Buried intelligent integrated prefabricated pump station

By introducing real-time monitoring and automated control systems into underground integrated pump stations, combined with solar power supply, the problem of lack of real-time monitoring and high energy consumption in traditional pump stations has been solved, and the effects of intelligent management and energy conservation and environmental protection have been achieved.

CN120211375AInactive Publication Date: 2025-06-27TAIZHOU SHENGHE WATER TREATMENT EQUIP MFG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202510643062.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-19
Publication Date
2025-06-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional buried integrated pump stations lack real-time monitoring capabilities, which makes it difficult for managers to detect equipment failures and abnormal water level problems in a timely manner, which may cause accidents such as sewage overflow and equipment damage, and have high energy consumption.

Method used

An embedded intelligent integrated prefabricated pump station was designed, using a variety of sensors (such as flow sensors, liquid level sensors and gas sensors) for real-time monitoring, data transmission and remote monitoring are realized through edge computing gateways and cloud management platforms, and automatic control is used for use with PLC controllers and inverters to reduce the operating power of the water pump. At the same time, power supply components consisting of solar panels, MPPT controllers, photovoltaic inverters and batteries are used to provide power supply ventilation and control components.

Benefits of technology

The intelligent operation of the pump station has been realized, management efficiency has been improved, equipment failures have been discovered and dealt with in a timely manner, and accidents such as sewage overflow and equipment damage have been avoided, energy consumption has been reduced, and energy-saving effects have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120211375A_ABST
    Figure CN120211375A_ABST
Patent Text Reader

Abstract

The invention discloses a buried intelligent integrated prefabricated pump station which comprises a shaft assembly, a cylinder body, an access cover installed at the top of the cylinder body, a water inlet assembly used for water to enter the cylinder body, an access platform fixed to the middle of an inner cavity of the cylinder body, a crawling ladder fixed to the inner wall of the cylinder body and a handrail fixed to the top of the cylinder body. And the ventilation assembly is used for ventilation and air exchange of the inner cavity of the barrel body. The monitoring assembly comprises various sensors, the flow of the water outlet pipe, the liquid level in the barrel and the gas concentration can be monitored in real time, monitoring data are connected with the edge computing gateway through RS485, then intercommunicated with the cloud management platform through an MQTT protocol and finally transmitted to the central control end of a remote duty room, workers can remotely master the running state of the pump station in real time, and the working efficiency is improved. The PLC automatically controls the first submersible pump, the second submersible pump and the ventilation assembly through the frequency converter according to monitoring data, intelligent operation of the pump station is achieved, and the management efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of buried integrated prefabricated pumping stations, and specifically to a buried intelligent integrated prefabricated pumping station. Background Technique

[0002] A buried integrated prefabricated pumping station is a device used for sewage, rainwater or water collection and lifting, which has the characteristics of small floor area and short construction period. Its core equipment mainly consists of submersible pumps, grille systems and auxiliary devices, and is widely used in municipal engineering, industrial and building drainage and other fields, solving many problems of traditional pumping stations, and is an efficient and reliable modern solution; As an important infrastructure for urban drainage, sewage lifting and other systems, buried pumping stations play a key role in urban construction and operation. However, traditional buried integrated pumping stations lack effective real-time monitoring and cannot timely and accurately grasp the operating parameters such as liquid level, flow rate, gas composition, etc. inside the pumping station, resulting in difficulties for the management personnel of the pumping station to timely discover problems such as equipment failures and abnormal water levels during actual operation, and thus easily lead to accidents such as sewage overflow and equipment damage, affecting the normal operation of the city and environmental quality. Moreover, the energy-saving effect of traditional pumping stations is poor. Their pumps and other equipment usually adopt a constant-speed operation mode. No matter how the actual sewage flow rate and water level change, the pumps operate at a fixed power, causing a large amount of energy waste. Summary of the Invention

[0003] The purpose of the present invention is to provide a buried intelligent integrated prefabricated pumping station, which has the advantages of being able to monitor the operation of the pumping station in real time and reducing energy consumption during use, and solves the problems of lack of effective real-time monitoring and high energy consumption during use of buried integrated pumping stations.

