steel close to the rack. The pressure sensors are respectively arranged on opposite sides of the two right-angle steel plates. The displacement sensor is arranged on one side of the first vertical channel steel. The number of the displacement sensors is the same as the number of the steel corridor bodies. Each of the displacement sensors is respectively arranged at the connecting parts of each floor.

[0014] Furthermore, the calibration module includes two infrared sensors, which are arranged on both sides of the lifting frame and located above the corridor clamp.

[0015] Furthermore, the angle adjustment module includes an inclination sensor, and the inclination sensor is arranged above the steel corridor body.

[0016] Furthermore, the console is electrically connected to the drive motor, the pressure sensor, the displacement sensor, the infrared sensor and the inclination sensor respectively.

[0017] In a second aspect, an embodiment of the present invention provides a method for installing a multi-story steel structure long-span corridor, comprising the following steps:

[0018] S1. Preparation before construction: embed the connectors on the floor according to the construction drawings, determine the installation position of the track assembly, and the initial assembly position of the steel corridor body;

[0019] S2, laying the track assembly, laying the track assembly based on the track assembly installation position determined in step S1, fixing the track assembly in the wall by tensioning screws, and testing the structural strength;

[0020] S3, assembling the steel corridor body, assembling multiple levels of steel corridor bodies at the initial assembly position of the steel corridor body, and arranging them outward in order from high level to low level, and a movable tire frame is set at the bottom of each steel corridor body as an auxiliary support tool;

[0021] S4, installation of lifting components, installing lifting components on both sides of the steel corridor body, and setting the lifting components on the track components on the buildings on both sides;

[0022] S5, initial position calibration, calibrating the position of the steel corridor body based on the infrared sensor, and finally fixing it by lifting the corridor clamp on the assembly;

[0023] S6, lifting the steel corridor body, starting the lifting components on both sides through the basic lifting control module, so that the steel corridor body is moved to the target position, and then the steel corridor body is aligned and fixed with the pre-buried connection parts on the building body;

[0024] S7, dynamic calibration, during the lifting process of the steel corridor body, the angle tilt data thereof is obtained through the angle adjustment module, thereby respectively controlling the power of the two driving motors to correct the angle posture of the steel corridor body;

[0025] S8. Install the steel corridor bodies of the subsequent levels, move the subsequent steel corridor bodies to the initial assembly position, and repeat steps 4-7.

[0026] The beneficial effects of the above technical solution provided by the embodiment of the present invention include at least:

[0027] Through the gear transmission method between the track assembly and the lifting assembly, compared with the existing cable suspension method, the steel corridor body can be stably raised without being affected by environmental factors and shaking; the introduction of intelligent control modules, such as the cooperation of infrared sensors, position sensors and drive motors, makes the lifting, calibration and fixing processes of the steel corridor body faster and more accurate. At the same time, the angle adjustment module in the dynamic calibration technology can monitor and correct the angle posture of the steel corridor body in real time during the lifting process to ensure that it always maintains the correct position and posture, thereby enhancing the safety of the entire corridor structure; the use of this intelligent control system and automated equipment improves construction efficiency and shortens the construction period.

[0028] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0029] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0031] Figure 1 It is a schematic diagram of the overall structure disclosed in the embodiment of the present invention;

[0032] Figure 2 Figure 1 The structural diagram at A in the middle;

[0033] Figure 3 A structural schematic diagram of a lifting assembly disclosed in an embodiment of the present invention from one perspective;

[0034] Figure 4 A structural schematic diagram of a lifting assembly disclosed in an embodiment of the present invention from another perspective;

[0035] Figure 5 It is a schematic structural diagram of a track assembly disclosed in an embodiment of the present invention;

[0036] Figure 6 It is a schematic diagram of the structure of the track assembly and the lifting assembly disclosed in the embodiment of the present invention;

[0037] Figure 7 A communication block diagram disclosed in an embodiment of the present invention;

[0038] Figure 8 The present invention discloses a flow chart of a method for installing a multi-story steel structure long-span corridor.

