Chip bulk material detecting and packaging equipment

By using the bottom and top camera detection mechanisms in the chip bulk material detection and packaging equipment for comprehensive inspection, and combining the flexible loading mechanism and the fixture loading and unloading track to provide multiple loading methods, the problem of inability to comprehensively detect material defects and single loading methods in the prior art is solved, and an efficient and flexible material detection and packaging process is achieved.

CN119786368AActive Publication Date: 2025-04-08JINYAO INTELLIGENT PRECISION MFG (SHENZHEN) CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411808862.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-04-08
Estimated Expiration
2044-12-10

AI Technical Summary

Technical Problem

The existing flexible tape braiding machine cannot fully detect material defects, especially defects on the lower surface, and the loading method is single, which cannot meet the diverse needs of users.

Method used

A chip bulk material detection and packaging equipment is designed, using the bottom camera detection mechanism and the top camera detection mechanism for comprehensive inspection, and a variety of loading methods are provided through the flexible loading mechanism and the fixture loading and unloading track.

Benefits of technology

It realizes comprehensive inspection of the upper and lower surfaces of the material, reduces the generation rate of defective products, and improves the reliability and service life of the product. At the same time, it provides flexible feeding methods, which improves the adaptability and production efficiency of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119786368A_ABST
    Figure CN119786368A_ABST
Patent Text Reader

Abstract

The chip bulk material detecting and packaging equipment comprises a rack, a flexible feeding mechanism, a jig feeding and discharging track, a bottom camera detecting mechanism, a top camera detecting mechanism, a transplanting mechanism, a first material taking mechanical arm, a braid packaging mechanism, an NG temporary storage mechanism and a second material taking mechanical arm. According to the invention, comprehensive detection of the upper surface and the lower surface of the material is realized, the production rate of defective products is greatly reduced, and meanwhile, two modes of bulk material loading and jig loading are provided to meet different loading requirements, so that the flexibility and the adaptability of the equipment are improved, and the use requirements of more users can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of SMT, and in particular to a chip bulk material detection and packaging device. Background Art

[0002] In the Surface Mount Technology (SMT) industry, a series of fine particles and defects are inevitably generated during the production process. These problems are caused by a variety of factors that cannot be completely avoided. With the continuous advancement of SMT technology, the size of components is becoming increasingly miniaturized, and the circuit layout is becoming more compact and high-density. This trend has greatly aggravated the adverse effects of these tiny defects or particles on the quality of the final product of the printed circuit board (PCB). Specifically, even extremely small defects may cause circuit performance degradation, signal transmission obstruction, or component connection failure, which seriously affects the reliability and service life of electronic products. In order to maintain the stability of product quality, it is necessary to perform defect detection on the produced chips to increase the yield of finished products. In addition, after completing defect detection and screening out qualified chips, in order to ensure the efficiency and protection of their subsequent processing, these chips are usually sorted and packaged using taping packaging technology.

[0003] The patent with publication number CN216943685U discloses a flexible braiding machine based on machine vision, which is equipped with a top camera, an industrial computer, a vibration plate, a silo, a manipulator, a vacuum nozzle, a pulling motor, a carrier assembly, a heating assembly, a flying camera and a visual inspection camera. Through the cooperation of the top camera, the industrial computer, the silo and the vibration plate, the state detection and filling functions of the vibration plate and the silo can be realized, through the cooperation of the manipulator and the vacuum nozzle, the automatic material transfer function can be realized, and through the cooperation of the pulling motor, the carrier assembly and the heating assembly, the hot pressure sealing function of the material can be realized. During the operation, the flying camera and the visual inspection camera can be used to monitor the entire operation process to avoid errors.

[0004] However, the visual inspection camera of the above-mentioned flexible braiding machine can only capture the upper surface of the material and cannot comprehensively detect defects in the material. In actual industrial production, defects in the material may not only exist on the upper surface, but also on the lower surface. Due to the limitation of the camera's shooting range, defects on the lower surface are likely to be ignored, resulting in the production of defective products. At the same time, the flexible braiding machine can only load materials through a vibration plate combined with a silo, and the loading method is single and cannot meet the user's diversified loading needs. Summary of the invention

[0005] In order to overcome the problems in the prior art that the tape braiding machine cannot fully detect defects of materials and has a single material loading method, the present invention provides a chip bulk material detection and packaging equipment.