[0004] To achieve the above object, the present invention provides the following technical solutions: A buried intelligent integrated prefabricated pumping station, comprising a wellbore assembly, including a cylinder body, a maintenance cover installed on the top of the cylinder body, a water inlet assembly for water inlet inside the cylinder body, a maintenance platform fixed in the middle of the inner cavity of the cylinder body, a ladder fixed on the inner wall of the cylinder body, a handrail fixed on the top of the cylinder body, and a ventilation assembly for ventilation and air exchange inside the cylinder body; a sewage lifting assembly, including a sump, a pipe rack fixed at the bottom of the inner cavity of the cylinder body, a first submersible pump installed at the lower end of the inner cavity of the cylinder body, a second submersible pump installed in the inner cavity of the sump, a water outlet pipe installed at the upper end outside the cylinder body, a connecting pipe for connecting the water outlet pipe, the first submersible pump and the second submersible pump, an automatic coupler for connecting the first submersible pump and the second submersible pump to the connecting pipe, and a coupling guide rail for lifting the first submersible pump and the second submersible pump; a control assembly, including a control box, a PLC controller fixed in the inner cavity of the control box, an edge computing gateway, an inverter and a display, and a monitoring assembly for real-time monitoring inside the cylinder body. The monitoring assembly includes a flow sensor installed on the surface of the water outlet pipe, a first liquid level sensor fixed at the lower end of the inner cavity of the cylinder body, a second liquid level sensor fixed at the upper end of the inner cavity of the cylinder body, a third liquid level sensor fixed in the inner cavity of the sump, and a gas sensor fixed in the inner cavity of the cylinder body and located below the ventilation assembly. The gas sensor adopts a composite sensor. The monitoring assembly is connected to the edge computing gateway through RS485. The edge computing gateway communicates with the cloud management platform through the MQTT protocol. The cloud management platform is connected to the central control end of the remote duty room through the WebSocket protocol. The edge computing gateway is connected to the PLC controller through RS485. The edge computing gateway is also connected to the display through an HDMI interface. The output end of the PLC controller is connected to the input end of the inverter. The output end of the inverter is respectively connected to the first submersible pump, the second submersible pump and the ventilation assembly; a power supply assembly, including a bracket, a solar panel fixed on the surface of the bracket, an MPPT controller fixed in the inner cavity of the control box, a photovoltaic inverter for power conversion, and a storage battery for power storage. The power supply assembly is used to supply power to the ventilation assembly and the control assembly.

[0005] Preferably, the control box includes a box body, a box door hinged to the box body, and an observation window installed at the upper end of the surface of the box door. The display is fixed at the upper end of the inner cavity of the box body. The photovoltaic inverter and the storage battery are both fixedly connected to the inner wall of the box body.

[0006] Preferably, the water inlet assembly includes a water inlet pipe communicating with the outside of the cylinder body, a grille guide rail fixed on the inner wall of the cylinder body, and a crushing grille installed on the surface of the grille guide rail through a guide seat. The crushing grille is located at the connection between the water inlet pipe and the cylinder body.

[0007] Preferably, the ventilation assembly includes an air inlet pipe and an exhaust pipe connected to both sides of the top of the cylinder body, and a duct fan installed at the top of the inner cavity of the cylinder body. There are two duct fans, which are respectively connected to the air inlet pipe and the exhaust pipe, and the input end of the air inlet pipe is connected to the input end of the frequency converter.

[0008] Preferably, multiple groups of coupling guide rails are provided, and all are fixedly connected to the inner wall of the cylinder body. The coupling guide rails are used to lift the first submersible pump and the second submersible pump, and both the first submersible pump and the second submersible pump are installed on the surface of the coupling guide rails.

[0009] Preferably, the control box and the bracket are both fixed to the top of the cylinder body, and the handrail is located on one side of the inspection cover.

[0010] Preferably, multiple groups of automatic couplers are provided. Both the first submersible pump and the second submersible pump are connected to the connecting pipe through the automatic coupler. The end of the connecting pipe far from the automatic coupler is connected to the water outlet pipe, and the connecting pipe is fixedly connected to the pipe rack.

[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The monitoring component of the present invention includes a variety of sensors, which can real-time monitor the flow rate of the water outlet pipe, the liquid level in the cylinder body and the gas concentration. The monitoring data is connected to the edge computing gateway through RS485, and then communicated with the cloud management platform through the MQTT protocol, and finally transmitted to the central control terminal in the remote duty room. The staff can remotely and real-time master the operation status of the pumping station. The PLC controller automatically controls the first submersible pump, the second submersible pump and the ventilation assembly through the frequency converter, realizing the intelligent operation of the pumping station, improving the management efficiency. The power supply assembly uses solar panels, and through the MPPT controller, photovoltaic inverter and battery, converts solar energy into electrical energy and stores it to supply power to the ventilation assembly and the control assembly, reducing the dependence on the traditional power grid and realizing energy conservation and environmental protection.

