Climbing frame system, using method of climbing frame system and tower belt machine

By designing a climbing frame system, including up and down climbing devices and platform interoperability devices, the problem of the tower crane climbing frame and belt conveyor not being installed interoperable in the tower crane, improving operational convenience.

CN120117543APending Publication Date: 2025-06-10HUNAN ZOOMLION CONSTR HOISTING MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510204188.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-24
Publication Date
2025-06-10

AI Technical Summary

Technical Problem

In the existing tower belt conveyor technology, the tower lift frame and the rack for installation of the belt conveyor are separately arranged, resulting in inconvenience in personnel operation.

Method used

A climbing frame system is designed, including an up climbing device, a down climbing device and a platform intercommunication device. The upper climbing frame of the upward climbing device can perform climbing operations along the standard section of the tower body. The lower climbing frame of the downward climbing device is equipped with a conveying installation platform. The conveying installation platform is equipped with an arm frame conveying device, and the platform intercommunication device enables the platforms of the upward and downward climbing frame to be interconnected.

Benefits of technology

Through the design of the climbing frame system, the tower crane climbing frame and the installation frame of the belt conveyor are interconnected, which significantly improves the convenience of personnel operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120117543A_ABST
    Figure CN120117543A_ABST
Patent Text Reader

Abstract

The invention discloses a climbing frame system, a using method of the climbing frame system and a tower belt conveyor, the climbing frame system comprises an upper climbing device, a lower climbing device and a platform intercommunication device, an upper climbing frame of the upper climbing device can conduct climbing operation along a tower body standard knot, an introduction installation platform is arranged on the upper climbing frame and can be used for installation of an introduction device, and the platform intercommunication device is arranged on the lower climbing frame. The upper end of a lower climbing frame of the lower climbing device is connected with the lower end of an upper climbing frame, the conveying and mounting platform is arranged on the lower climbing frame and can be used for mounting of the platform conveying device, and the conveying and mounting platform is provided with an arm frame conveying device at the outlet end of the platform conveying device. And the platform intercommunication device is arranged between the introduction mounting platform and the conveying mounting platform, so that the platforms on the upper climbing frame and the lower climbing frame can be intercommunicated, and the operation convenience of personnel is obviously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of tower belt machines, and particularly relates to a climbing frame system, a method for using the climbing frame system, and a tower belt machine. Background Art

[0002] A tower belt machine is a special equipment that combines a tower crane and a belt conveyor, mainly used for the high-altitude transportation and placing operations of materials such as concrete, and is widely used in large-scale water conservancy projects. Materials such as concrete are first produced by a mixing station and transported to the belt conveyor of the tower belt machine through a supporting feeding belt system. The belt conveyor is suspended on the tower crane and can move in horizontal and vertical directions, so as to transport the materials to the designated pouring position. However, in the prior art, the climbing frame of the tower crane and the sleeve for installing the belt conveyor are separately arranged and not interconnected, which is very inconvenient for personnel operation. Summary of the Invention

[0003] Aiming at the above defects or deficiencies, the present invention provides a climbing frame system, a method for using the climbing frame system, and a tower belt machine, aiming to solve the technical problem that the climbing frame of the tower crane and the sleeve for installing the belt conveyor in the prior art are separately arranged, resulting in inconvenient personnel operation.

[0004] To achieve the above object, the first aspect of the present invention provides a climbing frame system, wherein the climbing frame system includes an upper climbing device, a lower climbing device, and a platform interconnection device; the upper climbing device includes an upper climbing frame and an introduction and installation platform, the upper climbing frame can perform climbing operations along the standard section of the tower body, and the introduction and installation platform is arranged on the upper climbing frame and is available for the installation of the introduction device; the lower climbing device includes a lower climbing frame and a conveying and installation platform, the upper end of the lower climbing frame is connected to the lower end of the upper climbing frame, the conveying and installation platform is arranged on the lower climbing frame and is available for the installation of the platform conveying device, and an arm conveyor is installed at the outlet end of the platform conveying device on the conveying and installation platform, so that the arm conveyor can receive the materials to be placed from the platform conveying device and transport them to the designated position; the platform interconnection device is arranged between the introduction and installation platform and the conveying and installation platform.

[0005] In an embodiment of the present invention, the lower climbing device further includes an arm support platform, the arm support platform and the conveying and installation platform are respectively arranged on opposite sides of the lower climbing frame, and the arm support platform is available for placing the arm conveyor that has stopped working and been unhooked from the tower crane hook.

[0006] In an embodiment of the present invention, the arm support platform includes a walking platform and an arm support frame arranged in sequence from top to bottom, the walking platform is flush with the conveying and installation platform and is interconnected through a connecting platform, and the arm support frame forms a support surface below the walking platform for placing the arm conveyor.

[0007] In an embodiment of the present invention, the climbing frame system further includes a hoop device. The hoop device can be provided on the upper climbing frame and / or the lower climbing frame, and the hoop device can be used to hold or release the standard main chord of the tower standard section.