[0006] The technical solution of the present invention is as follows:

[0007] A chip bulk material detection and packaging device, comprising:

[0008] frame;

[0009] A flexible feeding mechanism, mounted on the frame, for transporting bulk materials to the first material taking position;

[0010] A jig loading and unloading track is installed on the frame and is used to transport the jig fully loaded with materials to the second material taking position and output the empty jig;

[0011] A bottom camera detection mechanism, mounted on the frame, for detecting defects on the bottom of the material;

[0012] A top camera detection mechanism, mounted on the frame, for detecting defects on the top of the material;

[0013] A transplanting mechanism, mounted on the frame, for sequentially transporting materials to the bottom of the top camera detection mechanism and to the third material fetching position;

[0014] A first material-retrieving manipulator, mounted on the frame, for sequentially conveying the material located at the first material-retrieving position or the second material-retrieving position to the top of the bottom camera detection mechanism and to the transplanting mechanism;

[0015] A taping packaging mechanism, installed on the frame, for packaging qualified materials;

[0016] An NG temporary storage mechanism, installed on the frame, for temporarily storing unqualified materials;

[0017] The second material picking robot is installed on the frame and is used to transport qualified materials located at the third material picking position to the braiding packaging mechanism, and transport unqualified materials located at the third material picking position to the NG temporary storage mechanism.

[0018] As a preferred solution of the present invention, the flexible loading mechanism includes a silo for storing materials in bulk state, a flexible feeding mechanism arranged at the bottom of the silo, a vibrating plate and a first upper visual positioning camera, the vibrating plate is located at the first material collection position and at the discharge end of the silo, and the first upper visual positioning camera is located above the vibrating plate.

[0019] As a preferred solution of the present invention, the jig loading and unloading track includes an incoming material stacking mechanism, a loading track, an intermediate track, a unloading track and an empty jig stacking mechanism, the loading track, the intermediate track and the unloading track are connected in sequence, the feeding end of the loading track is docked with an external jig loading device, the intermediate track is located at the second material taking position, the discharging end of the loading track is docked with an external jig unloading device, the incoming material stacking mechanism is arranged on the loading track, and the empty jig stacking mechanism is arranged on the unloading track;

[0020] The incoming material stacking mechanism is used to stack and store the jigs fully loaded with materials on the feeding track, and to put the stacked jigs fully loaded with materials back onto the feeding track one by one;

[0021] The empty jig stacking mechanism is used to stack and store the empty jigs on the unloading track, and to put the stacked empty jigs back onto the unloading track one by one.

[0022] As a preferred solution of the present invention, the incoming material stacking mechanism includes a first stacking bracket arranged on the top of the loading track, four first supporting cylinders respectively arranged at the four corners of the bottom of the first stacking bracket in a horizontal direction, and a first stacking lifting cylinder vertically arranged below the first stacking bracket, and the telescopic ends of the four first supporting cylinders are each provided with a first supporting support plate, and the telescopic end of the first stacking lifting cylinder is provided with a first stacking lifting plate;

[0023] The empty jig stacking mechanism includes a second stacking bracket arranged on the top of the unloading track, four second supporting cylinders respectively arranged horizontally at the four corners of the bottom of the second stacking bracket, and a second stacking lifting cylinder vertically arranged below the second stacking bracket, and the telescopic ends of the four second supporting cylinders are each provided with a second supporting pallet, and the telescopic end of the second stacking lifting cylinder is provided with a second stacking lifting plate.

[0024] As a preferred solution of the present invention, the output end of the loading track is provided with a first positioning cylinder for positioning the jig fully loaded with materials, the middle track is provided with a second positioning cylinder for positioning the jig fully loaded with materials at the end of the second material picking position, and the output end of the unloading track is provided with a third positioning cylinder for positioning the empty jig.

[0025] As a preferred solution of the present invention, the transplanting mechanism includes two platform transplanting assemblies arranged side by side, and the two platform transplanting assemblies work alternately. The platform transplanting assembly includes a linear drive module arranged on the frame and a material placement table arranged at the driving end of the linear drive module. The linear drive module receives the material conveyed by the first material picking robot through the material placement table, and conveys the material to the bottom of the top camera detection mechanism and the third material picking position in sequence.

[0026] As a preferred solution of the present invention, the first material picking robot includes a four-axis robot arranged on the frame and a second upper visual positioning camera, a code scanning component and a first suction nozzle component arranged at the end of the four-axis robot.

[0027] As a preferred solution of the present invention, the braid packaging mechanism includes a material guide bracket arranged on the frame, and a carrier tape unwinding mechanism, a cover tape unwinding mechanism, a third upper visual positioning camera, a tape sealing mechanism and a finished product winding mechanism arranged on the material guide bracket. The third upper visual positioning camera is located on the feeding side of the tape sealing mechanism. After the carrier tape supplied by the carrier tape unwinding mechanism is placed into the material sucked by the second material picking robot, it passes through the photographing area of ​​the third upper visual positioning camera and enters the tape sealing mechanism together with the cover tape supplied by the cover tape unwinding mechanism for tape sealing. After tape sealing, it is wound up in the finished product winding mechanism.

[0028] As a preferred solution of the present invention, the NG temporary storage mechanism includes a cylinder drive mechanism, a linear slide rail and an NG bin, the cylinder drive mechanism and the linear slide rail are fixed on the frame, the driving end of the cylinder drive mechanism is fixed to one end of the NG bin, and the NG bin is also slidably connected to the linear slide rail.