[0012] 2. The present invention sets the first submersible pump and the second submersible pump in the pumping station, which are respectively installed at the bottom of the cylinder body and in the sump, and are connected to the connecting pipe through the coupling guide rail and the automatic coupler, so as to effectively lift the sewage to the water outlet pipe for discharge, ensuring the high efficiency of sewage discharge. The wellbore assembly is equipped with an inspection cover, an inspection platform, a ladder and a handrail, which is convenient for the staff to enter the inside of the cylinder body for equipment inspection and maintenance, improving the safety and convenience of operation. The crushing grid in the water inlet assembly can preliminarily treat the sewage entering the cylinder body, crush the sundries in it, prevent pipeline blockage, and ensure the stable operation of the pumping station. The ventilation assembly realizes the ventilation and air exchange inside the cylinder body through the air inlet pipe, the exhaust pipe and the duct fan, effectively improving the internal air quality and reducing the accumulation of harmful gases. Brief Description of the Drawings

[0013] Figure 1 This is the front view structural schematic diagram of the present invention; Figure 2 This is the connection state structural schematic diagram of the wellbore assembly and the sewage lifting assembly of the present invention; Figure 3 This is the front view structural schematic diagram of the sewage lifting assembly of the present invention; Figure 4 This is the front view sectional structural schematic diagram of the cylinder body of the present invention; Figure 5 This is the bottom view structural schematic diagram of the present invention; Figure 6 This is the front view structural schematic diagram of the control box of the present invention; Figure 7 This is the system flow schematic diagram of the present invention; Figure 8 This is the power generation process schematic diagram of the power supply assembly of the present invention.

[0014] In the figure: 100, wellbore assembly; 110, cylinder body; 120, maintenance cover; 130, water inlet assembly; 131, water inlet pipe; 132, crushing grille; 133, grille guide rail; 140, maintenance platform; 150, ladder; 160, handrail; 170, ventilation assembly; 171, air inlet pipe; 172, exhaust pipe; 173, duct fan; 200, sewage lifting assembly; 210, sump pit; 220, pipe rack; 230, first submersible pump; 240, second submersible pump; 250, outlet pipe; 260, connecting pipe; 270, automatic coupler; 280, coupling guide rail; 300, control assembly; 310, control box; 311, box body; 312, box door; 313, observation window; 320, PLC controller; 330, edge computing gateway; 340, frequency converter; 350, display; 360, monitoring assembly; 361, flow sensor; 362, first liquid level sensor; 363, second liquid level sensor; 364, third liquid level sensor; 365, gas sensor; 400, power supply assembly; 410, bracket; 420, solar panel; 430, MPPT controller; 440, PV inverter; 450, storage battery. Detailed implementation manners

