Template system for lintel construction

By using a formwork system that connects support frames, prefabricated lint beams and steel bars in lint beam construction, the problem of time-consuming and labor-intensive construction of formwork and easy slurry leakage at the connection is solved, and efficient and stable lint beam construction is achieved.

CN119914066APending Publication Date: 2025-05-02ZHEJIANG XINSHENG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510046240.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-13
Publication Date
2025-05-02

AI Technical Summary

Technical Problem

In lintel construction, building formwork is time-consuming and labor-intensive, and gaps are easily formed at the connection between the wooden formwork and the concrete wall column, resulting in slurry leakage and affecting the pouring quality.

Method used

The formwork system consisting of support frames, prefabricated lintels, spliced ​​steel bars and fixed steel bars is adopted. The prefabricated lintels are fixed to the concrete shear wall columns and block walls through pulling mechanisms and compression mechanisms to ensure the sealing of the connections.

Benefits of technology

It improves construction efficiency, reduces construction time, enhances the sealing of the lintel joints, prevents slurry leakage, and improves the stability, firmness and shear resistance of the joints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119914066A_ABST
    Figure CN119914066A_ABST
Patent Text Reader

Abstract

The formwork system for lintel construction comprises a supporting frame, the top end of the supporting frame abuts against a prefabricated lintel, and the two ends of the prefabricated lintel abut against a concrete shear wall column and a block wall correspondingly; a first splicing steel bar is mounted in the concrete shear wall column, a second splicing steel bar is mounted in the prefabricated lintel, and a third splicing steel bar is mounted at one end of the block wall; a first fixing steel bar is obliquely installed between the first splicing steel bar and the second splicing steel bar, and a second fixing steel bar is obliquely installed between the third splicing steel bar and the second splicing steel bar. A traction mechanism is installed between every two adjacent first splicing steel bars. And a compression mechanism for tensioning the second fixing steel bars is mounted between the adjacent second fixing steel bars. The formwork system for lintel construction has the advantages that the construction efficiency is improved, and the construction quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lintel construction, and in particular to a template system for lintel construction. Background Art

[0002] When door and window openings are opened in the wall, and the wall openings are larger than 300mm, in order to support the various loads transmitted from the masonry above the openings and transfer these loads to the walls on both sides of the door and window openings, cross beams are often set on the door and window openings. These beams are called lintels.

[0003] During the construction process, for a lintel with masonry on one side and concrete wall columns on the other, the conventional practice is to first plant reinforcement in the concrete wall column, then set up a wooden formwork, set up a steel pipe support system at the bottom of the formwork, tie the lintel reinforcement, and finally pour concrete; but building the lintel formwork is time-consuming and laborious, which increases the construction time, and the connection between the wooden formwork and the concrete wall column is prone to form a gap due to the uneven surface of the concrete or the formwork, resulting in leakage, affecting the pouring quality.

[0004] Therefore, it is necessary to provide a new template system for lintel construction to solve the above problems. Summary of the invention

[0005] The technical problem solved by the invention is to provide a template system for lintel construction which can accelerate construction efficiency and improve construction quality.

[0006] In order to solve the above technical problems, the formwork system for lintel construction provided by the present invention includes: a support frame, the top of the support frame abuts against the prefabricated lintel, and the two ends of the prefabricated lintel respectively abut against the concrete shear wall column and the block wall; the first spliced ​​steel bar is installed inside the concrete shear wall column, the second spliced ​​steel bar is installed inside the prefabricated lintel, and the third spliced ​​steel bar is installed at one end of the block wall; the first fixed steel bar is obliquely installed between the first spliced ​​steel bar and the second spliced ​​steel bar, and the second fixed steel bar is obliquely installed between the third spliced ​​steel bar and the second spliced ​​steel bar; a pulling mechanism is installed between adjacent first spliced ​​steel bars, the pulling mechanism includes a hook, the side wall of the first spliced ​​steel bar is engaged with the hook, the side wall of the hook is symmetrically connected to the support rod, and the support rod is rotationally connected with the screw sleeve and the fixing sleeve, the screw sleeve is threadedly connected with the screw, and one end of the screw is rotationally connected with the inside of the fixing sleeve; a compression mechanism for tightening the second fixed steel bar is installed between adjacent second fixed steel bars.

