Construction waste regeneration treatment equipment and method

By using a combination technology of a double feeding mechanism, a multi-layer equalizing mold, a horizontal and vertical driving mechanism and a press-molding mechanism in the construction waste regeneration and treatment equipment, the problem of difficulty in efficiently producing permeable bricks in construction waste is solved, and an efficient and smooth permeable brick production process is achieved, avoiding resource waste.

CN119897929AActive Publication Date: 2025-04-29BENGBU HUATONG SOLID WASTE DISPOSAL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510174252.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2025-04-29
Estimated Expiration
2045-02-18

AI Technical Summary

Technical Problem

In the prior art, it is difficult to achieve efficient permeable brick production when handling construction waste, resulting in waste of construction waste resources and inefficient production efficiency.

Method used

A construction waste regeneration and treatment equipment is adopted, including a double feeding mechanism, a multi-layer equalizing mold, a horizontal and vertical driving mechanism and a press-molding mechanism. Through the disturbance and humidification treatment of the double feeding mechanism, combined with the uniform laying of the horizontal and vertical driving mechanism and the press-molding molding mechanism, the efficient production of permeable bricks is achieved.

Benefits of technology

It improves the smoothness and production efficiency of the permeable brick processing process, and avoids waste of resources caused by abandonment of construction waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119897929A_ABST
    Figure CN119897929A_ABST
Patent Text Reader

Abstract

The invention discloses construction waste regeneration treatment equipment and method.The equipment comprises a double-material feeding mechanism arranged above a horizontal working table, multiple layers of material uniformizing molds are installed on the horizontal working table in a sliding mode, and a transverse and longitudinal driving mechanism and a compression molding mechanism are arranged on the two sides of the double-material feeding mechanism correspondingly; the transverse and longitudinal driving mechanism is connected with the multi-layer material uniformizing mold, and one side of the horizontal working table penetrates through the compression molding mechanism. According to the method, additive adding and humidifying are carried out on the basic crushed aggregates and the basic surface crushed aggregates obtained from construction waste through the equipment, the basic crushed aggregates and the basic surface crushed aggregates are filled into the multi-layer material homogenizing mold in a layered mode, and finally the basic crushed aggregates and the basic surface crushed aggregates are pressed through the pressing mold forming mechanism to form the water permeable brick with the basic layer and the surface layer. According to the invention, the smoothness of the water-permeable brick processing flow is improved, the production efficiency of the water-permeable brick is improved, and the situation of resource waste caused by abandoned construction waste is avoided. The method is suitable for the technical field of construction waste recycling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of construction waste regeneration, and in particular, relates to a construction waste regeneration treatment device and method. Background Art

[0002] In the field of demolition of concrete buildings such as buildings, after removing recyclable parts such as glass and steel bars, a large amount of construction waste (concrete, gravel, etc.) will be generated. This part of construction waste is extremely difficult to recycle, and the cost of recycling is high. Generally, this part of construction waste is directly discarded. In order to avoid construction waste from polluting the environment, the means usually taken are to transport construction waste to landfills and bury them deep underground to avoid construction waste being exposed on the surface and generating a large amount of dust. However, in the infiltration of precipitation and / or the flow of groundwater, construction waste comes into contact with water bodies, thereby polluting water bodies. Then, in order to deal with construction waste in a long-term manner, landfilling construction waste becomes a relatively useless means. The existing method is to crush construction waste, use it as aggregate for paving or re-use it as aggregate for concrete, etc. in the construction field. However, when construction waste is used as aggregate, its own strength is insufficient, and its bonding performance with other mixtures such as cement is greatly reduced, which in turn affects the structural strength and stability of roads or buildings. In harsh environments (large temperature differences), cracks are easily generated. At present, using construction waste as raw material for permeable bricks is the preferred solution. However, in the entire permeable brick production process, the production process is relatively cumbersome and cannot achieve the purpose of continuous production. Generally, each process is independent of each other, such as the mixing of aggregates, the addition of materials in the mold and the molding of permeable bricks, which are all completed independently, thereby greatly reducing the production efficiency. Therefore, there is an urgent need for a means of regenerating permeable bricks from construction waste, so that the processing flow of permeable bricks is smoother, the production efficiency of permeable bricks is improved, and the waste of resources caused by abandonment of construction waste is effectively avoided. Summary of the invention

[0003] The present invention provides a construction waste recycling and processing device and method, which are used to improve the fluency of the permeable brick processing process, improve the production efficiency of the permeable brick, and avoid the waste of resources caused by abandonment of construction waste.

[0004] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0005] A construction waste recycling and processing equipment includes a double-material feeding mechanism arranged above a horizontal workbench, a multi-layer material distribution mold is slidably installed on the horizontal workbench, and a horizontal and vertical driving mechanism and a compression molding mechanism are respectively arranged on both sides of the double-material feeding mechanism. The horizontal and vertical driving mechanism is connected with the multi-layer material distribution mold, and one side of the horizontal workbench passes through the compression molding mechanism.

[0006] Furthermore, the dual-material feeding mechanism includes two crushed material feeding units arranged side by side, one end of the two crushed material feeding units is connected to the additive pipe system, and the other end of the two crushed material feeding units is connected to the humidification pipe system.

