Tower crane channel modularized quick-mounting structure based on high-rise building climbing frame construction
By adopting the tower crane channel of a modular quick-install structure and an intelligent monitoring system in the construction of high-rise buildings, the problems of low construction efficiency, large safety hazards and lack of intelligent monitoring in the existing technology are solved, and an efficient and safe construction process is achieved.
Patent Information
- Application Number
- CN202510453840.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-11
- Publication Date
- 2025-06-17
AI Technical Summary
The existing tower crane passages have low construction efficiency, high safety hazards and lack of intelligent monitoring during high-rise buildings.
The modular quick-install structure of tower crane passages based on high-rise building climbing frame construction is adopted, including the removable and connected channel standardized unit modules connected to the intelligent monitoring system. The intelligent monitoring system includes a stress sensor, an inclination meter and an early warning module. The channel standardization unit module is equipped with adjustable support structure and multiple protection facilities.
It improves construction efficiency, enhances the safety performance of the channel, realizes intelligent management, and reduces construction costs and difficulty.
Smart Images

Figure CN120157036A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of connecting passages between climbing frames and tower cranes, and in particular is a modular quick-assembly structure of a tower crane passage based on the construction of a climbing frame for a high-rise building. Background Art
[0002] In the construction of high-rise buildings, tower cranes are important vertical transportation equipment, and the reasonable construction of their passages is crucial to the construction progress and safety. However, there are many problems with the existing tower crane passages: 1. The traditional on-site assembly method is cumbersome: the traditional tower crane channel is usually assembled on the construction site, and each component needs to be installed and debugged one by one, which consumes a lot of time and manpower. In addition, when assembling the tower crane channel on site, it is necessary to frequently use the tower crane for lifting, which makes the tower crane occupied for a long time and cannot efficiently serve other construction links.
[0003] 2. Difficulty in real-time monitoring: Traditional tower crane channels lack real-time monitoring methods for structural status during use.
[0004] Therefore, how to effectively solve the above-mentioned defects is a technical problem that needs to be solved urgently.
[0005] It should be particularly noted that the above technical information is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as admitting or implying in any form that the above technical information constitutes the prior art already known to those skilled in the art. Summary of the invention
[0006] In view of the deficiencies in the above-mentioned background technology, the present invention proposes a modular quick-assembly structure of a tower crane channel based on high-rise building climbing frame construction to solve the problems of low construction efficiency, great safety hazards and lack of intelligent monitoring existing in the prior art.
[0007] The technical solution of this application is: The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction includes a detachable and connected channel standardized unit module, and the channel standardized unit module is connected to the intelligent monitoring system. The intelligent monitoring system includes stress sensors, inclinometers, and early warning modules that are all connected to the construction management platform.
[0008] Furthermore, the channel standardization unit module includes a channel support keel connected by an intelligent connection structure, the channel support keel is detachably connected to the guardrail, and an adjustable support structure is provided in the channel standardization unit module.
[0009] Furthermore, the adjustable support structure includes a telescopic rod for supporting dynamic adaptation of the channel width and an angle adjustment mechanism for adjusting the inclination angle of the channel.
[0010] Further, the intelligent connection structure includes a plug - type connector and a snap - type positioning guide groove self - locking device, and the snap - type positioning guide groove self - locking device includes a spring - driven snap and a redundant safety bolt.
[0011] Further, anti - slip grilles and anti - fall nets are provided on the channel support keel.
[0012] Further, the guardrail is foldable. After the guardrail is unfolded, it forms a closed channel protection structure, and the guardrail works together with the anti - slip grilles and the anti - fall nets.
[0013] Further, the stress sensors are arranged at the key nodes of the channel to monitor the stress change of the structure in real time. The stress sensors adopt high - precision patch - type resistance strain gauges with an accuracy of ±0.1%, and transmit the data to the construction management platform in real time.
[0014] Further, the inclinometer selects a MEMS three - axis inclinometer with a measuring range of ±30° and a resolution of 0.01°.
