Protective device and method for constructional engineering
By designing protective devices that integrate anti-snake, rat, wind and mudslide functions in construction projects, the protection problems of multiple threats to temporary housing in complex environments are solved, and higher safety and comprehensive protection effects are achieved.
Patent Information
- Application Number
- CN202510515368.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-23
- Publication Date
- 2025-06-06
AI Technical Summary
The existing technology has single protective measures for temporary housing in construction projects, making it difficult to deal with multiple threats in complex environments, such as strong winds, mudslides, etc., and lacks a systematic comprehensive protection system.
A protective device for construction engineering is designed, including a foundation poured in the pit foundation, a building body is installed on the foundation, a drainage prefabricated parts are laid on the circumference of the foundation, a water collection tank is installed between adjacent drainage prefabricated parts, a mud storage prefabricated boxes are buried on both sides of the windward face of the building body, and a prefabricated parts are connected to the channel between the mud storage prefabricated boxes and the drainage prefabricated parts, and a tripod is installed on the main side of the building to enhance wind and mudslide resistance.
By integrating the functions of preventing snakes, rats, winds and mudslides, the safety of buildings in special areas is improved, and a systematic protection system is formed, which can effectively deal with multiple threats in complex environments.
Smart Images

Figure CN120100234A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to a protective device and method for construction engineering. Background Art
[0002] During the construction process, temporary housing is an important place for construction workers to rest and live, and its safety is of vital importance. Especially in areas with complex geological and climatic conditions such as the southwest region, temporary housing is not only subject to the invasion of snakes, rats and insects, but also may be threatened by natural disasters such as strong winds and mudslides.
[0003] At present, the protective measures for temporary housing on the market are relatively simple. In terms of wind protection, most temporary housing only uses simple fixing measures to resist wind force, which is difficult to cope with strong winds and heavy rains. And there is a lack of effective means for protection against mudslides. In addition, the existing protective devices and methods are often independent of each other, and have not formed a systematic protection system, which cannot meet the comprehensive protection needs of temporary housing for construction projects in complex environments. Summary of the invention
[0004] The purpose of the present invention is to address the problems existing in the background technology and to provide a protective device and method for construction engineering.
[0005] The technical solution of the present invention is as follows: a protective device for construction engineering, comprising a foundation cast in a pit foundation, a building body installed on the foundation, drainage prefabricated parts located in the pit foundation are laid on the surrounding side of the foundation, a water collecting tank is installed between adjacent drainage prefabricated parts, mud storage prefabricated boxes located underground are buried on both sides of the windward surface of the building body, a channel prefabricated part is connected between the mud storage prefabricated box and the drainage prefabricated parts, and tripods connected to each other are installed on both sides of the windward surface of the building body; The tripod is composed of vertical rods, oblique rods and horizontal rods connected end to end. The water collecting box includes a water collecting bucket. A pull rod located in the water collecting bucket is fixed at the bottom of the vertical rod. A piston located at the bottom of the water collecting bucket is fixed on the pull rod. A diversion pipe is connected between the top of the water collecting bucket and the drainage prefabricated component. The end of the inclined rod is inserted into the ground and fixed with a blocking seat located in the mud storage prefabricated box.
[0006] Preferably, tripods are installed at the four corners of the building body, the horizontal rods are fixed between the vertical rods and the diagonal rods, the vertical rods and the diagonal rods are anchored in the ground, and reinforcement plates are fixed between the tripods, and the reinforcement plates are located on the top of the building body.
[0007] Preferably, a scaffolding board is laid on the top of the drainage prefabricated component, a V-shaped drainage groove is opened on the bottom of the drainage prefabricated component, the middle part of the scaffolding board is a split part, and a supporting frame fixed in the drainage prefabricated component is provided at the bottom of the scaffolding board.
[0008] Preferably, the water collecting tank also includes a water diversion channel, which is located above the water collecting barrel. A liquid level sensor and a drainage pump are provided on the side of the water collecting barrel. The drainage pump is connected to an external discharge pipe. The V-shaped drainage groove is connected to the water diversion channel, and a check valve is provided at the connection point. A water retaining cover is provided at the connection point between the drainage prefabricated part and the channel prefabricated part.
