Offset cold spraying road edge line marking trolley
By designing a scribing cart along the roadside with offset cold spray, and using the automatic replacement of the paint bucket and the laser projection marking path, the sputtering and paint waste caused by manual replacement of the paint bucket in the prior art is solved, and efficient and accurate marking construction is achieved.
Patent Information
- Application Number
- CN202510372798.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-27
- Publication Date
- 2025-05-27
AI Technical Summary
In the prior art, the marking machine can easily cause sputtering to cause skin damage by manually replacing the paint bucket, and it is easy to leave many unused paints at the end of the work, resulting in the precipitation of the paint affecting the construction quality and discarding it, causing waste.
A biased cold spray scribing cart along the roadside is designed. The automatic replacement of the paint bucket is used to project the scribing path through the laser projector to ensure the accuracy of the scribing. When the paint bucket is replaced, the paint is stirred with a stirring component to ensure its uniformity.
It realizes convenient replacement of paint buckets, avoids the risk of sputtering during manual operation, ensures the uniformity of paint and the accuracy of marking, thereby improving construction quality and reducing paint waste.
Smart Images

Figure CN120042131A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of road marking, and particularly to a road edge line marking vehicle with offset cold spraying. Background Art
[0002] Road marking refers to the markings on the road surface, such as lines, arrows, words, elevation markings, raised road signs, and contour markers, etc., which convey traffic information such as guidance, restriction, and warning to traffic participants. Its function is to control and guide traffic, and it can be used in combination with signs or alone. The marking methods can be divided into hot melt marking and cold spray marking.
[0003] In some places with cold weather, when it is not suitable to use hot melt markings, cold spray coatings can be used for marking. During road renovation construction, temporary markings are required, and cold spray coating markings can be used at this time to reduce subsequent cleaning work. However, currently, when the paint in the marking machine runs out, it is necessary to manually open the paint bucket by workers and pour the paint inside into the storage bucket of the marking machine, which is prone to splashing and causing skin damage. Moreover, since many buckets of paint need to be poured into the storage bucket, when the work is over, there are often a lot of unused paints left. Storing them will cause the paint to precipitate, which will affect the quality of the marking construction, and discarding them will cause waste. Therefore, there is an urgent need for a road edge line marking vehicle with offset cold spraying to solve the above problems. Summary of the Invention
[0004] (1) Technical Problems to be Solved
[0005] Aiming at the deficiencies of the prior art, the present invention provides a road edge line marking vehicle with offset cold spraying, which has the advantages of automatically replacing the paint bucket, etc., and solves the problems that the current marking machine is prone to splashing and causing skin damage when manually replacing the paint bucket, and there are often a lot of unused paints left when the work is over, which will affect the quality of the marking construction.
[0006] (2) Technical Solutions
[0007] The technical solution of the present invention to solve the above technical problems is as follows: A roadside line marking trolley with offset cold spraying, including a vehicle body, a support column is rotatably connected to the top of the vehicle body, a tray is fixedly connected to the top of the support column, a paint bucket is placed inside the tray, a fixing component is arranged on the top of the tray, a driving component for rotating the support column is arranged on the top of the vehicle body, a lifting frame is fixedly connected to the top of the vehicle body, a first motor is fixedly installed on the top of the lifting frame, a unidirectional threaded rotating shaft is fixedly connected to the output shaft of the first motor, a cover plate is threadedly connected to the outside of the unidirectional threaded rotating shaft, a suction pipe is fixedly connected to the inside of the cover plate, a stirring component is arranged outside the cover plate, a line marking frame is fixedly installed on the side wall of the vehicle body, a second motor is fixedly installed on the side wall of the line marking frame, a bidirectional threaded rotating shaft is fixedly connected to the output shaft of the second motor, an adjustment platform is threadedly connected to the outside of the bidirectional threaded rotating shaft, a blowing hood is fixedly installed at one end of the adjustment platform, and a road sign nozzle is fixedly installed at the end of the adjustment platform away from the blowing hood.
[0008] The beneficial effects of the present invention are:
[0009] For the roadside line marking trolley with offset cold spraying, a laser line projector is used to project the line marking path, ensuring the accuracy of line marking. The paint bucket can be conveniently replaced, and the paint is stirred to ensure its uniformity, so that the line marking trajectory is more accurate and the road markings drawn are more in line with national standards.
[0010] On the basis of the above technical solution, the present invention can be further improved as follows.
