Evaluation method and device for dynamic construction of electromagnetic environment for equipment combat examination
By determining the electromagnetic environment requirements for each mission phase, configuring environmental construction equipment resource units, establishing collaborative and command decision-making relationships, and constructing an information topology, the problem of dynamic electromagnetic environment construction in equipment combat assessment was solved, and dynamic construction and evaluation of the electromagnetic environment were realized.
Patent Information
- Application Number
- CN202311552995.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-20
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2043-11-20
AI Technical Summary
Existing technologies are unable to effectively conduct dynamic construction and evaluation of the electromagnetic environment for equipment combat-oriented assessments, and do not involve specific methods for constructing the electromagnetic environment.
By determining the electromagnetic environment requirements for each mission phase, configuring environmental construction equipment resource units, establishing collaborative and command-decision relationships, constructing information topology, and dynamically building the electromagnetic environment.
It enables the dynamic construction of electromagnetic environments that meet the electromagnetic environment requirements of different mission stages based on the electromagnetic environment requirements of the actual combat assessment process, thereby improving the accuracy and efficiency of equipment combat capability assessment.
Smart Images

Figure CN120013040B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of data processing, in particular to an electromagnetic environment dynamic construction evaluation method and device for equipment combat evaluation. BACKGROUND
[0002] With the development of weapon equipment being increasingly informationized, intelligentized and systematized, the electromagnetic environment in future battlefield has become a core element affecting the combat effectiveness of weapon equipment and the combat capability production of troops, so it is necessary to place the improvement of equipment combat capability in the electromagnetic environment of the battlefield in an important position, and the realistic construction of electromagnetic environment has become an important condition and starting point for equipment combat evaluation activities. Due to the development of electronic technology and the wide use of electronic information equipment, the battlefield electromagnetic environment presents the characteristics of complexity and dynamics. Therefore, the dynamic construction of battlefield electromagnetic environment has become a research hotspot in the field of equipment combat evaluation.
[0003] At present, many research results have been achieved for the electromagnetic environment construction problem of equipment test and evaluation activities, mainly focusing on the following aspects: first, the basic principles of electromagnetic environment construction, second, the classification and construction elements of electromagnetic environment, third, the construction method of electromagnetic environment, and fourth, the evaluation method of electromagnetic environment construction. The above four electromagnetic environment construction methods essentially belong to the construction approach or idea of electromagnetic environment, and do not involve the specific means of electromagnetic environment construction, so how to realize the dynamic construction of electromagnetic environment becomes a technical problem to be solved. SUMMARY
[0004] The main purpose of the present application is to provide an electromagnetic environment dynamic construction evaluation method and device for equipment combat evaluation, aiming to solve the technical problem that the electromagnetic environment dynamic construction evaluation for equipment combat evaluation cannot be performed in the prior art.
[0005] To achieve the above purpose, the present application provides an electromagnetic environment dynamic construction evaluation method for equipment combat evaluation, which comprises the following steps:
[0006] According to the electromagnetic environment requirement of the combat evaluation process, the task stage of constructing the electromagnetic environment in the combat evaluation process is determined;
[0007] According to the stage electromagnetic environment requirement of the task stage, the resource capability execution sequence that meets the stage electromagnetic environment requirement in the task stage is determined;
[0008] According to the resource capability execution sequence, the environment construction equipment resource unit is configured for the task stage, and the resource unit configuration result of the task stage is generated;
[0009] According to the resource unit configuration result, the cooperation relationship between the environment construction equipment resource units is determined;
[0010] grouping the environment construction equipment resource units according to the cooperation relationship, generating a command decision relationship between the environment construction equipment resource units;
[0011] determining an information topology between the environment construction equipment resource units according to the cooperation relationship, the command decision relationship, and task information flow of the task stage;
[0012] constructing, by the environment construction equipment resource units, an electromagnetic environment corresponding to the task stage according to the information topology.
[0013] Optionally, the determining of the resource capability execution sequence that meets the stage electromagnetic environment requirement of the task stage according to the stage electromagnetic environment requirement of the task stage comprises:
[0014] determining a task execution flow that meets the stage electromagnetic environment requirement of the task stage according to the stage electromagnetic environment requirement of the task stage;
[0015] determining basic resource means required by each task node in the task execution flow;
[0016] determining the resource capability execution sequence that meets the stage electromagnetic environment requirement according to the basic resource means required by each task node.
[0017] Optionally, the configuring of the environment construction equipment resource units for the task stage according to the resource capability execution sequence, and the generating of a resource unit configuration result of the task stage comprise:
[0018] obtaining equipment parameters of the environment construction equipment resource units;
[0019] configuring the environment construction equipment resource units for the task stage according to the resource capability execution sequence and the equipment parameters, and generating a resource unit configuration result of the task stage.
[0020] Optionally, the determining of the cooperation relationship between the environment construction equipment resource units according to the resource unit configuration result comprises:
[0021] determining environment construction equipment resource unit groups of each task node in the execution of the task stage according to the resource unit configuration result;
[0022] determining the cooperation relationship between the environment construction equipment resource units according to group parameters of the environment construction equipment resource unit groups of each task node.
[0023] Optionally, after the constructing, by the environment construction equipment resource units, an electromagnetic environment corresponding to the task stage according to the information topology, the method further comprises:
[0024] an evaluation index of evaluating the electromagnetic environment is acquired, and an evaluation matrix is constructed according to the evaluation index;
[0025] the evaluation matrix is normalized to generate a normalized evaluation matrix;
[0026] an index difference closeness value is determined according to the normalized evaluation matrix;
[0027] an index change closeness value is determined according to the normalized evaluation matrix;
[0028] a closeness value of the electromagnetic environment to the electromagnetic environment requirement is determined according to the index difference closeness value and the index change closeness value.
[0029] Optionally, the index difference closeness value is determined according to the normalized evaluation matrix, and the method comprises the following steps of:
[0030] a positive ideal solution and a negative ideal solution of the normalized evaluation matrix are determined;
[0031] a first Euclidean distance and a second Euclidean distance are determined according to the positive ideal solution and the negative ideal solution;
[0032] a relative closeness is determined according to the first Euclidean distance and the second Euclidean distance;
[0033] a grey correlation degree is determined according to the positive ideal solution and an index element of the evaluation index;
[0034] the index difference closeness value is determined according to the relative closeness and the grey correlation degree.
[0035] Optionally, the closeness value of the electromagnetic environment to the electromagnetic environment requirement is determined according to the index difference closeness value and the index change closeness value, and the method comprises the following steps of:
[0036] an index difference weight and an index change weight are acquired;
[0037] the closeness value of the electromagnetic environment to the electromagnetic environment requirement is determined according to the index difference weight, the index change weight, the index difference closeness value and the index change closeness value.