[0029] As a preferred solution of the present invention, the second material picking robot includes a second suction nozzle assembly for sucking materials, an X-axis moving module for driving the second suction nozzle assembly to move along the X-axis direction, a Y-axis moving module for driving the second suction nozzle assembly to move along the Y-axis direction, and a Z-axis moving module for driving the second suction nozzle assembly to move along the Z-axis direction, the X-axis moving module is fixed on the frame, the driving end of the X-axis moving module is fixed to the Y-axis moving module, the driving end of the Y-axis moving module is fixed to the Z-axis moving module, and the driving end of the Z-axis moving module is fixed to the second suction nozzle assembly.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1. By setting up the bottom camera detection mechanism and the top camera detection mechanism, comprehensive detection of the upper and lower surfaces of the material is achieved, which greatly reduces the rate of defective products and improves the reliability and service life of the product;

[0032] 2. By setting up a flexible feeding mechanism and a jig loading and unloading track, two methods of bulk material feeding and jig loading are provided to cope with different feeding requirements, improve the flexibility and adaptability of the equipment, and meet the needs of more users;

[0033] 3. Through the coordinated work of the first material-retrieving manipulator, the transplanting mechanism and the second material-retrieving manipulator, the whole process of material automatic processing from loading to defect detection to packaging or temporary storage is realized, which improves production efficiency and reduces labor costs;

[0034] 4. It integrates a variety of advanced monitoring and detection methods, such as code scanning, bottom camera detection and top camera detection, which can monitor the status and position of materials in real time to ensure the accuracy and safety of materials during processing. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 It is a schematic structural diagram of a bulk chip inspection and packaging device according to an embodiment of the present invention;

[0037] Figure 2 It is a structural schematic diagram of another perspective of a bulk chip inspection and packaging device in one embodiment of the present invention;

[0038] Figure 3 It is a structural schematic diagram of a flexible feeding mechanism in one embodiment of the present invention;

[0039] Figure 4 It is a structural schematic diagram of a jig loading and unloading track in one embodiment of the present invention;

[0040] Figure 5 It is a structural schematic diagram of a material stacking mechanism in one embodiment of the present invention;

[0041] Figure 6 It is a structural schematic diagram of a hollow jig stacking mechanism according to an embodiment of the present invention;

[0042] Figure 7 It is a structural schematic diagram of a transplanting mechanism in one embodiment of the present invention;

[0043] Figure 8 It is a structural schematic diagram of a first material taking manipulator in one embodiment of the present invention;

[0044] Fig. 9 It is a structural schematic diagram of a tape packaging mechanism in one embodiment of the present invention;

[0045] Fig.10 It is a structural schematic diagram of the NG temporary storage mechanism in one embodiment of the present invention;

[0046] Fig.11 It is a schematic structural diagram of the second material-retrieving robot in one embodiment of the present invention.

[0047] In the figure,

[0048] 1. Frame; 2. Flexible loading mechanism; 201. Bin; 202. Flexible feeding mechanism; 203. Vibrating plate; 204. First upper visual positioning camera; 3. Fixture loading and unloading tracks; 301. Incoming material stacking mechanism; 3011. First stacking bracket; 3012. First supporting cylinder; 3013. First supporting support plate; 3014. First stacking lifting plate; 302. Loading track; 303. Middle track; 304. Unloading track; 305. Empty fixture stacking mechanism; 3051. Second stacking bracket; 3052. Second supporting cylinder; 3053. Second supporting support plate; 3054. Second stacking lifting plate; 306. First positioning cylinder; 307. Second positioning cylinder; 308. Third positioning cylinder; 4. Bottom camera detection mechanism; 5. Top camera Machine detection mechanism; 6. Transplantation mechanism; 601. Platform transplantation assembly; 6011. Linear drive module; 6012. Material placement table; 7. First material picking manipulator; 701. Four-axis robot; 702. Second upper visual positioning camera; 703. First suction nozzle assembly; 8. Tape packaging mechanism; 801. Material guide bracket; 802. Carrier tape unwinding mechanism; 803. Cover tape unwinding mechanism; 804. Third upper visual positioning camera; 805. Sealing mechanism; 806. Finished product winding mechanism; 9. NG temporary storage mechanism; 901. Cylinder drive mechanism; 902. Linear slide rail; 903. NG bin; 10. Second material picking manipulator; 1001. Second suction nozzle assembly; 1002. X-axis moving module; 1003. Y-axis moving module; 1004. Z-axis moving module. DETAILED DESCRIPTION

[0049] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. It is also stated that the embodiments described below are only used to explain the present invention and are not used to limit the present invention.