[0008] In an embodiment of the present invention, the hoop device includes a first hoop rod and a second hoop rod. The first ends of the first hoop rod and the second hoop rod are respectively hinged to two climbing vertical web members connected to the same climbing main chord at the same height in the corresponding climbing frame. The second ends of the first hoop rod and the second hoop rod extend into the inner side of the tower standard section at intervals from the standard main chord of the tower standard section and are detachably connected. And first top blocks are provided on both the first hoop rod and the second hoop rod, and the first top blocks can press the standard main chord tightly against or release it from the corresponding climbing vertical web member.

[0009] In an embodiment of the present invention, a second top block is provided on the inner side of the climbing vertical web member, and the second top block and the first top block can press the standard main chord tightly against or release it from the opposite sides of the standard main chord.

[0010] In an embodiment of the present invention, the climbing frame system further includes a roller device. The roller device can be provided on the upper climbing frame and / or the lower climbing frame, and the roller device can contact the standard main chord of the tower standard section.

[0011] In an embodiment of the present invention, the upper climbing frame is provided with roller devices at different height positions of the standard main chord.

[0012] In an embodiment of the present invention, the roller device includes a first roller assembly and a second roller assembly. The first roller assembly and the second roller assembly are respectively provided on two climbing vertical web members connected to the same climbing main chord at the same height in the corresponding climbing frame. And both the first roller assembly and the second roller assembly include a hinge seat, an adjustment seat and a roller frame. The hinge seat and the adjustment seat are respectively provided on the inner side and the lower side of the climbing vertical web member. The first end of the roller frame is hinged to the hinge seat, and the second end of the roller frame is movably provided on the adjustment seat so that the distance between the roller body on the roller frame and the standard main chord can be adjusted.

[0013] In an embodiment of the present invention, the upper end of the lower climbing frame is detachably connected to the lower end of the upper climbing frame.

[0014] In an embodiment of the present invention, the upper climbing device further includes a luffing installation platform. The luffing installation platform is provided on the upper climbing frame and can be used for installing a luffing mechanism that provides a suspension point for the boom conveying device.

[0015] In an embodiment of the present invention, mounting hanging plates and mounting support plates are sequentially arranged at intervals from top to bottom on the same climbing main chord of the lower climbing frame. Hanging seats and bottom support seats are respectively arranged on the upper and lower sides of the conveying and mounting platform. The hanging seats and the bottom support seats are respectively detachably connected to the mounting hanging plates and the mounting support plates in a one-to-one correspondence.

[0016] In an embodiment of the present invention, the platform intercommunication device includes an intermediate operation platform and a ladder. The intermediate operation platform is arranged between the introduction and mounting platform and the conveying and mounting platform, and the ladder is placed between two adjacent platforms.

[0017] To achieve the above object, the second aspect of the present invention provides a method for using a climbing frame system. The method for using the climbing frame system adopts the climbing frame system described above and can be switched between the tower belt machine mode and the tower crane mode. In the tower belt machine mode, the method for using the climbing frame system includes:

[0018] Disassemble the upper end of the upper climbing frame from the transition section, and rely on the climbing mechanism on the upper climbing frame to adjust the height on the tower body standard section. After the height adjustment is in place, rely on the step-changing device in the climbing mechanism to support the climbing frame system;

[0019] Suspend one end of the boom conveying device far from the conveying and mounting platform on the tower crane hook;

[0020] In the tower crane mode, the method for using the climbing frame system includes:

[0021] Remove the boom conveying device from the tower crane hook and adjust it to be placed on the boom support platform arranged opposite to the conveying and mounting platform, or remove the boom conveying device and the lower climbing device;

[0022] Use the tower crane hook to lift and hoist construction materials.

[0023] To achieve the above object, the third aspect of the present invention provides a tower belt machine. The tower belt machine includes the climbing frame system described above, or the tower belt machine adopts the method for using the climbing frame system described above.

[0024] Through the above technical solutions, the climbing frame system provided by the embodiments of the present invention has the following beneficial effects:

[0025] When using the above-mentioned climbing frame system, since it includes an upper climbing device, a lower climbing device, and a platform interconnection device, the upper climbing frame of the upper climbing device can climb along the tower standard section, that is, the upper climbing frame can be used as the climbing frame of the tower crane. The lower climbing frame of the lower climbing device is provided with a conveying and installation platform for installing the platform conveying device, and an arm conveying device is installed at the outlet end of the platform conveying device on the conveying and installation platform, so that the arm conveying device can receive the material to be distributed from the platform conveying device and transfer it to the designated position, that is, the lower climbing frame can be used as a sleeve for installing the arm conveying device. At the same time, the upper end of the lower climbing frame is connected to the lower end of the upper climbing frame, and a platform interconnection device is added between the introduction and installation platform on the upper climbing frame and the conveying and installation platform on the lower climbing frame, so that the platforms on the upper climbing frame and the lower climbing frame can communicate with each other, significantly improving the convenience of personnel operation.

