Mounting structure of prestressed concrete pipe pile
By adopting a combination design of automatic connection components, external fixing components and positioning components in the installation structure of prestressed concrete pipe piles, the problem of time-consuming and labor-intensive installation process and connection stability depend on manual operation in the prior art is solved, and efficient and stable pipe pile connection is achieved.
Patent Information
- Application Number
- CN202510413773.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-03
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2045-04-03
AI Technical Summary
The installation structure of existing prestressed concrete pipe piles requires the use of screws and special connectors. The installation process is time-consuming and labor-intensive, and the connection stability depends on manual operation, which is prone to decrease the connection stability due to operational errors.
The installation mechanism includes an upper connecting seat, a lower connecting seat, an automatic connection assembly, an external fixing assembly and a positioning assembly. The design of the automatic connection assembly makes it automatically connected and fixed between the lower pipe pile and the upper pipe pile. The external fixing assembly and the positioning assembly are used to enhance connection stability and limit relative rotation.
It realizes the stable connection of the lower pipe pile and the upper pipe pile without the use of connectors and screws, which improves the installation efficiency and the stability of the assembly, and avoids the decrease in connection stability caused by operating errors.
Smart Images

Figure CN119913892A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of concrete pipe piles, in particular to an installation structure of a prestressed concrete pipe pile. Background Art
[0002] Prestressed concrete pipe piles, also known as precast concrete piles, are prefabricated in prefabricated component processing plants, and after curing, they are transported to the construction site and driven into the soil by a pile driver after reaching the designed strength. Then, the cap beam (slab) foundation is poured on the top of the pile. The concrete grade used for reinforced concrete prefabricated piles should not be less than 300#. The diameter of the force-bearing steel bars of the piles should not be less than 12 mm, and generally 4 to 8 main bars are configured.
[0003] The existing prestressed concrete pipe pile installation structure can be specifically referred to the Chinese patent with publication number CN218479152U, which discloses a concrete pipe pile installation and connection structure in detail, including a concrete pipe pile A, a fixing frame and a concrete pipe pile B; a fixing plate A for placing the concrete pipe pile A is welded on one side of the fixing frame; a connecting shaft A that drives the connecting plate A to rotate is screwed to one side of the fixing plate A, and a connecting shaft B that drives the connecting plate B to rotate is screwed to one end of the fixing plate A away from the connecting shaft A, and fixing screw holes A for fixing the connecting plate A and the connecting plate B are provided on the surfaces of the connecting plate A and the connecting plate B so that the fixing screw A fixes the connecting plate A and the connecting plate B; the utility model solves the problem that the existing concrete pipe piles cannot respectively fix the concrete pipe piles A and the concrete pipe piles B on the inner side of the fixing frame when in use, and it is inconvenient to install and connect the concrete pipe piles A and the concrete pipe piles B by installing the fixing plate A, the fixing plate B, the connecting plate A, the connecting plate B, the connecting plate C, the connecting plate D, the connecting shaft A, the connecting shaft B, the connecting shaft C and the connecting shaft D.
[0004] Although the above-mentioned prestressed concrete pipe pile installation structure can be used to assemble prestressed concrete pipe piles more conveniently, screws and other fixings are still needed during its use. Tools such as screwdrivers are also needed when installing screws and other fixings, which is time-consuming and laborious during installation. In addition, the connection stability of the connection part depends on the manual operation of the operator. If an operation error occurs and the connection part is not completely tightened, the overall connection stability will be reduced. Therefore, a prestressed concrete pipe pile installation structure is proposed to address the above problems. Summary of the invention
[0005] In order to solve the problem that the existing prestressed concrete pipe piles need to use screws and special connecting parts during their assembly, and tools such as screwdrivers are also needed when installing the screws and other fixing parts, which is time-consuming and labor-intensive during installation, and the connection stability of the connecting parts depends on the manual operation of the operator. If an operation error occurs and the connecting parts are not completely tightened, the overall connection stability will be reduced, the present invention proposes an installation structure for prestressed concrete pipe piles.