[0015] Further, when the data monitored by the stress sensors exceeds the preset threshold or the inclination detected by the inclinometer exceeds the preset threshold, the warning module immediately triggers an audible and visual alarm and sends a text message to the management personnel at the same time.
[0016] Further, the construction management platform supports BIM model pre - assembly simulation and RFID tag tracking module status.
[0017] The specific beneficial effects of the present invention include: 1. The construction efficiency is improved. By pre - fabricating standardized unit modules in the factory and only requiring quick assembly on site, the on - site construction time is greatly reduced. Compared with the traditional method, the construction time of a single - layer channel is shortened from several hours originally to within 30 minutes by 2 - 3 people, and the installation time is shortened by about 70%, significantly improving the construction efficiency.
[0018] 2. The application of the intelligent interface system enables quick and accurate module docking, reduces the adjustment time caused by docking errors, and further improves the assembly speed. At the same time, since the on - site construction time is reduced, the occupancy time of the tower crane is also correspondingly reduced by about 50%, enabling the tower crane to serve other construction links more efficiently and accelerating the overall construction progress.
[0019] 3. The safety performance during the use of the channel is enhanced. The design of the multiple protection structures enables the wind - resistance grade of the tower crane channel to reach level 12, and the bearing capacity ≥1.5 tons per square meter. Compared with the traditional channel structure, both the wind - resistance ability and the bearing capacity have been greatly improved. This effectively improves the stability of the channel in bad weather and under heavy loads, and reduces the risk of safety accidents caused by structural damage.
[0020] 4. The comprehensive application of protective facilities such as anti-slip gratings, anti-fall nets, and folding guardrails provides all-round safety protection for construction workers. The anti-slip gratings effectively reduce the risk of construction workers slipping; the anti-fall nets can reliably intercept the fall of people and objects; while forming a closed protection space, the folding guardrails have sufficient strength and stability. The combined effect of these measures reduces the accident rate by more than 90% compared with traditional structures, providing strong protection for the lives of construction workers.
[0021] 5. It can improve the versatility and adaptability of the passage. The universal interfaces reserved at the connection nodes enable this tower crane passage to be compatible with the installation requirements of attached climbing frames, cantilevered climbing frames, and mainstream tower crane brands. Regardless of the type of climbing frame and tower crane used at the construction site, the tower crane passage of the present invention can be conveniently installed and used without complex modification and adjustment, greatly improving the versatility and application scope of the product, and reducing the construction cost and difficulty.
[0022] 6. The adjustable support system can support the dynamic adaptation of the passage width (0.8 - 1.5 meters) and height (3 - 5 meters), as well as the adjustment of the tilt angle of ±15°. This enables the tower crane passage to flexibly adjust its own size and angle according to the structural characteristics of different buildings, the installation deviation of the climbing frame, and the actual use requirements, better adapting to various complex construction environments and improving the adaptability and flexibility of the product.
[0023] 7. It realizes intelligent management. The intelligent monitoring system can real-time monitor the stress and tilt angle data of the passage by embedding stress sensors and inclinometers at key nodes, and transmit these data to the construction management platform. Managers can understand the status of the passage at any time through the platform and promptly discover potential safety hazards. The setting of the warning module can quickly issue an alarm when the monitored data exceeds the preset threshold, notify relevant personnel to take measures, realizing the timely warning and handling of safety hazards and effectively avoiding the occurrence of safety accidents.
[0024] 8. The BIM model pre-assembly simulation and RFID tag tracking module status functions supported by the construction management platform realize the digital management of the entire life cycle of the tower crane passage from design, installation to use and maintenance. The BIM model pre-assembly simulation helps to optimize the construction plan and improve the installation quality; the RFID tag tracking facilitates the management and maintenance of the module, reasonably arranges the use and replacement of the module, and improves the service life and management efficiency of the equipment. Description of the Drawings
[0025] To more clearly illustrate the embodiments of the present invention, the accompanying drawings required for the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other accompanying drawings can be obtained based on these drawings.
[0026] Figure 1 Schematic diagram of the present invention; Detailed implementation manners
[0027] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, rather than all embodiments. Based on the core concept of the present invention and the following embodiments, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present invention.