[0007] Furthermore, the crushed material feeding unit includes a spiral disturbing blade coaxially arranged in the horizontal mixing kettle, and a first assembly tube and a second assembly tube are respectively fixed at both ends of the spiral disturbing blade, the first assembly tube and the second assembly tube are respectively rotatably connected to the axial ends of the horizontal mixing kettle, and the axes of the first assembly tube, the second assembly tube and the horizontal mixing kettle coincide, the first assembly tube and the second assembly tube are respectively rotatably connected to the additive pipe system and the humidification pipe system, and a transmission wheel is coaxially mounted on the first assembly tube.

[0008] Furthermore, a first liquid chamber and a second liquid chamber are independently constructed in the spiral disturbing blade, and the first liquid chamber and the second liquid chamber extend from the two ends of the spiral disturbing blade along its spiral shape to the middle of the spiral disturbing blade respectively, and the first liquid chamber and the second liquid chamber are connected to the first assembly tube and the second assembly tube respectively, and a plurality of first liquid outlet holes and a plurality of second liquid outlet holes are respectively distributed in the first liquid chamber and the second liquid chamber on the spiral disturbing blade, and these first liquid outlet holes are all connected to the first liquid chamber, and these second liquid outlet holes are all connected to the second liquid chamber.

[0009] Furthermore, the additive pipe system includes two first liquid inlet branches connected to the first liquid inlet main pipe, the two first liquid inlet branches are respectively rotatably connected to the two first assembly pipes, and a first control valve is installed on each first liquid inlet branch pipe; the humidification pipe system includes two second liquid inlet branches connected to the second liquid inlet main pipe, the two second liquid inlet branches are respectively rotatably connected to the two second assembly pipes, and a second control valve is installed on each second liquid inlet branch pipe.

[0010] Furthermore, the multi-layer material equalizing mold includes a basic mold body, a sub-layer mold body and a top-layer material equalizing frame which are arranged in sequence from bottom to top, the basic mold body is laterally slidably connected to the horizontal workbench, the sub-layer mold body is longitudinally slidably connected to the basic mold body, the top-layer material equalizing frame is longitudinally slidably connected to the sub-layer mold body, and the sub-layer mold body and the top-layer material equalizing frame are transmission-connected to the transverse and longitudinal driving mechanism, a plurality of basic cavities and a plurality of sub-layer cavities are respectively opened on the basic mold body and the sub-layer mold body, when the two ends of the basic mold body and the two ends of the sub-layer mold body are aligned with each other, the basic cavities are aligned one by one with the sub-layer cavities, third electromagnets are respectively installed at the two ends of the upper end of the basic mold body, and magnetic suction blocks are respectively fixed at the two ends of the lower end of the sub-layer mold body.

[0011] Furthermore, the transverse and longitudinal driving mechanism includes a longitudinal guide rail arranged on one side of the horizontal workbench, a linear motor is mounted on the longitudinal guide rail, the linear motor is detachably connected to the adapter seat on the cylinder body of the transverse cylinder, a first connecting joint and a second connecting joint are installed on the cylinder rod of the transverse cylinder, a first electromagnet and a second electromagnet are respectively installed on the first connecting joint and the second connecting joint, and the first electromagnet and the second electromagnet are respectively arranged corresponding to the sub-layer mold body and the top layer material equalizing frame.

[0012] Furthermore, the die forming mechanism includes an upper die body and a lower die body respectively arranged above and below the horizontal working table, and a plurality of upper die blocks and a plurality of lower ejector blocks are respectively installed at the ends of the upper die body and the lower die body that are close to each other, the plurality of upper die blocks are arranged at intervals along the longitudinal direction of the horizontal working table, and the upper die blocks and the lower ejector blocks are arranged one-to-one, a plurality of conducting holes are opened on the horizontal working table, the plurality of lower ejector blocks and the plurality of conducting holes are arranged one-to-one, and an upper vertical oil cylinder and a lower vertical oil cylinder are respectively installed at the ends of the upper die body and the lower die body that are away from each other.

[0013] Furthermore, the lower end of the lower pressure mold body is movably assembled in the assembly cavity of the assembly shell, and a plurality of connecting springs are arranged in the assembly cavity. The upper and lower ends of each connecting spring are respectively connected to the lower pressure mold body and the assembly shell, and the upper end of the lower vertical cylinder is connected to the lower end surface of the assembly shell.

[0014] The present invention also discloses a method for utilizing the above-mentioned construction waste recycling and processing equipment, comprising the following steps:

[0015] Step 1. The base crushed material and the base surface crushed material are respectively and continuously supplied to the double-material feeding mechanism, and the double-material feeding mechanism is controlled to disturb the base crushed material and the base surface crushed material entering therein, and transport them toward the outlet end of the double-material feeding mechanism;

[0016] Step 2. During the conveying process, the additive is supplied to the disturbed base crushed material and the base surface crushed material respectively, and the humidifying water is supplied to the disturbed base crushed material and the base surface crushed material respectively;

[0017] Step 3. Control the movement of the horizontal and vertical drive mechanisms so that the base scraps discharged by the double-material feeding mechanism enter the multi-layer material distribution mold, and the base scraps are evenly laid on the upper part of the multi-layer material distribution mold;

[0018] Step 4. Afterwards, the transverse and longitudinal driving mechanisms are controlled to drive the multi-layer material distribution mold to move to the compression molding mechanism;

[0019] Step 5. Control the die-forming mechanism to press the material in the multi-layer material-distributing mold, so that the material is formed into a permeable brick in the die-forming mechanism.