[0007] Preferably, a support plate is fixed to the surface of the concrete shear wall column by expansion screws, and the surface of the support plate contacts the prefabricated lintel.

[0008] Preferably, steel cages are laid inside the prefabricated lintel and inside the concrete shear wall column, and the first spliced ​​steel bars and the second spliced ​​steel bars are connected to the steel cages.

[0009] Preferably, both ends of the prefabricated lintel are provided with connecting grooves, rubber pads are engaged inside the connecting grooves, and the rubber pads are installed at the connection between the prefabricated lintel and the concrete shear wall column and at the connection between the prefabricated lintel and the block wall.

[0010] Preferably, a groove is provided inside the prefabricated lintel, and a side wall cross-section of the groove is a trapezoidal structure.

[0011] Preferably, block reinforcement is laid inside the block wall, and the block reinforcement is welded to the third spliced ​​steel bars; the side walls of the block wall are staggered and stacked with connecting blocks, and the connecting blocks are located inside the groove.

[0012] Preferably, the compression mechanism comprises a compression plate, one end of which hooks the second fixed steel bar, a side wall of the compression plate is provided with a slide groove, and a bolt passes through the slide groove to fix the two compression plates together.

[0013] Preferably, one end of the first spliced ​​steel bar, the second spliced ​​steel bar, one end of the compression plate, both ends of the first fixed steel bar, and both ends of the second fixed steel bar are all hook-shaped, and the diameter of the first fixed steel bar is greater than the diameter of the second fixed steel bar.

[0014] Compared with the related art, the template system for lintel construction provided by the present invention has the following beneficial effects: The present invention provides a formwork system for lintel construction. When the lintel is constructed, the support plate and the first spliced ​​steel bar are installed on the surface of the concrete shear wall column, the height of the block wall is flush with the surface of the support plate, the prefabricated lintel is placed on the surface of the support plate and the block wall, and then the position of the prefabricated lintel is aligned; the first spliced ​​steel bar and the second spliced ​​steel bar are connected by the first fixed steel bar, in the vertical direction, the hooks are respectively hooked on the surfaces of the two first fixed steel bars, the screw is rotated, the screw rotates and moves forward inside the screw sleeve, the screw moves inside the fixed sleeve, and the screw pushes The distance between the fixing sleeve and the screw sleeve becomes larger and larger, driving the fixing sleeve and the support rod of the screw sleeve side wall to rotate, thereby driving the distance between the two hooks to become closer and closer, and the hooks push the two first fixing steel bars to approach each other, so that the two ends of the first fixing steel bar pull the first spliced ​​steel bar and the second spliced ​​steel bar respectively, so that the first fixing steel bar tilts upward to pull the prefabricated lintel, thereby driving the prefabricated lintel to move toward the direction of the concrete shear wall column, and the rubber pad is squeezed between the two to improve the sealing of the connection between the two, prevent leakage and fix the position of the prefabricated lintel; continue to The blocks are stacked in an interlaced manner so that the height of the block wall is higher than the height of the precast lintel, so that the block wall and the concrete shear wall column respectively close the two ends of the precast lintel, and at the same time, the third spliced ​​steel bar is connected to the second spliced ​​steel bar by using the second fixed steel bar, and the third spliced ​​steel bar is tightened by using the compression mechanism, and at the same time, the screw rod is continuously rotated, so that the tension of the first fixed steel bar on the second spliced ​​steel bar is increased, so that the second spliced ​​steel bar pulls the second fixed steel bar toward the direction of the concrete shear wall column, so that the second fixed steel bar and the block embedded steel bar pull the precast lintel obliquely upward, and when pouring the precast lintel into the interior of the precast lintel Mortar is built, and the mortar connects the prefabricated lintel, the concrete shear wall column and the block wall together; during the construction process, the prefabricated lintel, the concrete shear wall column and the block wall are combined to form a lintel construction template system, and there is no need to support wooden modules separately, thereby speeding up the construction efficiency. At the same time, the first fixed steel bar, the second fixed steel bar and the second spliced ​​steel bar obliquely arranged inside the prefabricated lintel are in a pulled state, and prestress is applied to the steel bars inside the prefabricated lintel in advance, thereby improving the stability, firmness and shear resistance of the connection between the prefabricated lintel and the concrete shear wall column and the block wall, and reducing the probability of cracks at the connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A structural schematic diagram of a preferred embodiment of a template system for lintel construction provided by the present invention; Figure 2 for Figure 1 An enlarged schematic diagram of the structure at A shown; Figure 3 for Figure 1 An enlarged schematic diagram of the structure at B shown; Figure 4 for Figure 1 The schematic diagram of the prefabricated lintel structure shown; Figure 5 for Figure 1 A top view of the precast lintel structure is shown; Figure 6 A schematic diagram of the installation of the prefabricated lintel provided by the present invention; Figure 7 for Figure 3 Schematic diagram of the compression mechanism structure decomposition shown.