[0050] It should be noted that the terms "install", "set", "connect", "fix" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. The indicated orientation or position relationship is based on the orientation or position relationship shown in the accompanying drawings, or the orientation or position relationship in which the application product is usually placed when in use, or the orientation or position relationship commonly understood by those skilled in the art, or the orientation or position relationship in which the application product is usually placed when in use. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0051] See also Figure 1 , Figure 2 The present embodiment provides a chip bulk material detection and packaging equipment, including a frame 1, a flexible feeding mechanism 2, a jig loading and unloading track 3, a bottom camera detection mechanism 4, a top camera detection mechanism 5, a transplanting mechanism 6, a first material picking manipulator 7, a tape packaging mechanism 8, an NG temporary storage mechanism 9 and a second material picking manipulator 10. The flexible feeding mechanism 2 is installed on the frame 1, and the flexible feeding mechanism 2 is used to transport the bulk material to the first material picking position. The jig loading and unloading track 3 is installed on the frame 1, and the jig loading and unloading track 3 is used to transport the jig full of materials to the second material picking position and output the empty jig. The bottom camera detection mechanism 4 is installed on the frame 1, and the bottom camera detection mechanism 4 is used to perform defect detection on the bottom of the material. The top camera detection mechanism 5 is installed on the frame 1, and the top camera detection mechanism 5 is used to perform defect detection on the top of the material. The transplanting mechanism 6 is installed on the frame 1, and the transplanting mechanism 6 is used to transport the material to the bottom of the top camera detection mechanism 5 and the third material picking position in sequence. The first material picking robot 7 is installed on the frame 1, and the first material picking robot 7 is used to transport the materials located at the first material picking position or the second material picking position to the top of the bottom camera detection mechanism 4 and the transplanting mechanism 6 in sequence. The taping packaging mechanism 8 is installed on the frame 1, and the taping packaging mechanism 8 is used to package qualified materials. The NG temporary storage mechanism 9 is installed on the frame 1, and the NG temporary storage mechanism 9 is used to temporarily store unqualified materials. The second material picking robot 10 is installed on the frame 1, and the second material picking robot 10 is used to transport qualified materials located at the third material picking position to the taping packaging mechanism 8, and transport unqualified materials located at the third material picking position to the NG temporary storage mechanism 9.

[0052] The chip bulk material detection and packaging equipment provided by the present invention has two loading modes: bulk material loading and fixture loading, so as to cope with different loading modes.

[0053] The workflow of bulk material loading is as follows:

[0054] First, the flexible feeding mechanism 2 transports the bulk material to the first material picking position; secondly, the first material picking robot 7 transports the material on the first material picking position to the top of the bottom camera detection mechanism 4 (scanning the material at the same time), allowing the bottom camera detection mechanism 4 to perform defect detection on the bottom of the material, and then transports the material after the bottom defect detection to the transplanting mechanism 6; then, the transplanting mechanism 6 transports the material to the bottom of the top camera detection mechanism 5, allowing the top camera detection mechanism 5 to perform defect detection on the top of the material, and then transports the material after the top defect detection to the third material picking position; finally, the second material picking robot 10 transports the qualified material on the third material picking position to the braiding packaging mechanism 8 for packaging, and transports the unqualified material on the third material picking position to the NG temporary storage mechanism 9 for temporary storage.

[0055] The workflow of fixture loading is as follows:

[0056] First, the jig loading and unloading track 3 transports the jig fully loaded with materials to the second material picking position; secondly, the first material picking robot 7 transports the materials on the second material picking position to the top of the bottom camera detection mechanism 4 (scanning the materials at the same time), allowing the bottom camera detection mechanism 4 to perform defect detection on the bottom of the materials, and then transporting the materials after the bottom defect detection to the transplanting mechanism 6; then, the transplanting mechanism 6 transports the materials to the bottom of the top camera detection mechanism 5, allowing the top camera detection mechanism 5 to perform defect detection on the top of the materials, and then transporting the materials after the top defect detection to the third material picking position; finally, the second material picking robot 10 transports the qualified materials on the third material picking position to the braiding packaging mechanism 8 for packaging, and transports the unqualified materials on the third material picking position to the NG temporary storage mechanism 9 for temporary storage.

[0057] The bulk chip inspection and packaging equipment provided in this embodiment realizes comprehensive inspection of the upper and lower surfaces of the material by setting up a bottom camera inspection mechanism 4 and a top camera inspection mechanism 5, greatly reduces the generation rate of defective products, and improves the reliability and service life of the product; by setting up a flexible feeding mechanism 2 and a jig loading and unloading track 3, two methods of bulk material loading and jig loading are provided to cope with different feeding requirements, thereby improving the flexibility and adaptability of the equipment and being able to meet the usage requirements of more users; through the coordinated work of the first material picking robot 7, the transplanting mechanism 6 and the second material picking robot 10, the whole process of material loading, defect detection, packaging or temporary storage is realized through automatic processing, which improves production efficiency and reduces labor costs; it integrates a variety of advanced monitoring and detection methods, such as code scanning, bottom camera detection and top camera detection, etc., which can monitor the status and position of the material in real time to ensure the accuracy and safety of the material during the processing.