[0006] The technical solution adopted by the present invention to solve the technical problem is as follows: the installation structure of a prestressed concrete pipe pile of the present invention comprises a lower pipe pile, an upper pipe pile is arranged at the bottom end of the lower pipe pile; an installation mechanism is arranged between the lower pipe pile and the upper pipe pile, and the installation mechanism is used to connect the lower pipe pile and the upper pipe pile; The mounting mechanism comprises an upper connecting seat, a lower connecting seat, an automatic connecting assembly, an external fixing assembly and a positioning assembly, the upper connecting seat is fixedly connected to the bottom end of the lower pipe pile, the bottom end of the upper connecting seat is provided with a lower connecting seat, the lower connecting seat is fixedly connected to the top end of the lower pipe pile, the automatic connecting assembly is arranged between the upper connecting seat and the lower connecting seat, the external fixing assembly is arranged on the outside of the upper connecting seat and the lower connecting seat, the positioning assembly is arranged inside the lower connecting seat, the automatic connecting assembly is used to automatically connect and fix the lower pipe pile with the upper pipe pile, the external fixing assembly is used to assist the installation between the lower pipe pile and the upper pipe pile, and the positioning assembly is used to limit the relative rotation between the lower pipe pile and the upper pipe pile.
[0007] Preferably, the automatic connecting component includes a connecting ring, which is fixedly connected to the bottom end of the upper connecting seat and is inserted into the first connecting groove, the first connecting groove is opened at the top of the lower connecting seat, and notches are opened at both front and rear ends of the connecting ring, and an active rack is fixedly connected to the inner wall of the notch, the active rack is meshed with the transmission gear, and the transmission gear is rotatably connected to the inside of a transmission cavity, the transmission cavity is opened in the interior of the lower connecting seat and the transmission cavity is connected with the first connecting groove and the storage cavity, the storage cavity is opened at the top of the lower connecting seat, the transmission gear is also meshed with a passive rack, the top end of the passive rack is inserted into the interior of the connecting cavity, the connecting cavity is opened at the bottom end of the upper connecting seat, and a movable cavity is opened on one side of the top end of the passive rack, a first spring is arranged inside the movable cavity, and a connecting block is also sleeved inside the movable cavity, the connecting block is engaged with the second connecting groove, and the second connecting groove is opened on the outer side of the upper connecting seat.
[0008] Preferably, one end of the first spring is fixedly connected to the connecting block, and the other end of the first spring is fixedly connected to the inner wall of the movable cavity, and an end of the connecting block away from the first spring is provided with an inclined surface.
[0009] Preferably, a first sliding block is fixedly connected to the bottom end of the connecting block, the first sliding block is slidably connected to the inside of a first sliding groove, and the first sliding groove is opened at the bottom end of the movable cavity.
[0010] Preferably, the external fixing component includes a movable groove, which is opened on the outer side of the upper connecting seat, the top of the external fixing card is sleeved inside the movable groove, and a reset component is provided at the bottom of the top of the external fixing card, the bottom end of the external fixing card is engaged with the fixed groove, the fixed groove is opened on the outer side of the lower connecting seat, and the fixed groove is communicated with the first connecting groove.
[0011] Preferably, the reset assembly includes a second slide groove, the second slide groove is opened at the bottom of the top end of the external fixing card, the second slide groove is slidably connected to the inside of the second slide groove, and a second spring is arranged inside the second slide groove, the second slide groove is fixedly connected to the inner wall of the movable groove, and the bottom end of the external fixing card is opened with an inclined surface on one side close to the lower connecting seat.
[0012] Preferably, one end of the second spring close to the second slider is fixedly connected to the second slider, and one end of the second spring away from the second slider is fixedly connected to the inner wall of the second sliding groove.
[0013] Preferably, the positioning assembly includes an abutment groove, which is arranged on the outer side of the bottom end of the connecting ring and cooperates with the positioning block. A sliding groove is arranged at the bottom end of the positioning block. A guide rod is fixedly connected to the inside of the sliding groove. A sliding block is sleeved on the outer side of the guide rod, and a third spring is also wound around the outer side of the guide rod. The bottom end of the sliding block is fixedly connected to the bottom end of the inner wall of the first connecting groove, and a slope is arranged on the top end of the positioning block.
[0014] Preferably, a side of the third spring close to the sliding block is fixedly connected to the sliding block, and a side of the third spring away from the sliding block is fixedly connected to the inner wall of the sliding groove.