[0038] In addition, to achieve the above object, the application further provides an electromagnetic environment dynamic construction evaluation device for equipment actual combat examination, which comprises:
[0039] a determination module, configured to determine a task stage of constructing an electromagnetic environment in an actual combat examination process according to an electromagnetic environment requirement of the actual combat examination process;
[0040] a stage environment flow planning module configured to determine a sequence of resource capability execution according to the stage electromagnetic environment requirement of the task stage so as to meet the stage electromagnetic environment requirement in the task stage;
[0041] an environment construction equipment configuration module configured to configure environment construction equipment resource units for the task stage according to the sequence of resource capability execution, and generate a resource unit configuration result of the task stage;
[0042] a construction equipment cooperation planning module configured to determine a cooperation relationship between the environment construction equipment resource units according to the resource unit configuration result;
[0043] a construction equipment marshalling planning module configured to group the environment construction equipment resource units according to the cooperation relationship, and generate a command decision relationship between the environment construction equipment resource units;
[0044] a construction equipment information planning module configured to determine an information topology between the environment construction equipment resource units according to the cooperation relationship, the command decision relationship and a task information flow of the task stage;
[0045] a construction module configured to construct an electromagnetic environment corresponding to the task stage through the environment construction equipment resource units according to the information topology.
[0046] In addition, to achieve the above object, the present application further provides an electromagnetic environment dynamic construction evaluation device for equipment actual combat examination, which comprises a memory, a processor, and an electromagnetic environment dynamic construction evaluation program for equipment actual combat examination stored in the memory and executable on the processor, wherein the electromagnetic environment dynamic construction evaluation program for equipment actual combat examination is configured to implement the steps of the electromagnetic environment dynamic construction evaluation method for equipment actual combat examination.
[0047] In addition, to achieve the above object, the present application further provides a storage medium having an electromagnetic environment dynamic construction evaluation program for equipment actual combat examination stored thereon, wherein the electromagnetic environment dynamic construction evaluation program for equipment actual combat examination is executed by a processor to implement the steps of the electromagnetic environment dynamic construction evaluation method for equipment actual combat examination.
[0048] This invention determines the task phase for constructing the electromagnetic environment during a realistic combat assessment based on the electromagnetic environment requirements of that assessment. Based on the phase-specific electromagnetic environment requirements, it determines the resource capability execution sequence for meeting those requirements. According to the resource capability execution sequence, it configures environment construction equipment resource units for the task phase, generating resource unit configuration results. Based on the resource unit configuration results, it determines the collaborative relationships between the environment construction equipment resource units. Based on these collaborative relationships, it groups the environment construction equipment resource units, generating command and decision relationships between them. Based on the collaborative relationships, the command and decision relationships, and the task information flow of the task phase, it determines the information topology between the environment construction equipment resource units. Based on the information topology, it constructs the electromagnetic environment corresponding to the task phase using the environment construction equipment resource units. This invention determines the information topology between environmental construction equipment resource units through phased environmental process planning, environmental construction equipment configuration, construction equipment collaboration plan, construction equipment grouping plan, and construction information plan. By controlling the construction of electromagnetic environments corresponding to task phases by environmental construction equipment resource units through this information topology, it is possible to control the dynamic construction of electromagnetic environments corresponding to different task phases by environmental construction equipment resource units, thereby realizing the dynamic construction of electromagnetic environments. Attached Figure Description
[0049] Figure 1 This is a schematic diagram of the structure of the electromagnetic environment dynamic construction and evaluation device for equipment combat-oriented assessment of the hardware operating environment involved in the embodiments of the present invention.
[0050] Figure 2 This is a flowchart illustrating the first embodiment of the electromagnetic environment dynamic construction and evaluation method for equipment combat assessment according to the present invention.
[0051] Figure 3 This is a schematic diagram of the resource capability execution sequence in one embodiment of the electromagnetic environment dynamic construction and evaluation method for equipment combat assessment of the present invention;
[0052] Figure 4 This is a flowchart illustrating the second embodiment of the electromagnetic environment dynamic construction and evaluation method for equipment combat assessment according to the present invention.
[0053] Figure 5 This is a structural block diagram of the first embodiment of the electromagnetic environment dynamic construction and evaluation device for equipment combat assessment according to the present invention.
[0054] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0055] It should be understood that the specific embodiments described herein are merely illustrative of the present application and should not be construed as limiting the present application.
[0056] With reference to Figure 1 , Figure 1 The hardware environment of the embodiment of the present application involves the equipment-oriented combat evaluation of the dynamic construction and evaluation equipment structure diagram of the electromagnetic environment.
[0057] As Figure 1 shown, the equipment-oriented combat evaluation of the dynamic construction and evaluation equipment of the electromagnetic environment can include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. The communication bus 1002 is used to realize the connection and communication between the components. The user interface 1003 can include a display screen, an input unit such as a keyboard, and an optional user interface 1003 can also include a standard wired interface, a wireless interface. The network interface 1004 can optionally include a standard wired interface, a wireless interface (such as a wireless fidelity (WI-FI) interface). The memory 1005 can be a high-speed random access memory (RAM), and can also be a stable non-volatile memory (NVM), such as a disk memory. The memory 1005 can also be an independent storage device from the aforementioned processor 1001.
[0058] Those skilled in the art can understand that Figure 1 the structure shown in the foregoing description does not constitute a limitation on the equipment-oriented combat evaluation of the dynamic construction and evaluation equipment of the electromagnetic environment, and can include more or fewer components than the illustrated components, or combine certain components, or different component arrangements.
[0059] As Figure 1 shown, the memory 1005 as a storage medium can include an operating system, a network communication module, a user interface module, and an equipment-oriented combat evaluation of the dynamic construction and evaluation program of the electromagnetic environment.
[0060] In Figure 1The network interface 1004 is mainly used for data communication with a network server; the user interface 1003 is mainly used for data interaction with a user; the processor 1001 and the memory 1005 can be arranged in the equipment combat-oriented examination electromagnetic environment dynamic construction evaluation equipment, and the equipment combat-oriented examination electromagnetic environment dynamic construction evaluation equipment calls the combat-oriented examination electromagnetic environment dynamic construction evaluation program stored in the memory 1005 through the processor 1001, and executes the combat-oriented examination electromagnetic environment dynamic construction evaluation method provided in the embodiment of the application.
[0061] The embodiment of the application provides a combat-oriented examination electromagnetic environment dynamic construction evaluation method. Figure 2 , Figure 2 The embodiment of the application provides a combat-oriented examination electromagnetic environment dynamic construction evaluation method.
[0062] In the embodiment, the combat-oriented examination electromagnetic environment dynamic construction evaluation method comprises the following steps.
[0063] Step S10: determining a task stage of constructing an electromagnetic environment in the combat-oriented examination process according to electromagnetic environment requirements of the combat-oriented examination process.
[0064] It should be noted that the execution subject of the embodiment can be a computing service device with data processing, network communication and program running functions, or an electronic device, an equipment combat-oriented examination electromagnetic environment dynamic construction evaluation equipment, an environment construction equipment design and integration equipment and the like capable of realizing the above functions. In the following, the environment construction equipment design and integration equipment is taken as an example to illustrate the embodiment and the following embodiments.