[0015] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0016] Embodiment 1 Such asFigure 1-8 As shown in the figure, this is the first embodiment of the present invention. This embodiment provides an underground intelligent integrated prefabricated pumping station, which includes a wellbore assembly 100, including a cylinder body 110, a maintenance cover 120 installed on the top of the cylinder body 110, a water inlet assembly 130 for water inlet inside the cylinder body 110, a maintenance platform 140 fixed in the middle of the inner cavity of the cylinder body 110, a ladder 150 fixed on the inner wall of the cylinder body 110, a handrail 160 fixed on the top of the cylinder body 110, and a ventilation assembly 170 for ventilation and air exchange inside the cylinder body 110; a sewage lifting assembly 200, including a sump 210, a pipe rack 220 fixed at the bottom of the inner cavity of the cylinder body 110, a first submersible pump 230 installed at the lower end of the inner cavity of the cylinder body 110, a second submersible pump 240 installed in the inner cavity of the sump 210, a water outlet pipe 250 installed at the upper end outside the cylinder body 110, a connecting pipe 260 for connecting the water outlet pipe 250, the first submersible pump 230 and the second submersible pump 240, an automatic coupler 270 for connecting the first submersible pump 230 and the second submersible pump 240 with the connecting pipe 260, and a coupling guide rail 280 for lifting the first submersible pump 230 and the second submersible pump 240; a control assembly 300, including a control box 310, a PLC controller 320 fixed in the inner cavity of the control box 310, an edge computing gateway 330, a frequency converter 340 and a display 350, and a monitoring assembly 360 for real-time monitoring inside the cylinder body 110. The monitoring assembly 360 includes a flow sensor 361 installed on the surface of the water outlet pipe 250, a first liquid level sensor 362 fixed at the lower end of the inner cavity of the cylinder body 110, a second liquid level sensor 363 fixed at the upper end of the inner cavity of the cylinder body 110, a third liquid level sensor 364 fixed in the inner cavity of the sump 210, and a gas sensor 365 fixed in the inner cavity of the cylinder body 110 and located at the lower end of the ventilation assembly 170. The gas sensor 365 adopts a composite sensor. The monitoring assembly 360 is connected to the edge computing gateway 330 through RS485. The edge computing gateway 330 communicates with the cloud management platform through the MQTT protocol. The cloud management platform is connected to the central control end of the remote duty room through the WebSocket protocol. The edge computing gateway 330 is connected to the PLC controller 320 through RS485. The edge computing gateway 330 is also connected to the display 350 through an HDMI interface. The output end of the PLC controller 320 is connected to the input end of the frequency converter 340. The output end of the frequency converter 340 is respectively connected to the first submersible pump 230, the second submersible pump 240 and the ventilation assembly 170; a power supply assembly 400, including a bracket 410, a solar panel 420 fixed on the surface of the bracket 410, an MPPT controller 430 fixed in the inner cavity of the control box 310, a photovoltaic inverter 440 for power conversion, and a storage battery 450 for power storage. The power supply assembly 400 is used to supply power to the ventilation assembly 170 and the control assembly 300.

[0017] As Figure 1-8As shown in the figure, the monitoring component 360 includes a flow sensor 361, a first liquid level sensor 362, a second liquid level sensor 363, a third liquid level sensor 364, and a gas sensor 365. The flow sensor 361 can monitor the flow rate of the outlet pipe 250 in real time. The three groups of liquid level sensors can accurately obtain the liquid level information at different positions of the cylinder body 110 and the sump 210. The gas sensor 365 can detect the gas composition in the cylinder body 110, so as to monitor the operation parameters inside the pumping station in real time. The monitoring component 360 is connected to the edge computing gateway 330 through RS485. The edge computing gateway 330 communicates with the cloud management platform through the MQTT protocol. The cloud management platform is connected to the central control terminal in the remote duty room through the WebSocket protocol. Therefore, the pumping station management personnel can timely and accurately master the operation parameters inside the pumping station at the central control terminal in the remote duty room, timely discover problems such as equipment failures and abnormal water levels, avoid accidents such as sewage overflow and equipment damage, ensure the normal operation of the pumping station. The output end of the PLC controller 320 in the control component 300 is connected to the input end of the frequency converter 340. The output end of the frequency converter 340 is respectively connected to the first submersible pump 230, the second submersible pump 240, and the ventilation component 170. Through the frequency converter 340, the operating power of the pump can be adjusted according to the actual sewage flow rate and water level changes, avoiding the pump running at a fixed power and constant speed, thereby reducing energy waste and improving the energy-saving effect. The power supply component 400 can provide electrical energy for the ventilation component 170 and the control component 300 through the solar panel 420, the MPPT controller 430, the photovoltaic inverter 440, and the storage battery 450. Using solar power generation further reduces the pumping station's dependence on the traditional power grid, reduces energy consumption, and improves the energy-saving performance of the pumping station. Through real-time monitoring and energy-saving control, the problems of lack of real-time monitoring and poor energy-saving effect in traditional underground integrated pumping stations can be effectively solved.

[0018] Embodiment 2 Referring to Figure 1 、 4 Figures 6 and 7, this is the second embodiment of the present invention. This embodiment is based on the previous embodiment.

[0019] In this embodiment, the control box 310 includes a box body 311, a box door 312 hinged to the box body 311 through a hinge, and an observation window 313 installed at the upper end of the surface of the box door 312. The display 350 is fixed to the upper end of the inner cavity of the box body 311. The photovoltaic inverter 440 and the storage battery 450 are both fixedly connected to the inner wall of the box body 311.

[0020] The control box 310 and the bracket 410 are both fixed to the top of the cylinder body 110. The handrail 160 is located on one side of the inspection cover 120.

