An intelligent marshaling station - automatic train distribution and marshaling system

Through the intelligent marshalling station-train automatic distribution and decomposition system, the automatic distribution and mitigation system and a variety of algorithms are used to solve the problem of inefficient traditional manual train marshalling and dismantling plans, and efficient and accurate traffic organization and marshalling dismantling plans are achieved, and train turnover efficiency and station operation efficiency are improved.

CN119784311APending Publication Date: 2025-04-08GUANGZHOU BEIYANG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411829879.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-12
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

The traditional train marshalling and dismantling plan mainly relies on manual preparation, and it is impossible to fully consider all traffic flows, tray usage and tray adjustment operation at one time, resulting in high labor intensity, poor tray effect, unreasonable tray usage, and insufficient placing of aircraft adjustment capabilities, resulting in station congestion and delayed train departures.

Method used

Design an intelligent marshalling station-train automatic flow distribution and solution system, including a planning station, a train automatic flow distribution and relief system, a parameter maintenance database, a bureau-station integrated system, a station tuner system and a freight subsystem. Through iterative recursion, backtracking algorithm, backpack algorithm, etc., to achieve fast, accurate and efficient traffic organization and marshalling disassembly planning.

Benefits of technology

It has achieved rapid, accurate and efficient traffic organization and marshalling dismantling plan preparation, improved the utilization rate of the lane and the utilization rate of the aircraft, reduced the stopover time, and improved the efficiency of train turnover.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119784311A_ABST
    Figure CN119784311A_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent marshaling yard-train automatic flow distribution and disassembly system, comprising a planning platform, an automatic train flow distribution and relief system, a parameter maintenance database, a station integration system, a station dispatching subsystem and a freight subsystem; the automatic train flow distribution and relief system is used to receive data provided by the planning platform; the automatic train flow distribution and relief system realizes rapid, accurate and efficient vehicle flow organization and marshaling and disassembling plan preparation according to station conditions, track idle status, locomotive shunting task status and freight loading and unloading plans and loading and unloading requirements provided by the freight subsystem; the station dispatching subsystem receives and executes the marshaling and disassembling plan sent by the automatic train flow distribution and relief system; the parameter maintenance database provides experience data and judgment rules to the automatic train flow distribution and relief system; the present invention realizes rapid, accurate and efficient vehicle flow organization and marshaling and disassembling plan preparation, obtains high track utilization rate and locomotive utilization rate, reduces intermediate stops, and improves train turnover efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of railway transportation information technology, in particular to an intelligent marshaling station-train automatic flow distribution and assembly system. Background Art

[0002] The train flow distribution and marshaling and disassembling plan is the traffic organization plan for the entire railway. In the actual production activities and technical operations of the station, the traditional train marshaling and disassembling plan is mainly manually compiled by the station dispatchers and assistant dispatchers. After manually pushing the flow calculation and meeting with the planner to meet the traffic flow that meets the driving conditions in the next stage, the shunting hook plan is manually compiled, and it can only be compiled one hook at a time and one train at a time. Since it is impossible to consider all traffic flows at one time, the track usage and shunting machine usage cannot be considered in place at one time, the station dispatchers often conduct repeated experiments to find the best solution within a limited time. Not only is the labor intensity high, but some train marshaling and disassembling still cannot achieve the expected effect, the track is not used reasonably, the shunting machine capacity is not maximized, causing station congestion and train departure delays. The traditional train disassembly and marshaling plan that completely relies on the manual push flow of station assistants is no longer suitable for the requirements of high-speed, high-density and high-load transportation organization under the new system and new layout.