[0009] Preferably, the foundation comprises a concrete layer at the bottom, a crushed stone layer is laid on the concrete layer, and drainage boards fixed on both sides of the concrete layer are provided on the crushed stone layer.
[0010] Preferably, a plurality of drainage channels are provided in adjacent gravel layers, the drainage channels penetrate the concrete layer and are connected with the prefabricated drainage components, and the foundation is provided with a plurality of installation holes penetrating the concrete layer, the gravel layer and the drainage board.
[0011] A protection method for construction engineering, comprising the following steps: S1: Excavate the pit foundation, pour the foundation in the center of the pit foundation, and install the drainage prefabricated parts, mud storage prefabricated box and water collection tank after the foundation solidifies; S2: Install the channel prefabricated parts between the drainage prefabricated parts and the mud storage prefabricated box, and then install the main building on the foundation. After the main building is installed, install the tripod so that the pull rod enters the water collection bucket and the inclined rod is inserted into the mud storage prefabricated box; S3: After safety is completed, backfill the pit foundation with soil.
[0012] Compared with the existing technology, the beneficial effects of the present invention are as follows: the present invention pours the foundation in the pit foundation, installs the building body on the foundation, arranges drainage prefabricated parts and water collecting tanks, and installs mud storage prefabricated boxes and channel prefabricated parts underground, and then installs a tripod on the side of the building body, so that the functions of preventing snakes, rats, insects, wind and mudslides are integrated into one. The concrete isolation belt can prevent snakes and rats from digging holes and enhance the anti-slip ability of the foundation, which greatly improves the safety of the building when used in special areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a schematic diagram of the structure of the present invention when it is installed; Figure 3 It is a schematic diagram of the cross-sectional structure of the present invention; Figure 4 It is a structural schematic diagram of the water collecting tank of the present invention; Figure 5 It is a schematic structural diagram of the concrete layer of the present invention.
[0014] Figure numerals: 1. foundation; 2. drainage prefabricated parts; 3. water collecting tank; 4. V-shaped drainage trough; 5. tripod; 6. scaffolding board; 7. mud storage prefabricated box; 8. channel prefabricated parts; 11. concrete layer; 12. gravel layer; 13. drainage board; 14. installation hole; 15. drainage channel; 31. water diversion channel; 32. water collecting bucket; 33. liquid level sensor; 34. drainage pump; 35. external drainage pipe; 51. vertical rod; 52. diagonal rod; 53. horizontal rod; 511. pull rod; 512. piston; 513. diversion pipe; 521. plug seat; 61. support frame; 62. split part; 100. building body; 300. water retaining cover; 400. check valve; 500. reinforcement plate. DETAILED DESCRIPTION
[0015] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0016] See attached Figure 1-Figure 5 A protective device for construction engineering, comprising a foundation 1 cast in a pit foundation, a building body 100 installed on the foundation 1, drainage prefabricated parts 2 located in the pit foundation are laid around the foundation 1, a water collecting tank 3 is installed between adjacent drainage prefabricated parts 2, mud storage prefabricated boxes 7 located underground are buried on both sides of the windward surface of the building body 100, a channel prefabricated part 8 is connected between the mud storage prefabricated box 7 and the drainage prefabricated parts 2, and tripods 5 connected to each other are installed on both sides of the windward surface of the building body 100; The tripod 5 is composed of a vertical rod 51, an oblique rod 52 and a horizontal rod 53 connected end to end. The water collecting box 3 includes a water collecting bucket 32. A pull rod 511 located in the water collecting bucket 32 is fixed at the bottom of the vertical rod 51. A piston 512 located at the bottom of the water collecting bucket 32 is fixed to the pull rod 511. A diversion pipe 513 is connected between the top of the water collecting bucket 32 and the drainage prefabricated component 2. The end of the inclined rod 52 is inserted into the ground and fixed with a blocking seat 521 located in the mud storage prefabricated box 7.