[0058] See also Figure 3 In one embodiment, the flexible feeding mechanism 2 includes a silo 201 for storing materials in bulk state, a flexible feeding mechanism 202 arranged at the bottom of the silo 201, a vibration plate 203 and a first upper visual positioning camera 204, the vibration plate 203 is located at the first material picking position and at the discharge end of the silo 201, and the first upper visual positioning camera 204 is located above the vibration plate 203. The flexible feeding mechanism 202 can adapt to materials of different shapes and sizes, ensuring that the materials can be smoothly and orderly transported from the silo 201 to the vibration plate 203, enhancing the versatility and adaptability of the equipment, so that it can handle various types of chip bulk materials. The vibration plate 203 is used to arrange the materials neatly by vibration, which is convenient for the first material picking manipulator 7 to accurately grab. The first upper visual positioning camera 204 is used to monitor the position and posture of the materials in real time, and provide key information for the accurate grabbing of the first material picking manipulator 7.

[0059] See also Figure 4 In one embodiment, the jig loading and unloading track 3 includes an incoming material stacking mechanism 301, a loading track 302, an intermediate track 303, an unloading track 304, and an empty jig stacking mechanism 305. The loading track 302, the intermediate track 303, and the unloading track 304 are connected in sequence, and the feeding end of the loading track 302 is docked with an external jig loading device to realize automatic loading of the jig. The intermediate track 303 is located at the second material-retrieving position to realize the transportation of the jig fully loaded with materials to the second material-retrieving position for the first material-retrieving manipulator 7 to absorb the materials on the jig. The discharging end of the loading track 302 is docked with an external jig unloading device to realize automatic unloading of the jig. The incoming material stacking mechanism 301 is arranged on the feeding track 302. The incoming material stacking mechanism 301 is used to stack and store the jigs loaded with materials on the feeding track 302, so as to realize one-time loading of a large amount of materials, significantly improve production efficiency, and occupy less space; when necessary, the mechanism can release the stacked fully loaded jigs one by one and in an orderly manner to the feeding track 302, ensuring that the jigs are continuously and stably supplied to the subsequent process. The empty jig stacking mechanism 305 is arranged on the unloading track 304. The empty jig stacking mechanism 305 is used to stack and store the empty jigs on the unloading track 304, so as to realize the temporary storage of a large number of empty jigs, providing strong support for continuous production; when necessary, the mechanism can release the stacked empty jigs one by one and in an orderly manner to the unloading track 304 for subsequent use.

[0060] The jig loading and unloading track 3 set up as above enables the equipment to maintain continuity and stability when processing jigs, thereby improving the utilization rate and production efficiency of the equipment; at the same time, by stacking and managing jigs, it not only reduces the floor space and improves the space utilization rate, but also reduces the idle time of the equipment, thereby further improving the overall performance of the equipment.

[0061] See also Figure 5 In one embodiment, the incoming material stacking mechanism 301 includes a first stacking bracket 3011 arranged on the top of the loading track 302, four first supporting cylinders 3012 respectively arranged horizontally at the four corners of the bottom of the first stacking bracket 3011, and a first stacking lifting cylinder vertically arranged below the first stacking bracket 3011, and the telescopic ends of the four first supporting cylinders 3012 are each provided with a first supporting support plate 3013, and the telescopic ends of the first stacking lifting cylinders are provided with a first stacking lifting plate 3014. The four first supporting cylinders 3012 cooperate with their corresponding first supporting support plates 3013 and the first stacking bracket 3011 to ensure that the stacked fixtures remain stable in the vertical direction and facilitate lifting operations when necessary. The telescopic movement of the first stacking lifting cylinder can push the stacked fixtures to move upward or downward through the first stacking lifting plate 3014, thereby realizing automatic stacking and release of the fixtures. The incoming material stacking mechanism 301 realizes the automatic stacking and releasing of the jigs through the coordinated work of the four first supporting cylinders 3012 and the first stacking lifting cylinder, reduces manual intervention, improves the accuracy and efficiency of stacking, makes full use of the internal space of the equipment, reduces the floor space, and improves space utilization.

[0062] See also Figure 6 In one embodiment, the empty jig stacking mechanism 305 includes a second stacking bracket 3051 arranged on the top of the unloading track 304, four second supporting cylinders 3052 respectively arranged at the four corners of the bottom of the second stacking bracket 3051, and a second stacking lifting cylinder vertically arranged below the second stacking bracket 3051, and the telescopic ends of the four second supporting cylinders 3052 are each provided with a second supporting support plate 3053, and the telescopic ends of the second stacking lifting cylinders are provided with a second stacking lifting plate 3054. The four second supporting cylinders 3052 cooperate with their corresponding second supporting support plates 3053 and the second stacking bracket 3051 to ensure that the stacked jigs remain stable in the vertical direction and facilitate lifting operations when necessary. The telescopic movement of the second stacking lifting cylinder can push the stacked jigs to move upward or downward through the second stacking lifting plate 3054, thereby realizing automatic stacking and release of the jigs. The empty jig stacking mechanism 305 realizes the automatic stacking and releasing of the jigs through the coordinated work of the four second supporting cylinders 3052 and the second stacking lifting cylinder, reduces manual intervention, improves the accuracy and efficiency of stacking, makes full use of the internal space of the equipment, reduces the floor space, and improves space utilization.