[0026] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The drawings are used to provide a further understanding of the embodiments of the present invention, and constitute a part of the specification. Together with the following specific implementation, they are used to explain the embodiments of the present invention, but do not constitute a limitation to the embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on the structures shown in these drawings. In the drawings:

[0028] Figure 1 is a schematic structural diagram of the climbing frame system according to an embodiment of the present invention;

[0029] Figure 2 is a schematic structural diagram of the arm conveying device folded and placed on the arm support platform according to an embodiment of the present invention;

[0030] Figure 3 is a schematic structural diagram of the connection between the upper climbing frame of the climbing frame system and the transition section according to an embodiment of the present invention;

[0031] Figure 4 is a schematic structural diagram of the disassembly and descent of the upper climbing frame of the climbing frame system and the transition section according to an embodiment of the present invention;

[0032] Figure 5 is a schematic structural diagram of the upper climbing frame according to an embodiment of the present invention;

[0033] Figure 6 is a schematic structural diagram of the lower climbing frame according to an embodiment of the present invention;

[0034] Figure 7It is a schematic structural diagram in which four hoop devices on the same layer in an embodiment of the present invention respectively hold the standard main chord tightly;

[0035] Figure 8 It is an enlarged schematic diagram in which the hoop device in an embodiment of the present invention holds the standard main chord tightly;

[0036] Figure 9 It is a schematic structural diagram in which four roller devices on the same layer in an embodiment of the present invention respectively contact the standard main chord;

[0037] Figure 10 It is an enlarged schematic diagram in which the roller device is installed on the corresponding climbing frame in an embodiment of the present invention;

[0038] Figure 11 It is an enlarged schematic diagram in which the conveying and installation platform is installed in an embodiment of the present invention.

[0039] Explanation of reference numerals

[0040] 100 Upper climbing device 110 Upper climbing frame

[0041] 111 First flange plate 112 Second flange plate

[0042] 120 Introduction and installation platform 130 Luffing installation platform

[0043] 131 Triangular platform 132 Diagonal brace

[0044] 133 Connecting flange plate 134 Installation ear plate

[0045] 140 Step-changing device 150 Jacking oil cylinder

[0046] 160 Jacking cross beam 200 Lower climbing device

[0047] 210 Lower climbing frame 211 Third flange plate

[0048] 212 Installation hanging plate 213 Installation support plate

[0049] 220 Conveying and installation platform 221 Hanging seat

[0050] 222 Bottom support seat 230 Boom support platform

[0051] 231 Walking platform 232 Boom support frame

[0052] 233 Support surface 10a Climbing main chord

[0053] 10b Climbing straight web member 300 Boom conveying device

[0054] 301 First boom conveyor section 302 Second boom conveyor section

[0055] 400 Platform interconnection device 411 Roller adjustment platform

[0056] 412 First jacking operation platform 413 Second jacking operation platform

[0057] 420 Ladder 500 Hoop device

[0058] 510 First hoop rod 520 Second hoop rod

[0059] 530 First top block 540 Second top block

[0060] 550 Connecting pin shaft 560 First threaded component

[0061] 600 Roller device 610 First roller assembly

[0062] 620 Second roller assembly 630 Hinge seat

[0063] 640 Adjusting seat 650 Roller frame

[0064] 651 Roller body 660 Second threaded component

[0065] 700 Tower standard section 701 Standard main chord

[0066] 800 Transition section Detailed implementation mode

[0067] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0068] The climbing frame system, the using method of the climbing frame system and the tower belt machine of the present invention will be described below with reference to the accompanying drawings.

[0069] As Figures 1 to 4 shown, the present invention provides a climbing frame system, wherein the climbing frame system includes:

[0070] The upward climbing device 100 includes an upward climbing frame 110 and an introduction and installation platform 120. The upward climbing frame 110 can perform climbing operations along the tower standard section 700, and the introduction and installation platform 120 is arranged on the upward climbing frame 110 and can be used for the installation of the introduction device;

[0071] Lower climbing device 200, including a lower climbing frame 210 and a conveying and installation platform 220. The upper end of the lower climbing frame 210 is connected to the lower end of the upper climbing frame 110. The conveying and installation platform 220 is arranged on the lower climbing frame 210 and is available for the installation of the platform conveying device. The conveying and installation platform 220 is installed with a boom conveying device 300 at the outlet end of the platform conveying device, so that the boom conveying device 300 can receive the material to be distributed from the platform conveying device and transport it to a designated position.

[0072] Platform intercommunication device 400, arranged between the introduction and installation platform 120 and the conveying and installation platform 220.