[0020] Due to the adoption of the above structure, the technical progress achieved by the present invention compared with the prior art is that: the present invention has two mixing chambers through the double-material feeding mechanism, the basic crushed material and the base surface crushed material are respectively supplied to the two mixing chambers, the double-material feeding mechanism is controlled to disturb and convey the materials in the two mixing chambers, and the additives (binders) are respectively injected into the two mixing chambers. After the basic crushed material and the base surface crushed material are respectively mixed with the additives, the humidification water is respectively added to the two mixing chambers to humidify the basic crushed material and the base surface crushed material. Compared with the existing two materials that are added with additives and humidified separately, its efficiency is greatly improved. Afterwards, the basic crushed material and the base surface crushed material are added to the multi-layer uniform material mold in sequence. When the basic crushed material is added, the horizontal and vertical driving mechanisms are controlled to operate so that the basic crushed material is evenly laid in the multi-layer uniform material mold; when the base surface crushed material is added, the horizontal and vertical driving mechanisms are controlled to operate so that the base surface crushed material is evenly laid on the upper part of the multi-layer uniform material mold. Finally, the compression molding mechanism is used to compression mold it into a permeable brick. When production is stopped, the injection channel of the additive needs to be cleaned with detergent, clean water, etc. to prevent the additive from staying in the injection channel and condensing and clogging. In the processing of existing permeable bricks, whether it is the separate processing of two materials in the early stage, or the subsequent layered addition, quantitative, and leveling of materials, corresponding equipment is required to complete, making the entire production process too complicated, greatly delaying the efficiency of production, and the more equipment there is, the greater the investment cost, and the later maintenance cost will also increase accordingly. In summary, the present invention can effectively improve the fluency of the permeable brick processing process, improve the production efficiency of permeable bricks, and avoid the waste of resources caused by abandonment of construction waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0022] In the attached picture:

[0023] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;

[0024] Figure 2 It is a structural schematic diagram of a double-material feeding mechanism according to an embodiment of the present invention;

[0025] Figure 3 It is a structural schematic diagram of a horizontal mixing kettle in a double-material feeding mechanism in an embodiment of the present invention;

[0026] Figure 4 It is a structural schematic diagram of the connection between the spiral material disturbing blade, the first assembly pipe and the second assembly pipe in the double-material feeding mechanism of the embodiment of the present invention;

[0027] Figure 5This is a schematic diagram of the structure of an embodiment of the present invention after removing the double-material feeding mechanism;

[0028] Figure 6 This is a schematic diagram of the structure of the transverse and longitudinal drive mechanism of an embodiment of the present invention;

[0029] Figure 7 This is a schematic structural diagram of a multi-layer material distribution mold according to an embodiment of the present invention;

[0030] Figure 8 This is a structural front view of a multi-layer material distribution mold according to an embodiment of the present invention;

[0031] Fig. 9 This is a schematic diagram of the structure of the multi-layer material distribution mold after being disassembled according to an embodiment of the present invention;

[0032] Fig.10 It is a structural schematic diagram of the corresponding arrangement of the horizontal working table and the die forming mechanism according to an embodiment of the present invention;

[0033] Fig.11 This is a schematic diagram of the structure of a horizontal workbench according to an embodiment of the present invention;

[0034] Fig.12 It is a schematic structural diagram of the lower die body and the assembly shell after being separated in the die forming mechanism of the embodiment of the present invention.

[0035] Labeled parts: 100- double material feeding mechanism, 101- horizontal mixing kettle, 102- feed cylinder, 103- discharge cylinder, 104- feed pipe, 105- discharge pipe, 106- discharge nozzle, 107- discharge control valve, 108- spiral disturbing blade, 109- first liquid outlet, 110- second liquid outlet, 111- first assembly pipe, 112- first adapter sleeve, 113- transmission wheel, 114- second assembly Pipe, 115-second adapter sleeve, 116-first liquid inlet main pipe, 117-first liquid inlet branch pipe, 118-first control valve, 119-second liquid inlet main pipe, 120-second liquid inlet branch pipe, 121-second control valve, 200-horizontal workbench, 201-horizontal platform, 202-lateral guide bar, 203-first collection tank, 204-second collection tank, 205-conducting hole, 300-multi-layer material distribution mold Tool, 301-basic mold body, 302-basic cavity, 303-first limit edge, 304-lateral guide groove, 305-third electromagnet, 306-secondary mold body, 307-secondary cavity, 308-second limit edge, 309-magnetic suction block, 310-top material balancing frame, 400-lateral and longitudinal driving mechanism, 401-longitudinal guide rail, 402-linear motor, 403-cylinder body, 404-gas Cylinder rod, 405-adapter, 406-first connecting joint, 407-second connecting joint, 408-first electromagnet, 409-second electromagnet, 500-die forming mechanism, 501-upper die body, 502-upper die block, 503-upper vertical cylinder, 504-lower die body, 505-lower top block, 506-assembly shell, 507-assembly cavity, 508-connecting spring, 509-lower vertical cylinder. DETAILED DESCRIPTION