[0028] These embodiments are provided in this application to make this application thorough and complete, and to fully convey the scope of this application to those skilled in the art. It should be noted that: unless otherwise specifically stated, the relative arrangements of components and steps, the components of materials, numerical expressions and values described in these embodiments should be construed as merely exemplary, rather than as limitations.
[0029] It should be noted that in the description of this application, unless otherwise specified, the meaning of "several" is greater than or equal to two; the terms "upper", "lower", "left", "right", "inner", "outer", "axial", "radial", etc. indicate the orientation or positional relationship only for the convenience of describing this application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as a limitation of this application. When the absolute position of the described object changes, the relative position relationship may also change accordingly.
[0030] In addition, the "first", "second" and similar terms used in this application do not represent any order, quantity or importance, but are only used to distinguish different parts. "Vertical" is not strictly vertical, but within the allowable error range. "Parallel" is not strictly parallel, but within the allowable error range. The terms "including" or "comprising" and the like mean that the elements before this term cover the elements listed after this term, and do not exclude the possibility of also covering other elements.
[0031] It should also be noted that in the description of this application, unless otherwise clearly specified and defined, the terms "installation", "connection", and "linkage" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the communication inside two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances. When it is described that a specific device is located between a first device and a second device, there may or may not be an intermediate device between the specific device and the first device or the second device.
[0032] All terms used in this application have the same meanings as understood by those of ordinary skill in the art to which this application pertains, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries should be interpreted as having meanings consistent with their meanings in the context of the relevant art, and should not be interpreted in an idealized or overly formal sense, unless specifically defined as such here.
[0033] Technologies, methods, and devices known to those of ordinary skill in the relevant fields may not be discussed in detail, but where appropriate, the corresponding technologies, methods, and devices should be regarded as part of the specification.
[0034] The modular quick - installation structure of the tower crane passage based on the high - rise building climbing frame construction includes detachably connected standardized unit modules of the passage. The standardized unit modules of the passage are connected to an intelligent monitoring system, and the intelligent monitoring system includes a stress sensor, an inclinometer, and a warning module, all of which are connected to the construction management platform.
[0035] On the basis of the above - mentioned implementation manner, as a preferred implementation manner, the standardized unit module of the passage includes passage support keels connected through an intelligent connection structure. The passage support keels are detachably connected to the guardrail, and an adjustable support structure is provided in the standardized unit module of the passage.
[0036] Specifically, the passage support keel is the main load - bearing structure of the tower crane passage and is made of high - strength aluminum alloy or composite steel. High - strength aluminum alloy has the advantages of light weight, high strength, and corrosion resistance; composite steel combines the advantages of different materials and can meet different usage requirements while ensuring strength. The weight of a single module is controlled within ≤200 kg, which is convenient for tower crane hoisting and on - site installation operations.
[0037] The guardrail adopts a folding design. After unfolding, its height is ≥ 1.2 meters, which can provide reliable protection for construction workers and prevent people from falling. After closing, the volume is reduced by 60%, which is convenient for saving space during transportation and storage, and reducing transportation costs and storage space requirements. The material and structure of the guardrail are carefully selected and designed, with sufficient strength and stability to withstand certain external force impacts.
[0038] On the basis of the above embodiments, as a preferred embodiment, the adjustable support structure includes a telescopic rod for supporting the dynamic adaptation of the channel width and an angle adjustment mechanism for adjusting the inclination angle of the channel.
[0039] Specifically, the telescopic rod built into the module is used to support the dynamic adaptation of the channel width, and its working range is 0.8 - 1.5 meters. The telescopic rod adopts an advanced mechanical or hydraulic drive structure, with good telescopic performance and load-bearing capacity. During the construction process, the channel width can be conveniently adjusted according to actual needs to adapt to different building structures and construction requirements. The angle adjustment mechanism realizes ±15° inclination angle adjustment through worm and worm gear transmission. Worm and worm gear transmission has the advantages of large transmission ratio, compact structure, good self-locking performance, etc., and can accurately adjust the inclination angle of the channel. When the climbing frame has a certain inclination or installation deviation, the channel can be adjusted in time through the angle adjustment mechanism to ensure good connection and normal use between the channel and the climbing frame, improving the adaptability and stability of the structure.