[0065] It can be understood that the combat-oriented examination process can be a combat-oriented examination of a ground communication countermeasure system; the electromagnetic environment requirement can be a requirement of an electromagnetic environment to be constructed in the combat-oriented examination process; the combat-oriented examination process can be divided into different task stages, and the task stage can be a stage of constructing different forms of electromagnetic environments. In the combat-oriented examination process, different forms of electromagnetic environments need to be constructed, and each form of electromagnetic environment corresponds to a task stage. For example, if the combat-oriented examination process is divided into four task stages, four forms of electromagnetic environments need to be constructed.
[0066] It should be understood that the electromagnetic environment requirements of the combat-oriented examination process are analyzed, different forms of electromagnetic environments to be constructed are determined according to the analysis results, the combat-oriented examination process is divided into different task stages according to different forms of electromagnetic environments, and different forms of electromagnetic environments need to be constructed in each task stage.
[0067] Step S20: determining a resource capability execution sequence that meets the phase electromagnetic environment requirement of the task phase according to the phase electromagnetic environment requirement of the task phase.
[0068] It can be understood that the phase electromagnetic environment requirement can be a requirement of an electromagnetic environment corresponding to the task phase; each task phase needs to perform multiple steps, each step needs a corresponding resource capability, and the resource capability execution sequence can be an execution order of constructing an environment construction equipment resource capability that meets the phase electromagnetic environment requirement; the environment construction equipment resource capability can be an electromagnetic wave emission capability.
[0069] It should be understood that the resource capability required to construct an electromagnetic environment that meets the phase electromagnetic environment requirement of the task phase is determined according to the phase electromagnetic environment requirement of the task phase, each resource capability is sorted according to the task execution steps of the task phase, and a resource capability execution sequence is generated, and the resource capability can be an electromagnetic wave emission capability, such as an ultrashort wave signal emission capability.
[0070] Step S30: configuring an environment construction equipment resource unit for the task phase according to the resource capability execution sequence, and generating a resource unit configuration result of the task phase.
[0071] It can be understood that the environment construction equipment resource unit can be an equipment resource unit with electromagnetic wave emission capability, for example, the environment construction equipment resource unit includes but is not limited to an ultrashort wave communication radio station, an ultrashort wave communication signal simulator, etc.; the resource unit configuration result can be an environment construction equipment resource unit allocated to each step according to the resource capability required in each step in the resource capability execution sequence and the resource capability possessed by the environment construction equipment resource unit.
[0072] Step S40: determining a cooperation relationship between the environment construction equipment resource units according to the resource unit configuration result.
[0073] It can be understood that the environment construction equipment resource unit configured for each step in the resource capability execution sequence can be regarded as an environment construction equipment resource group, and the cooperation relationship between the environment construction equipment resource units includes a cooperation relationship between the environment construction equipment resource units within the environment construction equipment resource group and a cooperation relationship between the environment construction equipment resource units between the environment construction equipment resource groups; the cooperation relationship can be a relationship in which the environment construction equipment resource units cooperate to meet the resource capability requirement; each step can be completed by one environment construction equipment resource unit, or can be completed by multiple environment construction equipment resource units; the environment construction equipment resource units can be used in one step, or can be used in multiple steps, which can be determined according to a specific scene.
[0074] Step S50: grouping the environment construction equipment resource units according to the cooperation relationship, to generate a command decision relationship between the environment construction equipment resource units.
[0075] It can be understood that the command decision relationship can be a data transmission relationship between the environment construction equipment resource units.
[0076] It should be understood that grouping the environment construction equipment resource units according to the cooperation relationship can also be referred to as an environment construction equipment grouping plan, which further groups the cooperative actions of the environment construction equipment resource groups based on the cooperation relationship between the environment construction equipment resource units, determines the command decision relationship between the environment construction equipment resource units, and determines the command decision relationship between the environment construction equipment resource units. The command decision relationship is the need for command decision, which is a temporary and virtual relationship, rather than a hierarchical command in the traditional sense, so the key technology in the command decision relationship setting is the distributed network decision problem; essentially, the environment construction equipment grouping plan is a further analysis of the cooperation and collaboration relationship between the environment construction equipment resource groups and within the environment construction equipment resource groups, and establishes the command decision relationship between the environment construction equipment resource groups and within the environment construction equipment resource groups, that is, sets the command decision nodes within a group of environment construction equipment, and sets the command decision relationship between the environment construction equipment resource groups; during the grouping plan process, the effectiveness and speed of command decision are emphasized, and the reachability and speed of instruction transmission are ensured; the input of the environment construction equipment grouping plan is the cooperation relationship and information-based network between the environment construction equipment resource units, and the output is the command decision relationship between the environment construction equipment resource units, and the essence of the cooperation relationship is the cooperation of the command decision nodes in information processing.
[0077] Step S60: determining the information topology between the environment construction equipment resource units according to the cooperation relationship, the command decision relationship, and the task information flow of the task stage.
[0078] It can be understood that the task information flow can be the information flow of executing the task of the task stage, and the task information flow includes but is not limited to task execution steps, specific contents of each task execution step, etc.; the information topology includes information topology links, link capacity, and traffic, etc.
[0079] It should be understood that determining the information topology between the environment construction equipment resource units can also be referred to as an environment construction equipment information plan, which establishes the information topology between the environment construction equipment resource units according to the information needs of the environment construction equipment resource units and the information needs of task execution (task information flow) on the basis of the cooperative relationship and command decision relationship between the environment construction equipment resource units. The content of the environment construction equipment information plan includes information topology links, link capacity and flow. The constraint condition of the environment construction equipment information plan is the information infrastructure network. The environment construction equipment information plan is a timely dynamic process. Different information topology structures need to be reconstructed at different stages of the environment construction task flow execution. This feature is derived from the demand of the environment construction task information flow. Relatively speaking, the cooperative relationship and command decision relationship between the environment construction equipment resource units are stable and can last for a stage or the whole process of mission execution, but the information topology structure is instantaneous and there is no organizational management constraint condition on the information plan, but only the constraint of the information infrastructure. The input of the environment construction equipment information plan includes the cooperative relationship, command decision relationship, information infrastructure network and task information flow between the environment construction equipment resource units. The output of the information plan is the information topology between the environment construction equipment resource units, including information topology links, link capacity and flow. The environment construction equipment information plan is the premise and basis of the robustness of the environment construction equipment. The environment construction equipment information plan first needs to establish the information needs between the environment construction equipment resources in the distributed environment, which mainly considers the environment construction task information flow, the cooperative relationship and command decision relationship of the equipment units on the task on the network infrastructure. The main task of the environment construction equipment information plan is to optimize the information topology between the environment construction equipment resource units on the assumed information infrastructure network. The environment construction equipment information plan problem can be described as designing a set of information links that meet the information interaction needs between the environment construction equipment resource units, minimizing the cost of designing information interaction under the condition that the average time delay of information transmission meets the environment construction task execution requirements. The optimization goal of the environment construction equipment information plan is to minimize the cost of information interaction structure design between the environment construction equipment resource units. The constraint is that the average time delay of information is less than the maximum allowed time delay, which is usually set according to the average information transmission rate during the completion of the entire environment mission time period.