[0073] When using the above climbing frame system, since it includes an upper climbing device 100, a lower climbing device 200 and a platform intercommunication device 400, the upper climbing frame 110 of the upper climbing device 100 can climb along the tower standard section 700, that is, the upper climbing frame 110 can be used as the climbing frame of the tower crane. The lower climbing frame 210 of the lower climbing device 200 is provided with a conveying and installation platform 220 available for the installation of the platform conveying device, and the conveying and installation platform 220 is installed with a boom conveying device 300 at the outlet end of the platform conveying device, so that the boom conveying device 300 can receive the material to be distributed from the platform conveying device and transport it to a designated position, that is, the lower climbing frame 210 can be used as the sleeve for the installation of the boom conveying device 300. At the same time, the upper end of the lower climbing frame 210 is connected to the lower end of the upper climbing frame 110, and a platform intercommunication device 400 is added between the introduction and installation platform 120 on the upper climbing frame 110 and the conveying and installation platform 220 on the lower climbing frame 210, so that the platforms on the upper climbing frame 110 and the lower climbing frame 210 can communicate with each other, significantly improving the convenience of personnel operation.

[0074] Specifically, the upper end of the upper climbing frame 110 can be detachably connected to the transition section 800. The boom conveying device 300 can have two sections. The two sections of the boom conveying device 300 are respectively a first boom conveying section 301 and a second boom conveying section 302. The conveying and installation platform 220 is docked with the first end of the first boom conveying section 301 at the outlet end of the platform conveying device. The second end of the first boom conveying section 301 is docked with the first end of the second boom conveying section 302. When used as a tower belt machine, the second end of the second boom conveying section 302 can be suspended on the tower crane hook. At the same time, the first boom conveying section 301 is set to be rotatable and variable amplitude and pitching installed on the conveying and installation platform 220, and the second boom conveying section 302 can also be set to be rotatable and variable amplitude and pitching installed on the first boom conveying section 301. Of course, the present invention is not limited to this, and it is also possible that the boom conveying device 300 has only one section or more than two sections.

[0075] More specifically, after the production of the material to be laid (such as concrete) is completed, it can first be transported to the platform conveyor through the supporting feeding belt system, and then transported to the designated pouring position through the arm conveyor 300. At this time, the end of the arm conveyor 300 away from the conveying installation platform 220 can be suspended on the tower crane hook. At the same time, both the platform conveyor and the arm conveyor 300 can be configured to use belt conveyors.

[0076] See also Figure 1 and Figure 2 In one embodiment of the present invention, the lower climbing device 200 further includes a boom support platform 230. The boom support platform 230 and the conveying installation platform 220 are arranged on opposite sides of the lower climbing frame 210. The boom support platform 230 can be used to place the boom conveying device 300 that has stopped working and removed from the tower crane hook. By adding the boom support platform 230, the boom conveying device 300 that has stopped working and removed from the tower crane hook can be stably placed on the boom support platform 230, so that in the process of switching from the tower belt machine function to the traditional tower crane function, the boom conveying device 300 does not need to be removed, which plays a role in improving production efficiency. It should be particularly noted that in addition to the placement support of the boom support platform 230, the boom conveying device 300 also has a connection between the end and the conveying installation platform 220, and the lifting of the variable amplitude mechanism on the climbing frame 110 can further improve the placement stability of the boom conveying device 300. More specifically, when the boom conveying device 300 is configured to be divided into two sections, the two sections of the boom conveying device 300 may be folded and placed in a V-shape so that the two sections of the boom conveying device 300 are disposed on opposite sides of the lower climbing frame 210 .

[0077] In one embodiment of the present invention, the arm support platform 230 includes a walking platform 231 and an arm support frame 232 arranged in sequence from top to bottom. The walking platform 231 is arranged flush with the conveying installation platform 220 and communicates with each other through the connecting platform. The arm support frame 232 forms a support surface 233 below the walking platform 231 for the arm conveying device 300 to be placed. That is, the conveying installation platform 220, the connecting platform and the walking platform 231 in the arm support platform 230 can allow personnel to communicate and walk at the current height, so as to further improve the convenience of personnel operation. Specifically, a ladder 420 is provided on the arm support frame 232 for personnel to climb up and down between the walking platform 231 and the support surface 233.

[0078] See also Figures 3 to 8, in an embodiment of the present invention, the climbing frame system further includes a hoop device 500. The hoop device 500 can be provided on the upper climbing frame 110 and / or the lower climbing frame 210. The hoop device 500 can be used to hold or release the standard main chord 701 of the tower body standard section 700. By adding the hoop device 500, the stability of the climbing frame system installed on the tower body can be enhanced. Specifically, the hoop device 500 can be provided with two layers. One layer of the hoop device 500 can be provided at the upper end of the upper climbing frame 110, and the other layer of the hoop device 500 can be provided in the middle section area of the lower climbing frame 210. And four hoop devices 500 are correspondingly provided for each layer to respectively hold the four standard main chords 701 of the tower body standard section 700 one by one. It should be particularly noted that the hoop device 500 can also be used to hold or release the transition main chord of the transition section 800.