[0003] The influencing factors of the automatic train distribution and disassembly system are diverse, and the correlations between the influencing factors are complex. It is a high-dimensional, nonlinear combinatorial optimization problem. Researchers at home and abroad have done a lot of research on the problem of "optimal planning for automatic marshaling and disassembly", but many studies consider relatively simple factors, simply aiming to improve the accuracy of train marshaling and disassembly, or simply aiming to improve the utilization rate of shunting machines. Some solutions are too idealistic, based only on theory, and have low practical application value. Some models and algorithms have a single test sample, and the samples fail to cover various situations in the actual production process, so it is difficult to apply them in practice. Therefore, it is necessary to provide an intelligent marshaling yard-train automatic distribution and disassembly system to solve the above technical problems. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent marshaling yard - automatic train distribution and disassembly system to achieve fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation, obtain high track utilization and locomotive utilization, reduce stop time, and improve train turnover efficiency.

[0005] The present invention is achieved through the following technical solutions:

[0006] An intelligent marshaling yard-train automatic flow distribution and disassembly system comprises a planning desk, an automatic train flow distribution and relief system, a parameter maintenance database, a station-station integration system, a station dispatching subsystem and a freight subsystem; the automatic train flow distribution and relief system is used to receive data provided by the planning desk; the automatic train flow distribution and relief system realizes fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation according to the station conditions, track idle status, shunting task status provided by the station-station integration system and the freight loading and unloading plan and loading and unloading requirements provided by the freight subsystem; the station dispatching subsystem receives and executes the marshaling and disassembly plan sent by the automatic train flow distribution and relief system; the parameter maintenance database provides experience data and judgment rules to the automatic train flow distribution and relief system.

[0007] As a further improvement of the technical solution of the present invention, the planning desk is used to issue shift plans and stage plans; the planning desk provides feasible marshaling schemes of shift plans, stage plans and marshaling technology to the train automatic flow distribution relief system.

[0008] As a further improvement of the technical solution of the present invention, the parameter maintenance database establishes a parameter directory of fixed business logic, business data and judgment conditions required for the calculation process, and digitizes station sequence information, no-slip and no-peak judgments, exchange flow judgments and vehicle freight grouping judgments, provides expert data to the automatic train flow distribution and relief system, and promotes the calculation and analysis process to obtain the optimal compilation and analysis results.

[0009] As a further improvement of the technical solution of the present invention, the automatic train flow allocation relief system adopts iterative recursion, backtracking algorithm, and backpack algorithm to construct a calculation model, and optimizes and infers to form an automatic train flow allocation and marshaling dismantling plan.

[0010] As a further improvement of the technical solution of the present invention, the overall calculation process of the automatic train flow allocation mitigation system is divided into the following multiple local algorithms: (1) train assembly sequence determination algorithm; (2) actual field priority train assembly algorithm; (3) dismantling sequence determination algorithm; (4) dismantling algorithm; (5) flow allocation algorithm; (6) dismantling sequence automatic adjustment algorithm; (7) delay conflict adjustment algorithm; (8) empty track new line opening algorithm; (9) chaotic line opening algorithm.

[0011] As a further improvement to the technical solution of the present invention, the train marshaling sequence calculation principle of the automatic train flow distribution relief system is as follows: (1) the departure cars corresponding to the special marshaling plan are given priority; (2) the trains are given priority.

[0012] As a further improvement of the technical solution of the present invention, the principles for determining the dismantling order of the automatic train flow distribution and relief system are as follows: (1) the flow of vehicles that belongs to the station sequence and is in a direction farther from the station sequence is dismantled first; (2) the arriving vehicles with a small number of direction groups are dismantled first.

[0013] As a further improvement of the technical solution of the present invention, the disintegration and flow-dropping principles of the automatic train distribution and relief system are as follows: (1) flow-dropping according to the manually designated track; (2) flow-dropping according to the assembly of departure trains; (3) flow-dropping according to special flow-dropping rules; (4) flow-dropping according to the assembly instructions of the planning platform; (5) flow-dropping according to the assembly rules of maintenance vehicles; (6) flow-dropping according to the station sequence grouping rules; (7) flow-dropping according to the freight grouping rules; (8) flow-dropping according to the exchange flow collection rules; (9) flow-dropping according to the outcroppings with the same direction attributes.

[0014] As a further improvement of the technical solution of the present invention, the automatic adjustment principle of the disassembly sequence of the train automatic flow distribution and relief system is: the arriving vehicles used by the departing vehicles with earlier starting points are disassembled first.