[0080] Step S70: According to the information topology, the electromagnetic environment corresponding to the task stage is constructed by the environment construction equipment resource units.
[0081] It can be understood that the execution order, execution parameters and other information of each environment construction equipment resource unit can be determined according to the information topology, and each environment construction equipment resource unit is controlled to operate according to the topology information, so as to construct the electromagnetic environment corresponding to the task stage.
[0082] It should be noted that the order between steps S20 to S60 in this embodiment is not limited, and can be adjusted according to specific circumstances.
[0083] Further, in order to perform the electromagnetic environment dynamic construction evaluation for the equipment actual combat examination, the step S20 comprises: determining a task execution process meeting the stage electromagnetic environment requirement according to the stage electromagnetic environment requirement of the task stage; determining basic resource means required by each task node in the task execution process; and determining a resource capability execution sequence meeting the stage electromagnetic environment requirement according to the basic resource means required by each task node.
[0084] It can be understood that the task execution process can be a process required to construct an electromagnetic environment meeting the stage electromagnetic environment requirement; the task node can be a node in the task execution process, for example, the task execution process is A-B-C-D-E, and the task nodes are A, B, C, D and E; the basic resource means can be resource means required to complete the task of the task node, for example, if a kilowatt of ultrashort wave signal needs to be emitted to complete the task node A, the basic resource means of the task node A is to emit a kilowatt of ultrashort wave signal; the basic resource means corresponding to each task node is sorted according to the order of the task execution process to generate a resource capability execution sequence meeting the stage electromagnetic environment requirement.
[0085] In specific implementation, referring to Figure 3 , Figure 3 is a schematic diagram of the resource capability execution sequence; C represents the capability state of all environment construction equipment resource units, and the basic resource means mb is generated by the functional capability of the environment construction equipment resource unit; it is assumed that the task execution process determined according to the stage electromagnetic environment requirement of the stage task comprises task nodes L1, L2 and L3, the basic resource means required by the task node L1 is mb1, the basic resource means required by the task node L2 is 2 mb1, and the basic resource means required by the task node L3 is mb2 to mb n , and the basic resource means required by the task node is sorted according to the task execution process to obtain a resource capability execution sequence meeting the stage electromagnetic environment requirement.
[0086] Further, in order to perform the electromagnetic environment dynamic construction evaluation for the equipment actual combat examination, the step S30 comprises: acquiring equipment parameters of the environment construction equipment resource unit; configuring the environment construction equipment resource unit for the task stage according to the resource capability execution sequence and the equipment parameters to generate a resource unit configuration result of the task stage.
[0087] It can be understood that the equipment parameter can be a parameter capable of characterizing the capability of the environment construction equipment resource unit; and the environment construction equipment resource unit is configured for the task stage according to the basic resource means required by each task node in the resource capability execution sequence and the equipment parameter.
[0088] It should be understood that the environment construction equipment resource configuration schedules the environment construction equipment resource unit on the basis of the resource capability execution sequence generated by the task flow planning, that is, dispatches (schedules) the environment construction equipment resource unit to the specific operational examination environment construction task, determines the allocation relationship between the environment construction equipment resource unit and the task, and specifically determines which environment construction equipment resource unit at what time and at what place uses what means (or function) to execute what operational examination electromagnetic environment construction task; the environment construction equipment resource configuration performs accurate configuration of the environment construction equipment resource unit on the basis of the task flow planning, so as to achieve the balance of effect and efficiency. The goal is generally to meet the capability demand of the environment construction task flow execution while maximizing resource saving and reducing the time for completing all task flows.
[0089] In a specific implementation, continuing to refer to Figure 3 , it is assumed that the capability of the environment construction equipment resource unit Z1 is mb2 according to the equipment parameter of the environment construction equipment resource unit, and the basic resource means required for the task node L2 is 2 mb2, so two environment construction equipment resource units Z1 are configured for it, and the configuration of the remaining task nodes is similar to the above process, which will not be described here in this embodiment.
[0090] Further, in order to perform the electromagnetic environment dynamic construction evaluation for equipment operational examination, the step S40: determines the environment construction equipment resource unit group of each task node in the execution of the task stage process according to the resource unit configuration result; and determines the cooperation relationship between the environment construction equipment resource units according to the group parameter of the environment construction equipment resource unit group of each task node.
[0091] It can be understood that the environment construction equipment resource units configured for each task node form the environment construction equipment resource unit group of the task node; and the group parameter can be an information parameter of the environment construction equipment resource units contained in the environment construction equipment resource unit group.
[0092] It should be understood that the same environment construction equipment resource unit can be operated at different task nodes, the cooperation relationship between the environment construction equipment resource unit groups is determined according to the same environment construction equipment resource unit in different task nodes, and the cooperation relationship within the group is determined according to the environment construction equipment resource units within the environment construction equipment resource unit group, such as continuing to refer to Figure 3, assuming that the capability of the environment construction equipment resource unit Z1 is determined as mb2 according to the equipment parameter of the environment construction equipment resource unit, and the basic resource means required by the task node L2 is 2 mb2, then two environment construction equipment resource units Z1 are configured for it, and the basic resource means mb2 to mb n , then the environment construction equipment resource unit Z1 and the remaining environment construction equipment resource units are configured for it, the Z1 in L2 can use the Z1 in L2, and the two environment construction equipment resource units Z1 corresponding to L2 can be regarded as an intra-group cooperation relationship, and the Z1 commonly used in L2 and L3 can be regarded as an inter-group cooperation relationship.
[0093] It should be noted that determining the cooperation relationship between the environment construction equipment resource units can also be referred to as an environment construction equipment cooperation plan. The input of the environment construction equipment cooperation plan is the resource unit configuration result, and the purpose of the environment construction equipment cooperation plan is to effectively organize the environment construction equipment resource units and improve the execution efficiency of the environment construction task. The content of the environment construction equipment cooperation plan is to establish the clustering and grouping of the environment construction equipment resource units in the task execution process, establish effective environment construction equipment resource groups and inter-group cooperation relationships. The clustering and grouping of the environment construction equipment resource units directly affect the cooperation between the environment construction equipment resource units, and part of the direct cooperation relationship needs the cooperation of a third party between groups, resulting in the generation of indirect cooperation relationship. Therefore, the essence of the environment construction equipment cooperation plan is to divide the environment construction equipment resource unit groups by weighing the direct cooperation load and the indirect cooperation load, establish effective cooperation relationships (including direct and indirect cooperation relationships) between the environment construction equipment resource units, and thus improve the command and decision-making efficiency of the environment construction equipment resources. Direct cooperation belongs to intra-group cooperation of the environment construction equipment resource units, and indirect cooperation needs to be carried out between the environment construction equipment resource unit groups through a group leader or other third party members. In the process of executing the task of the environment construction equipment resource units, direct cooperation and indirect cooperation lead to different workloads of the environment construction equipment resource groups (group leaders). The workloads of the equipment unit groups (group leaders) are usually calculated by weighted summation of the two. The goal of the environment construction equipment cooperation plan is to ensure the effective completion of the environment construction task process, maximize the realization of the maximum workload minimization between the environment construction equipment resources, and ensure the load balancing of the environment construction equipment resources. The constraint conditions of the environment construction equipment cooperation plan include the control ability of the environment construction equipment resource group (group leader) on the resources, the task processing ability of the resource group (group leader), and the external coordination ability of the resource group (group leader).