[0079] In an embodiment of the present invention, the hoop device 500 includes a first hoop rod 510 and a second hoop rod 520. The first ends of the first hoop rod 510 and the second hoop rod 520 are respectively and correspondingly hinged to two climbing vertical web members 10b connected to the same climbing main chord 10a at the same height in the corresponding climbing frame. Specifically, both the upper climbing frame 110 and the lower climbing frame 210 include a climbing main chord 10a and climbing vertical web members 10b connected to the climbing main chord 10a. The second ends of the first hoop rod 510 and the second hoop rod 520 extend into the inner side of the tower body standard section 700 at intervals from the standard main chord 701 of the tower body standard section 700 and are detachably connected. Then, both the first hoop rod 510 and the second hoop rod 520 surround the corresponding standard main chord 701, and first top blocks 530 are provided on both the first hoop rod 510 and the second hoop rod 520. The first top blocks 530 can hold the standard main chord 701 tightly or release it on the corresponding climbing vertical web member 10b. Then, by adding the first top blocks 530, the reliability of the hoop device 500 for clamping the standard main chord 701 can be improved. Further, a clamping port is formed at the second end of one of the first hoop rod 510 and the second hoop rod 520, and the second end of the other one extends into the clamping port. And the first hoop rod 510 and the second hoop rod 520 are connected in series at the position of the clamping port through a connecting pin shaft 550 to achieve their detachable connection.

[0080] In an embodiment of the present invention, a second top block 540 is provided inside the climbing straight web member 10b. The second top block 540 and the first top block 530 can tighten or loosen the standard main chord member 701 from opposite sides of the standard main chord member 701. By adding the second top block 540, the reliability of clamping the standard main chord member 701 can be further improved. Specifically, each hoop device 500 may correspondingly include four top blocks, which are two first top blocks 530 and two second top blocks 540 respectively. The two first top blocks 530 are respectively arranged on the first hoop rod 510 and the second hoop rod 520, and the two second top blocks 540 are respectively arranged on two climbing straight web members 10b that are respectively oppositely arranged with the first hoop rod 510 and the second hoop rod 520. First threaded assemblies 560 can be penetrated through the first hoop rod 510, the second hoop rod 520 and the climbing straight web member 10b, so as to connect with the corresponding top blocks through the screws in the first threaded assemblies 560. By loosening the nuts on the screws on the hoop rods and the climbing straight web member 10b and tightening the nuts after moving the positions of the screws, the corresponding top blocks can be tightened against and loosened from the standard main chord member 701.

[0081] See Figures 3 to 6 , Figure 9 and Figure 10 , in an embodiment of the present invention, the climbing frame system further includes a roller device 600. The roller device 600 can be provided on the upper climbing frame 110 and / or the lower climbing frame 210, and the roller device 600 can contact the standard main chord member 701 of the tower body standard section 700. The addition of the roller device 600 enables climbing along the standard main chord member 701 during the climbing operation, so as to ensure the stable and smooth progress of the climbing operation. Specifically, the upper climbing frame 110 is provided with roller devices 600 at different height positions of the standard main chord member 701. The roller device 600 can be provided with three layers. The first layer of roller device 600 is arranged in the middle section area of the upper climbing frame 110 and is located below the introduction space of the standard section. The second layer of roller device 600 is arranged at the lower end of the upper climbing frame 110. The third layer of roller device 600 is arranged at the lower end of the lower climbing frame 210. And each layer of roller device 600 correspondingly includes four roller devices 600 to respectively contact the four standard main chord members 701 of the tower body standard section 700 one by one.

[0082] In an embodiment of the present invention, the roller device 600 includes a first roller assembly 610 and a second roller assembly 620. The first roller assembly 610 and the second roller assembly 620 are respectively disposed on two climbing vertical web members 10b connected to the same climbing main chord 10a at the same height in the corresponding climbing frames. Moreover, both the first roller assembly 610 and the second roller assembly 620 include a hinge seat 630, an adjustment seat 640, and a roller frame 650. The hinge seat 630 and the adjustment seat 640 are respectively disposed on the inner side and the lower side of the climbing vertical web member 10b. The first end of the roller frame 650 is hinged to the hinge seat 630, and the second end of the roller frame 650 is movably disposed on the adjustment seat 640, so that the distance between the roller body 651 on the roller frame 650 and the standard main chord 701 can be adjusted. That is, the roller bodies 651 on the first roller assembly 610 and the second roller assembly 620 can respectively contact the standard main chord 701 from the adjacent two sides facing outward of the standard main chord 701, and by moving the roller frames 650 on the first roller assembly 610 and the second roller assembly 620, the gap between the roller body 651 and the standard main chord 701 can be adjusted to meet the requirements for stable climbing. Further, a second threaded assembly 660 can be passed through the adjustment seat 640 to connect the screw in the second threaded assembly 660 to the second end of the roller frame 650. By loosening the nut on the screw on the adjustment seat 640 and then tightening the nut after moving the position of the screw, the adjustment of the gap between the roller body 651 and the standard main chord 701 can be achieved.