[0017] When in use, firstly, a pit is excavated, and a foundation 1 is poured therein. The foundation 1 is made of concrete material, and the foundation 1 is used to install the building body 100, which improves the anti-slip ability and enhances the effect of resisting the impact of mud and rock flow; Then, the drainage prefabricated component 2, the mud storage prefabricated box 7 and the channel prefabricated component 8 are installed. All three are concrete prefabricated components with reinforcing ribs inside to ensure the stability of the structure. Finally, the installation position of the water collecting tank 3 is excavated, and then the water collecting tank 3 is installed. The water collecting tank 3 is used to store accumulated water. On rainy days, rainwater will enter the drainage prefabricated component 2. The drainage prefabricated component 2 forms an isolation zone to prevent rainwater from invading the building body 100; When a disaster such as a debris flow or a strong wind occurs, the debris flow will be blocked by the drainage prefabricated component 2 to prevent it from directly impacting the building body 100. The debris flow will enter the drainage prefabricated component 2 and finally flow into the mud storage prefabricated box 7 through the channel prefabricated component 8, thus ensuring the safety of the building body 100. After the installation of the building body 100 is completed, the tripod 5 is installed. The tripod 5 is installed at the four corners of the building body 100 respectively. The tripod 5 is composed of a vertical rod 51, an inclined rod 52 and a horizontal rod 53, which form a stable triangular structure. The tripod 5 is used to ensure the structural stability of the building body 100 when strong winds and mudslides occur, and to improve its wind and mudslide resistance. When the tripod 5 is installed, the soil is backfilled at the location to cover the prefabricated mud storage box 7 and the prefabricated channel part 8.
[0018] In the southwest of my country, strong winds and rains in summer are often accompanied by mudslides, so buildings are often faced with multiple challenges in terms of protection.
[0019] Specifically, in the above weather, it rains and strong winds first, and rainwater falls into the drainage prefabricated component 2 and is collected by the water collection box 3. The building body 100 can be supported by the tripod 5. When the wind is too strong, the tripod 5 may shake, and the shaking of the tripod 5 causes the vertical rod 51 to move along its installation direction. At this time, the vertical rod 51 will pull the pull rod 511 up, so that the piston 512 will rise. At this time, the water collection bucket 32 is full of rainwater, and the resistance of the piston 512 to rise will be greatly increased, thereby improving the stability of the vertical rod 51 under the action of force; In addition, when the piston 512 is pulled, it will discharge the rainwater in the water collection barrel 32 into the drainage prefabricated member 2 through the diversion pipe 513, and then the rainwater will fall into the water collection barrel 32 again, so that the piston 512 is pressed again, thus forming a cyclic pressurized state, which further improves the stability of the vertical rod 51 and ensures the supporting strength of the tripod 5 to the building body 100; When rain and strong winds continue for a period of time, debris flow often breaks out, and the impact of debris flow is often more serious than strong winds. As mentioned above, the debris flow will enter the drainage prefabricated component 2, and then flow into the mud storage prefabricated box 7 through the channel prefabricated component 8. When a large amount of debris flow enters the mud storage prefabricated box 7, the debris flow will press the blocking seat 521 to prevent the inclined rod 52 from being dislocated due to the impact of wind and other forces, so that it can continue to ensure the triangular structure of the tripod 5, thereby providing support for the building body 100; And because the structural strength of the building body 100 in the prior art is often very high and has the effect of resisting the impact of mudslides, it is only necessary to ensure the stability of its installation. Therefore, through the above-mentioned setting, the stability of the building body 100 can be guaranteed under any circumstances, thereby playing a protective effect.
[0020] In addition, by setting up the foundation 1 and the drainage prefabricated parts 2, the building body 100 is effectively isolated from the surrounding environment, which can prevent snakes and rats from entering under the temporary housing by digging tunnels. In addition, it can be combined with snake and rat repellent drugs used in the prior art, as well as electronic devices such as ultrasonic snake and rat repellents, to comprehensively ensure that the building body 100 is prevented from intrusion by snakes and rats, thereby ensuring the safety of users.
[0021] In this embodiment, tripods 5 are installed at the four corners of the building body 100, the horizontal rod 53 is fixed between the vertical rod 51 and the diagonal rod 52, the vertical rod 51 and the diagonal rod 52 are both anchored in the ground, and a reinforcing plate 500 is fixed between each tripod 5, and the reinforcing plate 500 is located at the top of the building body 100.
[0022] like Figure 1 As shown, in this diagram, arrows are used to indicate the wind direction at the installation location of the building body 100. The tripods 5 at various locations are connected by reinforcing plates 500 so that the tripods 5 are integrated as a whole, which can improve the strength of the support. In addition, the vertical rods 51 and the diagonal rods 52 are both anchored in the ground to ensure stability under normal use.