[0015] As a further improvement of the technical solution of the present invention, the flow distribution algorithm principle of the train automatic flow distribution relief system is as follows: the marshaling plan is divided into the plan issued by the planning desk and the original marshaling plan corresponding to this train number, and the two marshaling plans are combined together to form a combined marshaling plan, and then an empty car is added to form a combined empty car marshaling plan; the combined empty car marshaling plan is used to find a fully satisfying exposed track in the actual field track, and all situations are obtained by arranging and combining the tracks and the disintegration blocks, and then a reasonable plan is screened out, and finally the marshaling plan issued by the planner is used to find a fully compliant one.

[0016] As a further improvement of the technical solution of the present invention, the principles for opening a new line of the automatic train flow distribution and relief system are as follows: (1) short tracks are given priority for small operations; (2) tracks with the least turnout impact are given priority for opening a new line; and (3) hooking is given priority.

[0017] Beneficial effects of the present invention:

[0018] The present invention deeply studies the station traffic organization process, actual production activities and technical operation process, deeply understands the business logic, conducts comprehensive data analysis and organization, and determines a mathematical model of automatic train flow distribution, marshaling and disassembly that fits the actual situation. The present invention constructs a top-down plan-solution operation mode from the planning platform to the marshaling yard. The planning platform issues shift plans and stage plans, provides feasible marshaling plans, and provides global line stage plans and shift plans. The marshaling yard takes the planning platform data as the basis, comprehensively considers its own station conditions, track idle status, locomotive task status, freight loading and unloading plans and loading and unloading needs, and realizes fast, accurate and efficient traffic organization, marshaling and disassembly plan compilation, obtains high track utilization rate and locomotive utilization rate, reduces intermediate stops, and improves train turnover efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a structural diagram of an intelligent marshaling yard-train automatic flow distribution and marshaling system according to an embodiment of the present invention;

[0020] Figure 2This is the overall adjustment process of the intelligent marshaling yard-train automatic distribution and disassembly system in an embodiment of the present invention. DETAILED DESCRIPTION

[0021] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. The exemplary embodiments and descriptions of the present invention are used to explain the present invention, but are not intended to limit the present invention.

[0022] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, upper end, lower end, top, bottom...) are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0023] In the present invention, unless otherwise clearly defined and limited, the term "connection" should be understood in a broad sense, for example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0024] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features; in addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0025] like Figure 1 and Figure 2As shown, an intelligent marshaling yard-train automatic flow distribution and disassembly system includes a planning platform, an automatic train flow distribution and relief system, a parameter maintenance database, a station integration system, a station dispatching subsystem and a freight subsystem; the automatic train flow distribution and relief system is used to receive data provided by the planning platform; the automatic train flow distribution and relief system realizes fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation according to the station conditions, track idle status, locomotive shunting task status provided by the station integration system and the freight loading and unloading plan and loading and unloading requirements provided by the freight subsystem; the station dispatching subsystem receives the marshaling and disassembly plan sent by the automatic train flow distribution and relief system and executes it; the parameter maintenance database provides experience data and judgment rules to the automatic train flow distribution and relief system. The present invention realizes fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation, obtains high track utilization and locomotive utilization, reduces intermediate stops, and improves train turnover efficiency.

[0026] Specifically, in the present embodiment, the planning platform is used to issue shift plans and stage plans; the planning platform provides the shift plans, stage plans and feasible marshaling schemes of marshaling technology to the train automatic flow distribution relief system.

[0027] Specifically, in the present embodiment, the parameter maintenance database establishes a parameter directory of fixed business logic, business data and judgment conditions required for the calculation process, and digitizes station sequence information, no-slip and no-peak judgments, exchange flow judgments and vehicle freight grouping judgments, provides expert data to the automatic train distribution relief system, and promotes the calculation and analysis process to obtain the optimal compilation and analysis results.