[0016] Numbers in the figure: 1. Concrete shear wall column, 11. Floor slab, 12. Steel cage, 13. First spliced ​​steel bar, 14. Support plate, 2. Support frame, 3. Prefabricated lintel, 31. Second spliced ​​steel bar, 32. Groove, 33. Connecting groove, 34. Rubber pad, 4. Block wall, 41. Connecting blocks, 42. Third spliced ​​steel bar, 43. Block embedded reinforcement, 5. First fixed steel bar, 6. Second fixed steel bar, 7. Pulling mechanism, 71. Hook, 72. Support rod, 73. Screw, 74. Screw sleeve, 75. Fixed sleeve, 8. Compression mechanism, 81. Compression plate, 82. Slide groove, 83. Bolt. DETAILED DESCRIPTION

[0017] The present invention will be further described below in conjunction with the accompanying drawings and implementation modes.

[0018] See also Figure 1 to Figure 7 , Figure 1 A structural schematic diagram of a preferred embodiment of a template system for lintel construction provided by the present invention; Figure 2 for Figure 1 An enlarged schematic diagram of the structure at A shown; Figure 3 for Figure 1 An enlarged schematic diagram of the structure at B shown; Figure 4 for Figure 1 The schematic diagram of the prefabricated lintel structure shown; Figure 5 for Figure 1 A top view of the precast lintel structure is shown; Figure 6 A schematic diagram of the installation of the prefabricated lintel provided by the present invention; Figure 7 for Figure 3The schematic diagram of the compression mechanism structure is shown. The template system for lintel construction includes: a support frame 2, the top of the support frame 2 abuts against the precast lintel 3, and the two ends of the precast lintel 3 respectively abut against the concrete shear wall column 1 and the block wall 4, in order to make the concrete shear wall column 1 and the block wall 4 close the two ends of the precast lintel 3, so as to facilitate pouring concrete inside the precast lintel 3 to connect the three together, the precast lintel 3, the concrete shear wall column 1 and the block wall 4 are combined to form a lintel construction template system, which does not need to support wooden modules separately, thereby speeding up construction efficiency.

[0019] A first spliced ​​steel bar 13 is installed inside the concrete shear wall column 1, a second spliced ​​steel bar 31 is installed inside the prefabricated lintel 3, and a third spliced ​​steel bar 42 is installed at one end of the block wall 4; a first fixed steel bar 5 is installed obliquely between the first spliced ​​steel bar 13 and the second spliced ​​steel bar 31, and a second fixed steel bar 6 is installed obliquely between the third spliced ​​steel bar 42 and the second spliced ​​steel bar 31; a pulling mechanism 7 is installed between adjacent first spliced ​​steel bars 13, and the pulling mechanism 7 includes a hook 71, and the side wall of the first spliced ​​steel bar 13 is engaged with the hook 71, and the side wall of the hook 71 is symmetrically connected to the support rod 72, and the support rod 72 is rotatably connected to the screw sleeve 74 and the fixing sleeve 75, and the screw sleeve 74 is threadedly connected to the screw rod 73, and one end of the screw rod 73 is rotatably connected to the inside of the fixing sleeve 75; in the vertical direction , hook the hooks 71 on the surfaces of the two first fixing steel bars 5 respectively, rotate the screw rod 73, the screw rod 73 rotates and moves forward inside the screw sleeve 74, and the screw rod 73 moves inside the fixing sleeve 75, and the screw rod 73 pushes the distance between the fixing sleeve 75 and the screw sleeve 74 to become larger and larger, so that the support rod 72 drives the distance between the two hooks 71 to become closer and closer, and the hooks 71 push the two first fixing steel bars 5 to approach each other, so that the two ends of the first fixing steel bar 5 pull the first spliced ​​steel bar 13 and the second spliced ​​steel bar 31 respectively, so that the first fixing steel bar 13 tilts upward to pull the prefabricated lintel 3, thereby driving the prefabricated lintel 3 to move toward the direction of the concrete shear wall column 1, and the rubber pad 34 is squeezed between the two to improve the sealing of the connection between the two to prevent leakage.