[0023] like Figure 4 As shown, a scaffolding board 6 is laid on the top of the drainage prefabricated component 2, a V-shaped drainage groove 4 is opened at the bottom of the drainage prefabricated component 2, the middle part of the scaffolding board 6 is a split part 62, and a supporting frame 61 fixed in the drainage prefabricated component 2 is provided at the bottom of the scaffolding board 6.
[0024] By laying the scaffolding board 6, it can be ensured that the user can pass through the drainage prefabricated component 2 normally, and the scaffolding board 6 is provided with holes to ensure that rainwater can flow into the drainage prefabricated component 2 normally; By setting the support frame 61 and the splitting part 62, when a debris flow strikes, the support frame 61 will be directly broken at the splitting part 62 due to the heavy weight of the debris flow. At this time, the scaffolding board 6 will be broken at the splitting part 62, so that the scaffolding board 6 is divided into two halves, so that the drainage prefabricated component 2 can bear the debris flow, and the scaffolding board 6 will not cause any obstruction.
[0025] like Figure 1 and Figure 4 As shown, the water collecting box 3 also includes a water diversion channel 31, which is located above the water collecting barrel 32. A liquid level sensor 33 and a drainage pump 34 are provided on the side of the water collecting barrel 32. The drainage pump 34 is connected to an external discharge pipe 35. The V-shaped drainage groove 4 is connected to the water diversion channel 31, and a check valve 400 is provided at the connection point. A water retaining cover 300 is provided at the connection point between the drainage prefabricated component 2 and the channel prefabricated component 8.
[0026] On rainy days, rainwater will flow into the water channel 31 through the V-shaped drainage trough 4, and the water in the water channel 31 will be discharged into the water collecting barrel 32. As the rainwater increases, the water level in the water collecting barrel 32 rises rapidly. The water level in the water collecting barrel 32 can be detected by the liquid level sensor 33 to prevent the water collecting barrel 32 from being full. The water in the water collecting barrel 32 can be discharged by starting the drainage pump 34, and the water will be discharged to low-lying areas through the external drainage pipe 35, ensuring that rainwater can be collected continuously.
[0027] The setting of the check valve 400 can prevent the water in the water collecting barrel 32 from flowing back. The setting of the water retaining cover 300 ensures that when light rainwater enters, the water retaining cover 300 will not open, thereby preventing rainwater from entering the mud storage prefabricated box 7. It will only open when a heavy mudslide enters.
[0028] like Figure 5 As shown, in this embodiment, the foundation 1 includes a concrete layer 11 at the bottom, a crushed stone layer 12 is laid on the concrete layer 11, and drainage boards 13 fixed on both sides of the concrete layer 11 are provided on the crushed stone layer 12. A plurality of drainage channels 15 are provided in adjacent crushed stone layers 12, and the drainage channels 15 penetrate the concrete layer 11 and are connected to the drainage prefabricated parts 2. The foundation 1 is provided with a plurality of installation holes 14 penetrating the concrete layer 11, the crushed stone layer 12 and the drainage boards 13.
[0029] This can effectively prevent rainwater from intruding and improve the strength of the foundation 1. In addition, the installation hole 14 is opened so that the bottom of the building body 100 can be provided with connecting parts for adaptive installation, thereby improving the installation stability of the building body 100.
[0030] Specifically, in this embodiment, the concrete layer 11 is a 20 cm thick C30 concrete layer, with a reinforcement ratio of 0.5% and a compressive strength of ≥30 MPa, the crushed stone layer 12 is a 30 cm thick graded crushed stone layer, with a particle size of 10-30 mm and a permeability coefficient of ≥1×10⁻²cm / s, and the drainage board 13 is a 5 cm thick polymer drainage board with a convex point height of 10 mm and a drainage capacity of ≥3 L / m・s; In addition, the drainage prefabricated member 2 set around the foundation has an upper opening width of 60 cm and a depth of 40 cm; A 50cm deep concrete isolation zone is also set up around the foundation, which contains a 304 stainless steel mesh with a pore size of 0.5cm and is coated with a nano-snake repellent coating with a weather resistance of ≥5 years.