[0028] Specifically, in the present embodiment, the automatic train flow allocation mitigation system adopts iterative recursion, backtracking algorithm, and backpack algorithm to construct a calculation model, and optimizes and infers to form an automatic train flow allocation and marshaling dismantling plan.

[0029] Specifically, in the present embodiment, the overall calculation process of the automatic train flow allocation mitigation system is divided into the following multiple local algorithms: (1) train assembly sequence determination algorithm; (2) actual field priority train assembly algorithm; (3) disassembly sequence determination algorithm; (4) disassembly algorithm; (5) flow allocation algorithm; (6) disassembly sequence automatic adjustment algorithm; (7) delay conflict adjustment algorithm; (8) empty track new line opening algorithm; (9) chaotic line opening algorithm.

[0030] Specifically, in the present embodiment, the train marshaling sequence calculation principle of the automatic train flow allocation and relief system is as follows: (1) the departure train corresponding to the special marshaling plan is given priority; (2) the train is given priority.

[0031] Specifically, in this embodiment, the principles for determining the dismantling order of the automatic train flow distribution and relief system are as follows: (1) the flow of vehicles that belongs to the station sequence and is farther from the station sequence is dismantled first; (2) the arriving vehicles with fewer direction groups are dismantled first.

[0032] Specifically, in the present embodiment, the dismantling and flow-dropping principles of the automatic train distribution and relief system are as follows: (1) flow-dropping according to the manually designated track; (2) flow-dropping according to the departure train assembly; (3) flow-dropping according to special flow-dropping rules; (4) flow-dropping according to the assembly instructions of the planning platform; (5) flow-dropping according to the assembly rules of the maintenance vehicle; (6) flow-dropping according to the station sequence grouping rules; (7) flow-dropping according to the freight grouping rules; (8) flow-dropping according to the exchange flow collection rules; (9) flow-dropping according to the outcroppings with the same direction attributes.

[0033] Specifically, in the present embodiment, the principle of automatic adjustment of the disassembly order of the automatic train flow distribution and relief system is as follows: the arriving vehicles used by the departing vehicles with earlier starting points are disassembled first.

[0034] Specifically, in the scheme of this embodiment, the flow distribution algorithm principle of the train automatic flow distribution relief system is: the marshaling plan is divided into the plan issued by the planning desk and the original marshaling plan corresponding to the train number, and the two marshaling plans are combined together to form a combined marshaling plan, and then an empty car is added to form a combined empty car marshaling plan; the combined empty car marshaling plan is used to find a fully satisfying exposed track in the actual field track, and all situations are obtained by arranging and combining the tracks and the disintegration blocks, and then a reasonable plan is screened out, and finally the marshaling plan issued by the planner is used to find a fully compliant one.

[0035] Specifically, in the present embodiment, the principles for opening a new line of the automatic train flow relief system are as follows: (1) short tracks are given priority for small operations; (2) tracks with the least turnout impact are given priority for opening a new line; and (3) hooking is given priority.

[0036] Example:

[0037] 1. The present invention deeply studies the station traffic organization process, actual production activities and technical operation process, deeply understands the business logic, conducts comprehensive data analysis and organization, determines a mathematical model of automatic train flow distribution, marshaling and disassembly that fits the actual situation, and provides an intelligent marshaling station-train automatic flow distribution and disassembly system.

[0038] 2. Construct the planning platform-marshaling yard from top to bottom in the marshaling solution operation mode. Figure 1As shown. The planning station issues shift plans and stage plans, provides feasible marshaling schemes, and provides overall line dispatch stage plans and shift plans. The marshaling station uses the planning station data as a basis, comprehensively considers its own station conditions, track idleness, shunting task status, freight loading and unloading plans and loading and unloading needs, and realizes fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation, obtains high track utilization rate, shunting utilization rate, reduces intermediate stops, and increases train turnover efficiency.

[0039] 3. Build a parameter maintenance information database. Create a parameter directory for the fixed business logic, business data, and judgment conditions required for the calculation process, and add them to the parameter maintenance information database. Digitalize station order information, no-slip and no-peak judgments, exchange flow judgments, and vehicle freight grouping judgments to provide expert data for automatic flow distribution and analysis, and promote the calculation and analysis process to obtain the optimal analysis results.