[0039] Reference numerals:

[0040] 10. Steel corridor body; 11. Docking part; 20. Track assembly; 21. Fixed frame; 2101. First vertical channel steel; 2102. Second vertical channel steel; 2103. Horizontal channel steel; 22. Guide rail; 23. Rack; 30. Lifting assembly; 31. Lifting frame; 3101. Main fixing plate; 3102. Motor fixing plate; 32. Sliding block; 33. Driving motor; 3301. Transmission gear; 34. Corridor clamp; 3401. Connecting plate; 3402. Embedded plate; 3403. Clamping screw; 40. Control module; 41. Control console; 42. Basic lifting control module; 4201. Pressure sensor; 4202. Displacement sensor; 43. Calibration module; 4301. Infrared sensor; 44. Angle adjustment module; 4401. Inclination sensor; 50. Connecting parts. DETAILED DESCRIPTION

[0041] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0042] Embodiment 1

[0043] like Figure 1-2 As shown, an embodiment of the present invention provides a multi-story steel structure large-span corridor lifting device, including a steel corridor body 10, and docking parts 11 are provided at both ends of the steel corridor body 10. A corresponding number of steel corridor bodies 10 are assembled based on corridors at the same vertical position on the construction drawings, and lifting components 30 are assembled at both ends of each steel corridor body 10. At the same time, track components 20 are vertically erected at the embedded connectors 50 on both sides of the wall. Through the gear transmission mechanism between the lifting component 30 and the two track components 20, the steel corridor body 10 is smoothly lifted. When the steel corridor body 10 is lifted to the predetermined position, the relevant sensor will immediately detect and stop moving to ensure accurate positioning. Subsequently, the steel corridor body 10 is fixed to the connector 50 on the wall. It should be noted that when lifting and fixing the multi-story steel structure corridor, the top-down order should be followed to ensure construction safety and efficiency.

[0044] like Figure 3-4 As shown, there are two lifting assemblies 30, which are arranged at both ends of the steel corridor body 10. The lifting assemblies 30 include a lifting frame 31, a driving motor 33 and a corridor clamp 34. A main fixing plate 3101 is arranged in the middle of one side of the lifting frame 31, and a motor fixing plate 3102 is arranged on the other side near the top. Sliders 32 are arranged at the four corners of the lifting frame 31 on this side. The driving motor 33 is fixed to the motor fixing plate 3102 from the direction of the main fixing plate 3101, and its output shaft passes through the motor fixing plate 3102. There are two corridor clamps 34, which are respectively arranged on both sides of the middle part of the lifting frame 31. The corridor clamps 34 are used to clamp and fix the steel corridor body 10.

[0045] Among them, the corridor clamp 34 includes a connecting plate 3401 arranged on the main fixing plate 3101, and an embedded plate 3402 is arranged on the connecting plate 3401. A clamping screw 3403 is threadedly connected to one side of the embedded plate 3402. The cross-section of the embedded plate 3402 is L-shaped. The embedded plate 3402 of this shape can quickly hang the steel corridor body 10 on two sets of corridor clamps 34. After the calibration module 43 calibrates the unknown steel corridor body 10, the clamping screw 3403 can be tightened to fix the steel corridor body 10 on the embedded plate 3402.

[0046] like Figure 5As shown, the track assembly 20 includes a fixed frame 21 and a rack 23. The fixed frame 21 is fixed to the floor walls on both sides by tension screws. A rack 23 is provided on one side of the fixed frame 21 near the middle in the vertical direction. The lifting assembly 30 is slidably set on the fixed frame 21, and a transmission gear 3301 is provided at the output end of the driving motor 33. The transmission gear 3301 passes through the lifting frame 31 and meshes with the rack 23. The calibration assembly includes a control module 40. The control module 40 is used to control the operation of the lifting assembly 30 and control the posture of the steel corridor body 10 during the lifting process.

[0047] Furthermore, the fixed frame 21 includes two first vertical channel steels 2101 and two horizontal channel steels 2103, a guide rail 22 is arranged on one side of the first vertical channel steel 2101, a second vertical channel steel 2102 is arranged between the two horizontal channel steels 2103, a tension screw is arranged between the second vertical channel steel 2102 and the floor wall, and the rack 23 is fixedly arranged on one side of the second vertical channel steel 2102. Since the second vertical channel steel 2102 is the main force-bearing part of the rack 23, its stability is ensured by the tension screw to avoid loosening during the gear transmission process to cause a safety accident.