[0036] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0037] The present invention discloses a construction waste recycling and processing device, such as Figure 1-12As shown, it includes a double-material feeding mechanism 100, a horizontal workbench 200, a multi-layer material distribution mold 300, a horizontal and vertical driving mechanism 400, and a die forming mechanism 500. The double-material feeding mechanism 100 is arranged above the horizontal workbench 200, the multi-layer material distribution mold 300 is slidably installed on the horizontal workbench 200, the horizontal and vertical driving mechanism 400 and the die forming mechanism 500 are respectively arranged on both sides of the double-material feeding mechanism 100, the horizontal and vertical driving mechanism 400 is connected with the multi-layer material distribution mold 300, and one side of the horizontal workbench 200 passes through the die forming mechanism 500. The working principle and advantages of the present invention are as follows: the present invention has two mixing chambers through the dual-material feeding mechanism 100, the basic crushed material and the base surface crushed material are respectively supplied to the two mixing chambers, the dual-material feeding mechanism 100 is controlled to disturb and convey the materials in the two mixing chambers, and the additives (binders) are respectively injected into the two mixing chambers, and after the basic crushed material and the base surface crushed material are respectively mixed with the additives, humidifying water is respectively added into the two mixing chambers to humidify the basic crushed material and the base surface crushed material. Compared with the existing method of adding additives and humidifying the two materials separately, its efficiency is greatly improved. Afterwards, the basic crushed material and the base surface crushed material are sequentially added into the multi-layer uniform material mold 300. When the basic crushed material is added, the horizontal and vertical driving mechanism 400 is controlled to operate so that the basic crushed material is evenly laid in the multi-layer uniform material mold 300; when the base surface crushed material is added, the horizontal and vertical driving mechanism 400 is controlled to operate so that the base surface crushed material is evenly laid on the upper part of the multi-layer uniform material mold 300. Finally, the compression molding mechanism 500 is used to compression mold it into a permeable brick. When the production is stopped, the injection channel of the additive needs to be cleaned with detergent, clean water, etc. to prevent the additive from staying in the injection channel and condensing and clogging. In the processing of existing permeable bricks, whether the materials are the separate processing of the two materials in the early stage, or the subsequent layered addition, quantitative, and leveling of the materials, all require corresponding equipment to complete, making the entire production process too complicated, greatly delaying the efficiency of production, and the more equipment, the greater the investment cost, and the later maintenance cost will also increase accordingly. In summary, the present invention can effectively improve the fluency of the permeable brick processing process, improve the production efficiency of the permeable bricks, and avoid the waste of resources caused by abandonment of construction waste.

[0038] As a preferred embodiment of the present invention, Figure 1 , 2As shown, the dual material feeding mechanism 100 includes an additive pipe system, a humidifying pipe system and two crushed material feeding units. The two crushed material feeding units are arranged side by side, and the two mixing chambers are formed in the two crushed material feeding units respectively. One end of the two crushed material feeding units is connected to the additive pipe system, and the other end of the two crushed material feeding units is connected to the humidifying pipe system. The base crushed material and the base surface crushed material are disturbed and transported in the two crushed material feeding units respectively, and the additive is supplied to the two crushed material feeding units through the additive pipe system, so that the additive is fully mixed with the base crushed material and the base surface crushed material respectively, and the humidifying water is supplied to the two crushed material feeding units through the humidifying pipe system, so that the humidifying water is fully mixed with the base crushed material and the base surface crushed material respectively.

[0039] As a preferred embodiment of the present invention, Figure 2-4As shown, the crushed material feeding unit includes a horizontal mixing kettle 101, a spiral disturbing blade 108, a first assembly pipe 111 and a second assembly pipe 114. The axis of the horizontal mixing kettle 101 extends in the horizontal direction, and the radial length of the horizontal mixing kettle 101 increases along the conveying direction of the material. The inlet and outlet ends of the horizontal mixing kettle 101 (the small diameter end and the large diameter end of the feed barrel 102) are respectively configured with a feed barrel 102 and a discharge barrel 103. The axes of the horizontal mixing kettle 101, the feed barrel 102 and the discharge barrel 103 coincide. The upper end of the feed barrel 102 is connected with a feed pipe 104, and the lower end of the discharge barrel 103 is connected with a discharge pipe 105. The lower end of the discharge pipe 105 is configured with a discharge nozzle 106 with a gradually expanding diameter, and a discharge control valve 107 is installed on the discharge pipe 105. The spiral disturbing blade 108 of this embodiment is arranged in the horizontal mixing kettle 101, and the spiral disturbing blade 108 extends spirally along the axis of the horizontal mixing kettle 101. The axis of the horizontal mixing kettle 101 coincides with the axis of the spiral disturbing blade 108. The outer wall of the spiral disturbing blade 108 contacts the inner circumferential wall of the horizontal mixing kettle 101, that is, the radial length of the spiral disturbing blade 108 increases along the conveying direction of the material, and when the spiral disturbing blade 108 is driven to rotate, the spiral disturbing blade 108 scrapes the inner circumferential wall of the horizontal mixing kettle 101 to achieve stirring and conveying of the material and avoid the material sticking to the inner circumferential wall of the horizontal mixing kettle 101. The first assembly tube 111 and the second assembly tube 114 of the present embodiment are respectively fixed at the two ends of the spiral disturbing blade 108, and the first assembly tube 111 and the second assembly tube 114 are respectively rotatably connected to the ends of the feed barrel 102 and the discharge barrel 103 that are away from each other, and the axes of the first assembly tube 111, the second assembly tube 114 and the horizontal mixing kettle 101 coincide, and the first assembly tube 111 and the second assembly tube 114 are respectively rotatably connected to the additive piping system and the humidification piping system, and a transmission wheel 113 is coaxially mounted on the first assembly tube 111. The working principle and advantages of this embodiment are: this embodiment drives the transmission wheel 113 to rotate, so that it drives the first assembly pipe 111, the second assembly pipe 114 and the spiral disturbing blade 108 to rotate synchronously, and the basic crushed material or the base surface crushed material enters the horizontal mixing kettle 101 through the feeding pipe 104 and the feeding barrel 102. Under the stirring and conveying of the spiral disturbing blade 108, the basic crushed material or the base surface crushed material gradually moves toward the discharge barrel 103. At the same time, the additive and the humidifying water are respectively injected into the horizontal mixing kettle 101 through the additive pipe system and the humidifying pipe system, so that the basic crushed material or the base surface crushed material is gradually mixed with the additive and the humidifying water during the stirring and conveying process, so that the structural strength of the subsequent pressed permeable bricks reaches the expected standard. Under normal circumstances, it is necessary to add the additive first, mix it sufficiently, and then perform the humidification operation. If the two processes are reversed, the structural strength of the permeable bricks obtained will be relatively weak.