[0040] 4. The system uses iterative recursion, backtracking algorithm, and backpack algorithm to build a calculation model, and optimizes and infers the formation of an automatic train flow distribution marshaling and disassembly plan to maximize the train turnover efficiency, the number of departure cars, the number of high-quality trains, the track utilization rate, and the utilization rate of shunting locomotives, and ensure smooth traffic flow, reduce marshaling yard congestion, eliminate safety issues that may arise in the manual plan preparation process, and improve operation safety and plan quality. The automatic train flow distribution marshaling and disassembly system is based on the general principles of improving traffic flow organization efficiency, following station operation scheduling rules, and generating high-quality marshaling and disassembly plans. Specifically, improving traffic flow organization efficiency means that after automatic flow distribution marshaling and disassembly, as many departure plans as possible are fulfilled, and the departure car is delayed or the departure car cannot be prepared due to turnover failure. Improving the utilization rate of shunting locomotives means that the marshaling and disassembly plan can reasonably arrange the shunting locomotives, eliminating the situation where one shunting locomotive is working continuously while other shunting locomotives are idle, tasks are uneven, and shunting locomotives fail to work in parallel with high quality. Improving track utilization means that through high-quality traffic organization and marshaling and disassembling plans, the quality of traffic assembly can be improved, the number of chaotic tracks can be reduced, traffic transfer and unblocking can be quickly carried out, station congestion can be reduced, vehicle hook-overs during marshaling can be reduced, and the effect of opening new lines on empty tracks can be improved. Figure 2As shown. The overall calculation process is divided into the following multiple local algorithms: (1) Car marshaling sequence determination algorithm. (2) Actual field priority car marshaling algorithm. (3) Disassembly sequence determination algorithm. (4) Disassembly algorithm. (5) Flow distribution algorithm. (6) Disassembly sequence automatic adjustment algorithm. (7) Delay conflict adjustment algorithm. (8) Empty track new line opening algorithm. (9) Disordered line opening algorithm. And according to the strategy of manual plan compilation, each module is based on the following principles. Car marshaling sequence calculation principle: (1) Special marshaling plan corresponding to the departure car priority marshaling. (2) Train priority. Disassembly sequence determination principle: (1) Car flow that belongs to the station sequence and belongs to the direction far from the station sequence is disassembled first. (2) Arrival cars with fewer direction groups are disassembled first. Disassembly drop principle: (1) Drop according to the manually designated track. (2) Drop according to the departure car number. (3) Drop according to special drop rules. (4) Drop according to the assembly instruction of the planning station. (5) Drop according to the assembly rules of the maintenance car. (6) Flow is released according to the station sequence grouping rules. (7) Flow is released according to the freight grouping rules. (8) Flow is released according to the exchange flow set rules. (9) Flow is released according to the same direction attribute. Principle of automatic adjustment of the disassembly order: the arriving vehicles used by the departure vehicles with earlier departure points are disassembled first. Principle of flow distribution algorithm: the marshaling plan is divided into the plan issued by the planning station and the original marshaling plan corresponding to this train. These two marshaling plans are combined to form a combined marshaling plan, and then an empty car is added to form a combined empty car marshaling plan. The combined empty car marshaling plan is used to find the fully satisfied open track in the actual field track, and all situations are obtained by arranging and combining the track and the disassembly block, and then a reasonable plan is screened out. Finally, the marshaling plan issued by the planner is used to find the fully compliant one. Principle of opening a new line: (1) Short tracks are given priority for small operations. (2) Tracks with the least turnout influence are given priority for opening new lines. (3) Hooking is given priority.