[0048] like Figure 6 As shown, the slider 32 on the lifting assembly 30 is slidably set on the guide rail 22, and the two cooperate to ensure the sliding stability of the lifting assembly 30 on the track assembly 20, and the transmission gear 3301 on the output end of the driving motor 33 is engaged with the rack 23.

[0049] like Figure 7 As shown, the control module 40 includes a base lifting control module 42, a calibration module 43, an angle adjustment module 44 and a control console 41, wherein:

[0050] The basic lifting control module 42 is used to control the operation of the lifting component 30 on the track component 20, including two pressure sensors 4201 and a plurality of displacement sensors 4202. Two right-angle steel plates are respectively arranged at both ends of one side of the second vertical channel steel 2102 close to the rack 23. The pressure sensors 4201 are respectively arranged on the opposite sides of the two right-angle steel plates. The function of the pressure sensor 4201 is mainly to transmit an emergency stop signal when the lifting component 30 is at the upper and lower critical values ​​on the track to avoid the driving motor 33 from continuing to run after being at the extreme value, thereby causing a construction accident. Specifically, when the lifting component 30 is at the upper and lower critical values ​​on the track, the driving motor 33 is prevented from continuing to run after being at the extreme value, thereby causing a construction accident. When the component 30 moves to any end point of the track component 20, the lifting frame 31 contacts the pressure sensor 4201, and a signal is generated to the control console 41, thereby controlling the drive motor 33 to stop. The displacement sensor 4202 is set on one side of the first vertical channel steel 2101. The number of displacement sensors 4202 is the same as the number of the steel corridor body 10. Each displacement sensor 4202 is respectively set at the connecting member 50 on each floor. It is used to transmit a signal to the control console 41 when it is checked that the lifting component 30 rises to the preset position (that is, the docking point of the connecting member 50), thereby controlling the drive motor 33 to stop.

[0051] The calibration module 43 is used to calibrate any docking part 11 on the steel corridor body 10 to be in the same vertical position relationship with the pre-buried connecting parts 50 on the floor in the vertical direction. It includes two infrared sensors 4301. The infrared sensors 4301 are arranged on both sides of the lifting frame 31 and are located above the corridor clamp 34. When the steel corridor body 10 is placed on the embedded plate 3402, the edge contours of the docking parts 11 at both ends are at the same distance from the two sides of the lifting frame 31. A loudspeaker for auxiliary warning can be set here to make voice broadcasts according to the numerical deviation to assist construction personnel in fine-tuning to quickly fix it.

[0052] The angle adjustment module 44 is used to obtain the angle state of the steel corridor body 10 during the lifting process, so as to fine-tune the lifting posture of the steel corridor body 10. The angle adjustment module 44 includes an inclination sensor 4401. The inclination sensor 4401 is arranged above the steel corridor body 10. Due to the assembly and parts errors or the different gravity effects on the two lifting components 30 during the gear transmission process, the steel corridor body 10 may tilt. When the steel corridor body 10 is detected to be tilted, the operating power of the drive motors 33 on both sides is controlled based on the tilt direction, thereby modulating it to be consistent with the angle in the drawing.

[0053] The control console 41 is used to realize the control synchronization of the basic lifting control module 42, the calibration module 43 and the angle adjustment module 44.

[0054] The control console 41 is electrically connected to the driving motor 33 , the pressure sensor 4201 , the displacement sensor 4202 , the infrared sensor 4301 and the inclination sensor 4401 , respectively.

[0055] Embodiment 2

[0056] The embodiment of the present invention also discloses a method for installing a multi-layer steel structure long-span corridor, such as Figure 8 , including the following steps:

[0057] S1. Preparation before construction

[0058] Before construction, first of all, according to the requirements of the construction drawings, the connectors 50 are embedded in the floor. These connectors 50 will serve as fixing points between the subsequent steel corridor body 10 and the floor wall. At the same time, the installation position of the track assembly 20 and the initial assembly position of the steel corridor body 10 on the ground need to be determined.