[0015] The present invention is beneficial in that: 1. The present invention realizes the function of stably connecting the lower pipe pile and the upper pipe pile by relying on the deadweight of the lower pipe pile without using any connecting pieces and fixing pieces such as screws through the structural design of the installation mechanism, thereby solving the problem that screws and special connecting pieces and the like are needed in the assembly process of the existing prestressed concrete pipe piles, and tools such as screwdrivers are also needed when installing fixing pieces such as screws, which is time-consuming and laborious during installation, and the connection stability of the connection part depends on the manual operation of the operator. If the connecting piece is not completely tightened due to an operation error, the overall connection stability will be reduced, thereby improving the installation efficiency between the lower pipe pile and the upper pipe pile, and also improving the stability of the assembly formed by the lower pipe pile and the upper pipe pile; 2. The present invention realizes the function of connecting the lower pipe pile with the upper pipe pile by the deadweight of the lower pipe pile through the structural design of the automatic connection assembly. Compared with the existing installation method, it is more convenient and quick, and the lower pipe pile and the upper pipe pile can be connected without using any tools, connectors and fixings; 3. The present invention realizes the function of enhancing the stability of the connection between the lower pipe pile and the upper pipe pile and limiting the relative rotation between the lower pipe pile and the upper pipe pile through the structural design of the combination of the external fixing component and the positioning component, thereby avoiding the lower pipe pile and the upper pipe pile from being disconnected due to the relative rotation between the lower pipe pile and the upper pipe pile after the lower pipe pile and the upper pipe pile are connected. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention; Figure 2 It is a schematic diagram of a partial side cross-sectional three-dimensional structure of the present invention; Figure 3 For the present invention Figure 2 The enlarged structural diagram at A in the middle; Figure 4 For the present invention Figure 3 The enlarged structural diagram at B in the middle; Figure 5 It is a partial front view cross-sectional three-dimensional structure schematic diagram of the present invention; Figure 6 For the present invention Figure 5 The enlarged structural diagram at C in the middle; Figure 7 For the present invention Figure 6 The enlarged structural diagram at D in the middle; Figure 8 It is a partial three-dimensional structural schematic diagram of the lower connecting seat, the first connecting groove and the fixing groove of the present invention; Fig. 9 It is a schematic diagram of the partial three-dimensional structure of the connecting ring, notch, active rack and abutment groove of the present invention.
[0018] In the figure: 1. lower pipe pile; 2. upper pipe pile; 21. upper connecting seat; 22. lower connecting seat; 23. connecting ring; 24. first connecting groove; 25. notch; 26. active rack; 27. transmission gear; 28. transmission cavity; 29. passive rack; 30. storage cavity; 31. connecting cavity; 32. movable cavity; 33. first spring; 34. connecting block; 35. second connecting groove; 36. first slider; 37. first slide groove; 38. movable groove; 39. external fixing card; 40. second slide groove; 41. second slider; 42. second spring; 43. fixed groove; 44. abutting groove; 45. positioning block; 46. sliding groove; 47. guide rod; 48. sliding block; 49. third spring. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Embodiment 1
[0020] See also Figure 1-Figure 9As shown, a prestressed concrete pipe pile installation structure comprises a lower pipe pile 1, wherein an upper pipe pile 2 is arranged at the bottom end of the lower pipe pile 1; an installation mechanism is arranged between the lower pipe pile 1 and the upper pipe pile 2, and the installation mechanism is used to connect the lower pipe pile 1 and the upper pipe pile 2; the installation mechanism comprises an upper connecting seat 21, a lower connecting seat 22, an automatic connecting component, an external fixing component and a positioning component, wherein the upper connecting seat 21 is fixedly connected to the bottom end of the lower pipe pile 1, and a lower connecting seat 22 is arranged at the bottom end of the upper connecting seat 21, and the lower connecting seat 22 is fixedly connected to the top end of the lower pipe pile 1, and the automatic connecting component is arranged on the upper connecting seat The outer fixing assembly is arranged between the upper connecting seat 21 and the lower connecting seat 22, and the positioning assembly is arranged inside the lower connecting seat 22. The automatic connecting assembly is used to automatically connect and fix the lower pipe pile 1 and the upper pipe pile 2. The outer fixing assembly is used to assist the installation between the lower pipe pile 1 and the upper pipe pile 2. The positioning assembly is used to limit the relative rotation between the lower pipe pile 1 and the upper pipe pile 2. The automatic connecting assembly includes a connecting ring 23, which is fixedly connected to the bottom end of the upper connecting seat 21, and the connecting ring 23 is inserted inside the first connecting groove 24. The first connecting groove 24 is provided at the top of the lower connecting seat 22, and notches 25 are provided at both the front and rear ends of the connecting ring 23. An active rack 26 is fixedly connected to the inner wall of the notch 25. The active rack 26 is meshed with a transmission gear 27. The transmission gear 27 is rotatably connected to the inside of a transmission cavity 28. The transmission cavity 28 is provided inside the lower connecting seat 22 and the transmission cavity 28 is connected to the first