[0031] Therefore, the present invention integrates the functions of preventing snakes, rats and insects, wind and mudslides. The concrete isolation belt can prevent snakes and rats from digging holes and enhance the anti-slip ability of the foundation.
[0032] The present invention also discloses a protection method for construction engineering, comprising the following steps: S1: excavate the pit foundation, pour the foundation 1 in the center of the pit foundation, and after the foundation 1 is solidified, install the drainage prefabricated parts 2, the mud storage prefabricated box 7 and the water collection tank 3; S2: Install the channel prefabricated member 8 between the drainage prefabricated member 2 and the mud storage prefabricated box 7, and then install the building body 100 on the foundation 1. After the building body 100 is installed, install the tripod 5 so that the pull rod 511 enters the water collection bucket 32, and the inclined rod 52 is inserted into the mud storage prefabricated box 7; S3: After safety is completed, backfill the pit foundation with soil.
[0033] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0034] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0035] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A protective device for construction engineering, characterized in that: It includes a foundation poured in a pit foundation, a building body is installed on the foundation, drainage prefabricated parts located in the pit foundation are laid on the periphery of the foundation, a water collecting tank is installed between adjacent drainage prefabricated parts, underground mud storage prefabricated boxes are buried on both sides of the windward surface of the building body, a channel prefabricated part is connected between the mud storage prefabricated box and the drainage prefabricated parts, and tripods connected to each other are installed on both sides of the windward surface of the building body; The tripod is composed of vertical rods, oblique rods and horizontal rods connected end to end. The water collecting box includes a water collecting bucket. A pull rod located in the water collecting bucket is fixed at the bottom of the vertical rod. A piston located at the bottom of the water collecting bucket is fixed on the pull rod. A diversion pipe is connected between the top of the water collecting bucket and the drainage prefabricated component. The end of the inclined rod is inserted into the ground and fixed with a blocking seat located in the mud storage prefabricated box.
2. A protective device for construction engineering according to claim 1, characterized in that: Tripods are installed at the four corners of the building body, the horizontal rod is fixed between the vertical rod and the diagonal rod, the vertical rod and the diagonal rod are anchored in the ground, and reinforcement plates are fixed between the tripods, and the reinforcement plates are located on the top of the building body.
3. A protective device for construction engineering according to claim 1, characterized in that: A scaffolding board is laid on the top of the drainage prefabricated component, a V-shaped drainage groove is opened at the bottom of the drainage prefabricated component, the middle part of the scaffolding board is a split part, and a supporting frame fixed in the drainage prefabricated component is provided at the bottom of the scaffolding board.
4. A protective device for construction engineering according to claim 1, characterized in that: The water collecting tank also includes a water diversion channel, which is located above the water collecting barrel. A liquid level sensor and a drainage pump are arranged on the side of the water collecting barrel. The drainage pump is connected to an external discharge pipe. The V-shaped drainage groove is connected to the water diversion channel, and a check valve is arranged at the connection point. A water retaining cover is arranged at the connection point between the drainage prefabricated part and the channel prefabricated part.
5. A protective device for construction engineering according to claim 1, characterized in that: The foundation includes a concrete layer at the bottom, a crushed stone layer is laid on the concrete layer, and a drainage board fixed on both sides of the concrete layer is provided on the crushed stone layer.
6. A protective device for construction engineering according to claim 5, characterized in that: A plurality of drainage channels are arranged in adjacent gravel layers, the drainage channels penetrate the concrete layer and are connected with the prefabricated drainage components, and a plurality of installation holes penetrating the concrete layer, the gravel layer and the drainage board are arranged in the foundation.
7. A construction engineering protection method, based on the construction engineering protection device according to claim 1, characterized in that: The steps include: S1: Excavate the pit foundation, pour the foundation in the center of the pit foundation, and install the drainage prefabricated parts, mud storage prefabricated box and water collection tank after the foundation solidifies; S2: Install the channel prefabricated parts between the drainage prefabricated parts and the mud storage prefabricated box, and then install the main building on the foundation. After the main building is installed, install the tripod so that the pull rod enters the water collection bucket and the inclined rod is inserted into the mud storage prefabricated box; S3: After safety is completed, backfill the pit foundation with soil.