[0059] S2. Track assembly 20 laying

[0060] After determining the installation position of the track assembly 20, the laying work of the track assembly 20 begins. The track assembly 20 is fixed to the wall by tension screws to ensure that it will not shift or loosen during the subsequent construction process. After the laying is completed, the structural strength of the track assembly 20 needs to be tested to ensure that it can withstand the huge load during the lifting process of the steel corridor body 10.

[0061] S3, Steel Corridor Body 10 Assembly

[0062] At the initial assembly position of the steel corridor body 10, multiple levels of steel corridor bodies 10 are arranged outward in sequence from high level to low level. At the same time, a movable tire frame is set at the bottom of each steel corridor body 10 as an auxiliary support tool to facilitate the movement of the subsequently assembled steel corridor body 10.

[0063] S4, installation of lifting assembly 30

[0064] Lifting assemblies 30 are installed on both sides of the steel corridor body 10, and these lifting assemblies 30 are respectively set on the track assemblies 20 on the buildings on both sides. The installation of the lifting assemblies 30 needs to ensure that they fit closely with the track assemblies 20 and run smoothly. At the same time, various functions of the lifting assemblies 30 need to be tested to ensure that they can start, stop and run normally.

[0065] S5. Initial position calibration

[0066] After the lifting assembly 30 is installed, the position calibration of the steel corridor body 10 is performed based on the infrared sensor 4301. The infrared sensor 4301 can accurately measure the position of the steel corridor body 10 on the lifting assembly 30, thereby ensuring that the two ends of the steel corridor body 10 and the pre-buried connectors 50 on the wall are in the same vertical position. After the calibration is completed, the steel corridor body 10 is finally fixed by the corridor clamp 34 on the lifting assembly 30 to prevent shaking or falling off during the lifting process.

[0067] S6, steel corridor main body 10 promotion

[0068] The lifting components 30 on both sides are started through the basic lifting control module 42, so that the steel corridor body 10 can be smoothly moved to the target position along the track component 20. When the displacement sensor 4202 detects that the steel corridor body 10 has moved to the target position, it sends a signal to the control console 41 to control the drive motor 33 to stop running, and fixes the steel corridor body 10 to the floor wall through the embedded connecting parts 50.

[0069] S7, Dynamic Calibration

[0070] During the lifting process of the steel corridor body 10, the angle inclination data is obtained in real time through the angle adjustment module 44. These data can reflect the posture changes of the steel corridor body 10 during the lifting process, so as to timely discover and correct possible deviations. According to the angle inclination data, the power of the two drive motors 33 is controlled respectively to correct the angle posture of the steel corridor body 10 to ensure that it always maintains an angle and posture consistent with the requirements of the construction drawings.

[0071] S8. Installation of the steel corridor body 10 at the subsequent levels

[0072] After completing the installation of the steel corridor body 10 of the current level, move the steel corridor body 10 of the subsequent level to the initial assembly position, and repeat the process from step 4 to step 7. During the repetitive process, special attention should be paid to the connection and fixing method between the steel corridor bodies 10 of each level to ensure the stability and safety of the entire corridor structure.

[0073] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of protection of the present disclosure. The attached method claims present the elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.

[0074] In the above detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that the embodiments of the claimed subject matter require more features than are clearly stated in each claim. On the contrary, as reflected in the appended claims, the invention is in a state of having less than all the features of the disclosed individual embodiments. Therefore, the appended claims are hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.

[0075] Those skilled in the art will also appreciate that the various illustrative logic blocks, modules, circuits, and algorithmic steps described in conjunction with the embodiments herein can all be implemented as electronic hardware, computer software, or a combination thereof. In order to clearly illustrate the interchangeability between hardware and software, various illustrative components, blocks, modules, circuits, and steps are generally described above around their functions. Whether such functions are implemented as hardware or software depends on specific applications and the design constraints imposed on the entire system. A skilled person can implement the described functions in an alternative manner for each specific application, but such implementation decisions should not be interpreted as departing from the scope of protection of the present disclosure.

[0076] The steps of the method or algorithm described in conjunction with the embodiments herein may be directly embodied as hardware, a software module executed by a processor, or a combination thereof. The software module may be located in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a mobile disk, a CD-ROM, or any other form of storage medium well known in the art. An exemplary storage medium is connected to the processor so that the processor can read information from the storage medium and can write information to the storage medium. Of course, the storage medium may also be an integral part of the processor. The processor and the storage medium may be located in an ASIC. The ASIC may be located in a user terminal. Of course, the processor and the storage medium may also be present in a user terminal as discrete components.