[0040] On the basis of the above embodiments, as a preferred embodiment, the intelligent connection structure includes a plug-in connector and a snap-in positioning guide groove self-locking device, and the snap-in positioning guide groove self-locking device includes a spring-driven snap and a redundant safety bolt.
[0041] Specifically, the modules are quickly docked through the plug-in connector. The plug-in connector is made of high-strength materials, with good wear resistance and fatigue resistance. Its design dimensions are precise, and it can quickly fix the module position after insertion, ensuring the stability of the connection. The snap-in positioning guide groove used in conjunction with the plug-in connector can provide accurate positioning for the plug, ensuring that the module docking error is controlled within a range of less than 2 millimeters. The structure of the snap-in positioning guide groove is ingeniously designed, which can not only guide the plug to accurately insert, but also provide a certain clamping force after the plug is inserted, enhancing the reliability of the connection.
[0042] The self-locking device set at the interface is a key part of the intelligent interface system. The self-locking device includes a spring-driven buckle and a redundant safety bolt, which requires double unlocking operations. After the bolt is inserted in place, the spring-driven buckle can automatically lock to prevent the bolt from loosening; the redundant safety bolt provides additional safety protection. It can only be unlocked when specific operations (press the buckle first and then rotate the safety bolt) are performed simultaneously, effectively avoiding module separation caused by accidental collisions or other reasons, and ensuring the safety and stability of the tower crane passage during use.
[0043] Based on the above implementation, as a preferred implementation, anti-slip gratings and anti-fall nets are provided on the channel support keel. The anti-slip gratings integrated on both sides of the channel have a special anti-slip treatment on their surfaces, such as diamond patterns or matte treatments, to increase friction, and the friction coefficient is ≥0.6. The aperture of the anti-slip gratings is ≤10mm, which can effectively prevent construction workers from slipping and avoid small tools or sundries from falling. Its material is strong and durable, and can withstand various abrasions and pressures during construction. The anti-fall net is made of high-density polyethylene woven net, and the mesh size is ≤20mm, with high strength and toughness, and the tensile strength is ≥50kN / m. The anti-fall net is installed on both sides of the channel, which can effectively intercept the fall of personnel and objects, providing an important safety line for construction workers.
[0044] Based on the above implementation, as a preferred implementation, the guardrail is foldable. After the guardrail is unfolded, it forms a closed channel protection structure, and the guardrail acts together with the anti-slip gratings and the anti-fall nets. The foldable guardrail forms a closed channel protection structure after unfolding, and acts together with the anti-slip gratings and anti-fall nets to further improve the safety of the channel. Its wind resistance rating reaches level 12, and it can withstand strong wind forces, still ensuring the safety of construction workers in strong wind weather. The design of the foldable guardrail also considers the operation convenience of construction workers, and is convenient for unfolding and closing operations without affecting use.
[0045] Based on the above implementation, as a preferred implementation, the stress sensors are set at the key nodes of the channel to monitor the stress change of the structure in real time. The stress sensors use high-precision patch-type resistance strain gauges with an accuracy of ±0.1%, and transmit the data to the construction management platform in real time. By analyzing these data, problems such as stress concentration or overload of the structure can be detected in time, and measures can be taken in advance to avoid structural damage and safety accidents.
[0046] On the basis of the above embodiments, as a preferred embodiment, the inclinometer is selected as a MEMS triaxial inclinometer sensor with a measuring range of ±30° and a resolution of 0.01°. It can monitor the inclination angle of the channel in real time. When the channel shows abnormal inclination, it will timely feedback the data to the construction management platform. This is of great significance for timely discovering the inclination problem of the channel during use and preventing safety accidents caused by excessive inclination.