[0021] The ventilation assembly 170 includes an intake pipe 171 and an exhaust pipe 172 that are connected to both sides of the top of the cylinder 110, and a duct fan 173 installed at the top of the inner cavity of the cylinder 110. There are two duct fans 173, which are respectively connected to the intake pipe 171 and the exhaust pipe 172, and the input end of the intake pipe 171 is connected to the input end of the frequency converter 340.

[0022] As Figure 1 、 4 shown in Figures 6 and 7, the two duct fans 173 of the ventilation assembly 170 are respectively connected to the intake pipe 171 and the exhaust pipe 172. When the gas sensor 365 detects that the gas inside the cylinder 110 needs to be replaced, the frequency converter 340 controls the operation of the duct fan 173, inhales fresh air through the intake pipe 171, and discharges harmful gases through the exhaust pipe 172, thereby realizing ventilation and air exchange inside the cylinder 110. The solar panel 420 is fixed on the bracket 410, converts solar energy into electrical energy, and the MPPT controller 430 performs maximum power point tracking control on the output of the solar panel 420 to improve the power generation efficiency. The photovoltaic inverter 440 converts direct current into alternating current, a part of which is directly supplied to the ventilation assembly 170 and the control assembly 300 for use, and the other part is stored in the storage battery 450 for use when solar energy is insufficient. The control box 310 is used to provide protection and installation space for the PLC controller 320, the edge computing gateway 330, the frequency converter 340, the MPPT controller 430, the photovoltaic inverter 440, and the storage battery 450. The display 350 is installed at the upper end of the inner cavity of the box body 311 and is used to display the operation data of the pumping station in real time. The operation data can be read through the observation window 313, which is convenient for the inspection personnel to view.

[0023] Embodiment 3 Referring to Figure 1 、 2 Figures 4 and 5, this is the third embodiment of the present invention, and this embodiment is based on the first two embodiments.

[0024] In this embodiment, the water inlet assembly 130 includes an intake pipe 131 connected to the outside of the cylinder 110, a grille guide rail 133 fixed to the inner wall of the cylinder 110, and a crushing grille 132 installed on the surface of the grille guide rail 133 through a guide seat, and the crushing grille 132 is located at the connection between the intake pipe 131 and the cylinder 110.

[0025] There are multiple groups of coupling guide rails 280, and all of them are fixedly connected to the inner wall of the cylinder 110. The coupling guide rails 280 are used for lifting the first submersible pump 230 and the second submersible pump 240, and both the first submersible pump 230 and the second submersible pump 240 are installed on the surface of the coupling guide rails 280.

[0026] There are multiple sets of automatic couplers 270. The first submersible pump 230 and the second submersible pump 240 are both connected to the connecting pipe 260 through the automatic coupler 270. One end of the connecting pipe 260 away from the automatic coupler 270 is connected to the water outlet pipe 250. The connecting pipe 260 is fixedly connected to the pipe rack 220.

[0027] As Figure 1 , 2 , 4, and 5 show that sewage flows into the interior of the cylinder 110 through the water inlet pipe 131 of the water inlet assembly 130. The crushing grille 132 is installed at the connection between the water inlet pipe 131 and the cylinder 110, and can crush large particle impurities in the incoming sewage to prevent it from blocking subsequent equipment. The crushing grille 132 can be lifted through the grille guide rail 133 and in cooperation with an electric hoist or a winch for cleaning and maintenance. The first submersible pump 230 and the second submersible pump 240 can be conveniently overhauled and maintained by being lifted through the coupling guide rail 280. By using the automatic coupler 270, it can be connected to the connecting pipe 260, and the sewage is transported to the water outlet pipe 250 through the connecting pipe 260 and finally discharged from the pumping station. The pipe rack 220 plays a role in fixing the connecting pipe 260.