[0077] For software implementation, the techniques described in this application can be implemented with modules (e.g., procedures, functions, etc.) that perform the functions described in this application. These software codes can be stored in a memory unit and executed by a processor. The memory unit can be implemented within the processor or outside the processor. In the latter case, it is coupled to the processor in a communication manner via various means, which are well known in the art.

[0078] The above description includes examples of one or more embodiments. Of course, it is impossible to describe all possible combinations of components or methods for the purpose of describing the above embodiments, but it should be recognized by those skilled in the art that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications and variations that fall within the scope of protection of the appended claims. In addition, with respect to the term "comprising" used in the specification or claims, the word is covered in a manner similar to the term "including", just as "including," is explained as a transitional word in the claims. In addition, any term "or" used in the specification of the claims is intended to mean "non-exclusive or".

Claims

1. A multi-story steel structure long-span corridor lifting device, comprising a steel corridor body (10), wherein both ends of the steel corridor body (10) are provided with a butt joint (11), characterized in that: The invention comprises a lifting assembly (30), a track assembly (20) and a calibration assembly. The lifting assembly (30) has two components and is arranged at two ends of the steel corridor body (10). The lifting assembly (30) comprises a lifting frame (31), a driving motor (33) and a corridor clamp (34). The corridor clamp (34) has two components and is arranged at two sides of the middle of the lifting frame (31). The corridor clamp (34) is used to clamp and fix the steel corridor body (10). The driving motor (33) is fixedly arranged on the lifting frame (31) at a position above the corridor clamp (34). The track assembly (20) comprises a fixing frame (2 1) and a rack (23), the fixed frame (21) is fixed to the floor walls on both sides by means of tension screws, a rack (23) is arranged on one side of the fixed frame (21) close to the middle in the vertical direction, the lifting assembly (30) is slidably arranged on the fixed frame (21), and a transmission gear (3301) is arranged at the output end of the driving motor (33), the transmission gear (3301) passes through the lifting frame (31) and meshes with the rack (23), the calibration assembly includes a control module (40), the control module (40) is used to control the operation of the lifting assembly (30), and control the posture of the steel corridor body (10) during the lifting process.

2. A multi-story steel structure long-span corridor lifting device as claimed in claim 1, characterized in that: A main fixing plate (3101) is arranged in the middle of one side of the lifting frame (31), and a motor fixing plate (3102) is arranged on the other side close to the top. Slide blocks (32) are arranged at the four corners of the lifting frame (31) on this side. The driving motor (33) is fixed to the motor fixing plate (3102) from the direction of the main fixing plate (3101), and its output shaft passes through the motor fixing plate (3102).

3. A multi-story steel structure long-span corridor lifting device as claimed in claim 2, characterized in that: The corridor clamp (34) includes a connecting plate (3401) arranged on the main fixing plate (3101), and an embedded plate (3402) is arranged on the connecting plate (3401). One side of the embedded plate (3402) is threadedly connected with a clamping screw (3403). After the steel corridor body (10) is placed on the embedded plate (3402), the clamping screw (3403) is tightened to fix the steel corridor body (10) to the embedded plate (3402).

4. A multi-story steel structure long-span corridor lifting device as claimed in claim 2, characterized in that: The fixed frame (21) includes two first vertical channel steels (2101) and two horizontal channel steels (2103), a guide rail (22) is arranged on one side of the first vertical channel steel (2101), a second vertical channel steel (2102) is arranged between the two horizontal channel steels (2103), a tension screw is arranged between the second vertical channel steel (2102) and the floor wall, the rack (23) is fixedly arranged on one side of the second vertical channel steel (2102), the slider (32) on the lifting component (30) is slidably arranged on the guide rail (22), and the transmission gear (3301) on the output end of the driving motor (33) is meshed with the rack (23).