[0047] On the basis of the above embodiments, as a preferred embodiment, the early warning module in the intelligent monitoring system is an important link to ensure safety. When the data monitored by the stress sensor exceeds the preset threshold (such as stress ≥ 80% of the design value), or when the inclinometer detects abnormal inclination (>5°), the early warning module will immediately trigger an audible and visual alarm and send a text message to the management personnel at the same time. The audible and visual alarm can timely remind the construction personnel to pay attention to safety on site, while the text message notification ensures that the management personnel can obtain the abnormal information immediately no matter where they are, and make decisions and arrange treatment measures in time.
[0048] On the basis of the above embodiments, as a preferred embodiment, the construction management platform supports the pre-assembly simulation of the BIM model and the status tracking of the RFID tag module. The construction management platform is the core of the entire intelligent monitoring system. It can not only receive the real-time monitoring data from the stress sensor and the inclinometer, but also support the pre-assembly simulation of the BIM model and the status tracking of the RFID tag module. Through the pre-assembly simulation of the BIM model, the assembly process of the tower crane channel can be virtually simulated before construction, and possible problems such as interference between modules and unreasonable installation sequence can be discovered in advance and optimized and adjusted, so as to improve the efficiency and accuracy of on-site installation. By using the RFID tag to track the module status, information such as the usage times, maintenance records, and location of each module can be understood in real time, realizing the digital management of the entire life cycle of the module. This helps to reasonably arrange the usage and maintenance plans of the modules, timely replace the modules that are about to reach the service life or are damaged, and ensure the overall safety and reliability of the tower crane channel.
[0049] The details not elaborated in the present invention are all well-known conventional technical means in the art.
[0050] The above content shows and describes the basic principles, main features and the beneficial effects of the present invention. The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. The tower crane channel modular quick-installation structure based on the high-rise building climbing frame construction is characterized by: It includes a detachably connected channel standardization unit module, which is connected to an intelligent monitoring system. The intelligent monitoring system includes a stress sensor, an inclinometer, and an early warning module, all of which are connected to a construction management platform.
2. The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction according to claim 1 is characterized by: The channel standardization unit module includes a channel support keel connected by an intelligent connection structure, the channel support keel is detachably connected to the guardrail, and an adjustable support structure is provided in the channel standardization unit module.
3. The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction according to claim 2 is characterized by: The adjustable support structure includes a telescopic rod for supporting dynamic adaptation of the channel width and an angle adjustment mechanism for adjusting the inclination angle of the channel.
4. The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction according to claim 3 is characterized by: The intelligent connection structure comprises a latch-type connection piece and a snap-on positioning guide groove self-locking device, wherein the snap-on positioning guide groove self-locking device comprises a spring-driven snap and a redundant safety bolt.
5. The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction according to claim 2 is characterized by: The channel supporting keel is provided with an anti-skid grille and an anti-falling net.
6. The modular quick-assembly structure of the tower crane channel based on the high-rise building climbing frame construction according to claim 2 is characterized by: The guardrail is foldable and forms a closed channel protection structure when unfolded. The guardrail works together with the anti-slip grille and the anti-fall net.
7. The modular quick-assembly structure of a tower crane channel based on high-rise building climbing frame construction according to any one of claims 1 to 6, characterized in that: The stress sensor is set at the key node of the channel to monitor the stress change of the structure in real time. The stress sensor adopts a high-precision chip-type resistance strain gauge with an accuracy of ±0.1%, and transmits the data to the construction management platform in real time.
8. The modular quick-assembly structure of a tower crane channel based on high-rise building climbing frame construction according to any one of claims 1 to 6, characterized in that: The inclinometer uses a MEMS three-axis inclinometer with a measuring range of ±30° and a resolution of 0.01°.
9. The modular quick-assembly structure of a tower crane channel based on high-rise building climbing frame construction according to any one of claims 1 to 6, characterized in that: When the data monitored by the stress sensor exceeds the preset threshold or the inclinometer detects that the inclination exceeds the preset threshold, the early warning module immediately triggers an audible and visual alarm and sends a text message to the management personnel.
10. The modular quick-assembly structure of a tower crane channel based on high-rise building climbing frame construction according to any one of claims 1 to 6, characterized in that: The construction management platform supports BIM model pre-assembly simulation and RFID tag tracking of module status.