[0063] See also Figure 4In one embodiment, the output end of the loading track 302 is provided with a first positioning cylinder 306 for positioning the jig loaded with materials, so as to ensure that the incoming material stacking mechanism 301 can accurately stack and store the jigs loaded with materials on the loading track 302. The middle track 303 has a second positioning cylinder 307 for positioning the jig loaded with materials at the end of the second material picking position, so as to ensure that the first material picking manipulator 7 can accurately obtain the materials on the second material picking position. The output end of the unloading track 304 is provided with a third positioning cylinder 308 for positioning the empty jig, so as to ensure that the empty jig stacking mechanism 305 can accurately stack and store the empty jigs on the unloading track 304.

[0064] See also Figure 7 In one embodiment, the transplanting mechanism 6 includes two platform transplanting assemblies 601 arranged side by side. The two platform transplanting assemblies 601 work alternately, which can greatly shorten the material transmission time and improve the production efficiency of the entire production line. Specifically, the platform transplanting assembly 601 includes a linear drive module 6011 arranged on the frame 1 and a material placement table 6012 arranged at the driving end of the linear drive module 6011. The linear drive module 6011 receives the material conveyed by the first material retrieving manipulator 7 through the material placement table 6012, and conveys the material to the bottom of the top camera detection mechanism 5 and the third material retrieving position in sequence.

[0065] The workflow of the platform transplant component 601 is:

[0066] When the first material picking robot 7 places the object on the material placement table 6012, the linear drive module 6011 will start and drive the material placement table 6012 to move along a predetermined linear trajectory. During the movement, the linear drive module 6011 can maintain a stable movement speed and smooth acceleration to ensure the stability and accuracy of the material during the transmission process. When the material placement table 6012 transfers the material to the bottom of the top camera detection mechanism 5, the top camera detection mechanism 5 will start and perform defect detection on the top of the material. After completing the detection, the linear drive module 6011 will continue to drive the material placement table 6012 to transport the material to the third material picking position, waiting for the second material picking robot 10 to pick up the material.

[0067] See also Figure 8In one embodiment, the first material-retrieving manipulator 7 includes a four-axis robot 701 arranged on the frame 1, a second upper visual positioning camera 702 arranged at the end of the four-axis robot 701, a code scanning component, and a first suction nozzle component 703 for sucking materials. As the main part of the first material-retrieving manipulator 7, the four-axis robot 701 has the characteristics of high flexibility, precise positioning, stable operation, etc., and can perform precise motion control in a complex spatial environment to ensure the stability and accuracy of the material during the material-retrieving and transportation process. The second upper visual positioning camera 702 is used to perform high-precision visual positioning of the material during the material-retrieving process; by taking the image of the material and combining the image processing algorithm, the position, shape, size and other information of the material can be accurately determined, thereby providing reliable data support for the material-retrieving operation of the four-axis robot 701. The code scanning component is used to read the identity information such as the barcode or QR code on the material to realize the tracking and management of the material; during the material-retrieving process, the code scanning component will scan the barcode information on the material and transmit it to the control system of the production line; in this way, the production line can grasp the flow of materials in real time and accurately manage and track the materials. The first material picking manipulator 7 realizes efficient and accurate material picking and transportation by integrating the four-axis robot 701, the second upper visual positioning camera 702, and the first suction nozzle assembly 703 of the code scanning assembly machine, providing a strong guarantee for the stable operation of the entire production line.

[0068] See also Fig. 9 In one embodiment, the braid packaging mechanism 8 includes a material guide bracket 801 disposed on the frame 1, a carrier tape unwinding mechanism 802, a cover tape unwinding mechanism 803, a third upper visual positioning camera 804, a tape sealing mechanism 805 and a finished product rewinding mechanism 806 disposed on the material guide bracket 801, and the third upper visual positioning camera 804 is located at the feeding side of the tape sealing mechanism 805. After the second material picking robot 10 puts the sucked material into the groove of the carrier tape supplied by the carrier tape unwinding mechanism 802, the carrier tape with the material placed will pass through the photographing area of ​​the third upper visual positioning camera 804, and the third upper visual positioning camera 804 will perform high-precision visual positioning on the material to ensure the accuracy and stability of the material during the packaging process; then, the tape sealing mechanism 805 will package the carrier tape, the material and the cover tape supplied by the cover tape unwinding mechanism 803 together according to the result of visual positioning; finally, the packaged finished product roll will be sent to the finished product rewinding mechanism 806 for rewinding and storage.