connecting groove 24 and the storage cavity 30. The storage cavity 30 is provided at the top of the lower connecting seat 22. The transmission gear 27 is also meshed with a passive rack 29. The top of the passive rack 29 is inserted in the connecting seat 22. The interior of the connecting cavity 31 is provided at the bottom end of the upper connecting seat 21, and an active cavity 32 is provided on one side of the top end of the passive rack 29. A first spring 33 is provided inside the active cavity 32, and a connecting block 34 is also sleeved inside the active cavity 32. The connecting block 34 is engaged with a second connecting groove 35, and the second connecting groove 35 is provided on the outer side of the upper connecting seat 21. One end of the first spring 33 is fixedly connected to the connecting block 34, and the other end of the first spring 33 is fixedly connected to the inner wall of the active cavity 32, and an end of the connecting block 34 away from the first spring 33 is provided with an inclined surface; During operation, when the lower pipe pile 1 and the upper pipe pile 2 are to be installed, the connecting ring 23 fixedly connected to the bottom end of the upper connecting seat 21 is first inserted into the first connecting groove 24. When the connecting ring 23 is inserted into the first connecting groove 24, the active rack 26 fixedly connected to the inner wall of the notch 25 drives the transmission gear 27 to rotate, so that the passive rack 29 meshing with the other side of the transmission gear 27 moves upward and is inserted into the connecting cavity 31. When the passive rack 29 is inserted into the connecting cavity 31, the inner wall of the connecting cavity 31 squeezes the inclined surface provided on the connecting block 34, so that the connecting block 34 is pressed under the action of the squeezing force. The connecting ring 23 moves downward into the interior of the active cavity 32 and squeezes the first spring 33, causing the first spring 33 to produce elastic deformation under the action of the squeezing force. When the connecting ring 23 is fully inserted into the interior of the first connecting groove 24, the passive rack 29 is also inserted into the interior of the connecting cavity 31 to the limit. At this time, the squeezing force of the inner wall of the connecting cavity 31 on the connecting block 34 disappears. At this time, the connecting block 34 returns to its original position under the action of the restoring force of the first spring 33, and is inserted into the interior of the second connecting groove 35 and engages with the second connecting groove 35. At this time, the lower pipe pile 1 and the upper pipe pile 2 can be connected through the combined action of the connecting block 34 and the second connecting groove 35.
[0021] Furthermore, a first slider 36 is fixedly connected to the bottom end of the connecting block 34, and the first slider 36 is slidably connected to the inside of a first slide groove 37, and the first slide groove 37 is opened at the bottom end of the movable cavity 32; during operation, when the connecting block 34 moves, the first slider 36 fixedly connected to the connecting block 34 slides synchronously inside the first slide groove 37, and the moving distance of the connecting block 34 is limited by the combined action of the first slider 36 and the first slide groove 37, so as to prevent the connecting block 34 from moving excessively and escaping from the inside of the movable cavity 32 under the action of the restoring force of the first spring 33, thereby making it impossible for the connecting block 34 to engage with the second connecting groove 35, and it is impossible to assemble the lower pipe pile 1 and the upper pipe pile 2.
[0022] Further, the external fixing component includes a movable groove 38, which is opened on the outer side of the upper connecting seat 21, and the top of the external fixing card 39 is sleeved inside the movable groove 38. The bottom of the top of the external fixing card 39 is provided with a reset component, and the bottom end of the external fixing card 39 is engaged with the fixed groove 43. The fixed groove 43 is opened on the outer side of the lower connecting seat 22, and the fixed groove 43 is communicated with the first connecting groove 24. The reset component includes a second slide groove 40, and the second slide groove 40 is opened at the bottom of the top of the external fixing card 39. The second slide groove 40 is slidably connected with a second slider 41 inside, and a second spring 42 is provided inside the second slide groove 40. The second slider 41 is fixedly connected to the inner wall of the movable groove 38, and the bottom end of the external fixing card 39 is provided with an inclined surface on one side close to the lower connecting seat 22, and the second spring 42 is close to the first One end of the second slider 41 is fixedly connected to the second slider 41, and the end of the second spring 42 away from the second slider 41 is fixedly connected to the inner wall of the second slide groove 40; during operation, when the connecting ring 23 moves downward and is inserted into the interior of the first connecting groove 24, the outer fixing card 39 is squeezed by the outer wall of the lower connecting seat 22 under the action of the inclined surface opened at its bottom end, and then moves, so that the second slider 41 slides inside the second slide groove 40 and squeezes the second spring 42, causing the second spring 42 to produce elastic deformation. When the connecting ring 23 is fully inserted into the interior of the first connecting groove 24, the bottom end of the fixing groove 43 is no longer squeezed by the outer wall of the lower connecting seat 22. At this time, the outer fixing card 39 returns to its original position under the action of the restoring force of the second spring 42 and is inserted into the interior of the fixing groove 43, thereby playing the effect of auxiliary fixing the connection between the lower pipe pile 1 and the upper pipe pile 2.