[0094] It can be understood that the equipment combat readiness examination environment has stages, dynamics and complexity with the advancement of examination process, therefore, the dynamic construction and evaluation of electromagnetic environment for equipment combat readiness examination is a complex system engineering. In this embodiment, the examination environment construction requirements are designed by taking the combat readiness examination target as the traction, the method of combining "top-down" requirement decomposition with "bottom-up" environment construction is adopted, the mapping relationship between environment construction equipment capability and environment requirement is established based on environment construction equipment resource unit (facilities, equipment and systems for constructing examination environment), and then the environment construction is performed. The qualitative and quantitative analysis method is adopted for "requirement decomposition", the environment construction task decomposition is performed according to the examination process based on the total environment construction requirement, and the executable task stage is formed; on this basis, the various capabilities required for stage environment construction task execution are further decomposed, the comprehensive integration and quantitative analysis method is adopted for "environment construction", the related environment construction equipment is integrated, the functions, information, control, time and the like among multiple stages and multiple systems are cooperated to meet the requirements of combat readiness examination environment in each stage. Since "requirement decomposition" and "environment construction" are both complex system engineering, the related design work is interrelated, and there is input-output, feedback and iteration relationship; the environment construction equipment capability analysis and modeling, combat readiness examination mission task decomposition and stage environment construction task modeling analysis are the basic work of combat readiness examination electromagnetic environment construction and reconstruction, are the input of environment construction equipment design and integration module, and can determine the task stage in the combat readiness examination process according to the electromagnetic environment requirement of the combat readiness examination process; the environment construction equipment design and integration device is the main design work of combat readiness examination electromagnetic environment construction, mainly includes stage environment process planning module, environment construction equipment configuration module, construction equipment cooperation planning module, construction equipment grouping planning module and construction equipment information planning module and the like, each design work needs to determine the corresponding environment construction relationship element, including the sequence relationship among stage environment processes, the configuration relationship of environment construction equipment to task, the cooperation relationship of environment construction equipment on task process, the command decision relationship of environment construction equipment, the information flow of stage environment process and the information topology structure of environment construction equipment; the electromagnetic environment construction task process planning in different combat readiness examination stages is based on the task unit obtained by environment mission decomposition, the task process for efficiently executing environment mission is established through planning, that is, the planning of environment construction equipment tactical or campaign action strategy. The main purpose of task process planning is to determine the system function or resource capability execution sequence of environment construction equipment system.Based on the resource capability execution sequence, a specific task is analyzed to establish its capability demand and other attribute data, i.e., to establish its atomic task model, including the logical relationship between tasks and the basic attributes of the tasks. The system function or resource means of the environment construction equipment resource unit is the application of the environment construction capability, and the function or means has a one-to-one mapping relationship with the capability. A task can contain the use of one or more functions or means.
[0095] In this embodiment, according to the electromagnetic environment demand of the actual combat examination process, the task stage of constructing the electromagnetic environment in the actual combat examination process is determined; according to the stage electromagnetic environment demand of the task stage, the resource capability execution sequence that meets the stage electromagnetic environment demand in the task stage is determined; according to the resource capability execution sequence, the environment construction equipment resource unit is configured for the task stage to generate the resource unit configuration result of the task stage; according to the resource unit configuration result, the cooperation relationship between the environment construction equipment resource units is determined; according to the cooperation relationship, the environment construction equipment resource units are grouped to generate the command decision relationship between the environment construction equipment resource units; according to the cooperation relationship, the command decision relationship and the task information flow of the task stage, the information topology between the environment construction equipment resource units is determined; and according to the information topology, the electromagnetic environment corresponding to the task stage is constructed through the environment construction equipment resource units. In this embodiment, the information topology between the environment construction equipment resource units is determined through stage environment flow planning, environment construction equipment configuration, construction equipment cooperation planning, construction equipment grouping planning and construction information planning, and the electromagnetic environment corresponding to the task stage is constructed through the environment construction equipment resource units, so that the electromagnetic environment corresponding to different task stages can be dynamically constructed by the environment construction equipment resource units, and the dynamic construction of the electromagnetic environment is realized.
[0096] Reference Figure 4 , Figure 4 The flowchart of the second embodiment of the electromagnetic environment dynamic construction evaluation method for the equipment actual combat examination of the present application is shown.
[0097] Based on the above embodiments, in this embodiment, after the step S70, the following steps are further included:
[0098] Step S80: An evaluation index for evaluating the electromagnetic environment is obtained, and an evaluation matrix is constructed according to the evaluation index.
[0099] It can be understood that the evaluation index can be an index for evaluating the comprehensive closeness of the constructed electromagnetic environment; and the evaluation matrix can be a matrix composed of evaluation data corresponding to each evaluation index.
[0100] Step S90: The evaluation matrix is standardized to generate a standardized evaluation matrix.
[0101] It can be understood that the dimensions of each evaluation index in the evaluation matrix are different, and the standardization of the evaluation matrix can eliminate the differences between the evaluation indexes, and obtain a standardized evaluation matrix, in which the data corresponding to each evaluation index are dimensionless.
[0102] Step S100: determining an index difference closeness value according to the standardized evaluation matrix.
[0103] It can be understood that the index difference closeness value can be a numerical value for representing the difference degree between the actual constructed electromagnetic environment and the electromagnetic environment requirement.
[0104] Step S110: determining an index change closeness value according to the standardized evaluation matrix.
[0105] It can be understood that the index change closeness value can be a numerical value for representing the change degree between the actual constructed electromagnetic environment and the electromagnetic environment requirement.
[0106] Step S120: determining a closeness value of the electromagnetic environment and the electromagnetic environment requirement according to the index difference closeness value and the index change closeness value.
[0107] It should be understood that the closeness value of the actual constructed electromagnetic environment and the electromagnetic environment requirement is determined according to the index difference closeness value, the index change closeness value and the index weight.
[0108] Further, in order to improve the accuracy of the electromagnetic environment evaluation, the step S100 comprises: determining a positive ideal solution and a negative ideal solution of the standardized evaluation matrix; determining a first Euclidean distance and a second Euclidean distance according to the positive ideal solution and the negative ideal solution; determining a relative closeness according to the first Euclidean distance and the second Euclidean distance; determining a grey correlation degree according to the positive ideal solution and the index elements of the evaluation indexes; and determining the index difference closeness value according to the relative closeness and the grey correlation degree.