[0040] As a preferred embodiment of the present invention, Figure 2 , 4 As shown, a first liquid chamber and a second liquid chamber that are independent of each other are constructed in the spiral disturbing blade 108. The first liquid chamber is formed by one end of the spiral disturbing blade 108 connected to the first assembly tube 111, and extends to the middle of the spiral disturbing blade 108 along the spiral shape of the spiral disturbing blade 108. The second liquid chamber is formed by one end of the spiral disturbing blade 108 connected to the second assembly tube 114, and extends to the middle of the spiral disturbing blade 108 along the spiral shape of the spiral disturbing blade 108. The first liquid chamber and the second liquid chamber are connected to the first assembly tube 111 and the second assembly tube 114, respectively. A plurality of first liquid outlet holes 109 are distributed on the spiral disturbing blade 108 at the first liquid chamber, and these first liquid outlet holes 109 are all connected to the first liquid chamber; a plurality of second liquid outlet holes 110 are distributed on the spiral disturbing blade 108 at the second liquid chamber, and these second liquid outlet holes 110 are all connected to the second liquid chamber. The additive pipe system of this embodiment includes a first liquid inlet main pipe 116 and two first liquid inlet branch pipes 117, the two first liquid inlet branch pipes 117 are both connected to the outlet end of the first liquid inlet main pipe 116, a first adapter sleeve 112 is configured at the end of the first assembly pipe 111, the two first liquid inlet branch pipes 117 are respectively rotatably connected to the two first adapter sleeves 112, and a first control valve 118 is installed on each first liquid inlet branch pipe 117. The humidification pipe system of this embodiment includes a second liquid inlet main pipe 119 and two second liquid inlet branch pipes 120, the two second liquid inlet branch pipes 120 are both connected to the outlet end of the second liquid inlet main pipe 119, a second adapter sleeve 115 is configured at the end of the second assembly pipe 114, the two second liquid inlet branch pipes 120 are respectively rotatably connected to the two second adapter sleeves 115, and a second control valve 121 is installed on each second liquid inlet branch pipe 120. The working principle and advantages of this embodiment are as follows: this embodiment pressurizes the additive and injects it into the first liquid inlet main pipe 116, and controls the different openings of the two first control valves 118, so that the additive enters the two first assembly pipes 111 respectively through the two first liquid inlet branches 117; when the additive enters the first liquid cavity of the spiral disturbing blade 108 through the first assembly pipe 111, as the spiral disturbing blade 108 rotates, the additive can be fully combined with the material during the process of stirring and conveying the material, thereby improving the mixing efficiency. After the additives are mixed, the material is transported to the area where the humidifying water acts, the humidifying water is pressurized and injected into the second liquid inlet main pipe 119, and the different openings of the two second control valves 121 are controlled so that the humidifying water enters the two second assembly pipes 114 respectively through the two second liquid inlet branches 120; when the humidifying water enters the second liquid cavity of the spiral disturbing blade 108 through the second assembly pipe 114, as the spiral disturbing blade 108 rotates, the humidifying water can be fully combined with the material during the process of stirring and conveying the material, thereby improving the humidification efficiency of the material.