[0011] Further, the stirring component includes a third motor fixedly connected to the top of the cover plate, a stirring rod is fixedly connected to the output shaft of the third motor, a pressing plate is fixedly connected to the bottom of the stirring rod, leakage holes are formed inside the pressing plate, a scraping plate is fixedly connected to the top of the pressing plate, and the scraping plate is attached to the inner wall of the paint bucket.
[0012] The beneficial effect of adopting the above further solution is that the third motor is used to drive the stirring rod to drive the pressing plate to rotate, so that the scraping plate rotates to scrape the paint on the inner wall of the paint bucket. At the same time, the paint is stirred to ensure its uniformity and improve the quality of line marking.
[0013] Further, the fixing component includes a threaded rod rotatably connected to the top of the tray, a lifting block is threadedly connected to the outside of the threaded rod, a rotating handle is fixedly connected to the top of the threaded rod, an adjusting rod is rotatably connected to the side wall of the lifting block, a first fixing plate is rotatably connected to the end of the adjusting rod away from the lifting block, and a second fixing plate is fixedly connected to the top of the tray. The number of the first fixing plates is not less than four.
[0014] The beneficial effect of adopting the above further scheme is that by rotating the threaded rod, the first fixed plate will be pushed through the adjusting rod when the lifting block is raised or lowered, and the paint bucket will be clamped and fixed by the first fixed plate and the second fixed plate to ensure stability during movement.
[0015] Furthermore, the driving assembly includes a fourth motor fixedly mounted on the top of the vehicle body, a worm is fixedly connected to the output shaft of the fourth motor, and a worm wheel connected to the worm gear is fixedly connected to the outside of the support column.
[0016] The beneficial effect of adopting the above further solution is that the fourth motor drives the worm to drive the worm wheel to rotate, thereby rotating the tray, thereby achieving the purpose of replacing the paint bucket.
[0017] Furthermore, a damping spring shock absorber is fixedly installed on the top of the vehicle body, a mounting plate is fixedly connected to the top of the damping spring shock absorber, a plunger pump driving component is fixedly connected to the top of the mounting plate, and a plunger pump transmission-connected to the plunger pump driving component is fixedly installed on the top of the mounting plate.
[0018] The beneficial effect of adopting the above further solution is that by providing a damping spring shock absorber, the vibration of the plunger pump driving member when starting up is prevented from affecting the accuracy of marking.
[0019] Furthermore, one end of the suction pipe away from the cover plate is fixedly connected to the suction port of the plunger pump, and a first delivery pipe is fixedly connected to the outlet of the plunger pump. An electromagnetic valve is fixedly installed on the outside of the first delivery pipe, and one end of the first delivery pipe away from the plunger pump is fixedly connected to the road sign nozzle.
[0020] The beneficial effect of adopting the above further solution is that the first delivery pipe is a three-channel hose, the number of road marking nozzles is two, and the needs of single and double lane marking can be met by setting a solenoid valve.
[0021] Furthermore, a laser line projector is fixedly installed on the front of the marking frame, and the number of the adjustment platforms is two, and the two adjustment platforms are distributed at both ends of the bidirectional threaded shaft.
[0022] The beneficial effect of adopting the above further solution is that a marking path is projected using a laser line projector, thereby achieving a more accurate marking purpose.
[0023] Furthermore, a baffle is fixedly connected to the top of the vehicle body, a handrail is fixedly connected to the back of the baffle, a controller is fixedly connected to the front of the baffle, a hot air blower is fixedly installed on the front of the baffle, a second delivery pipe is fixedly connected to the air outlet end of the hot air blower, and the end of the second delivery pipe away from the hot air blower is fixedly connected to the blow hood.
[0024] The beneficial effect of adopting the above further solution is that the drawn road marking is dried by a hot air blower, enabling the road marking to be put into use earlier and at the same time preventing impurities from mixing into the marking after a long time.
[0025] Furthermore, a first positioning rod is fixedly connected inside the lifting frame, the cover plate is slidably connected to the outside of the first positioning rod, a second positioning rod is fixedly connected inside the marking frame, and the adjustment platform is slidably connected to the outside of the second positioning rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a schematic structural diagram of the present invention;
[0027] Figure 2 is a top view of the structure of the present invention;
[0028] Figure 3 is a cross-sectional view of the structure of the present invention;
[0029] Figure 4 is a side view of the structure of the present invention;
[0030] Figure 5 is a schematic structural diagram of the scraper of the present invention;
[0031] Figure 6 is a schematic structural diagram of the marking frame of the present invention;
[0032] Figure 7 is an enlarged view of part A in the present invention.