[0083] As Figure 1 , Figure 3 , Figures 4 to 6 As shown, in an embodiment of the present invention, the upper end of the lower climbing frame 210 is detachably connected to the lower end of the upper climbing frame 110. By setting the lower climbing frame 210 and the upper climbing frame 110 to be detachably connected, when the device is used as a traditional tower crane, in addition to folding and placing the boom conveying device 300 on the boom support platform 230, the lower climbing frame 210 can also be removed from the upper climbing frame 110 and the upper climbing frame 110 can be used alone. Further, the upper and lower ends of the climbing main chord 10a of the upper climbing frame 110 are respectively disposed on a first flange plate 111 and a second flange plate 112, and the upper end of the climbing main chord 10a of the lower climbing frame 210 is provided with a third flange plate 211. The first flange plate 111 can be detachably connected to the flange plate on the transition section 800 through bolts, and the second flange plate 112 and the third flange plate 211 can also be detachably connected through bolts.

[0084] See Figure 1 and Figure 5, in an embodiment of the present invention, the upper climbing device 100 further includes a luffing mounting platform 130. The luffing mounting platform 130 is arranged on the upper climbing frame 110 and can be used for installing a luffing mechanism that provides a suspension point for the boom conveying device 300. So that on the basis that the tower crane hook provides a suspension point for the boom conveying device 300, a new suspension point for the boom conveying device 300 can also be provided by adding a luffing mechanism on the luffing mounting platform 130.

[0085] Specifically, the luffing mounting platform 130 includes a triangular platform 131 and a diagonal brace 132. The triangular platform 131 is arranged at the upper end of the upper climbing frame 110 and on one side of the upper climbing frame 110. The triangular platform 131 is arranged in a triangular shape, and one side of the upper climbing frame 110 serves as one side length of the triangular platform 131. And the luffing mechanism can be arranged at the corner position of the triangular platform 131 far from the upper climbing frame 110. The diagonal brace 132 is located below the triangular platform 131. One end of the diagonal brace 132 is connected to the upper climbing frame 110, and the other end is connected to the lower side position of the triangular platform 131 where the luffing mechanism is arranged. More specifically, two connecting flange plates 133 are arranged at intervals on one side of the upper climbing frame 110. The two connecting flange plates 133 can be detachably connected to the two main beams of the triangular platform 131 in a one-to-one correspondence. An installation ear plate 134 that can be connected to the lower end of the diagonal brace 132 is also arranged on the upper climbing frame 110.

[0086] See Figure 1 , Figure 6 and Figure 11 , in an embodiment of the present invention, on the same climbing chord 10a of the lower climbing frame 210, an installation hanging plate 212 and an installation support plate 213 are arranged at intervals from top to bottom. Hanging seats 221 and bottom support seats 222 are respectively arranged on the upper and lower sides of the conveying installation platform 220. The hanging seats 221 and the bottom support seats 222 are respectively detachably connected to the installation hanging plate 212 and the installation support plate 213 in a one-to-one correspondence. Then the conveying installation platform 220 can establish connections with the lower climbing frame 210 from both the upper and lower sides to improve the installation stability of the conveying installation platform 220 on the lower climbing frame 210. At the same time, the installation structure of the boom support platform 230 can also be set to be the same as that of the conveying installation platform 220.

[0087] Please see again Figure 1 , in an embodiment of the present invention, the platform intercommunication device 400 includes an intermediate operation platform and a ladder 420. The intermediate operation platform is arranged between the introduction installation platform 120 and the conveying installation platform 220. The ladder 420 is placed between two adjacent platforms. Thus, on the basis of establishing the intercommunication between the introduction installation platform 120 and the conveying installation platform 220, other operations can also be carried out while standing on the intermediate operation platform.

[0088] Specifically, there can be three intermediate operation platforms. The three intermediate operation platforms are successively arranged from bottom to top as the roller adjustment platform 411, the first jacking operation platform 412, and the second jacking operation platform 413. On the roller adjustment platform 411, the roller device 600 at the lower end of the upper climbing frame 110 can be adjusted. On the first jacking operation platform 412, the jacking cross beam 160 can be operated. On the second jacking operation platform 413, the jacking oil cylinder 150 and the step-changing device 140 can be operated. More specifically, there can be a total of six platform layers on the climbing frame system. The six platform layers can successively be: the conveying and installation platform 220, the roller adjustment platform 411, the first jacking operation platform 412, the second jacking operation platform 413, the introduction and installation platform 120, and the luffing installation platform 130. The conveying and installation platform 220 can form the first-layer platform with the connecting platform and the boom support platform 230. Its function is to allow operators to stand and operate the conveying of the treated cloth materials, fold and unfold the boom conveying device 300, and adjust the hoop device 500 on the lower climbing frame 210. The function of the luffing installation platform 130 is not only to allow operators to stand and install the luffing mechanism, but also to disassemble and assemble the upper climbing frame 110 and the transition section 800 and adjust the hoop device 500 on the upper climbing frame 110.