[0041] The technical solutions provided by the embodiments of the present invention are introduced in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the embodiments of the present invention. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present invention. At the same time, for those skilled in the art, according to the embodiments of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. An intelligent marshaling station - automatic train distribution and marshaling system, characterized by: It includes a planning platform, an automatic train flow allocation and relief system, a parameter maintenance database, a station integration system, a station dispatching subsystem and a freight subsystem; the automatic train flow allocation and relief system is used to receive data provided by the planning platform; the automatic train flow allocation and relief system realizes fast, accurate and efficient vehicle flow organization and marshaling and disassembly plan preparation according to the station yard conditions, track idle status, shunting task status provided by the station integration system and the freight loading and unloading plan and loading and unloading requirements provided by the freight subsystem; the station dispatching subsystem receives and executes the marshaling and disassembly plan sent by the automatic train flow allocation and relief system; The parameter maintenance database provides experience data and decision rules to the automatic train flow allocation and relief system.

2. According to claim 1, the intelligent marshaling station - train automatic distribution and disassembly system is characterized by: The parameter maintenance database establishes a parameter directory of fixed business logic, business data and judgment conditions required for the calculation process, and digitizes station sequence information, no-slip and no-peak judgments, exchange flow judgments and vehicle freight grouping judgments, providing expert data to the automatic train flow distribution and relief system, and promoting the calculation and analysis process to obtain the optimal compilation and analysis results.

3. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The automatic train flow allocation and relief system adopts iterative recursion, backtracking algorithm and backpack algorithm to build a calculation model, and optimizes and infers to form an automatic train flow allocation and marshaling dismantling plan.

4. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The overall calculation process of the automatic train flow allocation mitigation system is divided into the following multiple local algorithms: (1) train assembly sequence determination algorithm; (2) actual field priority train assembly algorithm; (3) disassembly sequence determination algorithm; (4) disassembly algorithm; (5) flow allocation algorithm; (6) disassembly sequence automatic adjustment algorithm; (7) delay conflict adjustment algorithm; (8) empty track new line opening algorithm; (9) chaotic line opening algorithm.

5. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The train marshaling sequence calculation principles of the automatic train flow allocation and relief system are as follows: (1) the departure trains corresponding to the special marshaling plan are given priority; (2) the trains are given priority.

6. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The principles for determining the dismantling order of the automatic train flow distribution and relief system are as follows: (1) the flow of vehicles that belongs to the station sequence and is in a direction farther from the station sequence is dismantled first; (2) the arriving vehicles with fewer direction groups are dismantled first.

7. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The dismantling and flow-dropping principles of the automatic train distribution and relief system are as follows: (1) flow-dropping according to the manually designated track; (2) flow-dropping according to the assembly of departure trains; (3) flow-dropping according to special flow-dropping rules; (4) flow-dropping according to the assembly instructions of the planning platform; (5) flow-dropping according to the assembly rules of maintenance vehicles; (6) flow-dropping according to the station sequence grouping rules; (7) flow-dropping according to the freight grouping rules; (8) flow-dropping according to the exchange flow assembly rules; (9) flow-dropping according to the outcroppings with the same direction attributes.

8. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The automatic adjustment principle of the disassembly sequence of the automatic train flow distribution and relief system is: the arriving vehicles used by the departing vehicles with earlier starting points will be disassembled first.

9. The intelligent marshaling station-train automatic distribution and assembly system according to claim 1 is characterized by: The flow distribution algorithm principle of the train automatic flow distribution and relief system is as follows: the marshaling plan is divided into the plan issued by the planning desk and the original marshaling plan corresponding to the train number. The two marshaling plans are combined together to form a combined marshaling plan, and then an empty car is added to form a combined empty car marshaling plan; the combined empty car marshaling plan is used to find a fully satisfying exposed track in the actual field track, and all situations are obtained by arranging and combining the tracks and the decomposition blocks, and then a reasonable plan is screened out, and finally a fully compliant one is found using the marshaling plan issued by the planner.

10. The intelligent marshaling station-train automatic distribution and disassembly system according to claim 1 is characterized by: The principles for opening new lines of the automatic train flow relief system are as follows: (1) short tracks are given priority for small operations; (2) tracks with the least turnout impact are given priority for opening new lines; and (3) hooking is given priority.