[0041] As a preferred embodiment of the present invention, Figure 7-9As shown, the multi-layer material distribution mold 300 includes a basic mold body 301, a secondary mold body 306 and a top material distribution frame 310, and the basic mold body 301, the secondary mold body 306 and the top material distribution frame 310 are arranged in sequence from bottom to top. Among them, transverse guide grooves 304 are respectively constructed at both ends of the longitudinal direction of the basic mold body 301, and two transverse guide bars 202 are constructed side by side on the horizontal workbench 200. The two transverse guide bars 202 are respectively slidably assembled with the two transverse guide grooves 304, thereby achieving the purpose of transverse sliding connection between the basic mold body 301 and the horizontal workbench 200. First limiting edges 303 are respectively constructed on both sides of the upper end of the basic mold body 301, and the secondary mold body 306 is assembled between the two first limiting edges 303, so as to achieve the purpose of longitudinal sliding connection between the secondary mold body 306 and the basic mold body 301. Second limiting edges 308 are respectively constructed on both sides of the upper end of the secondary mold body 306, and the top material equalizing frame 310 is assembled between the two second limiting edges 308, so as to realize the purpose of longitudinal sliding connection of the top material equalizing frame 310 to the secondary mold body 306. Moreover, the secondary mold body 306 and the top material equalizing frame 310 are connected to the transverse and longitudinal driving mechanism 400, so that the transverse and longitudinal driving mechanism 400 can drive the secondary mold body 306 and the top material equalizing frame 310 to move transversely or longitudinally. In this embodiment, a plurality of basic cavities 302 are provided on the basic mold body 301, and these basic cavities 302 are arranged at intervals along the longitudinal direction of the basic mold body 301, and a plurality of secondary cavities 307 are provided on the secondary mold body 306, and these secondary cavities 307 are arranged at intervals along the longitudinal direction of the secondary mold body 306. When the two ends of the basic mold body 301 and the two ends of the secondary mold body 306 are aligned, the basic cavities 302 and the secondary cavities 307 are aligned one by one. In this embodiment, third electromagnets 305 are respectively installed at both ends of the upper end of the basic mold body 301, and magnetic blocks 309 are respectively fixed at both ends of the lower end of the secondary mold body 306. In this embodiment, when the basic crushed material is loaded at the basic crushed material loading station, the basic crushed material is filled in each basic cavity 302, and the secondary mold body 306 is driven to reciprocate along the longitudinal direction of the basic mold body 301 by the horizontal and vertical driving mechanism 400, so that the basic crushed material evenly fills each basic cavity 302, and the excess basic crushed material is discharged from the longitudinal ends of the basic mold body 301; then, the multi-layer material equalization mold 300 is driven by the horizontal and vertical driving mechanism 400 to move to the base surface crushed material loading station, and the base surface crushed material is filled in the secondary cavity 307 above each basic cavity 302. At this time, the third electromagnet 305 is energized to make it firmly attract the magnetic block 309, thereby achieving the fixed position of the basic mold body 301 and the secondary mold body 306.The top material distribution frame 310 is driven by the transverse and longitudinal drive mechanism 400 to reciprocate along the longitudinal direction of the secondary mold body 306, so that each secondary cavity 307 is filled and scraped flat, and the excess base surface scraps are discharged from the longitudinal ends of the secondary mold body 306; then, the transverse and longitudinal drive mechanism 400 is controlled to drive the multi-layer material distribution mold 300 to move laterally to the die pressing station to facilitate the die pressing operation of the die forming mechanism 500. It can be seen that this embodiment can accurately layer the base scraps and the base surface scraps, and add them into the multi-layer material distribution mold 300 according to a predetermined ratio, thereby improving the consistency of the obtained permeable brick structure and the yield of the permeable brick.

[0042] As a preferred embodiment of the present invention, Figure 5 , 6 As shown, the transverse and longitudinal driving mechanism 400 includes a longitudinal guide rail 401 , a linear motor 402 , a transverse cylinder, a first connecting joint 406 , a second connecting joint 407 , a first electromagnet 408 and a second electromagnet 409 . Among them, the longitudinal guide rail 401 is set on one side of the horizontal workbench 200, the linear motor 402 is assembled on the longitudinal guide rail 401, and an adapter 405 is installed on the cylinder body 403 of the transverse cylinder. The linear motor 402 and the adapter 405 are detachably connected together, the first connecting joint 406 and the second connecting joint 407 are respectively installed on the cylinder rod 404 of the transverse cylinder, the first electromagnet 408 and the second electromagnet 409 are respectively installed on the first connecting joint 406 and the second connecting joint 407, the first electromagnet 408 and the second electromagnet 409 are respectively arranged corresponding to the sub-layer mold body 306 and the top-layer material equalizing frame 310, the middle part of the side of the sub-layer mold body 306 close to the first electromagnet 408 is a structure made of magnetic material, and the middle part of the side of the top-layer material equalizing frame 310 close to the second electromagnet 409 is a structure made of magnetic material. Fig.11As shown, the horizontal workbench 200 of this embodiment includes a horizontal platform body 201, and first collecting troughs 203 are respectively constructed at both ends of the horizontal platform body 201 at a position corresponding to one of the crushed material feeding units, and second collecting troughs 204 are respectively constructed at both ends of the horizontal platform body 201 at a position corresponding to the other crushed material feeding unit. Excess base crushed materials are discharged into the first collecting trough 203, and excess base surface crushed materials are discharged into the second collecting trough 204. In this embodiment, the first electromagnet 408 and the second electromagnet 409 firmly hold the secondary mold body 306 and the top material equalizing frame 310, and control the linear motor 402 to move along the longitudinal guide rail 401, so that the secondary mold body 306 reciprocates on the basic mold body 301, and then the basic scraps are evenly added into the basic cavity 302 and scraped flat; when the third electromagnet 305 firmly holds the magnetic block 309, the second electromagnet 409 is controlled to release the top material equalizing frame 310 and the first electromagnet 408 from the secondary mold body 306, and the linear motor 402 is controlled to move along the longitudinal guide rail 401, so that the top material equalizing frame 310 reciprocates on the secondary mold body 306, and then the base surface scraps are evenly added into the secondary cavity 307 and scraped flat. In this embodiment, the purpose of switching back and forth between the basic scrap material feeding station, the base surface scrap material feeding station and the die pressing station is achieved by controlling the action of the transverse cylinder.