[0023] Further, the positioning assembly includes an abutment groove 44, which is arranged on the outer side of the bottom end of the connecting ring 23, and the abutment groove 44 cooperates with the positioning block 45, and a sliding groove 46 is arranged at the bottom end of the positioning block 45, and a guide rod 47 is fixedly connected to the inside of the sliding groove 46, and a sliding block 48 is sleeved on the outer side of the guide rod 47, and a third spring 49 is also wound around the outer side of the guide rod 47, and the bottom end of the sliding block 48 is fixedly connected to the bottom end of the inner wall of the first connecting groove 24, and an inclined surface is arranged on the top of the positioning block 45, and the side of the third spring 49 close to the sliding block 48 is fixedly connected to the sliding block 48, and the side of the third spring 49 away from the sliding block 48 is fixedly connected to the inner wall of the sliding groove 46; during operation, when the connecting ring 23 is inserted into the first connecting groove 24, the abutment groove 44 arranged at the bottom end of the connecting ring 23 squeezes the inclined surface arranged on the positioning block 45, so that the positioning block 4 Under the action of the extrusion force, the positioning block 45 moves toward the fixed groove 43 until the positioning block 45 is stuck between the fixed groove 43 and the abutting groove 44. At this time, the positioning block 45 moves to the limit, and the connecting ring 23 is also completely inserted into the first connecting groove 24. The rotation of the connecting ring 23 can be limited by the cooperation between the positioning block 45, the abutting groove 44 and the fixed groove 43, so as to prevent the lower pipe pile 1 and the upper pipe pile 2 from being able to rotate relative to each other after being connected. At the same time, the stability of the connection between the lower pipe pile 1 and the upper pipe pile 2 can be further enhanced. When the positioning block 45 is moving, the sliding block 48 slides inside the sliding groove 46 opened at the bottom end of the positioning block 45, and squeezes the third spring 49 wound around the outer side of the guide rod 47, so that the third spring 49 is elastically deformed under the action of the extrusion force, and the positioning block 45 is stably maintained in the gap between the fixed groove 43 and the abutting groove 44 by the restoring force of the third spring 49.
[0024] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A prestressed concrete pipe pile installation structure, comprising a lower pipe pile (1), wherein an upper pipe pile (2) is arranged at the bottom end of the lower pipe pile (1); characterized in that: A mounting mechanism is provided between the lower pipe pile (1) and the upper pipe pile (2), and the mounting mechanism is used to connect the lower pipe pile (1) and the upper pipe pile (2); The installation mechanism comprises an upper connecting seat (21), a lower connecting seat (22), an automatic connecting component, an external fixing component and a positioning component. The upper connecting seat (21) is fixedly connected to the bottom end of the lower pipe pile (1). The bottom end of the upper connecting seat (21) is provided with a lower connecting seat (22). The lower connecting seat (22) is fixedly connected to the top end of the lower pipe pile (1). The automatic connecting component is arranged between the upper connecting seat (21) and the lower connecting seat (22). The external fixing component is arranged on the outside of the upper connecting seat (21) and the lower connecting seat (22). The positioning component is arranged inside the lower connecting seat (22). The automatic connecting component is used to automatically connect and fix the lower pipe pile (1) and the upper pipe pile (2). The external fixing component is used to assist the installation of the lower pipe pile (1) and the upper pipe pile (2). The positioning component is used to limit the relative rotation between the lower pipe pile (1) and the upper pipe pile (2).