[0069] The above-mentioned braid packaging mechanism 8 realizes efficient and accurate packaging and winding of materials by integrating the material guide bracket 801, the carrier tape unwinding mechanism 802, the cover tape unwinding mechanism 803, the third upper visual positioning camera 804, the sealing mechanism 805 and the finished product winding mechanism 806, providing a strong guarantee for the stable operation of the entire production line.

[0070] See also Fig.10 In one embodiment, the NG temporary storage mechanism 9 includes a cylinder drive mechanism 901, a linear slide rail 902 and an NG bin 903. The cylinder drive mechanism 901 and the linear slide rail 902 are fixed on the frame 1. The drive end of the cylinder drive mechanism 901 is fixed to one end of the NG bin 903, and the NG bin 903 is also slidably connected to the linear slide rail 902. When the bottom camera detection mechanism 4 or the top camera detection mechanism 5 detects unqualified materials, a signal will be sent to the control system of the NG temporary storage mechanism 9; after receiving the signal, the control system will start the cylinder drive mechanism 901 to extend or retract the piston rod, thereby driving the NG bin 903 to move from the NG material taking position to the designated NG material receiving position along the linear slide rail 902, waiting for the second material taking manipulator 10 to transport the unqualified materials on the third material taking position to the NG bin 903; when the NG bin 903 is full or needs to be transferred, the control system will start the cylinder drive mechanism 901 again to move the NG bin 903 back to the NG material taking position.

[0071] The above-mentioned NG temporary storage mechanism 9 realizes the automatic storage and transfer of defective products by integrating the cylinder drive mechanism 901, the linear slide rail 902 and the NG bin 903, providing a strong guarantee for the stable operation of the production line and the handling of defective products.

[0072] See also Fig.11 In one embodiment, the second material picking robot 10 includes a second suction nozzle assembly 1001 for sucking materials, an X-axis moving module 1002 for driving the second suction nozzle assembly 1001 to move along the X-axis direction, a Y-axis moving module 1003 for driving the second suction nozzle assembly 1001 to move along the Y-axis direction, and a Z-axis moving module 1004 for driving the second suction nozzle assembly 1001 to move along the Z-axis direction. The X-axis moving module 1002 is fixed on the frame 1, the driving end of the X-axis moving module 1002 is fixed to the Y-axis moving module 1003, the driving end of the Y-axis moving module 1003 is fixed to the Z-axis moving module 1004, and the driving end of the Z-axis moving module 1004 is fixed to the second suction nozzle assembly 1001. The second material picking robot 10, through the cooperation between the second suction nozzle assembly 1001, the X-axis moving module 1002, the Y-axis moving module 1003 and the Z-axis moving module 1004, can stably and quickly transport the qualified materials at the third material picking position to the braiding packaging mechanism 8 for packaging, and transport the unqualified materials at the third material picking position to the NG temporary storage mechanism 9 for temporary storage.

[0073] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the appended claims of the present invention.

[0074] The above is an exemplary description of the present invention in conjunction with the accompanying drawings. It is obvious that the implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made by adopting the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A chip bulk material detection and packaging equipment, characterized in that: include: frame; A flexible feeding mechanism, mounted on the frame, for transporting bulk materials to the first material taking position; A jig loading and unloading track is installed on the frame and is used to transport the jig fully loaded with materials to the second material taking position and output the empty jig; A bottom camera detection mechanism, mounted on the frame, for detecting defects on the bottom of the material; A top camera detection mechanism, mounted on the frame, for detecting defects on the top of the material; A transplanting mechanism, mounted on the frame, for sequentially transporting materials to the bottom of the top camera detection mechanism and to the third material fetching position; A first material-retrieving manipulator, mounted on the frame, for sequentially conveying the material located at the first material-retrieving position or the second material-retrieving position to the top of the bottom camera detection mechanism and to the transplanting mechanism; A taping packaging mechanism, installed on the frame, for packaging qualified materials; An NG temporary storage mechanism, installed on the frame, for temporarily storing unqualified materials; The second material picking robot is installed on the frame and is used to transport qualified materials located at the third material picking position to the braiding packaging mechanism, and transport unqualified materials located at the third material picking position to the NG temporary storage mechanism.

2. The bulk chip detection and packaging equipment according to claim 1, characterized in that: The flexible loading mechanism includes a silo for storing materials in bulk state, a flexible feeding mechanism arranged at the bottom of the silo, a vibrating plate and a first upper visual positioning camera. The vibrating plate is located at the first material collection position and at the discharge end of the silo, and the first upper visual positioning camera is located above the vibrating plate.