[0089] In addition, the present invention also provides a usage method for the climbing frame system. Among them, the usage method of the climbing frame system adopts the climbing frame system described above and can be switched and used in the tower belt machine mode and the tower crane mode. In the tower belt machine mode, the usage method of the climbing frame system includes:

[0090] Disassemble the upper end of the upper climbing frame 110 from the transition section 800, and rely on the climbing mechanism on the upper climbing frame 110 to adjust the height on the tower body standard section 700. After the height adjustment is in place, rely on the step-changing device 140 in the climbing mechanism to support the climbing frame system;

[0091] Sling the end of the boom conveying device 300 away from the conveying and installation platform 220 on the tower crane hook.

[0092] Understandably, when the device is used as a tower belt conveyor, by disassembling the upper end of the upper climbing frame 110 from the transition section 800, and after adjusting the height of the upper climbing frame 110 in place by using the climbing mechanism, relying on the step-changing device 140 to support the climbing frame system, so that the boom conveying device 300 can adapt to the requirements of pouring operations at different heights. Specifically, the method of using the tower belt conveyor further includes: connecting the upper end of the upper climbing frame 110 to the transition section 800 so that the transition section 800 can support the climbing frame system. Then there are two methods of using the tower belt conveyor. One is that the upper climbing frame 110 and the transition section 800 are always connected, and the boom conveying device 300 can only adapt to the requirements of pouring operations at a single height. The other is to disassemble after connection. The upper climbing frame 110 can be adjusted in height, and the boom conveying device can adapt to the requirements of pouring operations at different heights.

[0093] At the same time, in the tower crane mode, the method of using the climbing frame system includes:

[0094] Unload the boom conveying device 300 from the tower crane hook and adjust it to be placed on the boom support platform 230 arranged opposite to the conveying installation platform 220, or, disassemble the boom conveying device 300 and the lower climbing device 200;

[0095] Use the tower crane hook to lift and hoist construction materials.

[0096] Understandably, when the device is used as a traditional tower crane, there are two methods of use, namely, not disassembling the boom conveying device 300 and the lower climbing device 200 and disassembling the boom conveying device 300 and the lower climbing device 200, which can be specifically selected according to actual needs.

[0097] In addition, the present invention further provides a tower belt conveyor, wherein the tower belt conveyor includes the climbing frame system described above, or, the tower belt conveyor adopts the method of using the climbing frame system described above. Since the tower belt conveyor adopts all the technical solutions of the above embodiments, it has at least all the beneficial effects brought by the technical solutions of the above embodiments, which will not be elaborated here one by one.

[0098] In the description of the present invention, it should be understood that the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, the features defined with "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, "a plurality" means at least two, such as two, three, etc., unless otherwise specifically defined.

[0099] In the present invention, unless otherwise clearly defined and limited, terms such as "installed", "connected", "linked", "fixed", etc. shall be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or integrated; it may be a mechanical connection, an electrical connection, or communicable with each other; it may be directly connected, or indirectly connected through an intermediate medium, and may be the communication inside two components or the interaction relationship between two components, unless otherwise clearly defined. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0100] In the description of this specification, the description with reference to terms such as "one embodiment", "some embodiments", "example", "specific example", or "some examples", etc. means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or more embodiments or examples. In addition, without contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples.

[0101] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those of ordinary skill in the art can make changes, modifications, substitutions, and variations to the above embodiments within the scope of the present invention.

Claims

1. A climbing frame system, characterized in that: The climbing frame system comprises: The upper climbing device (100) comprises an upper climbing frame (110) and an introduction installation platform (120), wherein the upper climbing frame (110) can perform a climbing operation along a tower body standard section (700), and the introduction installation platform (120) is arranged on the upper climbing frame (110) and can be used for installation of the introduction device; The lower climbing device (200) comprises a lower climbing frame (210) and a conveying installation platform (220), wherein the upper end of the lower climbing frame (210) is connected to the lower end of the upper climbing frame (110), the conveying installation platform (220) is arranged on the lower climbing frame (210) and can be installed on the platform conveying device, and the conveying installation platform (220) is installed with an arm conveying device (300) at the outlet end of the platform conveying device, so that the arm conveying device (300) can receive the material to be laid from the platform conveying device and transport it to a designated position; The platform intercommunication device (400) is arranged between the introduction installation platform (120) and the transportation installation platform (220).

2. The climbing frame system according to claim 1, characterized in that: The lower climbing device (200) further comprises a boom support platform (230), wherein the boom support platform (230) and the conveying and installing platform (220) are arranged on opposite sides of the lower climbing frame (210), and the boom support platform (230) can be used to place the boom conveying device (300) that has stopped working and been removed from the tower crane hook.

3. The climbing frame system according to claim 2, characterized in that: The arm support platform (230) comprises a walking platform (231) and an arm support frame (232) which are arranged in sequence from top to bottom; the walking platform (231) is arranged flush with the conveying installation platform (220) and is interconnected via a connecting platform; the arm support frame (232) is provided with a supporting surface (233) below the walking platform (231) on which the arm conveying device (300) can be placed.