[0043] As a preferred embodiment of the present invention, Figure 10-12 As shown, the die forming mechanism 500 includes an upper die body 501 and a lower die body 504. The upper die body 501 and the lower die body 504 are respectively arranged above and below the horizontal workbench 200, and a plurality of upper die blocks 502 are installed on the lower end surface of the upper die body 501, and a plurality of lower ejector blocks 505 are installed on the upper end surface of the lower die body 504. The plurality of upper die blocks 502 are arranged at intervals along the longitudinal direction of the horizontal workbench 200, and the upper die blocks 502 and the lower ejector blocks 505 are arranged one by one. A plurality of conducting holes 205 are opened on the horizontal workbench 200, and the plurality of lower ejector blocks 505 and the plurality of conducting holes 205 are arranged one by one. An upper vertical oil cylinder 503 and a lower vertical oil cylinder 509 are respectively installed at the ends of the upper die body 501 and the lower die body 504 away from each other. In this embodiment, when the multi-layer material distribution mold 300 is moved to the die pressing station, the conducting hole 205, the basic cavity 302, the secondary cavity 307, the upper pressing block 502 and the lower top block 505 are aligned with each other, and the lower top block 505 extends into the conducting hole 205, and the upper end surface of the lower top block 505 is flush with the upper end surface of the horizontal workbench 200. By controlling the upper vertical cylinder 503 to drive the upper pressing mold body 501 to move downward, the upper pressing block 502 presses the material in the multi-layer material distribution mold 300 to finally form a permeable brick.

[0044] As a preferred embodiment of the present invention, Fig.12As shown, the lower end of the pressing die 504 is movably assembled in the assembly cavity 507 of the assembly shell 506, and a plurality of connecting springs 508 are arranged in the assembly cavity 507. The upper and lower ends of each connecting spring 508 are respectively connected to the pressing die 504 and the assembly shell 506, and the upper end of the lower vertical oil cylinder 509 is connected to the lower end surface of the assembly shell 506. In this embodiment, since the pressing die 504 and the assembly shell 506 are elastically connected, the situation of hard collision is avoided during the pressing process, and the service life of each component and the safety of the pressing operation are improved.

[0045] The present invention also discloses a method for utilizing the above-mentioned construction waste recycling and processing equipment, comprising the following steps:

[0046] Step 1. The base crushed material and the base surface crushed material are respectively and continuously supplied to the double-material feeding mechanism 100, and the double-material feeding mechanism 100 is controlled to disturb the base crushed material and the base surface crushed material entering therein, and transport them toward the outlet end of the double-material feeding mechanism 100;

[0047] Step 2. During the conveying process, the additive is supplied to the disturbed base crushed material and the base surface crushed material respectively, and the humidifying water is supplied to the disturbed base crushed material and the base surface crushed material respectively;

[0048] Step 3. Control the horizontal and vertical driving mechanism 400 to move, so that the base scraps discharged by the double-material feeding mechanism 100 enter the multi-layer material distribution mold 300, and the base scraps are evenly laid on the upper part of the multi-layer material distribution mold 300;

[0049] Step 4. Afterwards, the horizontal and vertical driving mechanism 400 is controlled to drive the multi-layer material distribution mold 300 to move to the compression molding mechanism 500;

[0050] Step 5. Control the compression molding mechanism 500 to press the material in the multi-layer material distribution mold 300, so that the material is pressed into a permeable brick in the compression molding mechanism 500.

[0051] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. A construction waste recycling and processing equipment, characterized in that: It includes a double-material feeding mechanism arranged above a horizontal workbench, on which a multi-layer material distribution mold is slidably installed, and a horizontal and vertical driving mechanism and a compression molding mechanism are respectively arranged on both sides of the double-material feeding mechanism. The horizontal and vertical driving mechanism is connected with the multi-layer material distribution mold, and one side of the horizontal workbench passes through the compression molding mechanism.

2. The construction waste recycling and processing equipment according to claim 1 is characterized in that: The dual-material feeding mechanism comprises two crushed material feeding units arranged side by side, one end of the two crushed material feeding units is connected to the additive pipe system, and the other end of the two crushed material feeding units is connected to the humidification pipe system.

3. The construction waste recycling and processing equipment according to claim 2 is characterized in that: The crushed material feeding unit includes a spiral disturbing blade coaxially arranged in a horizontal mixing kettle, and a first assembly pipe and a second assembly pipe are respectively fixed at both ends of the spiral disturbing blade, the first assembly pipe and the second assembly pipe are respectively rotatably connected to the axial ends of the horizontal mixing kettle, and the axes of the first assembly pipe, the second assembly pipe and the horizontal mixing kettle coincide, the first assembly pipe and the second assembly pipe are respectively rotatably connected to the additive pipe system and the humidification pipe system, and a transmission wheel is coaxially mounted on the first assembly pipe.