[0033] In the figure: 1, vehicle body; 2, support column; 3, tray; 4, paint bucket; 5, first motor; 6, single-threaded screw shaft; 7, cover plate; 8, suction pipe; 9, marking frame; 10, second motor; 11, double-threaded screw shaft; 12, adjustment platform; 13, air blowing hood; 14, road sign nozzle; 15, third motor; 16, stirring rod; 17, pressing plate; 18, leakage hole; 19, scraper; 20, threaded rod; 21, lifting block; 22, adjusting rod; 23, first fixing plate; 24, second fixing plate; 25, fourth motor; 26, worm; 27, worm gear; 28, damping spring shock absorber; 29, mounting plate; 30, plunger pump driving part; 31, plunger pump; 32, first delivery pipe; 33, solenoid valve; 34, laser line projector; 35, second delivery pipe; 36, baffle; 37, handrail; 38, controller; 39, hot air blower. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0034] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0035] In the embodiment, it is given by Figure 1-7 A roadside line marking trolley with offset cold spraying. The present invention includes a vehicle body 1. A support column 2 is rotatably connected to the top of the vehicle body 1. A tray 3 is fixedly connected to the top of the support column 2. A paint bucket 4 is placed inside the tray 3. A fixing component is arranged on the top of the tray 3. The fixing component includes a threaded rod 20 rotatably connected to the top of the tray 3. A lifting block 21 is threadedly connected to the outside of the threaded rod 20. A rotating handle is fixedly connected to the top of the threaded rod 20. An adjusting rod 22 is rotatably connected to the side wall of the lifting block 21. One end of the adjusting rod 22 away from the lifting block 21 is rotatably connected to a first fixing plate 23. A second fixing plate 24 is fixedly connected to the top of the tray 3. The number of the first fixing plates 23 is not less than four.
[0036] In this embodiment, in actual use, the rotating handle is used to drive the threaded rod 20 to rotate. When the lifting block 21 moves up and down, the first fixing plate 23 will be pushed through the adjusting rod 22. The paint bucket 4 is clamped and fixed by the cooperation of the first fixing plate 23 and the second fixing plate 24 to ensure the stability during the movement of the vehicle body 1.
[0037] Specifically, referring to Figure 4 and Figure 5 A lifting frame is fixedly connected to the top of the vehicle body 1. A first motor 5 is fixedly installed on the top of the lifting frame. A one-way threaded rotating shaft 6 is fixedly connected to the output shaft of the first motor 5. A cover plate 7 is threadedly connected to the outside of the one-way threaded rotating shaft 6. A suction pipe 8 is fixedly connected to the inside of the cover plate 7. A stirring component is arranged outside the cover plate 7. The stirring component includes a third motor 15 fixedly connected to the top of the cover plate 7. A stirring rod 16 is fixedly connected to the output shaft of the third motor 15. A pressing plate 17 is fixedly connected to the bottom of the stirring rod 16. Leakage holes 18 are formed inside the pressing plate 17. A scraping plate 19 is fixedly connected to the top of the pressing plate 19. The scraping plate 19 is in fit with the inner wall of the paint bucket 4.
[0038] In this embodiment, in actual use, the first motor 5 is started to drive the one-way threaded rotating shaft 6 to rotate, so that the cover plate 7 moves up and down, and the pressing plate 17 enters the inside of the paint bucket 4. The paint in the lower layer of the paint bucket 4 passes through the leakage holes 18. Then, the third motor 15 is started to make the stirring rod 16 drive the pressing plate 17 to rotate, so that the scraping plate 19 rotates to scrape the paint on the inner wall of the paint bucket 4. At the same time, the paint is stirred to ensure its uniformity and improve the quality of line marking.
[0039] Specifically, referring to Figure 3 , a driving assembly for rotating the support column 2 is provided on the top of the vehicle body 1. The driving assembly includes a fourth motor 25 fixedly installed on the top of the vehicle body 1. A worm 26 is fixedly connected to the output shaft of the fourth motor 25. A worm gear 27 is fixedly connected to the outside of the support column 2 and is in transmission connection with the worm 26.
[0040] In this embodiment, during actual use, the fourth motor 25 drives the worm 26 to drive the worm gear 27 to rotate, thereby rotating the tray 3 and moving the new paint bucket 4 below the cover plate 7 to achieve the purpose of replacing the paint bucket 4.