[0020] The surface of the concrete shear wall column 1 is fixed with a support plate 14 by expansion screws, and the surface of the support plate 14 contacts the prefabricated lintel 3. In order to provide support for the prefabricated lintel 3 through the support plate 14, the prefabricated lintel 3 is placed on the side wall of the concrete shear wall column 1.

[0021] A steel cage 12 is laid inside the prefabricated lintel 3 and inside the concrete shear wall column 1, and the first spliced ​​steel bars 13 and the second spliced ​​steel bars 31 are connected to the steel cage 12 to increase the stability and firmness between the spliced ​​steel bars and the prefabricated lintel 3 and the concrete shear wall column 1.

[0022] Both ends of the prefabricated lintel 3 are provided with connecting grooves 33, and rubber pads 34 are engaged inside the connecting grooves 33. The rubber pads 34 are installed at the connection between the prefabricated lintel 3 and the concrete shear wall column 1, and at the connection between the prefabricated lintel 3 and the block wall 4. In order to make the rubber pads 34 increase the sealing of the connection between the prefabricated lintel 3 and the concrete shear wall column 1, and at the connection between the prefabricated lintel 3 and the block wall 4, leakage of mortar is avoided at the connection.

[0023] The interior of the block wall 4 is paved with block anchoring bars 43, which are welded to the third splicing steel bars 42; the side walls of the block wall 4 are staggered with connecting blocks 41, which are located inside the groove 32; the interior of the prefabricated lintel 3 is provided with a groove 32, and the side wall cross-section of the groove 32 is a trapezoidal structure, and the connecting block 41 is arranged inside the groove 32. When mortar is poured inside the groove 32, the mortar contacts the connecting block 41 with an uneven surface, thereby increasing the firmness of the connection between the connecting block 41 and the mortar, and a part of the connecting block 41 is fixed in the solidified mortar, and the other part is fixed inside the block wall 4, thereby increasing the stability and firmness of the connection between the prefabricated lintel 3 and the block wall 4, and avoiding looseness between the two.

[0024] A compression mechanism 8 for tightening the second fixed steel bars 6 is installed between adjacent second fixed steel bars 6; the compression mechanism 8 includes a compression plate 81, one end of the compression plate 81 hooks the second fixed steel bar 6, the side wall of the compression plate 81 is provided with a slide groove 82, a bolt 83 penetrates the slide groove 82 to fix the two compression plates 81 together, the compression plate 81 is hooked on the second fixed steel bar 6, the compression plate 81, the two compression plates 81 are close to each other, the compression plate 81 pulls the second fixed steel bar 6 to make it stretched, and then the bolt 83 is used to penetrate the slide groove 82 to fix the two compression plates 81, so as to fix the second fixed steel bar 6.

[0025] One end of the first spliced ​​steel bar 13, the second spliced ​​steel bar 31, one end of the compression plate 81, both ends of the first fixed steel bar 5, and both ends of the second fixed steel bar 6 are all hook-shaped to facilitate the direct connection of the steel bars to each other; the diameter of the first fixed steel bar 5 is greater than the diameter of the second fixed steel bar 6 to facilitate the second spliced ​​steel bar 31 to pull the second fixed steel bar 6 toward the concrete shear wall column 1.