[0109] It can be understood that the first Euclidean distance can be the sum of the Euclidean distances between the data corresponding to each evaluation index in the standardized evaluation matrix and the positive ideal solution; the second Euclidean distance can be the sum of the Euclidean distances between the data corresponding to each evaluation index in the standardized evaluation matrix and the negative ideal solution; and the relative closeness is obtained by dividing the first Euclidean distance by the sum of the first Euclidean distance and the second Euclidean distance.
[0110] Further, in order to improve the accuracy of the electromagnetic environment evaluation, the step S102 comprises: acquiring index difference weights and index change weights; and determining the proximity value of the electromagnetic environment to the electromagnetic environment requirement according to the index difference weights, the index change weights, the index difference closeness value and the index change closeness value.
[0111] In a specific implementation, it is assumed that the actual combat examination process is divided into M task stages, and N function or capability attributes are used to evaluate P constructed electromagnetic environments in the actual combat examination to evaluate and optimize the compliance degrees of the constructed electromagnetic environments. The parameter value of the jth(j=1, 2, …, M) task stage, the mth(m=1, 2, …, P) constructed scheme and the ith(i=1, 2, …, N) evaluation index for the compliance degree is described as The evaluation matrix is:
[0112]
[0113] The matrix The dimensions of each evaluation index in the matrix are different, and the standardized evaluation matrix is obtained by standardizing the matrix. That is,
[0114]
[0115] The relative closeness degree considering the index difference degree is calculated: it is assumed that the weight vector of the N evaluation indexes in the matrix 2 is w=(w1, w2, …, wN), and the standardized matrix F is calculated as follows: N
[0116]
[0117] The relative closeness degree based on the Euclidean distance is calculated: the positive ideal solution of the standardized evaluation matrix is
[0118]
[0119] The negative ideal solution of the standardized evaluation matrix is
[0120]
[0121] The first Euclidean distance of the data corresponding to each evaluation index in the standardized matrix to the positive ideal solution is calculated as follows:
[0122]
[0123] The second Euclidean distance of the data corresponding to each evaluation index in the standardized matrix to the negative ideal solution is calculated as follows:
[0124]
[0125] The relative closeness degree of each construction scheme based on the TOPSIS method can be calculated as c m (j) represents the relative closeness degree:
[0126]
[0127] Grey correlation degree calculation: calculate the maximum distance environmental parameters and the minimum distance environmental parameters denoted as:
[0128]
[0129] In the formula, |xi m - x0 i | represents the absolute value of the difference between the ith index element of the mth (m = 1, 2,..., P) electromagnetic environment construction scheme and the positive ideal solution; based on the basic idea of Deng's correlation degree, the grey correlation coefficient of the ith index element of the mth electromagnetic environment construction scheme can be calculated as:
[0130]
[0131] In the formula, ξ ∈ (0, 1) is a resolution coefficient, and is usually taken as ξ = 0.5; continuing the calculation, the grey correlation degree of the mth electromagnetic environment construction scheme and the positive ideal solution can be obtained as:
[0132]
[0133] First weighting based on the relative closeness degree and the grey correlation degree: aggregate the dimensionless Euclidean distance relative closeness degree and the grey correlation degree, and denote the preference degree of the decision maker for the two as α, so that the index difference closeness degree value of the mth electromagnetic environment construction scheme considering the difference degree of the evaluation index can be calculated as:
[0134]
[0135] Relative closeness degree calculation considering the index variation degree: based on the matrix (2), the evaluation index value variation matrix can be constructed, as shown in the following formula:
[0136]
[0137] Similarly, the relative closeness degree calculation based on the Euclidean distance, the grey correlation degree calculation, and the first weighting calculation based on the relative closeness degree and the grey correlation degree considering the index variation degree can be performed, and the relative closeness degree of the mth electromagnetic environment construction scheme considering the variation degree of the evaluation index is denoted as c m (j); the comprehensive closeness calculation considering the difference degree and change degree of the index
[12] : the secondary weighting calculation of this part contains two meanings: one is to comprehensively consider the difference degree and change degree of the index value, and calculate the comprehensive closeness of the jth task phase and the mth electromagnetic environment construction scheme. Assuming that the relative importance of the difference degree of the index value is β, the closeness value calculated by the comprehensive closeness model is:
[0138] C mj = βd m (j)+(1-β)c m (j) (14)
[0139] The second is to comprehensively consider the electromagnetic environment construction of the whole process of the combat task. Assuming that the weight vector of each task phase is E=(e1, e2, …, e M ), the comprehensive closeness of each task phase in the real combat evaluation process is:
[0140]
[0141] The comprehensive closeness values of each task phase can be sorted in size, and the larger one is better and the smaller one is worse.
[0142] In an example, the real combat evaluation process of a certain type of ultrashort wave ground communication countermeasure system is divided into four task phases, each of which needs to construct different forms of electromagnetic environment. In this embodiment, two ultrashort wave communication radios and one ultrashort wave communication signal simulator are selected, which are arranged in three different positions. The three equipments can all emit ultrashort wave signals of different styles and different powers that meet the efficiency evaluation requirements of the ultrashort wave ground communication countermeasure system. The required real combat evaluation electromagnetic environment is constructed by using the three equipments in different task phases with different working parameters. Five evaluation indexes are used to measure the conformity of the constructed electromagnetic environment, and the standardized data corresponding to each index is shown in Table 1:
[0143] Table 1
[0144]
[0145] The calculation result considering the difference degree of the index: assuming that the relative closeness and the grey correlation degree are considered as equally important, i.e. α=0.5, and the weight between the four task phases is taken as (0.2, 0.3, 0.4, 0.1), then the conformity of the construction scheme in the whole process of real combat evaluation, i.e. the closeness value, is shown in Table 2:
[0146] Table 2
[0147]
[0148] From the data in Table 2, it can be seen that the electromagnetic environment construction scheme in the whole process of task phase I, IV and actual combat examination has the order of scheme C, B and A.
[0149] The calculation result considering the index change degree: when β = 0, only the index value change degree (reflecting the change trend of the constructed electromagnetic environment) is considered, and the three task change phases are taken, and the degrees of conformity of the three sets of electromagnetic environment construction schemes in the three task change phases are calculated similarly and shown in Table 3:
[0150] Table 3
[0151]
[0152] From the data in Table 3, it can be seen that the electromagnetic environment construction scheme in the first and third change phases has the best degree of conformity of scheme C.
[0153] The calculation result considering the index difference and change degree: when β = 0.85, the index difference and change degree are considered at the same time, and the index difference degree is biased, and the degrees of conformity of the three sets of electromagnetic environment construction schemes in the four task phases are calculated and shown in Table 4:
[0154] Table 4
[0155]
[0156] From the data in Table 4, it can be seen that the electromagnetic environment construction scheme in the whole process of task phase I, IV and actual combat examination has the order of scheme C, B and A.