2. The installation structure of a prestressed concrete pipe pile according to claim 1, characterized in that: The automatic connection assembly comprises a connection ring (23), the connection ring (23) being fixedly connected to the bottom end of the upper connection seat (21), and the connection ring (23) being inserted into the inside of a first connection groove (24), the first connection groove (24) being opened at the top end of the lower connection seat (22), the connection ring (23) being opened at both the front and rear ends with notches (25), an active rack (26) being fixedly connected to the inner wall of the notch (25), the active rack (26) being meshed with a transmission gear (27), the transmission gear (27) being rotatably connected to the inside of a transmission cavity (28), the transmission cavity (28) being opened inside the lower connection seat (22) and the transmission cavity (28) being connected to the first connection groove (24). 4) is connected to a storage chamber (30), the storage chamber (30) is provided at the top end of the lower connecting seat (22), the transmission gear (27) is also meshed with a passive rack (29), the top end of the passive rack (29) is inserted into the interior of the connection chamber (31), the connection chamber (31) is provided at the bottom end of the upper connecting seat (21), a movable chamber (32) is provided on one side of the top end of the passive rack (29), a first spring (33) is provided inside the movable chamber (32), and a connecting block (34) is also sleeved inside the movable chamber (32), the connecting block (34) is engaged with a second connecting groove (35), and the second connecting groove (35) is provided on the outer side of the upper connecting seat (21).
3. The installation structure of a prestressed concrete pipe pile according to claim 2, characterized in that: One end of the first spring (33) is fixedly connected to the connecting block (34), and the other end of the first spring (33) is fixedly connected to the inner wall of the movable cavity (32); an end of the connecting block (34) away from the first spring (33) is provided with an inclined surface.
4. The installation structure of a prestressed concrete pipe pile according to claim 3 is characterized in that: A first sliding block (36) is fixedly connected to the bottom end of the connecting block (34), and the first sliding block (36) is slidably connected to the inside of a first sliding groove (37), and the first sliding groove (37) is opened at the bottom end of the movable cavity (32).
5. The installation structure of a prestressed concrete pipe pile according to claim 2, characterized in that: The external fixing component comprises a movable groove (38), the movable groove (38) being arranged on the outer side of the upper connecting seat (21), the top end of the external fixing card (39) being sleeved inside the movable groove (38), the bottom of the top end of the external fixing card (39) being provided with a reset component, the bottom end of the external fixing card (39) being engaged with a fixing groove (43), the fixing groove (43) being arranged on the outer side of the lower connecting seat (22), and the fixing groove (43) being communicated with the first connecting groove (24).
6. The installation structure of a prestressed concrete pipe pile according to claim 5, characterized in that: The reset assembly comprises a second slide groove (40), the second slide groove (40) is provided at the bottom of the top end of the external fixing card (39), a second slider (41) is slidably connected inside the second slide groove (40), and a second spring (42) is provided inside the second slide groove (40), the second slider (41) is fixedly connected to the inner wall of the movable groove (38), and a slope is provided on one side of the bottom end of the external fixing card (39) close to the lower connecting seat (22).
7. The installation structure of a prestressed concrete pipe pile according to claim 6, characterized in that: One end of the second spring (42) close to the second slider (41) is fixedly connected to the second slider (41), and one end of the second spring (42) away from the second slider (41) is fixedly connected to the inner wall of the second sliding groove (40).
8. The installation structure of a prestressed concrete pipe pile according to claim 1, characterized in that: The positioning assembly comprises an abutment groove (44), the abutment groove (44) being arranged on the outer side of the bottom end of the connecting ring (23), and the abutment groove (44) being matched with a positioning block (45), the bottom end of the positioning block (45) being provided with a sliding groove (46), the interior of the sliding groove (46) being fixedly connected with a guide rod (47), the outer side of the guide rod (47) being sleeved with a sliding block (48), and the outer side of the guide rod (47) being further wound with a third spring (49), the bottom end of the sliding block (48) being fixedly connected with the bottom end of the inner wall of the first connecting groove (24), and the top end of the positioning block (45) being provided with an inclined surface.
9. The installation structure of a prestressed concrete pipe pile according to claim 8, characterized in that: The side of the third spring (49) close to the sliding block (48) is fixedly connected to the sliding block (48), and the side of the third spring (49) away from the sliding block (48) is fixedly connected to the inner wall of the sliding groove (46).
Citation Information
Patent Citations
Concrete pipe pile mounting and connecting structure
CN218479152U
Concrete pipe pile and construction method thereof
CN116005650A
Concrete pipe pile connecting device
CN211973468U
Corrosion-resistant prestressed concrete pipe pile
CN214301721U
Multifunctional stainless steel suction pipe
CN218024219U