[0026] The working principle of the formwork system for lintel construction provided by the present invention is as follows: when performing lintel construction, the support plate 14 and the first spliced ​​steel bar 13 are installed on the surface of the concrete shear wall column 1, the height of the block wall 4 is flush with the surface of the support plate 14, one end of the second spliced ​​steel bar 31 inside the prefabricated lintel 3 is bent, and the rubber pad 34 is engaged inside the connecting groove 33; then the prefabricated lintel 3 is placed on the surface of the support plate 14 and the block wall 4, and then the position of the prefabricated lintel 3 is aligned. The first spliced ​​steel bar 13 and the second spliced ​​steel bar 31 are connected through the first fixed steel bar 5. In the vertical direction, the hooks 71 are hooked on the surfaces of the two first fixed steel bars 5 respectively, and the screw rod 73 is rotated. The screw rod 73 rotates and moves forward inside the screw sleeve 74, and the screw rod 73 moves inside the fixed sleeve 75. The screw rod 73 pushes the distance between the fixed sleeve 75 and the screw sleeve 73 to become larger and larger, driving the fixed sleeve 75 and the support rod 72 on the side wall of the screw sleeve 74 to rotate, thereby driving the distance between the two hooks 71 to become closer and closer. The hooks push the two first fixed steel bars 5 to approach each other, so that the two ends of the first fixed steel bar 5 pull the first spliced ​​steel bar 13 and the second spliced ​​steel bar 31 respectively, so that the first fixed steel bar 5 tilts upward to pull the prefabricated lintel 3, thereby driving the prefabricated lintel 3 to move toward the direction of the concrete shear wall column 1, and the rubber pad 34 is squeezed between the two to improve the sealing of the connection between the two, prevent leakage and fix the position of the prefabricated lintel 3 (as shown in the attached figure). Figure 6As shown). Continue to stack blocks alternately on the surface of the block wall 3, and place the block embedding bars 43 on the surface of each block for each layer. On the surface of the wall, extend some blocks into the interior of the groove 32, and place the third splicing steel bar 42 on one side of the block. When the height of the block wall 4 is higher than the height of the prefabricated lintel 3, stop wall construction. The block wall 4 and the concrete shear wall column 1 respectively close the two ends of the prefabricated lintel 3, and use the second fixed steel bar 6 to connect the third splicing steel bar 42 with the second splicing steel bar 31, hook one end of the compression plate 81 on the second fixed steel bar 6, and the compression plate 81 and the two compression plates 81 are close to each other. The compression plate 81 pulls the second fixed steel bar 6 to make it stretched, and then the bolt 83 is used to penetrate the slide groove 82 to fix the two compression plates 81 and the second fixed steel bar 6. Continue to rotate the screw rod 73, the tension of the first fixed steel bar 5 on the second spliced ​​steel bar 31 increases, so that the second spliced ​​steel bar 31 pulls the second fixed steel bar 6 toward the direction of the concrete shear wall column 1, so that the second fixed steel bar 6, the third spliced ​​steel bar 42 and the block embedded steel bar 43 pull the prefabricated lintel 3 upward obliquely, and then fix the prefabricated lintel 3 (as shown in the attached figure). Figure 1 and attached Figure 6 As shown). Pour mortar into the groove 32, the mortar covers the steel bars, and after the mortar solidifies, the prefabricated lintel 3, the concrete shear wall column 1 and the block wall 4 are connected together. During the construction process, the prefabricated lintel 3, the concrete shear wall column 1 and the block wall 4 are combined to form a lintel construction template system, and there is no need to support wooden modules separately, thereby speeding up the construction efficiency. At the same time, the first fixed steel bar 5, the second fixed steel bar 6 and the second spliced ​​steel bar 31 inclinedly arranged inside the prefabricated lintel 3 are in a pulled state, and prestress is applied to the steel bars inside the prefabricated lintel 3 in advance, so that the steel bars pull the prefabricated lintel 3 upward, thereby improving the stability, firmness and shear resistance of the connection between the prefabricated lintel 3 and the concrete shear wall column 1 and the block wall 4. When the mortar is poured inside the groove 32, the mortar contacts the connecting block 41 with an uneven surface inside the groove 32, thereby increasing the firmness of the connection between the connecting block 41 and the mortar, and a part of the connecting block 41 is fixed in the solidified mortar, and the other part is fixed inside the block wall 4, thereby increasing the stability and firmness of the connection between the prefabricated lintel 3 and the block wall 4, avoiding looseness between the two, and reducing the probability of a gap between the two.