[0041] Specifically, referring to Figure 6 , a marking frame 9 is fixedly installed on the side wall of the vehicle body 1. A second motor 10 is fixedly installed on the side wall of the marking frame 9. A bidirectional threaded rotating shaft 11 is fixedly connected to the output shaft of the second motor 10. An adjusting platform 12 is threadedly connected to the outside of the bidirectional threaded rotating shaft 11. A blowing hood 13 is fixedly installed at one end of the adjusting platform 12. A road sign nozzle 14 is fixedly installed at the end of the adjusting platform 12 away from the blowing hood 13. The number of adjusting platforms 12 is two, and the two adjusting platforms 12 are distributed at both ends of the bidirectional threaded rotating shaft 11.
[0042] In this embodiment, during actual use, a first positioning rod is fixedly connected inside the lifting frame. The cover plate 7 is slidably connected to the outside of the first positioning rod. A second positioning rod is fixedly connected inside the marking frame 9. The adjusting platform 12 is slidably connected to the outside of the second positioning rod. By starting the second motor 10 to drive the bidirectional threaded rotating shaft 11 to rotate, the two adjusting platforms 12 can move towards each other, thereby being able to adjust the distance between the two road sign nozzles 14 to meet different requirements.
[0043] It can be understood that a damping spring shock absorber 28 is fixedly installed on the top of the vehicle body 1. The top of the damping spring shock absorber 28 is fixedly connected to a mounting plate 29. The top of the mounting plate 29 is fixedly connected to a plunger pump driving member 30. A plunger pump 31 in transmission connection with the plunger pump driving member 30 is fixedly installed on the top of the mounting plate 29. By providing the damping spring shock absorber 28, the vibration during the start of the plunger pump driving member 30 is prevented from affecting the accuracy of marking.
[0044] In this embodiment, in actual use, the end of the suction tube 8 away from the cover plate 7 is fixedly connected to the suction port of the plunger pump 31, and the outlet of the plunger pump 31 is fixedly connected to the first delivery pipe 32. The outside of the first delivery pipe 32 is fixedly installed with a solenoid valve 33. The end of the first delivery pipe 32 away from the plunger pump 31 is fixedly connected to the road marking nozzle 14. The first delivery pipe 32 is a three-channel hose. The number of road marking nozzles 14 is two. By setting the solenoid valve 33, the needs of single and double-lane marking can be met. A laser line projector 34 is fixedly installed on the front of the marking frame 9. The laser line projector 34 is used to project the marking path, thereby achieving a more precise marking purpose.
[0045] Specifically, refer to Figure 4 A baffle 36 is fixedly connected to the top of the vehicle body 1, a handrail 37 is fixedly connected to the back of the baffle 36, a controller 38 is fixedly connected to the front of the baffle 36, a hot air blower 39 is fixedly installed on the front of the baffle 36, a second conveying pipe 35 is fixedly connected to the air outlet end of the hot air blower 39, and one end of the second conveying pipe 35 away from the hot air blower 39 is fixedly connected to the blowing hood 13. The hot air blower 39 is used to dry the drawn road markings, so that the road markings can be put into use earlier, and at the same time, impurities are prevented from mixing into the markings after a long time.
[0046] Working principle:
[0047] A laser line projector 34 is used to project a marking path, which is convenient for construction workers to move the vehicle body 1. The plunger pump driver 30 drives the plunger pump 31 to extract the paint from the paint bucket 4 and transport it to the inside of the road marking nozzle 14 to spray the road. The painted road marking lines are dried by the hot air blower 39. When the paint is used up, the first motor 5 is started to drive the one-way threaded shaft 6 to rotate, so that the cover plate 7 moves upward, and then the worm 26 is driven by the fourth motor 25 to drive the worm wheel 27 to rotate, so that the tray 3 rotates, so that the new paint bucket 4 moves to the bottom of the cover plate 7, and by moving the cover plate 7 downward, the pressure plate 17 enters the interior of the paint bucket 4, and the paint on the lower layer of the paint bucket 4 passes through the leakage hole 18, and then the third motor 15 is started to drive the stirring rod 16 to drive the pressure plate 17 to rotate, so that the scraper 19 rotates to scrape off the paint on the inner wall of the paint bucket 4, and at the same time, the paint is stirred to ensure its uniformity.