4. The climbing frame system according to claim 1, characterized in that: The climbing frame system further comprises a clamping device (500), and the clamping device (500) may be provided on the upper climbing frame (110) and / or the lower climbing frame (210), and the clamping device (500) may be used to clamp or loosen a standard main chord (701) of the tower body standard section (700).

5. The climbing frame system according to claim 4, characterized in that: The clamping device (500) comprises a first clamping rod (510) and a second clamping rod (520), wherein the first ends of the first clamping rod (510) and the second clamping rod (520) are respectively and one-to-one hingedly connected to two climbing straight webs (10b) connected to the same climbing main chord (10a) at the same height in the corresponding climbing frame, and the second ends of the first clamping rod (510) and the second clamping rod (520) extend into the inner side of the tower body standard section (700) via the standard main chord (701) of the tower body standard section (700) and are detachably connected, and the first clamping rod (510) and the second clamping rod (520) are both provided with a first top block (530), and the first top block (530) can press or loosen the standard main chord (701) on the corresponding climbing straight web (10b).

6. The climbing frame system according to claim 5, characterized in that: A second top block (540) is provided on the inner side of the climbing straight web bar (10b), and the second top block (540) and the first top block (530) can tighten or loosen the standard main chord (701) from opposite sides of the standard main chord (701).

7. The climbing frame system according to claim 1, characterized in that: The climbing frame system further comprises a roller device (600), and the upper climbing frame (110) and / or the lower climbing frame (210) may be provided with the roller device (600), and the roller device (600) may be in contact with a standard main chord (701) of the tower body standard section (700).

8. The climbing frame system according to claim 7, characterized in that: The upper climbing frame (110) is provided with the roller devices (600) at different height positions of the standard main chord (701); And / or, the roller device (600) comprises a first roller assembly (610) and a second roller assembly (620), the first roller assembly (610) and the second roller assembly (620) being separately arranged on two climbing straight web bars (10b) connected to the same climbing main chord (10a) at the same height in a corresponding climbing frame, and the first roller assembly (610) and the second roller assembly (620) both comprise an articulated seat (630), an adjustment seat (64 0) and a roller frame (650), the articulated seat (630) and the adjusting seat (640) are arranged one by one on the inner side and the lower side of the climbing straight belly rod (10b), the first end of the roller frame (650) is hinged on the articulated seat (630), and the second end of the roller frame (650) is movably arranged on the adjusting seat (640), so that the distance between the roller body (651) on the roller frame (650) and the standard main chord (701) can be adjusted.

9. The climbing frame system according to any one of claims 1 to 8, characterized in that: The upper end of the lower climbing frame (210) is detachably connected to the lower end of the upper climbing frame (110); And / or, the upper climbing device (100) further comprises a luffing installation platform (130), wherein the luffing installation platform (130) is arranged on the upper climbing frame (110) and can be used to install a luffing mechanism that provides a suspension point for the boom conveying device (300); And / or, the lower climbing frame (210) is provided with a mounting hanging plate (212) and a mounting support plate (213) in sequence from top to bottom on the same climbing main chord (10a), and the upper and lower sides of the conveying installation platform (220) are provided with a hanging seat (221) and a bottom support seat (222), and the hanging seat (221) and the bottom support seat (222) are respectively detachably connected to the mounting hanging plate (212) and the mounting support plate (213) in a one-to-one correspondence; And / or, the platform intercommunication device (400) includes an intermediate operating platform and a ladder (420), wherein the intermediate operating platform is arranged between the introduction installation platform (120) and the conveying installation platform (220), and the ladder (420) is placed between two adjacent platforms.

10. A method for using a climbing frame system, characterized in that: The method for using the climbing frame system adopts the climbing frame system according to any one of claims 1 to 9, and can be switched between tower belt machine mode and tower crane mode. In the tower belt machine mode, the method for using the climbing frame system includes: The upper end of the upper climbing frame (110) and the transition section (800) are disassembled, and the height is adjusted on the tower body standard section (700) by means of the climbing mechanism on the upper climbing frame (110), and after the height is adjusted to the right position, the climbing frame system is supported by means of the step-changing device (140) in the climbing mechanism; Suspending one end of the boom conveying device (300) away from the conveying installation platform (220) on a tower crane hook; In the tower crane mode, the method of using the climbing frame system includes: The boom conveying device (300) is removed from the tower crane hook and adjusted to be placed on the boom support platform (230) disposed opposite to the conveying installation platform (220), or the boom conveying device (300) and the lower climbing device (200) are removed; Use the tower crane hook to lift and hoist construction materials.

11. A tower belt conveyor, characterized in that: The tower belt machine comprises the climbing frame system according to any one of claims 1 to 9, or the tower belt machine adopts the method for using the climbing frame system according to claim 10.