[0027] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent mechanism or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A formwork system for lintel construction, characterized in that: include: A support frame (2), wherein the top end of the support frame (2) abuts against a prefabricated lintel (3), and the two ends of the prefabricated lintel (3) respectively abut against a concrete shear wall column (1) and a block wall (4); A first spliced ​​steel bar (13) is installed inside the concrete shear wall column (1), a second spliced ​​steel bar (31) is installed inside the prefabricated lintel (3), and a third spliced ​​steel bar (42) is installed at one end of the block wall (4); a first fixed steel bar (5) is installed obliquely between the first spliced ​​steel bar (13) and the second spliced ​​steel bar (31), and a second fixed steel bar (6) is installed obliquely between the third spliced ​​steel bar (42) and the second spliced ​​steel bar (31); A pulling mechanism (7) is installed between adjacent first spliced ​​steel bars (13), the pulling mechanism (7) comprising a pulling hook (71), the side wall of the first spliced ​​steel bar (13) being engaged with the pulling hook (71), the side wall of the pulling hook (71) being symmetrically rotationally connected to a support rod (72), and the support rod (72) being rotationally connected to a screw sleeve (74) and a fixing sleeve (75), the screw sleeve (74) being threadedly connected to a screw rod (73), and one end of the screw rod (73) being rotationally connected to the inside of the fixing sleeve (75); A compression mechanism (8) for tightening the second fixing steel bars (6) is installed between adjacent second fixing steel bars (6).

2. The formwork system for lintel construction according to claim 1, characterized in that: A support plate (14) is fixed to the surface of the concrete shear wall column (1) via expansion screws, and the surface of the support plate (14) contacts the prefabricated lintel (3).

3. The formwork system for lintel construction according to claim 2, characterized in that: A steel cage (12) is laid inside the prefabricated lintel (3) and inside the concrete shear wall column (1), and the first spliced ​​steel bars (13) and the second spliced ​​steel bars (31) are connected to the steel cage (12).

4. The formwork system for lintel construction according to claim 1, characterized in that: Both ends of the prefabricated lintel (3) are provided with connection grooves (33), and rubber pads (34) are engaged inside the connection grooves (33). The rubber pads (34) are installed at the connection between the prefabricated lintel (3) and the concrete shear wall column (1), and at the connection between the prefabricated lintel (3) and the block wall (4).

5. The formwork system for lintel construction according to claim 1, characterized in that: A groove (32) is provided inside the prefabricated lintel (3), and a side wall cross-section of the groove (32) is in a trapezoidal structure.

6. The formwork system for lintel construction according to claim 5, characterized in that: Block embedding bars (43) are laid inside the block wall (4), and the block embedding bars (43) are welded to the third splicing steel bars (42); the side walls of the block wall (4) are staggered and stacked with connecting blocks (41), and the connecting blocks (41) are located inside the groove (32).

7. The formwork system for lintel construction according to claim 1, characterized in that: The compression mechanism (8) comprises a compression plate (81), one end of the compression plate (81) hooking the second fixed steel bar (6), a side wall of the compression plate (81) is provided with a slide groove (82), and a bolt (83) passes through the slide groove (82) to fix the two compression plates (81) together.

8. The formwork system for lintel construction according to claim 7, characterized in that: One end of the first spliced ​​steel bar (13), the second spliced ​​steel bar (31), one end of the compression plate (81), both ends of the first fixing steel bar (5), and both ends of the second fixing steel bar (6) are all in a hook shape, and the diameter of the first fixing steel bar (5) is greater than the diameter of the second fixing steel bar (6).