[0048] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A road edge marking vehicle for offset cold spraying, comprising a vehicle body (1), characterized in that: The top of the vehicle body (1) is rotatably connected to a support column (2), the top of the support column (2) is fixedly connected to a tray (3), a paint bucket (4) is placed inside the tray (3), a fixing component is arranged on the top of the tray (3), a driving component for rotating the support column (2) is arranged on the top of the vehicle body (1), a lifting frame is fixedly connected to the top of the vehicle body (1), a first motor (5) is fixedly installed on the top of the lifting frame, a one-way threaded shaft (6) is fixedly connected to the output shaft of the first motor (5), the outer thread of the one-way threaded shaft (6) is connected to a cover plate (7), and the cover plate (7) is connected to the outer thread of the one-way threaded shaft (6). A suction pipe (8) is fixedly connected to the inside of the plate (7), a stirring assembly is arranged outside the cover plate (7), a marking frame (9) is fixedly mounted on the side wall of the vehicle body (1), a second motor (10) is fixedly mounted on the side wall of the marking frame (9), a bidirectional threaded rotating shaft (11) is fixedly connected to the output shaft of the second motor (10), an external thread of the bidirectional threaded rotating shaft (11) is connected to an adjustment platform (12), a blow hood (13) is fixedly mounted on one end of the adjustment platform (12), and a road marking nozzle (14) is fixedly mounted on the end of the adjustment platform (12) away from the blow hood (13).
2. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: The stirring assembly comprises a third motor (15) fixedly connected to the top of the cover plate (7); a stirring rod (16) is fixedly connected to the output shaft of the third motor (15); a pressing plate (17) is fixedly connected to the bottom of the stirring rod (16); a leakage hole (18) is provided inside the pressing plate (17); a scraper (19) is fixedly connected to the top of the pressing plate (17); and the scraper (19) is in contact with the inner wall of the paint bucket (4).
3. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: The fixing assembly comprises a threaded rod (20) rotatably connected to the top of the tray (3); a rotating handle is fixedly connected to the top of the threaded rod (20); an external thread of the threaded rod (20) is connected to a lifting block (21); an adjusting rod (22) is rotatably connected to the side wall of the lifting block (21); an end of the adjusting rod (22) away from the lifting block (21) is rotatably connected to a first fixing plate (23); a second fixing plate (24) is fixedly connected to the top of the tray (3); and the number of the first fixing plates (23) is not less than four.
4. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: The driving assembly comprises a fourth motor (25) fixedly mounted on the top of the vehicle body (1); a worm (26) is fixedly connected to the output shaft of the fourth motor (25); and a worm wheel (27) drivingly connected to the worm (26) is fixedly connected to the outside of the support column (2).
5. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: A damping spring shock absorber (28) is fixedly mounted on the top of the vehicle body (1); a mounting plate (29) is fixedly connected to the top of the damping spring shock absorber (28); a plunger pump driving component (30) is fixedly connected to the top of the mounting plate (29); and a plunger pump (31) drivingly connected to the plunger pump driving component (30) is fixedly mounted on the top of the mounting plate (29).
6. The road edge marking vehicle for offset cold spraying according to claim 5, characterized in that: One end of the suction pipe (8) away from the cover plate (7) is fixedly connected to the suction port of the plunger pump (31); the outlet of the plunger pump (31) is fixedly connected to a first delivery pipe (32); an electromagnetic valve (33) is fixedly installed on the outside of the first delivery pipe (32); and one end of the first delivery pipe (32) away from the plunger pump (32) is fixedly connected to a road sign nozzle (14).
7. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: A laser line projector (34) is fixedly mounted on the front of the marking frame (9), and there are two adjustment platforms (12), which are distributed at both ends of the bidirectional threaded shaft (11).
8. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: A baffle (36) is fixedly connected to the top of the vehicle body (1), a handrail (37) is fixedly connected to the back of the baffle (36), a controller (38) is fixedly connected to the front of the baffle (36), a hot air blower (39) is fixedly installed on the front of the baffle (36), a second delivery pipe (35) is fixedly connected to the air outlet end of the hot air blower (39), and one end of the second delivery pipe (35) away from the hot air blower (39) is fixedly connected to the blow hood (13).
9. The road edge marking vehicle for offset cold spraying according to claim 1, characterized in that: A first positioning rod is fixedly connected inside the lifting frame, the cover plate (7) is slidably connected to the outside of the first positioning rod, a second positioning rod is fixedly connected inside the marking frame (9), and the adjustment platform (12) is slidably connected to the outside of the second positioning rod.