4. The construction waste recycling and processing equipment according to claim 3 is characterized by: A first liquid chamber and a second liquid chamber are independently constructed in the spiral disturbing blade. The first liquid chamber and the second liquid chamber extend from the two ends of the spiral disturbing blade along the spiral shape to the middle of the spiral disturbing blade respectively. The first liquid chamber and the second liquid chamber are connected to the first assembly tube and the second assembly tube respectively. A plurality of first liquid outlet holes and a plurality of second liquid outlet holes are respectively distributed in the first liquid chamber and the second liquid chamber on the spiral disturbing blade. These first liquid outlet holes are all connected to the first liquid chamber, and these second liquid outlet holes are all connected to the second liquid chamber.

5. The construction waste recycling and processing equipment according to claim 3 is characterized by: The additive piping system includes two first liquid inlet branches connected to the first liquid inlet main pipe, the two first liquid inlet branches are rotatably connected to the two first assembly pipes respectively, and a first control valve is installed on each first liquid inlet branch pipe; the humidification piping system includes two second liquid inlet branches connected to the second liquid inlet main pipe, the two second liquid inlet branches are rotatably connected to the two second assembly pipes respectively, and a second control valve is installed on each second liquid inlet branch pipe.

6. The construction waste recycling and processing equipment according to claim 1 is characterized in that: The multi-layer material equalizing mold includes a basic mold body, a secondary mold body and a top material equalizing frame which are arranged in sequence from bottom to top. The basic mold body is laterally slidably connected to the horizontal workbench, the secondary mold body is longitudinally slidably connected to the basic mold body, the top material equalizing frame is longitudinally slidably connected to the secondary mold body, and the secondary mold body and the top material equalizing frame are transmission-connected to the horizontal and longitudinal driving mechanisms. A plurality of basic cavities and a plurality of secondary cavities are respectively provided on the basic mold body and the secondary mold body. When the two ends of the basic mold body and the two ends of the secondary mold body are aligned with each other, the basic cavities are aligned one by one with the secondary cavities, and third electromagnets are respectively installed at the two ends of the upper end of the basic mold body, and magnetic suction blocks are respectively fixed at the two ends of the lower end of the secondary mold body.

7. The construction waste recycling and processing equipment according to claim 6 is characterized in that: The transverse and longitudinal driving mechanism includes a longitudinal guide rail arranged on one side of the horizontal workbench, a linear motor is installed on the longitudinal guide rail, the linear motor is detachably connected to the adapter seat on the cylinder body of the transverse cylinder, a first connecting joint and a second connecting joint are installed on the cylinder rod of the transverse cylinder, a first electromagnet and a second electromagnet are respectively installed on the first connecting joint and the second connecting joint, and the first electromagnet and the second electromagnet are respectively arranged corresponding to the sub-layer mold body and the top layer material equalizing frame.

8. The construction waste recycling and processing equipment according to claim 1 is characterized by: The die forming mechanism includes an upper die body and a lower die body respectively arranged above and below a horizontal working table, and a plurality of upper die blocks and a plurality of lower ejector blocks are respectively installed at the ends of the upper die body and the lower die body close to each other, the plurality of upper die blocks are arranged at intervals along the longitudinal direction of the horizontal working table, and the upper die blocks and the lower ejector blocks are arranged one-to-one, a plurality of conducting holes are opened on the horizontal working table, the plurality of lower ejector blocks and the plurality of conducting holes are arranged one-to-one, and an upper vertical oil cylinder and a lower vertical oil cylinder are respectively installed at the ends of the upper die body and the lower die body away from each other.

9. The construction waste recycling and processing equipment according to claim 8, characterized in that: The lower end of the pressing die body is movably assembled in the assembly cavity of the assembly shell, and a plurality of connecting springs are arranged in the assembly cavity. The upper and lower ends of each connecting spring are respectively connected to the pressing die body and the assembly shell, and the upper end of the lower vertical cylinder is connected to the lower end surface of the assembly shell.

10. A method for utilizing the construction waste recycling equipment according to any one of claims 1 to 9, characterized in that: The steps include: Step 1. The base crushed material and the base surface crushed material are respectively and continuously supplied to the double-material feeding mechanism, and the double-material feeding mechanism is controlled to disturb the base crushed material and the base surface crushed material entering therein, and transport them toward the outlet end of the double-material feeding mechanism; Step 2. During the conveying process, the additive is supplied to the disturbed base crushed material and the base surface crushed material respectively, and the humidifying water is supplied to the disturbed base crushed material and the base surface crushed material respectively; Step 3. Control the horizontal and vertical driving mechanisms to move so that the base scraps discharged from the dual-material feeding mechanism enter the multi-layer material distribution mold, and the base scraps are evenly laid on the upper part of the multi-layer material distribution mold; Step 4. Afterwards, the horizontal and vertical driving mechanisms are controlled to drive the multi-layer material distribution mold to move to the compression molding mechanism; Step 5. Control the die-forming mechanism to press the material in the multi-layer material-distributing mold, so that the material is formed into a permeable brick in the die-forming mechanism.

Citation Information

Patent Citations

  • Water permeable brick production equipment

    CN109500990A

  • Conveyer apparatus and method for manufacturing a honeycomb structure

    EP1847366A2

  • Mixing hopper

    JP2002102665A

  • Double-shaft kneador for viscous fluid

    JP2003126668A

  • Building material manufacturing apparatus

    US20220143866A1