[0028] During use, sewage enters the interior of the cylinder 110 through the water inlet pipe 131. At the connection between the water inlet pipe 131 and the cylinder 110, the crushing grille 132 is installed on the grille guide rail 133 and can crush the sundries in the incoming sewage to prevent large particle sundries from affecting the operation of subsequent equipment. After the sewage enters the cylinder 110, it gathers in the sump 210. When the first liquid level sensor 362, the second liquid level sensor 363, or the third liquid level sensor 364 monitors that the liquid level reaches a certain height, a lifting action is triggered. The first submersible pump 230 and the second submersible pump 240 are connected to the connecting pipe 260 through the automatic coupler 270 under the guidance of the coupling guide rail 280. Then, the sewage is lifted to the water outlet pipe 250 through the connecting pipe 260 and discharged. The monitoring component 360 monitors various parameters of the pump station in real time. The flow sensor 361 monitors the sewage flow of the outlet pipe 250. The first liquid level sensor 362, the second liquid level sensor 363, and the third liquid level sensor 364 respectively monitor the liquid levels at different positions of the cylinder body 110 and the sump 210. The gas sensor 365 monitors the gas condition inside the cylinder body 110. The monitoring component 360 is connected to the edge computing gateway 330 through RS485. After the edge computing gateway 330 preliminarily processes the data, it communicates with the cloud management platform through the MQTT protocol. The cloud management platform then transmits the data to the central control terminal in the remote duty room through the WebSocket protocol, facilitating remote monitoring by the staff. At the same time, the edge computing gateway 330 is connected to the PLC controller 320 through RS485, and transmits the monitoring data to the PLC controller 320. The PLC controller 320 controls the output of the frequency converter 340 according to the preset program and the received data. The frequency converter 340 adjusts the operating states of the first submersible pump 230, the second submersible pump 240, and the ventilation component 170 according to the instructions of the PLC controller 320, achieving energy conservation and efficient operation. When the liquid level is low, the power of the submersible pump is reduced. When the gas sensor 365 detects that the concentration of harmful gases exceeds the standard, the ventilation volume of the ventilation component 170 is increased. The edge computing gateway 330 is also connected to the monitor 350 through the HDMI interface, and displays the monitoring data and the device operating status on the monitor 350, facilitating on-site staff to view; The duct fan 173 of the ventilation component 170 is respectively communicated with the intake pipe 171 and the exhaust pipe 172. When the gas sensor 365 detects that the gas inside the cylinder body 110 needs to be replaced, the frequency converter 340 controls the operation of the duct fan 173, inhales fresh air through the intake pipe 171, and discharges harmful gases through the exhaust pipe 172, realizing ventilation and air exchange inside the cylinder body 110; The solar panel 420 is fixed on the bracket 410, converts solar energy into electrical energy. The MPPT controller 430 performs maximum power point tracking control on the output of the solar panel 420 to improve the power generation efficiency. The photovoltaic inverter 440 converts direct current into alternating current. Part of it is directly supplied to the ventilation component 170 and the control component 300 for use, and the other part is stored in the storage battery 450 for use when solar energy is insufficient. Through real-time monitoring and energy-saving control, it can effectively solve the problems of lack of real-time monitoring and poor energy-saving effect existing in traditional underground integrated pump stations.

[0029] The standard parts used in this application document can all be purchased from the market, and can also be customized according to the descriptions in the specification and the drawings. The specific connection methods of each part all adopt conventional means such as bolts, rivets, and welding that are mature in the prior art. The machinery, parts, and equipment all adopt conventional models in the prior art. The control method is to automatically control through a controller, and the control circuit of the controller can be realized by simple programming by those skilled in the art, which belongs to the common general knowledge in this field. And this application document is mainly used to protect the mechanical device, so the control method and circuit connection will not be explained in detail in this application document.

[0030] It should be noted that in this text, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or also includes elements inherent to such process, method, article or device. Without further limitation, an element defined by the statement "comprising an..." does not exclude the existence of additional identical elements in the process, method, article or device comprising the element.