[0157] In the embodiment, the evaluation index for evaluating the electromagnetic environment is obtained, and an evaluation matrix is constructed according to the evaluation index; the evaluation matrix is standardized to generate a standardized evaluation matrix; an index difference closeness value is determined according to the standardized evaluation matrix; an index change closeness value is determined according to the standardized evaluation matrix; and a closeness value of the electromagnetic environment to the electromagnetic environment requirement is determined according to the index difference closeness value and the index change closeness value. In the embodiment, the evaluation index system for evaluating the electromagnetic environment conformity degree in actual combat examination is based on, the difference degree and the change degree of the evaluation index value are considered at the same time, the relative closeness based on the Euclidean distance is calculated to measure the closeness degree in two cases, the gray correlation degree is calculated to measure the overall correlation degree, then a comprehensive closeness value is obtained based on the first weighting of the relative closeness and the gray correlation degree, and the second weighting based on the index difference closeness value and the index change closeness value, which comprehensively reflects the conformity degree of the constructed electromagnetic environment in actual combat examination relative to the requirement, and improves the accuracy of the electromagnetic environment evaluation.
[0158] In addition, the embodiment of the present application further provides a storage medium, and the storage medium stores an electromagnetic environment dynamic construction evaluation program for equipment actual combat examination, and the electromagnetic environment dynamic construction evaluation program for equipment actual combat examination is executed by a processor to realize the steps of the electromagnetic environment dynamic construction evaluation method for equipment actual combat examination.
[0159] Referring to Figure 5 , Figure 5 FIG. 1 is a structural block diagram of an electromagnetic environment dynamic construction evaluation device for equipment actual combat examination according to an embodiment of the present application.
[0160] As Figure 5 shown, the electromagnetic environment dynamic construction evaluation device for equipment actual combat examination provided by the embodiment of the present application comprises:
[0161] A determination module 10 is configured to determine a task stage of constructing an electromagnetic environment in an actual combat examination process according to electromagnetic environment requirements of the actual combat examination process.
[0162] A stage environment flow planning module 20 is configured to determine a resource capability execution sequence for meeting stage electromagnetic environment requirements in the task stage according to stage electromagnetic environment requirements of the task stage.
[0163] An environment construction equipment configuration module 30 is configured to configure environment construction equipment resource units for the task stage according to the resource capability execution sequence, and generate a resource unit configuration result of the task stage.
[0164] A construction equipment cooperation planning module 40 is configured to determine a cooperation relationship between the environment construction equipment resource units according to the resource unit configuration result.
[0165] A construction equipment marshalling planning module 50 is configured to group the environment construction equipment resource units according to the cooperation relationship, and generate a command decision relationship between the environment construction equipment resource units.
[0166] A construction equipment information planning module 60 is configured to determine an information topology between the environment construction equipment resource units according to the cooperation relationship, the command decision relationship and task information flow of the task stage.
[0167] A construction module 70 is configured to construct an electromagnetic environment corresponding to the task stage by the environment construction equipment resource units according to the information topology.
[0168] The embodiment determines a task phase of constructing an electromagnetic environment in the actual combat examination process according to the electromagnetic environment demand of the actual combat examination process; determines a resource capability execution sequence that meets the phase electromagnetic environment demand in the task phase according to the phase electromagnetic environment demand of the task phase; configures an environment construction equipment resource unit for the task phase according to the resource capability execution sequence, and generates a resource unit configuration result of the task phase; determines a cooperation relationship between the environment construction equipment resource units according to the resource unit configuration result; groups the environment construction equipment resource units according to the cooperation relationship, and generates a command decision relationship between the environment construction equipment resource units; determines an information topology between the environment construction equipment resource units according to the cooperation relationship, the command decision relationship and the task information flow of the task phase; and constructs an electromagnetic environment corresponding to the task phase through the environment construction equipment resource units according to the information topology. The embodiment determines the information topology between the environment construction equipment resource units through phase environment flow planning, environment construction equipment configuration, construction equipment cooperation planning, construction equipment grouping planning and construction information planning, controls the environment construction equipment resource units to construct the electromagnetic environment corresponding to the task phase through the information topology, can control the environment construction equipment resource units to dynamically construct the electromagnetic environment corresponding to different task phases, and realizes dynamic construction of the electromagnetic environment.
[0169] Based on the above-mentioned first embodiment of the equipment actual combat examination-oriented electromagnetic environment dynamic construction evaluation device, the second embodiment of the equipment actual combat examination-oriented electromagnetic environment dynamic construction evaluation device is proposed.
[0170] In the embodiment, the phase environment flow planning module 20 is further configured to determine a task execution flow that meets the phase electromagnetic environment demand according to the phase electromagnetic environment demand of the task phase; determine basic resource means required by each task node in the task execution flow; and determine a resource capability execution sequence that meets the phase electromagnetic environment demand according to the basic resource means required by each task node.
[0171] The environment construction equipment configuration module 30 is further configured to obtain equipment parameters of the environment construction equipment resource unit; and configure the environment construction equipment resource unit for the task phase according to the resource capability execution sequence and the equipment parameters, and generate a resource unit configuration result of the task phase.
[0172] The construction equipment cooperation planning module 40 is further configured to determine an environment construction equipment resource unit group that executes each task node in the task phase process according to the resource unit configuration result; and determine a cooperation relationship between the environment construction equipment resource units according to group parameters of the environment construction equipment resource unit group of each task node.
[0173] The equipment combat-oriented examination electromagnetic environment dynamic construction evaluation device further comprises an evaluation module, which is configured to acquire evaluation indexes for evaluating the electromagnetic environment, and construct an evaluation matrix according to the evaluation indexes; perform standardization processing on the evaluation matrix to generate a standardized evaluation matrix; determine an index difference closeness value according to the standardized evaluation matrix; determine an index change closeness value according to the standardized evaluation matrix; and determine a closeness value of the electromagnetic environment to the electromagnetic environment requirement according to the index difference closeness value and the index change closeness value.
[0174] The evaluation module is further configured to determine a positive ideal solution and a negative ideal solution of the standardized evaluation matrix; determine a first Euclidean distance and a second Euclidean distance according to the positive ideal solution and the negative ideal solution; determine a relative closeness according to the first Euclidean distance and the second Euclidean distance; determine a grey correlation degree according to the positive ideal solution and index elements of the evaluation indexes; and determine the index difference closeness value according to the relative closeness and the grey correlation degree.
[0175] The evaluation module is further configured to acquire an index difference weight and an index change weight; and determine the closeness value of the electromagnetic environment to the electromagnetic environment requirement according to the index difference weight, the index change weight, the index difference closeness value and the index change closeness value.
[0176] Other embodiments or specific implementations of the equipment combat-oriented examination electromagnetic environment dynamic construction evaluation device can refer to the above-mentioned method embodiments, and details are not described herein.
[0177] It should be noted that, in this document, the terms "comprising", "containing" or any other variant thereof are intended to cover non-exclusive inclusion, so that processes, methods, articles or systems including a series of elements not only include those elements, but also include other elements not explicitly listed, or further include elements inherent to such processes, methods, articles or systems. Without more limitations, the element defined by the statement "comprising a" does not exclude the presence of other identical elements in the process, method, article or system including the element.