3. The chip bulk material detection and packaging equipment according to claim 1, characterized in that: The jig loading and unloading track includes an incoming material stacking mechanism, a loading track, an intermediate track, an unloading track and an empty jig stacking mechanism. The loading track, the intermediate track and the unloading track are connected in sequence. The feeding end of the loading track is docked with an external jig loading device. The intermediate track is located at the second material taking position. The discharging end of the loading track is docked with an external jig unloading device. The incoming material stacking mechanism is arranged on the loading track, and the empty jig stacking mechanism is arranged on the unloading track. The incoming material stacking mechanism is used to stack and store the jigs fully loaded with materials on the feeding track, and to put the stacked jigs fully loaded with materials back onto the feeding track one by one; The empty jig stacking mechanism is used to stack and store the empty jigs on the unloading track, and to put the stacked empty jigs back onto the unloading track one by one.

4. The chip bulk detection and packaging equipment according to claim 3, characterized in that: The incoming material stacking mechanism comprises a first stacking bracket arranged on the top of the feeding track, four first supporting cylinders respectively arranged at the four corners of the bottom of the first stacking bracket in a horizontal direction, and a first stacking lifting cylinder vertically arranged below the first stacking bracket, the telescopic ends of the four first supporting cylinders are each provided with a first supporting support plate, and the telescopic end of the first stacking lifting cylinder is provided with a first stacking lifting plate; The empty jig stacking mechanism includes a second stacking bracket arranged on the top of the unloading track, four second supporting cylinders respectively arranged horizontally at the four corners of the bottom of the second stacking bracket, and a second stacking lifting cylinder vertically arranged below the second stacking bracket, and the telescopic ends of the four second supporting cylinders are each provided with a second supporting pallet, and the telescopic end of the second stacking lifting cylinder is provided with a second stacking lifting plate.

5. The chip bulk material detection and packaging equipment according to claim 3, characterized in that: The output end of the loading track is provided with a first positioning cylinder for positioning a jig fully loaded with materials, the middle track has a second positioning cylinder for positioning a jig fully loaded with materials at the end of the second material picking position, and the output end of the unloading track is provided with a third positioning cylinder for positioning an empty jig.

6. The chip bulk material detection and packaging equipment according to claim 1, characterized in that: The transplanting mechanism includes two platform transplanting assemblies arranged side by side, and the two platform transplanting assemblies work alternately. The platform transplanting assembly includes a linear drive module arranged on the frame and a material placement table arranged at the driving end of the linear drive module. The linear drive module receives the material conveyed by the first material picking robot through the material placement table, and conveys the material to the bottom of the top camera detection mechanism and the third material picking position in sequence.

7. The chip bulk material detection and packaging equipment according to claim 1, characterized in that: The first material-retrieving robot comprises a four-axis robot arranged on the frame, and a second upper visual positioning camera, a code scanning component and a first suction nozzle component arranged at the end of the four-axis robot.

8. The chip bulk material detection and packaging equipment according to claim 1, characterized in that: The braid packaging mechanism includes a material guide bracket arranged on the frame, and a carrier tape unwinding mechanism, a cover tape unwinding mechanism, a third upper visual positioning camera, a tape sealing mechanism and a finished product winding mechanism arranged on the material guide bracket. The third upper visual positioning camera is located on the feeding side of the tape sealing mechanism. After the carrier tape supplied by the carrier tape unwinding mechanism is put into the material sucked by the second material picking robot, it passes through the photographing area of ​​the third upper visual positioning camera and enters the tape sealing mechanism together with the cover tape supplied by the cover tape unwinding mechanism for tape sealing. After tape sealing, it is wound up in the finished product winding mechanism.

9. The bulk chip detection and packaging equipment according to claim 1, characterized in that: The NG temporary storage mechanism includes a cylinder drive mechanism, a linear slide rail and an NG bin. The cylinder drive mechanism and the linear slide rail are fixed on the frame. The drive end of the cylinder drive mechanism is fixed to one end of the NG bin. The NG bin is also slidably connected to the linear slide rail.

10. The chip bulk detection and packaging equipment according to claim 1, characterized in that: The second material picking robot includes a second suction nozzle assembly for sucking materials, an X-axis moving module for driving the second suction nozzle assembly to move along the X-axis direction, a Y-axis moving module for driving the second suction nozzle assembly to move along the Y-axis direction, and a Z-axis moving module for driving the second suction nozzle assembly to move along the Z-axis direction. The X-axis moving module is fixed on the frame, the driving end of the X-axis moving module is fixed to the Y-axis moving module, the driving end of the Y-axis moving module is fixed to the Z-axis moving module, and the driving end of the Z-axis moving module is fixed to the second suction nozzle assembly.

Citation Information

Patent Citations

  • Flexible braiding machine based on machine vision

    CN216943685U

  • Full-automatic multidirectional visual inspection and packaging integrated equipment

    CN115043042A

  • Chip detection sorting machine

    CN115106300A

  • Equipment for braiding or placing chips after appearance inspection and working method of equipment

    CN115140364A

  • Automatic assembling equipment for ceramic packaging shell

    CN118720675A