[0031] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An underground intelligent integrated prefabricated pump station, characterized in that: include, A shaft assembly (100) comprises a barrel (110), an inspection cover (120) mounted on the top of the barrel (110), a water inlet assembly (130) for letting water into the barrel (110), an inspection platform (140) fixed to the middle of the inner cavity of the barrel (110), a ladder (150) fixed to the inner wall of the barrel (110), a handrail (160) fixed to the top of the barrel (110), and a ventilation assembly (170) for ventilating the inner cavity of the barrel (110); A sewage lifting assembly (200), comprising a sump (210), a pipe rack (220) fixed to the bottom of the inner cavity of the cylinder (110), a first submersible pump (230) installed at the lower end of the inner cavity of the cylinder (110), a second submersible pump (240) installed in the inner cavity of the sump (210), an outlet pipe (250) installed at the upper end of the outer portion of the cylinder (110), a connecting pipe (260) for connecting the outlet pipe (250), the first submersible pump (230) and the second submersible pump (240), an automatic coupler (270) for connecting the first submersible pump (230) and the second submersible pump (240) with the connecting pipe (260), and a coupling guide rail (280) for lifting the first submersible pump (230) and the second submersible pump (240); A control component (300), comprising a control box (310), a PLC controller (320) fixed to an inner cavity of the control box (310), an edge computing gateway (330), a frequency converter (340) and a display (350), and a monitoring component (360) for real-time monitoring of the interior of the cylinder (110); The monitoring component (360) comprises a flow sensor (361) mounted on the surface of the water outlet pipe (250), a first liquid level sensor (362) fixed to the lower end of the inner cavity of the cylinder (110), a second liquid level sensor (363) fixed to the upper end of the inner cavity of the cylinder (110), a third liquid level sensor (364) fixed to the inner cavity of the sump (210), and a gas sensor (365) fixed to the inner cavity of the cylinder (110) and located at the lower end of the ventilation component (170), wherein the gas sensor (365) is a composite sensor; The monitoring component (360) is connected to the edge computing gateway (330) via RS485, the edge computing gateway (330) is interconnected with the cloud management platform via the MQTT protocol, and the cloud management platform is connected to the central control terminal of the remote duty room via the WebSocket protocol, the edge computing gateway (330) is connected to the PLC controller (320) via RS485, the edge computing gateway (330) is also connected to the display (350) via an HDMI interface, the output end of the PLC controller (320) is connected to the input end of the frequency converter (340), and the output end of the frequency converter (340) is respectively connected to the first submersible pump (230), the second submersible pump (240) and the ventilation component (170); A power supply component (400) comprises a bracket (410), a solar panel (420) fixed to the surface of the bracket (410), an MPPT controller (430) fixed to the inner cavity of the control box (310), a photovoltaic inverter (440) for electric energy conversion, and a storage battery (450) for electric energy storage. The power supply component (400) is used to provide electric energy to the ventilation component (170) and the control component (300).

2. The underground intelligent integrated prefabricated pump station according to claim 1, characterized in that: The control box (310) comprises a box body (311), a box door (312) hingedly connected to the box body (311) by a hinge, and an observation window (313) installed on the upper surface of the box door (312); the display (350) is fixed to the upper end of the inner cavity of the box body (311); and the photovoltaic inverter (440) and the storage battery (450) are both fixedly connected to the inner wall of the box body (311).

3. The underground intelligent integrated prefabricated pump station according to claim 1 is characterized in that: The water inlet assembly (130) comprises a water inlet pipe (131) connected to the outside of the cylinder (110), a grille guide rail (133) fixed to the inner wall of the cylinder (110), and a crushing grille (132) mounted on the surface of the grille guide rail (133) via a guide seat, and the crushing grille (132) is located at the connection point between the water inlet pipe (131) and the cylinder (110).

4. The underground intelligent integrated prefabricated pump station according to claim 1 is characterized in that: The ventilation assembly (170) comprises an air intake pipe (171) and an air exhaust pipe (172) connected to both sides of the top of the cylinder (110), and a duct fan (173) installed on the top of the inner cavity of the cylinder (110), and two duct fans (173) are provided, which are connected to the air intake pipe (171) and the air exhaust pipe (172) respectively, and the input end of the air intake pipe (171) is connected to the input end of the frequency converter (340).

5. The underground intelligent integrated prefabricated pump station according to claim 1 is characterized in that: The coupling guide rails (280) are provided in multiple groups and are all fixedly connected to the inner wall of the cylinder (110). The coupling guide rails (280) are used for lifting the first submersible pump (230) and the second submersible pump (240). The first submersible pump (230) and the second submersible pump (240) are both installed on the surface of the coupling guide rails (280).

6. The underground intelligent integrated prefabricated pump station according to claim 1, characterized in that: The control box (310) and the bracket (410) are both fixed to the top of the cylinder (110), and the handrail (160) is located on one side of the inspection cover (120).

7. The underground intelligent integrated prefabricated pump station according to claim 1, characterized in that: The automatic couplers (270) are provided in multiple groups, the first submersible pump (230) and the second submersible pump (240) are both connected to the connecting pipe (260) via the automatic couplers (270), one end of the connecting pipe (260) away from the automatic couplers (270) is connected to the water outlet pipe (250), and the connecting pipe (260) is fixedly connected to the pipeline rack (220).