[0178] The above-mentioned embodiment numbers of the present application are only for description, and do not represent the advantages and disadvantages of the embodiments.
[0179] Through the above description of the embodiments, those skilled in the art can clearly understand that the above-mentioned example method can be realized by means of software and a necessary general hardware platform, and of course, it can also be realized by hardware, but in many cases, the former is a better embodiment. Based on such understanding, the technical solutions of the present application can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory / random access memory, a magnetic disk, or an optical disk) and includes a number of instructions for causing an end device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device) to execute the method described in each embodiment of the present application.
[0180] The above is only the preferred embodiment of the present application, and does not limit the patent scope of the present application, and any equivalent structure or equivalent flow transformation made by using the content of the specification and drawings of the present application, or directly or indirectly applied to other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for dynamically constructing and evaluating the electromagnetic environment for combat-oriented equipment assessment, characterized in that, The method includes: Based on the electromagnetic environment requirements of the combat-oriented assessment process, the task phase for constructing the electromagnetic environment during the combat-oriented assessment process is determined. Based on the electromagnetic environment requirements of the task phase, determine the resource capability execution sequence that satisfies the electromagnetic environment requirements of the task phase. Based on the resource capability execution sequence, configure the environment to build equipment resource units for the task phase, and generate the resource unit configuration result for the task phase; Based on the resource unit configuration results, the collaborative relationships between the environment construction equipment resource units are determined; Based on the cooperative relationship, the environmental construction equipment resource units are grouped together to generate command and decision relationships among the environmental construction equipment resource units; Based on the cooperative relationship, the command and decision relationship, and the task information flow of the task phase, determine the information topology between the environment construction equipment resource units; Based on the information topology, the electromagnetic environment corresponding to the task phase is constructed through the environment construction equipment resource unit.
2. The method as described in claim 1, characterized in that, The step of determining the resource capability execution sequence that satisfies the electromagnetic environment requirements of the task phase includes: Based on the electromagnetic environment requirements of the task phase, determine the task execution process that meets the electromagnetic environment requirements of the phase. Determine the basic resources and means required for each task node in the task execution process; Based on the basic resource means required by each task node, determine the resource capability execution sequence that meets the electromagnetic environment requirements of the stage.
3. The method as described in claim 1, characterized in that, The step of configuring environment construction equipment resource units for the task phase according to the resource capability execution sequence and generating resource unit configuration results for the task phase includes: Obtain the equipment parameters of the environment construction equipment resource unit; Based on the resource capability execution sequence and the equipment parameters, construct equipment resource units for the configuration environment of the task phase, and generate the resource unit configuration results for the task phase.
4. The method as described in claim 1, characterized in that, The step of determining the collaborative relationship between the environment construction equipment resource units based on the resource unit configuration results includes: Based on the resource unit configuration results, determine the environment construction equipment resource unit group for each task node during the execution of the task phase; Based on the group parameters of the environment construction equipment resource unit group of each task node, the cooperative relationship between the environment construction equipment resource units is determined.
5. The method according to any one of claims 1-4, characterized in that, After constructing the electromagnetic environment corresponding to the task phase through the environment construction equipment resource unit based on the information topology, the process further includes: Obtain evaluation indicators for assessing the electromagnetic environment, and construct an evaluation matrix based on the evaluation indicators; The evaluation matrix is standardized to generate a standardized evaluation matrix; Based on the standardized evaluation matrix, determine the degree of similarity of the indicator differences; Based on the standardized evaluation matrix, determine the degree of closeness of the indicator changes; Based on the degree of similarity between the differences in the indicators and the degree of similarity between the changes in the indicators, the degree of similarity between the electromagnetic environment and the electromagnetic environment requirements is determined.
6. The method as described in claim 5, characterized in that, The step of determining the degree of similarity of indicator differences based on the standardized evaluation matrix includes: Determine the positive and negative ideal solutions of the standardized evaluation matrix; Based on the positive ideal solution and the negative ideal solution, determine the first Euclidean distance and the second Euclidean distance; The relative proximity is determined based on the first Euclidean distance and the second Euclidean distance; The grey relational degree is determined based on the positive ideal solution and the index elements of the evaluation index. Based on the relative closeness and the gray correlation, the degree of closeness of the indicator differences is determined.
7. The method as described in claim 5, characterized in that, The step of determining the proximity value between the electromagnetic environment and the electromagnetic environment requirement based on the proximity value of the difference between the indicators and the proximity value of the changes in the indicators includes: Obtain the weights for differences in indicators and the weights for changes in indicators; Based on the indicator difference weight, the indicator change weight, the indicator difference closeness value, and the indicator change closeness value, the closeness value between the electromagnetic environment and the electromagnetic environment requirements is determined.
8. A dynamic electromagnetic environment construction and evaluation device for equipment combat-oriented assessment, characterized in that, The device includes: The determination module is used to determine the task phase for constructing the electromagnetic environment during the combat-oriented assessment process based on the electromagnetic environment requirements of the combat-oriented assessment process. The phased environment process planning module is used to determine the resource capability execution sequence that meets the phased electromagnetic environment requirements of the task phase based on the phased electromagnetic environment requirements of the task phase. The environment construction equipment configuration module is used to configure environment construction equipment resource units for the task phase according to the resource capability execution sequence, and generate the resource unit configuration result for the task phase. A construction equipment collaboration plan module is used to determine the collaboration relationship between the environmental construction equipment resource units based on the resource unit configuration results. An equipment grouping plan module is used to group the environmental construction equipment resource units according to the cooperation relationship and generate command and decision relationships between the environmental construction equipment resource units. An equipment information planning module is constructed to determine the information topology between the environmental construction equipment resource units based on the cooperation relationship, the command and decision relationship, and the task information flow of the task phase. The construction module is used to construct an electromagnetic environment corresponding to the task phase by means of the environment construction equipment resource unit, based on the information topology.
9. A dynamic electromagnetic environment construction and evaluation device for equipment combat-oriented assessment, characterized in that, The device includes: a memory, a processor, and an electromagnetic environment dynamic construction and evaluation program for equipment combat assessment stored in the memory and executable on the processor, wherein the electromagnetic environment dynamic construction and evaluation program for equipment combat assessment is configured to implement the steps of the electromagnetic environment dynamic construction and evaluation method for equipment combat assessment as described in any one of claims 1 to 7.
10. A storage medium, characterized in that, The storage medium stores a dynamic construction and evaluation program for electromagnetic environment for equipment combat assessment. When the processor executes the dynamic construction and evaluation program for electromagnetic environment for equipment combat assessment, it implements the steps of the dynamic construction and evaluation method for electromagnetic environment for equipment combat assessment as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Construction method, construction device and construction system for simulation wireless network
CN105472632A
Distributed battlefield electromagnetic environment dynamic simulated building method
CN106053964A