5. A multi-story steel structure long-span corridor lifting device as claimed in claim 4, characterized in that: The control module (40) comprises a basic lifting control module (42), a calibration module (43), an angle adjustment module (44) and a control console (41); The basic lifting control module (42) is used to control the operation of the lifting assembly (30) on the track assembly (20) The calibration module (43) is used to calibrate any of the docking parts (11) on the steel corridor body (10) to be in the same vertical position relationship with the pre-buried connection parts (50) on the floor in the vertical direction; The angle adjustment module (44) is used to obtain the angle state of the steel corridor body (10) during the lifting process, so as to fine-tune the lifting posture of the steel corridor body (10); The control console (41) is used to realize the control synchronization of the above modules.

6. A multi-story steel structure long-span corridor lifting device as claimed in claim 5, characterized in that: The foundation lifting control module (42) includes two pressure sensors (4201) and a plurality of displacement sensors (4202). Two right-angle steel plates are respectively arranged at both ends of one side of the second vertical channel steel (2102) close to the rack (23). The pressure sensors (4201) are respectively arranged on the opposite sides of the two right-angle steel plates. The displacement sensor (4202) is arranged on one side of the first vertical channel steel (2101). The number of the displacement sensors (4202) is the same as the number of the steel corridor body (10). Each of the displacement sensors (4202) is respectively arranged at the connecting piece (50) of each floor.

7. A multi-story steel structure long-span corridor lifting device as claimed in claim 6, characterized in that: The calibration module (43) comprises two infrared sensors (4301), and the infrared sensors (4301) are arranged on both sides of the lifting frame (31) and located above the corridor clamp (34).

8. The multi-story steel structure long-span corridor lifting device according to claim 6, characterized in that: The angle adjustment module (44) comprises an inclination sensor (4401), and the inclination sensor (4401) is arranged above the steel corridor body (10).

9. The multi-story steel structure long-span corridor lifting device according to claim 6, characterized in that: The console (41) is electrically connected to the drive motor (33), the pressure sensor (4201), the displacement sensor (4202), the infrared sensor (4301) and the inclination sensor (4401), respectively.

10. A method for installing a multi-story steel structure long-span corridor, using a multi-story steel structure long-span corridor lifting device as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Preparation before construction: pre-embedding the connector (50) on the floor according to the requirements of the construction drawings, and determining the installation position of the track assembly (20) and the initial assembly position of the steel corridor body (10); S2, laying the track assembly (20), laying the track assembly (20) based on the installation position of the track assembly (20) determined in step S1, fixing the track assembly (20) in the wall by means of tension screws, and testing the structural strength; S3, assembling the steel corridor body (10), assembling multiple levels of steel corridor bodies (10) at the initial assembly position of the steel corridor body (10), and arranging them outward in order from the highest level to the lowest level, and a movable tire frame is provided at the bottom of each steel corridor body (10) as an auxiliary support tool; S4, installing the lifting assembly (30), installing the lifting assembly (30) on both sides of the steel corridor body (10) respectively, and setting the lifting assembly (30) on the track assembly (20) on the building bodies on both sides respectively; S5, initial position calibration, based on the infrared sensor (4301) to calibrate the position of the steel corridor body (10), and finally fix it through the corridor clamp (34) on the lifting assembly (30); S6, the steel corridor body (10) is lifted, and the lifting components (30) on both sides are activated by the basic lifting control module (42), so that the steel corridor body (10) is moved to the target position, and then the steel corridor body (10) is aligned and fixed with the pre-buried connection piece (50) on the building body; S7, dynamic calibration, during the lifting process of the steel corridor body (10), the angle tilt data thereof is obtained through the angle adjustment module (44), thereby respectively controlling the power of the two driving motors (33) to correct the angle posture of the steel corridor body (10); S8. Install the steel corridor bodies (10) of the subsequent layers, move the subsequent steel corridor bodies (10) to the initial assembly position, and repeat steps 4-7.

Citation Information

Patent Citations

  • Steel corridor lifting installation method and lifting device

    CN114876070A

  • Integral lifting device for high-altitude steel corridor and mounting method

    CN115872314A

  • Integral lifting method for high-altitude multi-layer multi-channel steel corridor

    CN118241874A

  • High-rise steel structure corridor lifting synchronous control system and control method

    CN118637492A

  • Construction structure and method for multi-layer steel corridor with inclined triangular support at bottom

    CN118686289A